Pembuatan gudang dan bedeng

2 Survey Setting
3 MobilisasiAlat

B PEKERJAAN TANAH
Galian 40 cm
2 Bahu Jalan lebar 1 m tebal 0.1S

c PEKERJAAN JALAN MASUK LEBAR 8 M


Lapis pertama Makadam Lapisan tebal 25 cm
2 Lapis Kedua Base B tebal S cm
3 Bekisting
4 Plastik Cor
5 Besi 10
6 Dov1el Bar 12
7 Be on K 300 I:0,25
m2 9.00 811,600.00 7,304,400.00
Is 1.00 9,243,100.00 9,243,100.00
m2 1.00 17,325,000.00 17,325,000.00
SUB JUMLAH PEKERJAAN PENDAHULUAN 33,872,500.00

1,920.00 55,700.00 106,944,000.00


120.00 238,100.00 28,572,000.00
SUB JUMLAH PEKERJAAN TANAH 106,944,000.00

m3 960.00 307,000.00 294,720,000.00


m3' 320.00 337,200.00 107,904,000.00
m2 80.00 247,000.00 19,760,000.00
m2 1,700.00 14,100.00 23,970,000.00
Kg 8,551.11 23,200.00 198,385,777.78
Kg 208.33 22,100.00 4,604,166.67
m3 320.00 1,686,800.00 539,776,000.00