QUOTATION

Provided By: Provided to:


CYPEX GROUP | SPORTS Client: KHALED GARGASH

UAE, Dubai, Umm Ramool, Cypex Group Building Project: Pickleball Court
SUPPLY & INSTALLATION OF PICKLEBALL
Sales3@cypex-group.com I www.cypex-group.com Subject:
COURT INC. CIVIL WORKS'
+97142242460 +971565499010 Attn: Mr. Khaled; +971 52 944 4999
Prepared By: Quotation Reference Number Port of Entry: Quotation Date:
Hassan Saadeen Q-CTS-HS-211611-GARGASH-PKLBL-R2 UAE - Dubai 27/11/2021

LN DESCRIPTION QTY RATE TOTAL AMOUNT


Pickleball Court Acrylic - Pro System (Opt. 01) Di 6.1m * 13.41m (20ft * 44ft)
Acrylic hardcoat system Di 10m * 21m (32.80ft * 68.89ft)

Supply & installation of Acrylic Hardcoat system on existing floor.


Acrylic Hard coat system By using a special sport flooring system

1 210.00 120.00 25,200.00

Self leveling the areas by using our special Italian materials


1mm coating - Acrylic Resurfacer (Mixed with silica sand - quartz)
4 coats 1 -3 mm total thickness
Acrylic top coat
By Diasen Italy or Equelivant
Certified system by ITF - Color : Green / Red
Line Marking
2 1.00 800.00 800.00

Pickleball post fix type aluminium :-

100x3 mm dia pole H 91.4CM


internal gear winch.
fixing sleeve and cover cap.
3 Powder coated finish. 1.00 2,700.00 2,700.00
With net
6.1x0.91 M - 3mm thickness.

Lights :
4 Unit LED 200w - German ECOLED - 8 PCS Each court 8.00 330.00 2,640.00

Poles & lights installation:


Pole Structure 6 meter hight - 4 PCS Each court
5 4.00 1,770.00 7,080.00
Foundations + electrical cable should be ready for each post

CIVIL WORKS QTY RATE TOTAL AMOUNT


SITE PREPARATION (Total Dimention 22m * 11m)
- Watering and cleaning the sub base
6 - Removing the existing soil , debris and grass and cart away in DM designated garbage 242.00 10.00 2,420.00
areas inside the park
- Leveling and Compaction of Existing Soil