TRAINING GROUND RULES
%
No Smoking Appearance Save
Energy
“
>”
ILSAS is
Non-Smoking Put your Please switch
Area
0830 : Class starts
hand phone Full Dress code
1000 : Tea Break
commitment Ask Questions off lights &
1300 : Lunch on silent comply to TNB aircond when
Please Maintain 1600 :Tea Break
mode to achieve rules and
1715 : Adjourn
training Participate in not in use
Cleanliness Pay class activities regulations
attention in objectives
class
3
Module:
Newly Built >100kVa
WHAT?
Refers to the electricity application for load exceeding 100kVa, which is currently
submitted via manual form to KEDAI TENAGA only. myTNB will offer an
additional channel to apply for such facility. This functionality is used when
online users apply for electricity for load more than 100kVa. This function
applicable to myTNB Business Users.
4
Supply Application Summary
New
Normal
With
Single contractor
Express
Multiple
Without
Supply contractor
Application
Single
Multiple
Share same
process
5
Step 1: Applications
1. Click ‘Applications’
on Left Navigation
Pane. 1
2
6
Step 2: Supply Application
1. Click ‘>100kVa’
under ‘…load
1
requirement’
2
button.
7
Step 3: Developer Information
8
Step 4: PIC Contact Details
9
Step 5: Consultant Information (1/2)
10
Step 5: Consultant Information (2/2)
11
Step 6a: Contractor Information (Yes)
(1/2)
12
Step 6a: Contractor Information (Yes)
(2/2)
13
Step 6b: Contractor Information (No)
14
Step 7: Premise Information (1/2)
2. Select ‘Premise
1
type’.
3. Enter ‘House/Unit/
Lot No.’.
– If premise type is 2
‘Landed’, enter
‘House/Unit/Lot No.’ 3
– If premise type is
‘Building’, enter
‘Building Name' and
‘House/Unit/Lot No.’
15
Step 7: Premise Information (2/2)
1. Select ‘TNB
Station’ via drop-
down list and
select ‘Supply
required date’ via
calendar.
2. Select ‘Voltage
1
level’ via drop-
down list and enter
‘Maximum demand 2
declared’.
16
Step 8: Documents & Acknowledgement
(1/2)
2. Scan documents;
click ‘Browse’
button to search for 1
file location and
click ‘Upload’
button to attach 2
scanned copy of
required
documents.
17
Step 8: Documents & Acknowledgement
(2/2)
2. Click ‘Submit’
button to confirm.
18
Step 9a: My SSP Application Status
1. Click ‘Applications’
on Navigation 1
Pane.
2. Review submitted
application is
displayed at 'My
SSP Application
Status' table. Click
‘View’.
19
Step 9b: My SSP Application Status
1. Click ‘Applications’
on Navigation 1
Pane.
1
2. Click ‘View’ button
of selected project
application under
‘My SSP Project
Applications’.
20
Step 10: Pay Connection Charges
21
Step 11: Project Details
22
Step 12: View Status
23
Step 13: Project PIC
3. ‘√ ‘ indicates PIC
has already 3
registered as a
myTNB user while
‘X’ indicates PIC
has not.
24
Step 14a: Add Electrical Contractor
1. Click ‘Search”
button to look for 1
Electrical
Contractors list.
25
Step 14b: Add Electrical Contractor
2. Click ‘Save’ to
confirm the 1
selected
Contractor.
26
Step 15: Add Project PIC
1. Enter ‘SSP 1
Registered Email
Address’ and click
‘Search’ button. 2
– Backend system 3
will populate
subsequent fields.
27
Step 13.2: Project PIC
28
Step 16: Parcel
1
2. Click ‘View’ button
of selected parcel.
29
Step 17: Parcel Details
2. Click ‘Create’
button under
‘Application listing’.
1
Note: Create move-in is
not available if ‘Total no.
of units’ is below:
‒ Submitted applications
‒ Pending submission
applications
‒ Not created 2
applications
30
Step 18: Move-in Application Account Type
1. Click ‘Move-in
application’ button. 1
2
2. Choose the
account type here.
31
Step 19: Applicant Information
2. Enter the
Authorized Person
Contact here:
2
– Name
– Position
– Mobile Number
– Email
32
Step 20: Premise Location (1/2)
33
Step 20: Premise Location (2/2)
1. Enter ‘Supply
Required Date’,
‘GPS location’,
‘Meter location’ and
‘No. of feeder’.
34
Step 21: Mailing Address
35
Step 22: Documents & Acknowledgement
(1/2)
1. Click ‘Form A’ to
download, print
and manually sign
Form A.
2. Scan documents;
click ‘Browse’
button to search for 1
file location and
click ‘Upload’ 2
button to attach
scanned copy of
required
documents.
36
Step 22: Documents & Acknowledgement
(2/2)
2. Click ‘Submit’
button to confirm.
37
Step 23: Submit Group Application
38
Step 24: Premise Info Creation
1. If customer details
are not available, 1
please click on
‘Premise Info
Creation’ button.
2. Fill up the
information for
2
Premise Address
and Supply
Information here.
3. Click ‘Save and
Proceed’ button.
39
Step 25: Premise Info Creation
1. Scan documents;
click ‘Browse’ 1
button to search for
file location and
click ‘Upload’
button to attach
scanned copy of
required 21
documents.
2. Click ‘Submit’
button to confirm.
40
Step 26: Request for New Street
3. Click ‘Submit’
button.
41
Main Branch:
TNB Integrated Learning Solution Sdn Bhd – ILSAS,
Jalan IKRAM-UNITEN, 43650 Bandar Baru Bangi,
Selangor, Malaysia.
Tel: (+6)03-8922 7222
Fax: (+6)03-89263505
Email: infoILSAS@tnb.com.my
Website: www.tnbilsas.com.my Class ‘A’ Training Provider
Human Resource
Minister Award 2007
Winner—Best
Malim Nawar Branch: Training Provider
TNB Integrated Learning Solution Sdn Bhd – ILSAS, Category
42