You are on page 1of 1

PROJECT TURN OVER FORM

Project Name: Location: PIECE CONTRACT NO.:


FILI HOTEL AND RESORT KAWIT POINT SRP, CEBU CITY REF. # : VSI-FHR-PC-2021-0016

Work Description:
WALL
m2 STC - 50 Framing 35.94316667
m2 STC - 50 Boardup 62.29726667
m2 STC - 55 Framing 75.12
m2 STC - 55 Boardup 130.208
m2 Standard Drywall Framing 76.60271537
m2 Standard Drywall Boardup 66.38901999
m2 Wall Cladding Framing 11.34
m2 Wall Cladding Boardup 9.828
m2 Wallcover Installation 125.32
m2 Rockwool Installation 186.1831667
Prelims

COMULATIVE PERCENTAGE ACCOMPLISHMENT: 77%

THIS IS TO CERTIFY THAT THE SCOPE OF WORK STIPULATED ABOVE HAVE BEEN DELIVERED AND ACCPTED IN ACCORDANCE WITH THE STANDARDS AND REQUIREMENTS SET
FORTH BY VERTICAL SPACE INTERIORS INC.

CHECKED BY:

Ms. Trisha Jane Aldea


VSI- QUANTITY SURVEYOR

REMARKS

SUB-CONTRACTOR CONFIRMATION EVALUATED BY:

Ar. Mary Anthonette A. Olmoguez Ms. Carmelita Carla Moraleda


CONTRACTOR VSI-PROJECT MANAGER

APPROVED BY:

Mr. Richard Bejerano


VSI- VP OF OPERATIONS

You might also like