Total Received Quantity (MT) (A) 68.300 70.870 123.530 93.230 136.

690
Total Quantity (MT) CONSUPTION (B) 141.541 181.435 140.617 121.881 97.198
BALANCE AT SITE (A-B) -73.241 -110.565 -17.087 -28.651 39.492
Reinforcement Statement CIVIL TENDER 02 as on 18/05/2022
187.389 418.938 1098.95
271.525 452.118 1406.32
-84.136 -33.180 -307.368
SKB BUILDERS INDI
Client: Indian Oil Corporation Limited.
EPCM : Worley India Private Limited
Contractor : S.K.B. Builders India Limited
Name of Project : ACRYLIC / OXO ALCOHOL PROJECT

Material
Sr No IMIR No
ManufacturerSupplier Invoice no Invoice Date Receiving IMIR Date 8 mm
Date
Akriti GST/
22-Nov.-2021
Sales 3394/2021-22
1 IMIR/001 SAIL 11/25/2021
Corporatio GST/
n 21-Nov.2021
3375/2021-22
Akriti GST/
NSPL 20.83
Sales 3365/2021-22
2 IMIR/002 20-Nov.-2021 07-Dec.-2021
Corporatio GST/
SAIL n 3366/2021-22
SAIL Akriti
JSW Sales GST/
3 IMIR/003 23-Nov.2021 07-Dec.-2021
Steel Corporatio 3427/2021-22
Limited n
Akriti
Sales GST/
4 IMIR/004 SAIL 08-Dec.-2021 16-Dec.-2021
Corporatio 3694/2021-22
n
Metal
5 IMIR/005 JSPL Xperts SI-2122-02029 13-Dec.-2021 15-Dec.2021
( India )
Metal
6 IMIR/006 JSPL Xperts SI-2122-02028 13-Dec.-2021 16-Dec.2021
( India )
Metal
7 IMIR/007 JSPL Xperts SI-2122-02131 21-Dec.-2021 08-Jan.-2022
( India )
Metal
8 IMIR/008 JSPL Xperts SI-2122-02113 20-Dec.-2021 08-Jan.-2022 19.840
( India )
Metal
9 IMIR/009 JSPL Xperts SI-2122-02161 24-Dec.-2021 08-Jan.-2022
( India )
Metal
10 IMIR/010 JSPL Xperts SI-2122-02160 24-Dec.-2021 08-Jan.-2022
( India )
Metal
11 JSPL Xperts SI-2122-02228 30-Dec.-2021 08-Jan.-2022
( India )
Metal
12 IMIR/012 JSPL Xperts SI-2122-02229 30-Dec.-2021 08-Jan.-2022
( India )
Metal
13 JSPL Xperts SI-2122-02213 29-Dec.-2021 08-Jan.-2022
( India )
Metal
14 JSPL Xperts SI-2122-02215 29-Dec.-2021 11-Jan.-2022
( India )
IMIR/013
Metal
15 JSPL Xperts SI-2122-02214 29-Dec.-2021 11-Jan.-2022
( India )
Metal
16 IMIR/014 JSPL Xperts SI-2122-02216 29-Dec.-2021 11-Jan.-2022
( India )
Metal
17 IMIR/015 JSPL Xperts SI-2122-02274 04-Jan.-2022 11-Jan.-2022
( India )

18 JSPL JSPL RV6100042460 04-Jan.-2022 01-Feb.-2022

19 JSPL JSPL RV6100042494 04-Jan.-2022 01-Feb.-2022

Metal
20 IMIR/016 JSPL Xperts SI-2122-02275 04-Jan.-2022 01-Feb.-2022
( India )
Akriti
Sales GST/
21 SAIL 17-Jan-22 01-Feb.-2022
Corporatio 4365/2021-22
n
Akriti
Sales GST/
22 SAIL
Corporatio 4473/2021-22
20-Jan-22 01-Feb.-2022 27.630
n
IMIR/019
Akriti
Sales GST/
23 SAIL 24-Jan-22 01-Feb.-2022
Corporatio 4517/2021-22
n
SLSR 24SLSR202113
2-Feb.-2022 07-Feb.-2022
Constructi 7
24 IMIR/020 SAIL
on Private 24SLSR202113
Limited 2-Feb.-2022 07-Feb.-2022
2
25 FROM TECNIMIONT SITE TO WORLEY SITE (21/03/2022) 25 mm = 12 MT Received
Akriti
JSW
Sales GST/
26 IMIR/030 Steel 1-Mar-22 5-Mar-22
Corporatio 5144/2021-22
Limited
n
Akriti
Sales GST/
27 IMIR/043 SAIL 31-Mar-22
Corporatio 5615/2021-22
n
Akriti GST/23/2022-
Sales 23
28 IMIR/044 SAIL 2-Apr-22
Corporatio GST/24/2022-
n 23
Akriti GST/143/2022-
SAIL/ Sales 23
29 IMIR/047 8-Apr-22
JSPL Corporatio GST/144/2022-
n 23
Akriti
Sales
30 IMIR/050 GST-001 9-Apr-22
Corporatio
n
VSP Akriti
QMS/R/ Sales GST/194/2022-
31 12-Apr-22
QAD/RM Corporatio 23
/09/W n
IMIR/048
Akriti
Sales GST/195/2022-
32 SAIL
Corporatio 23
n
Akriti
Sales GST/241/2022-
33 SAIL 14-Apr-22
Corporatio 23
n
IMIR/049
Akriti
Sales GST/242/2022-
34 SAIL 14-Apr-22
Corporatio 23
n
Akriti
Sales GST/407/2022-
35 IMIR/54 JSPL 23-Apr-22
Corporatio 23
n
Akriti
Sales GST/408/2022-
36 IMIR/53 JSPL 23-Apr-22
Corporatio 23
n
Akriti
Sales GST/367/2022-
21-Apr-22
Corporatio 23
n
37 IMIR/52 SAIL
Akriti
Sales GST/368/2022-
21-Apr-22
Corporatio 23
n
68.300
Claim Qty . (Upto RA6) 40.615

SKB WORLEY
SIGNATURE
NAME
DATE
DERS INDIA LTD.

10 mm 12 mm 16 mm 20 mm 25 mm 32 mm Total Cumm Qty (MT)

10.18 20.16 30.34 30.34

24.09 9.8 33.89 64.23


95.17
10.11 30.94
95.17
8.42 7.34 15.51 31.27 126.44
8.11 8.11 134.55

24.5 24.5 159.05

31.58 31.58 190.63

15.88 23.99 39.87 230.5

38.75 38.75 269.25

20.74 20.08 40.82 310.07

19.840 39.68 349.75

27.260 27.26 377.01

36.460 36.46 413.47


8.902 8.902 422.372

17.918 17.918 440.29

32.400 32.4 472.69

32.520 32.52 505.21

32.420 32.42 537.63

15.899 5.878 21.777 559.407

26.960 26.960 586.367

16.570 16.570 602.937

17.610 17.610 620.547

26.460 26.460 647.007

28.170 28.170 675.177

27.630 702.807

32.950 32.950 735.757

32.550 32.550 768.307

13.000 13.000 781.307

0.000 781.307

31.160 31.160 812.467


9.840 9.570 10.220 29.630 842.097

7.480 15.000 6.000 28.480 870.577

0.900 0.800 1.700 872.277

10.430 7.920 18.350 890.627

7.100 1.500 8.600 899.227

33.870 33.870 933.097

24.800 24.800 957.897

5.250 5.250 963.147

4.140 3.220 7.360 970.507

9.660 11.330 20.990 991.497

38.740 38.740 1030.237

38.280 38.280 1068.517

10.020 11.870 21.890 1090.407

8.540 8.540 1098.947

70.870 123.530 93.230 136.690 187.389 418.938 1098.947


38.526 72.508 81.308 39.596 120.613 417.383

IOCL
Reinforcement Statement CIVIL TENDER 02 as
S.No.
Drawing Diameterwise Weig
Number Drawing Title 8 mm 10 mm 12 mm

44AC9100-
1 911/
C.01/0001/A1
Fire Water Tank 0001 & 0002 7.213
Footings
(Including
chairs ) 6.020

44AC9100-
Warehouse Columns &
2 951-C.01-
Building stirrups 3.509 2.370
0190_A0

Plinth Beam 1.086 3.967 1.125

Grade Slab
Slab at EL
106.00
Footings
(Including
chairs ) 7.161
Columns &
stirrups 1.552 0.371
Columns &
stirrups
44AC9100- Plinth Beam 1.606 0.765 0.557
Workshop
3 951-C.01-
Building
0210-A0
Lintel Beam EL
103.9,104.2,1
07.1,107.4
Slab atEL
EL104.850,105
.850etc
Slab atEL
EL109.00etc
Footings
(Including
chairs ) 9.432
Columns &
stirrups 2.387 1.720 0.060
Columns &
44AC9100- stirrups 5.839 4.250 0.080
Security Office
4 951-C.01-
Building
0170-A0
44AC9100-
Security Office
4 951-C.01-
Building
0170-A0
Plinth Beam ,
cable trench ,
stub column ,
RC Wall &
Retaining Wall 1.827 3.637 4.316
Slab at
EL106.5

Raft 1.250

Hidden Beam 8.530


Construction
Joint
Bar Around
the columns
Columns &
stirrups 5.807 2.990

Retaining Wall 2.320


Staircase
Dowels
Columns &
stirrups

Chairs (Raft)
Footings
(Including
chairs )F1 1.299
44AC9100- Columns &
5 951-C.01- Admin Building Stirrups (C60) 1.227
0221-A0
Ramp Footing
& Retaining
wall 1.796 0.039

Plinth Beam ,
stub column ,
RC Wall (Grid :
A to D - 1 to 8) 2.069 5.292 5.094
Slab 0.147 23.704

Ground Floor
Beam , slab ,
staircase ,
foundation ,
waist slab ,
trench ,&
retaining wall
First Floor
Beam ,Slab,W
affle Slab
Raft & Wall 11.938 28.980

44AC9100/00 Cable Trench


6 0/ (LPG to Precast
E.01/0001/A0 Boundary wall) (Consumed) 4.7025 9.9
Precast
(Required)

44AC9100/00 Cable Trench


7 0/ (MRSS to Raft & Wall
E.01/0001/A0 Boundary wall) (Chairs not
included) 7.541 16.707
Footings 0.86
Columns &
stirrups 0.123 0.22

44AC9100- Security Office


8 951/ Building Near
C.01/0250/A1 Material Gate Grade slab ,
Columns ,
Plinth Beam ,
Roof slab ,
roof Beams ,
Parapet wall
Footings 4.353
44AC9100- Tie Beam 0.152 0 0.513
9 951/ FOAM SHED
C.01/0256/A0 Pedestals &
stirrups 2.313
Footings 0.877
Columns &
Stirrups 0.258 0.207
Plinth Beam 0.227 0.07
44AC9100-
SecurityCheck
10 951/
C.01/0178/A1 Building

Column laps ,
Plinth Beams ,
Lintel Beam ,
Canpoy ,
Grade slab
44AC9100/95 KAHPL Fire Footings 0.858
11 1/ Station Control Columns &
C.01/0252/A0 Room stirrups 2.414 1.743

Total Received Quantity (MT) (A) 68.300 70.870 123.530

Total Quantity (MT) CONSUPTION (B) 53.185 67.422 106.764


Claim Qty . (Upto RA6) 40.615 38.526 72.508
BALANCE AT SITE (A-B)
15.116 3.448 16.766
Reinforcement Statement CIVIL TENDER 02 as on //2022
t CIVIL TENDER 02 as on //2022
Diameterwise Weight in MT
16 mm 20 mm 25 mm 32 mm Total Remarks

BBS Certified &


36.160 43.37 Claim in RA Bill

BBS Certified &


20.055 26.08 Claim in RA Bill

BBS Certified
(only stirrups
inlcuded & not
columns vertical)
1.850 11.710 2.550 21.99 & Claim in RA Bill
Required as per
0.00 drawing qty.
5.269 4.500 0.552 16.50 BBS approved
Required as per
0.00 drawing qty.
Required as per
0.00 drawing qty.

BBS Certified &


13.775 10.195 3.670 34.80 Claim in RA Bill
BBS Certified &
0.745 5.338 8.385 0.581 16.97 Claim in RA Bill
Required as per
0.00 drawing qty.
3.133 1.794 0.283 8.14 BBS Prepared

Required as per
0.00 drawing qty.

Required as per
0.00 drawing qty.
Required as per
0.00 drawing qty.

BBS Certified &


16.887 1.350 27.67 Claim in RA Bill
BBS Certified &
0.310 5.000 4.381 1.370 15.23 Claim in RA Bill
Required as per
0.208 3.321 2.910 0.910 17.52 drawing qty.
3.156 4.020 0.359 17.32 BBS Certified
Required as per
0.00 drawing qty.
BBS Certified &
372.810 374.06 Claim in RA Bill
BBS Certified &
1.610 10.14 Claim in RA Bill
BBS Certified &
2.610 2.61 Claim in RA Bill
BBS Certified &
2.230 2.23 Claim in RA Bill
BBS Certified &
26.600 8.290 43.69 Claim in RA Bill
BBS Certified &
14.130 16.45 Claim in RA Bill
BBS Certified &
0.360 0.090 0.45 Claim in RA Bill
Required as per
0.00 drawing qty.
BBS Certified &
29.456 29.46 Claim in RA Bill

BBS Certified &


0.734 2.03 Claim in RA Bill
BBS Certified &
1.410 0.770 3.41 Claim in RA Bill

BBS Certified &


4.887 4.365 11.09 Claim in RA Bill

0.623 5.627 15.030 6.489 40.22 BBS Prepared


1.044 24.90 BBS Prepared

Required as per
drawing qty.

0.00
Required as per
drawing qty.
0.00
40.92 BBS Approved
BBS Approved
(990 PRECAST
14.60 CASTED)
Required as per
0.00 BBS qty.

24.25 BBS Approved


0.86 BBS Approved

0.23 0.44 1.01 BBS Approved

Required as per
drawing qty.

0.00
2.271 6.62 BBS Approved
0 0 0 0.67 BBS Approved

1.693 1.5 5.51 BBS Approved


1.443 2.32 BBS Prepared

0.711 1.18 BBS Approved


0.158 0.246 0.012 0.71 BBS Approved

Required as per
0.00 drawing qty.
2.188 3.05 BBS Approved

3.627 1.592 9.38 BBS Approved


TOTAL CONSUMPTION 917.37
93.230 136.690 187.389 418.938
1098.95
91.606 52.032 121.529 424.836 917.37
81.308 39.596 120.613 417.383 810.55 106.82
1.624 84.658 65.860 -5.898 181.573
TENDER 02 as on //2022
SKB BUILDERS INDIA LTD.
Client: Indian Oil Corporation Limited.
EPCM : Worley
STATUS AS OF:
Sub - Contractor : S.K.B. Builders India Limited RA BILL 6 - CIVIL 2 CURRENCY:

Name of Project : ACRYLIC / OXO ALCOHOL REINFORCEMENT CONSUMPTION


PROJECT
DOC NO.:
Foundation
Sr No Area Nos 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
type

1 Warehouse FC3 1 0.14 0.25

2 FC4 2 0.31 0.56


3 FC6 5 0.19 0.33
4 FC8 2 0.17 0.31
5 FC9 1 3.43
6 FC10 1 4.10
7 FC11 2 0.20 0.35
WAHEREH
8 OUSE 1 5.01 9.32
FOOTING
Column
9 1 1.04 0.70 0.00 0.00 1.85 11.71
Dowels
Column
10 1 2.47 1.67 0.00 0.00 0.00 0.00
Strriups
WORKSHO
11 1 1.55 0.37 0.00 0.75 5.34 8.39
P Column
Workshop
12 Footing 1 0.00 0.00 6.93 12.96 9.83 3.67
BBS

14 Trench Steel 1 12.83 0.00 27.77 0.00 0.00 0.00

15 Firewater Tank 1 1 3.54 2.39 15.74


Tank 2 1 3.54 2.39 15.74
ADMIN
16 1 0.00 0.00 1.25 0.00 0.00 0.00
RAFT
ADMIN
17 1 5.05 2.99 0.00 0.00 0.00 27.11
COLUMNS
ADMIN
18 HIDDEN 1 0.00 7.89 0.00 0.00 0.00 0.00
BEAMS
ADMIN
18 RETAININ 1 0.00 2.33 0.00 14.07 0.00 0.00
G WALL
ADMIN
RAFT
19 1
CHAIRS
POUR 1
ADMIN
RAFT
20 1
CHAIRS
POUR 2

WORKSHO
P,
WAREHOU
21 1 2.93
SE & Cable
trench
CHAIRS

SECURITY
22 1 0.00 0.00 9.04 15.84 1.06 0.00
FOOTINGS
SECURITY
23 1 2.39 1.72 0.06 0.31 5.00 4.38
COLUMNS
ADMIN
24 F1 2 1.30 0.73
FOOTING
ADMIN
25 FOOTING 0.07
(CHAIRS)
ADMIN
26 C 60 2 1.23 1.41
COLUMNS
ADMIN
27 5.61 2.89 14.50
COLUMNS
ADMIN
RETAININ
28 G WALL & 1.80 0.04 4.89 4.37
RAMP
AREA

FC1(09
Nos.) ,
FC2(03
FOAM
Nos.) ,
29 SHED 17 4.35 2.27
FC3(03
FOOTINGS
Nos.) ,
FC4(02
Nos.)

FOAM
SHED
30 0.19
FOOTINGS
CHAIRS

P1(09
FOAM
Nos.) , P2 &
SHED
31 P3(06 17 2.31 1.69 1.50
PEDESTAL
Nos.) ,
S
P4(02 Nos)

FOAM
32 SHED TIE TB 0.15 0.51
BEAM

SECURITY
OFFICE FC1(04
NEAR Nos) ,
33 4 0.86
MATERIA FC2(04
L GATE Nos)
FOOTINGS
SECURITY
OFFICE
NEAR
34 MATERIA 0.06
L GATE
FOOTINGS
CHAIRS

SECURITY
OFFICE
NEAR C1 (04
35 MATERIA Nos.) ,C2 4 0.12 0.22 0.23 0.44
L GATE (04 Nos)
COLUMNS

WAREHOU
SE
SC1 ,SC2 ,
BUILDING
36 SC3 & PD 0.01 0.04 0.03
STUB
(02 Nos.)
COLUMN
& PD

WAREHOU
SE
37 BUILDING 1.08 3.97 0.62 5.06 4.26 0.52
PLINTH
BEAM

WAREHOU
SE
38 BUILDING 0.39 2.78 4.34
COLUMN
DOWELS

SECURITY
CHECK
39 F1 1 0.88 1.45
BUILDING
(FOOTING)

SECURITY
CHECK
40 BUILDING 0.10
(FOOTING
CHAIRS)

SECURITY
CHECK
41 BUILDING C1 4 0.18 0.21 0.71
(COLUMN
S)

SECURITY
CHECK
BUILDING
42 C1 4 0.47
(COLUMN
S
DOWELS)

WORKSHO
P
43 4.78 1.14 0.39 2.78 4.34
COLUMNS
DOWELS
SECURITY
OFFICE
44 0.09 0.25 3.33 2.92
COLUMN
DOWELS
CABLE
45 TRENCH PRECAST 700 3.36 7.68
PRECAST

40.615 38.526 72.508 81.308 39.596 120.613


STATUS AS OF: 15.03.2022 TO 14.04.2022
CURRENCY: INR

DOC NO.: SKB/WORLEY/RABILL 6


Previous This Bill
32 mm Total
Bill Qty. Qty Remarks

0.386 0.386
0.000
0.869 0.869 0.000
0.522 0.522 0.000
0.479 0.479 0.000
3.429 3.429 0.000
4.100 4.100 0.000
0.546 0.546 0.000

14.330
14.330 0.000
2.55 17.845
17.845 0.000
0.00 4.147
4.147 0.000
0.58 16.974
16.974 0.000

0.00 33.376
33.376 0.000
0.00 40.602 40.602
0.000
21.667 21.667 0.000
21.667 21.667 0.000
372.42 373.668
373.668 0.000
6.26 41.407
41.407 0.000

0.00 7.889
7.889 0.000

0.00 16.405
16.405 0.000

9.79 9.795
9.795 0.000
19.67 19.667
19.667 0.000

2.930

2.930 0.000
0.00 25.946
25.946 0.000
1.37 15.226
15.226 0.000
2.033
2.033

0.070
0.070
0.77 3.407
3.407
2.47 25.466
25.466

11.089

11.089

6.624

6.624

0.188
0.188

5.507

5.507

0.665
0.665

0.865

0.865
0.058

0.058

1.013

1.013

0.087

0.087

15.512

15.512

0.30 7.817

7.817

2.329

2.329

0.103

0.103

1.097

1.097

0.474

0.474

0.30 13.736
13.736
0.91 7.500
7.500

11.040
11.040
0.000
417.383 810.550 693.870 116.680 MT