JULY PROJECTS AND PENDINGS as of 6/23/22

PROJECT LIST TYPE LOCATION ACTIVITIES CONTACT PERSON REMARKS


Accomplish all DENIAL requirement for zoning
Tarpulin Layouting
KORIGO EMPIRE LA TRINIDAD
Numbering of trees
NWRB : Drilling and Bacteriology test

Accomplish additional requirements/checklist of DSUHD sir tom panis priority


Alpa (PMP) BUYAGAN Provide initial design and plan for staff and view deck

Provide initial design and plan for units (verify muna kay ar.carreon) sir tom panis
Alpa (San Fabian Subdivision) proposal SAN FABIAN Request copy of lot plans/map from Alpa office c/o sir ryan.
True copies of TCT/TAX DEC (need SPA; ROD prov.)(verify muna kay ar.carreon)

Provide Specification and BOM/BOQ Estimates Michelle Serafica


Michelle Serafica as built NAGUILIAN
Follow up professional identifications - Engr. Aniban & Engr. Sabado

Provide Specification and BOM/BOQ Estimates Basilio Falisong


Basilio Falisong as built & permit SHILAN Follow up professional identifications - Engr. Aniban & Engr. Sabado 9381904838
Meeting Mr. Falisong on, Sunday 06/26/22

Punchlisting woks, Make a time table of works and weekly accomplishment report
Site inspection / visit
Payroll every week ends,, daily 200 budjet for food
Camp 7 residence site visit CAMP 7
*LITO - 600
*Irong - 400 bali- 1000
*2 Laborers- 300 bali- 1000

Installation of c.r accessories and water heaters ECOTHERM


CRYSTAL CAVE residential site visit CRYSTAL CAVE
Site inspection / visit 9310373606

as built Re-cadd plans and reverify all measurements via site inspection, prep. For as built plans Fore PEPE
3-STOREY RESIDENTIAL BROOKSIDE
site visit/inspection Site safety inspection / visit 9637911850

BUILDPASS PENDINGS as of 6/23/22


PROJECT/OWNER TYPE LOCATION REQUIREMENTS REMARKS
pending application camp 7 Sanitary Permit Form non compliant
proposed/new Clear Latest picture of site non compliant
Architectural Plans non compliant
Civil/Structural Plans non compliant
Sanitary Plans non compliant
Bill of Materials (Signed and Sealed) non compliant
 MARIA SINSEMILLA OLIVERIA Structural Design and Analysis for Buildings with floor area of 20.00 sq.m. or more not applicable
Geodetic Documents (Other necessary Geodetic Documents aside from Survey Plan) non compliant
Building Specification (Signed and Sealed) non compliant
Civil Engineer Photocopy of Professional Details non compliant
Architect Photocopy of Professional Details non compliant
Sanitary Engineer/Master Plumber Photocopy of Professional Details non compliant
Certificate of Construction Safety Health Program (CSHP) from DOLE non compliant

pending application Kagitingan Structural Design and Analysis for Buildings with floor area of 20.00 sq.m. or mo not applicable
as built Soil Analysis for Residential Buildings with 3 storeys or more (Signed and Sealed) not applicable
Building Specification (Signed and Sealed) not applicable
 JOSE SR. & MARIA HEIR'S OF CORDOVIZ Geodetic Documents (Other necessary Geodetic Documents aside from Survey Plan) not applicable
Sheet 1 (Vicinity Map / Site Development Plan / A-1) not applicable
Geodetic Engineer Affidavit not applicable
Barangay Certificate not applicable
Camp 7 RESIDENCE (PAINT WORKS ET AL.)
Date Covered JUNE 19-JUNE 25
TOTAL ADVANCE NET TOTAL RECEIVED
NAME RATE No. of Days
Lito 600 6 3600 0 3600
Irong 400 6 2400 1000 1400
Labor 1 300 6 1800 500 1300
Labor 1 300 6 1800 500 1300
PAYROLL 7600
MEALS per day 200 1200
TOTAL PAYROLL 8800