े सं या: ERLDC/ddmmyy/Rev-
संदश Date: - 15/Sep/2022
18:09
Notes:
1) Before availing the shutdown, final switching off clearance must be taken from ERLDC.
2) Before requesting for the switching off/in code from ERLDC, it must be ensured that PTW has been taken/return ,all men and materials were
removed from site and all necessary safety precautions were taken.
3) The validity of any Outage or Charging code is 30 minutes. Beyond the stipulated time the codes stand cancelled.
4) The S/D is to be returned within scheduled period.
5) ERLDC may defer/postpone the shutdown if the system condition does not permit opening of the element/s.
6) Concerned parties are requested to submit opening/closing time of each individual bay related to a particular shutdown in real time to ERLDC
control room after each switching operation.
7) Switch off code will be issued only when good weather condition will be reported.
8) Equipment & protection setting of the element under shutdown will not be replaced/upgraded/repaired/altered without necessary intimation &
no configuration of equipment/bay will be changed.
9) For replacement of any electrical equipment/installation RIO/SIO (whichever applicable) certificate is required before charging of the same.