You are on page 1of 5

Optiplanning 3.01 © Biesse S.p.A.

(376063375)
ALU PROFILE FOR HANDLE C TYPE LITE BRONZE10012-B Tue Sep 13 10:01:12 2022
Material: 1 Parameters: Default + ...

SUMMARY
MATERIAL USED
Area Volume Cost
Quantity (m²) (m³) $ (%)
_____________________________________________________________________________________________________

Boards

Mat. Used 3 3.00 0.003 3.00 100


_____________________________________________________________________________________________________

Parts

Tot. Production 14 1.90 0.002 1.90 63.43


_____________________________________________________________________________________________________

Drops

Mat. Made up 0 0.00 0.000 0.00 0.00


_____________________________________________________________________________________________________

Total material lost

Tot. lost 1.10 0.001 1.10 36.57


_____________________________________________________________________________________________________

PRODUCTIVITY
Eff. Time of Cost of Cost
(%) Cut (m²/h) (m³/h) Cut Total
_____________________________________________________________________________________________________

100 0:05:33 32.43 0.032 0.00 3.00


80 0:06:56 25.95 0.026 0.00 3.00
_____________________________________________________________________________________________________

STATISTICS
Number of Patterns 2 Pieces / h (Eff.%) 121.08
Number of Cycles 2 Cycles / h (Eff.%) 17.30
Average prod. panel per cycle 1.50 - Max Stack Perc. 1.25%
Cutting distance 15.9 m

1
Optiplanning 3.01 © Biesse S.p.A. (376063375)
ALU PROFILE FOR HANDLE C TYPE LITE BRONZE10012-B Tue Sep 13 10:01:12 2022
Material: 1 Parameters: Default + ...

Pieces produced
Length Width Quantity Edges Area Cost Cost Cost Cost
N. (mm) (mm) Produced (m) (m²) Material Cut Unit Total
_____________________________________________________________________________________________________

1 591.0 230.0 14 23.0 1.90 3.00 0.00 0.21 3.00


_____________________________________________________________________________________________________

Total 14 23.0 1.90 3.00 0.00 3.00

2
Optiplanning 3.01 © Biesse S.p.A. (376063375)
ALU PROFILE FOR HANDLE C TYPE LITE BRONZE10012-B Tue Sep 13 10:01:12 2022
Material: 1 Parameters: Default + ...

Parts Produced
Length Width Quantity Diff. Prod. by
N. Cod (mm) (mm) Required. Prod. I Description II Description Patterns
_____________________________________________________________________________________________________

1 1 591.0 230.0 14 l Handle C Type 1 1-2


_____________________________________________________________________________________________________

Total 14

3
Optiplanning 3.01 © Biesse S.p.A. (376063375)
ALU PROFILE FOR HANDLE C TYPE LITE BRONZE10012-B Tue Sep 13 10:01:12 2022
Material: 1 Parameters: Default + ...

2  4000.0 x 250.0 x 1.0

Pattern : 1 of 2 Long Rip (LR)


230

230

230

230

230

230
591 591 591 591 591 591

Area used : 3,568.5 × 230.0


__________________________________________________________________________________________________________________________________________________________________

Cycles 1 Material Production Drops Scrap


Cycle Time 0:33:09 2.00 m² 1.63 m² 0.00 m² 0.37 m²
Total Time 0:03:39 0.002 m³ 0.002 m³ 0.000 m³ 0.000 m³
Max Stack 120 100.00 % 81.56 % 0.00 % 18.44 %
__________________________________________________________________________________________________________________________________________________________________

Length Width Quantity Quantity Quantity Quantity


Cod I Description (mm) (mm) Required. Prod. Pattern To Do
1 Handle C Type 591.0 230.0 14 0 12 2
__________________________________________________________________________________________________________________________________________________________________

4
Optiplanning 3.01 © Biesse S.p.A. (376063375)
ALU PROFILE FOR HANDLE C TYPE LITE BRONZE10012-B Tue Sep 13 10:01:12 2022
Material: 1 Parameters: Default + ...

1  4000.0 x 250.0 x 1.0

Pattern : 2 of 2 Long Rip (LR)

230

230
591 591

Area used : 1,186.5 × 230.0


__________________________________________________________________________________________________________________________________________________________________

Cycles 1 Material Production Drops Scrap


Cycle Time 0:31:39 1.00 m² 0.27 m² 0.00 m² 0.73 m²
Total Time 0:01:54 0.001 m³ 0.000 m³ 0.000 m³ 0.001 m³
Max Stack 120 100.00 % 27.19 % 0.00 % 72.81 %
__________________________________________________________________________________________________________________________________________________________________

Length Width Quantity Quantity Quantity Quantity


Cod I Description (mm) (mm) Required. Prod. Pattern To Do
1 Handle C Type 591.0 230.0 14 12 2 Completed
__________________________________________________________________________________________________________________________________________________________________

You might also like