B PEKERJAAN TANAH Galian 40 cm 2 Bahu Jalan lebar 1 m tebal 0.1S
c PEKERJAAN JALAN MASUK LEBAR 8 M
Lapis pertama Makadam Lapisan tebal 25 cm 2 Lapis Kedua Base B tebal S cm 3 Bekisting 4 Plastik Cor 5 Besi 10 6 Dov1el Bar 12 7 Be on K 300 I:0,25 m2 9.00 811,600.00 7,304,400.00 Is 1.00 9,243,100.00 9,243,100.00 m2 1.00 17,325,000.00 17,325,000.00 SUB JUMLAH PEKERJAAN PENDAHULUAN 33,872,500.00
1,920.00 55,700.00 106,944,000.00
120.00 238,100.00 28,572,000.00 SUB JUMLAH PEKERJAAN TANAH 106,944,000.00