QC/CSA/ITP/2013/102

APPENDIX 'A' INSPECTION AND TEST PLAN


Project Title : ASM Technology Extension - Pasir Gudang
Category : Concrete Work
Type of Test Description (Refer To Specification) Specification Provision / Contract Provision Acceptance Criteria (Refer to Approving Tick (/) if applicable Verification/ Approving Doc. Remark
Frequency [Tick (/) to adopt specification) Authority
specification
provision]
Issue construction - All construction drawing all construction drawing should be QC/RE/C-O-W / Delievry Order, material
drawing to sub-con approved by client, and with checking list
'APPROVED" stamp or signature.

Concrete Trial Mix Standard Specification of Materials one trial mix of 9 cubes for Standard Specification of Materials QC/RE/C-O-W / Design Mix calculation, Test
and Workmanship Chapter -5 each usage of concrete and Workmanship Chapter -5, 5.16 Report
grade table 3

Concrete Cube test Standard Specification of Materials -one set sample for every Standard Specification of Materials QC/RE/C-O-W / Test Report
and Workmanship Chapter -5 3 and Workmanship Chapter -5, 5.16
30m for critical structures,
column, beam table 3, 5.17

-one set sample for every


100m3 for intermediate
structures, ground slab, roof
slab

-one set sample for every


150m3 for civil concrete
construction
Slump Test Standard Specification of Materials every concrete truck Standard Specification of Materials QC/RE/C-O-W / Concrete work checklist
and Workmanship Chapter -5 and Workmanship Chapter -5, 5.16
table 3, 5.17, 75mm +/- 25mm for
normal concrete and 125mm +/-
25mm for pump mix

Rebar Tensile Test Standard Specification of Materials Standard Specification of actual yeild strength > specified QC/RE/C-O-W / Mill Cert. and Test report subject
to carry to
outthe
the test
and Workmanship Chapter -5 Materials and Workmanship yeild strength, actual tensile engineer
accordingdecision,
to MS 146:if
Chapter -5.10 strength > specified tensile 2011engineer
the requirement
strength, confidence on the
submittal document,
rebar tensile test may
no need to carry out

Installation of Rebar Standard Specification of Materials All placing rebar Nos of rebar, size, spacing, cover QC/RE/C-O-W / Approved Construction
and Workmanship Chapter -5 as shown in drawing drawings, Concrete work
checklist

Formwork Standard Specification of Materials All Placing formwork Clean (without dust, oil, dirt), No QC/RE/C-O-W / Approved Construction the minimum forming
and Workmanship Chapter -5 leakage, stable, applied with drawings, Concrete work period should follow
release agent checklist section 5.30.2

Dimension of Standard Specification of Materials All structural elements Standard Specification of Materials QC/RE/C-O-W / Approved Construction
Structural elements and Workmanship Chapter -5 and Workmanship Chapter -5, 5.31 drawings, Concrete work
checklist, floor as-built survey
plan