Step-2 taken a brush and lay down the shing film on platform
Step-2 when fully dry first coat then apply second coat
Step-1v after 24 hours any cracking found in film .that means Material is reject. Film should be crack
less form
2- SETTING TIME OF Cement testing Sop for Acrylic form water proffing (By flow table mathods)
Step-2 taken aflow table and mix material is drawn in flow cup
Step-3 when flow cup is full by material then pick up slowly slowly and leave for 1 min and note the
Flow of material .
Step -5 Conclusion :- if any polymer shows the flow quaninty is high that means settling time of cement
is fast in those polymer.
Step-4 AFTER 24 HRS physical check the Bonding property of coating by scrating by nails
Step-5 after this procees on coating sitting the dolly by apply the adhesive and after 24 hours check the
coating strength of Acrylic coating by pull of Adhesion tester. Strength should not b less tha 2 mpas
Sop for DETERMINATION OF Chloride contents testing in intregal water proffing testing
Precaution : should be bear safety tools during the making of Solution and taken the experiment ( Such
as Safety Goggles ,hair cover safety Mask )
Step-4 taken a 8 gram of Ferric Alum this is dissolved in 100 gm of hot Distilled water &Cool dawn at
RT(Note- Ferric Allum is highly moisture sensitive chemical .so solution is kept wit highly cap tightening )
Step-5 Preparation of Pott. Chromate soln: taken a clean conical flask and taken a 10 gm of Pott.
Chromate this is disoolved in 100 ml water
Step-1 mix part-A &B and apply the coat on shirring film by brush after 24 hours when Film is dry with
out cracking ,after that taken 5 ml water is drain upon the film at fixed area if water is penetrated in fim
that means polymer is not good shown the water penetration property .
Step-3 take the mixed material by spatula and add the tile by cram type ( Thickness should be 3 mm)
Step-4 after 24 hours tile is fully dry then tile pcs is fixed in machine and operate the machine ( Strength
should not be less than 4 KN) IF STRENGTH IS BELOW DAWN 4 KN THAT MEANS Material is Rejected .
9- Sop for Determined the Open time and Adhujustibility of Tile Adhesive
Step-2 mixed the tile adhesive as per given racio after that material is add on tile pcs and chipboard is
adhers to the tile surface
STEP-3When material is not adhers to the tile surface that time is open time of tile adhesive (this
situation is repeated on 5 min ,10 min,15 min )