Professional Documents
Culture Documents
Dr. Daniel Edney, State Health Officer of the Mississippi State Department of Health,
issued a Declaration of a Public Drinking Water Supply Emergency in the City of
Jackson ordering the City including, but not limited to, employees of the Public
Works Department and Emergency Management immediately cooperate with state
response teams and contractors deployed to augment current staffing and to take
remediation actions deemed necessary by the State Incident Commander. The
Governor of Mississippi, Tate Reeves, has declared an emergency for the City of
Jackson due to the effect on essential government services, medical facilities, and
schools. A Unified Command has been established to combat this emergency.
Following two rounds of sample collection and bacti analyses in the Mississippi Public
Health Laboratory, the state-imposed boil water notice for the City of Jackson was
lifted at 1300, on 15 Sept 2022.
O.B. Curtis remained at a steady pressure over the past 24 hours at around 85 p.s.i.
All tanks are currently maintaining good margins for overhead storage. On site
storage at O.B. Curtis has remained stable. Pressure should be stable throughout the
city. The City has received isolated reports of discolored water and pressure issues.
These reports are decreasing each day. The City reports that many of these issues
are related to routine water leaks or meter issues. Each is being assessed by the city
for response.
Overall water production continues to meet demand and is maintaining sufficient
margin to support limited work in both O.B. Curtis and J.H. Fewell water treatment
plants to improve water production toward rated capacities and redundancy for
continuous operations.
CITY OF JACKSON
• Reaching out to Calflo contractor to coordinate a service call
• Assessed raw water pumps at J.F. Fewell plant
• Continuing work on intermediate and long-term planning
• Finalizing budgets from multiple funding sources including ARPA and SRF
MARYLAND
(ANNE ARUNDEL CO.)
• Continuing installation of Raw Water Pump #4
o Electrical fault
Re-energizing of variable frequency drive overnight was
unsuccessful
Issue between variable frequency drive and motor
Contractor onsite, evaluating
• Polymer feed system repairs ongoing
o Almost finished restoring remote operations
o Will conduct training handover to COJ operators
WSSC
• High service pump #7
o Detected significant vibration
Unable to test valves in current condition
• High service pump #3
o Automation will not function; runs in manual
Difficulty opening valve
• Possible bad actuator
• Continue to backwash filter 4 in Conventional Filter Gallery
• Chemical line in high service building
o Removed old lime line
o Marked temporary lime line
MICHIGAN
• Replaced broken switches on 3 membrane train units
• Added turbidimeter to combined filter effluent membrane train line
• Repaired pump #3 in EQ basin
• Restored operation to rapid mix 2B
• Replaced various bulbs throughout the plant
SOUTH CAROLINA
(MOUNT PLEASANT)
• Repaired leak in upstairs bathroom affecting electrical panel in downstairs
meeting room
o Wash water can now be used
• Rehabilitating flocculation and mixing ahead of membranes
o Greasing motor bearings and couplings
• Assisted WSSC in removing old lime line
SOUTH CAROLINA
(SPARTANBURG)
• Repaired Clean in Place tank heaters
o Fully functional
• Repairing Calflo system
o Tracing wires from pumps to Programmable Logic Controller
o Calflo pump #1 inoperable
Pump will technically run, but is full of lime
• Continuing work on sump pumps
• Assisted Maryland with Raw Water Pump #4
OHIO/MSDH/USEPA
• High service pumps #1 - #4 have been tested
o High service pump #1 in overall best condition
Still in poor condition
o High service pumps #2 and #3 are in poor condition
o Disassembled high service pump #4
Pump utilizes a roller bearing
• Failure of packing sleeves and packing allowed water
intrusion to housings resulting in failure
Assessed impeller rings
o Recommend machining new brass rings to press onto
impeller hub
Rotating assembly should be dynamically balanced for motor
speed of 1170rpm
o Serial number tags on pumps are missing
Requested documentation assistance from COJ
• COJ maintenance staff will be onsite through the weekend
EMAC
• EMAC Coordinator, New York - deploying 09/18/22
• AAcoDPW Team, Maryland – 1 instrument tech, 1 mechanic, 1 electrician, 1
water operator, 1 team lead – deploying 09/17/2022-09/18/2022
• WSSC Water Team, Maryland – 1 electrician, 3 instrument techs, 2 mechanics,
2 maintenance – deploying 09/17/2022-09/18/2022
• WSSC, Maryland – 1 electrician, 2 operators extended – 10/04/22
• Mount Pleasant, South Carolina – 2 operators and 2 mechanics – onsite
09/09/2022
• Spartanburg, South Carolina – 3 mechanics – onsite 09/12/2022
• Maryland – 3 operators, 2 mechanics, 1 instrument tech, 1 maintenance
worker, 1 emergency management specialist supervisor, and 2 electricians –
onsite 09/10/2022
• Michigan – 1 electrician – onsite 09/11/2022
• Ohio – 1 instrument tech, 4 maintenance crew – onsite 09/13/2022
• EMAC requests made for staffing augmentation for 09/19 – 10/03/2022
EPA
• Plan for distribution system testing for nitrification
• Coordinating monitoring results with O.B. Curtis operators and lab staff for
accuracy
• Developing sampling plan for National Primary Drinking Water Regulation
Standards to test for maximum contaminant levels
• Identifying trends in plant water quality sampling
• One person supporting J.H. Fewell operation
• Evaluating chemical process control for O.B. Curtis
FEMA
• Finalizing dashboard development
• Working on federal staffing schedule with federal partners through October
29, 2022
• Managing situation briefs for federal executive level agencies
USACE
• Project Manager on-site developing resiliency playbook
• Established coordination meeting with MSDH and COJ for Monday, September
19, 2022