You are on page 1of 1

UNIVERSIDAD TECNOLÓGICA DE TABASCO

INDUSTRIAL PROCESSES DIVISION

EDUCATIONAL PROGRAM: MADE BY: NAME OF THE PROTOTYPE:


Industrial Maintenance Engineering Ricardo Alberto Antonio Jiménez ALTERNE X
José Francisco Córdova Peregrino
Miguel Ángel Pérez Gaspar
Erick Damián Priego Cruz
Oscar Jesús Jiménez Pérez
José Ricardo Ramón Gallegos
Ángel Felicito Suárez Crisóstomo
Jonathan Villegas Jiménez
Ángel Gabriel Guzmán Jiménez
Mario Alexander Sala Hernández
Fernando Miguel Ricárdez Sánchez
Hugo Hernández Hernández
Rubicel Hernández de la Cruz
Guillermo David Domínguez Méndez
Sergio García Nunez
Edwar Honorio Fuerte Hernández
Marco Antonio Pérez Gómez

TERM: ACADEMIC TUTOR:


May-August 2022 Lic. Guadalupe Correa Alcudia
TECHNICAL COUNSELOR (if so):
Tec. Kevin Jesús Leyva Ligonio
PHYSICAL DESCRIPTION OF THE PROJECT PHOTO OF THE PROTOTYPE:
Scope and use:
This project supplies energy in times of need,producing energy through solar
panels and storing it in li-ion batteries for later use,being that this functional
prototype has the ability to have a wall output type output.
Components:
Ajustable DC-DC step-up step-down regulator
12.6v li-ion charger module
voltage inverter
Li-ion 18650 2200 mAh batteries
Input type C
Rectifier diodes
Switch
Solar panel
Material:
Connecting cables
Tin
Solder paste
Silicone
Plastic box
Double-sided tape
TECHNICAL SPECIFICATIONS
Operating instructions:
Instructions for use, place the device in an area free of humidity and/or leaks, with access to sunlight, wait for a certain time and/or connect the
power cord to the power supply to accelerate the charging process.
Once the charging cycle has been completed, the user can access the charge through the wall output or by connecting the charger.
Due to its small size, this equipment can be used wherever the user wishes as long as the equipment does not come into contact with water.

Maintenance:
Its maintenance is very simple, since due to its size it is very easy to clean the components, more than anything else to shake the excess of
dust that is found. When the equipment does not work, it is necessary to detect which component is not working and then repair or replace the
component.
SUPPORTING SUBJECTS: PROJECT BACKGROUND DEVELOPMENT COST:
Electromagnetism The use of li-ion batteries became popular due to its $2999.99
Analog and digital electronics small size and the versatility of storage that can be
Electrical systems found, but this storage is limited by being only
Special facilities compatible with USB inputs type C, type lightning, etc.
Granting a more focused use mobile devices, being
these approaches very limited and even in capacity as
well.
JUSTIFICATION: The purpose of Alterne X is to open up SALE COST:
the versatility of areas in which li-ion batteries can be $5599.99
used, and in turn the ability to generate power through
REFERENCES: environmentally friendly energy. This variety that can be
2001, CEKIT Easy Basic given to our Alterne X is achieved through the
Electronics Course (1st Edition, discharge of energy that has the capacity to generate a
Volume 1) Cekit. discharge of 120 volts in alternating current.

USERS:
Students
Teachers

You might also like