Table of Contents
Introduction .................................................................................................................................................... 3
References ......................................................................................................................................................... 8
Appendices......................................................................................................................................................... 9
INTRODUCTION
buildings. According to the World Bank collection of development indicators, the Srilankan urban
population growth is 1.4015% in 2016 and urban population is expected to double in the next 50
years, driving cities to undertake a sustainable transformation of their model in order to meet the
demand for building and civil engineering products, and to support sustained national economic
TERMS OF REFERENCES
Amanda Property developer has expressed his interest on an investigation and a feasibility study
of a property development in this area which in return gives him and his shareholders a nice return
on their investment. The developer has come with few development options such as residential,
commercial, recreational, health and care, educational institutional buildings, etc. and ultimately
proposed to a development of residential block, the Prime Residential Development. Also the
developer is very keen of building an environmental friendly low operating cost structure. The
development plot of 200 perch is owned by the developer and the amount of the development is
100 million LKR, allowed project duration is twenty four month time.
The envisaged development of Gross Floor Area is 20,000 Square meter. The seventy (70%)
percentage of the investment from Amanda developer and remaining from financial institutions
and investors. The proposed residential development comprises of three stories of subterranean
parking plus ten stories of building.
The development plot is situated in a densely populated area and the exploding population in this
area creates an increasing demand for residential, commercial and recreational developments and
the supply has not yet met this strong demand. On the other hand Property development
promotes increased value for money to industry clients as well as environmental responsibility in
the delivery process. (Ofori, 2018)
The immediate vicinity includes schools, malls, parks, residential buildings, banks, offices, hospitals
etc. and the supply of residential spaces are way below than required, and as a result students,
workers, patients etc. are forced to spread and live in nearby suburbs and spending most of the
through suburban developments where arable lands are scarce (Ali and Aksamija, 2008). The
selection of a tall construction is due to the government policy of plot ratio or FSI (Floor space
The sustainable approach, all over the country there is an increasing trend of building that build to
demolish and the over consumption of electricity, solid waste management, emission of carbon
dioxide, heat, water wastage etc. posing huge threats to the environment and as well as to our
future generations. Therefore, there is void for residential developments which seek through and
adopt sustainable and environmental friendly structure that offers the occupiers and the public a
low cost of living under healthy and high quality living space.
SITE DETAIL
The development plot is of 2023.43 Square meter green field, located in densely populated urban
area of Mount Lavinia, surrounded by a public park, mall and a construction site (see appendix 1).
The immediate vicinity includes schools, hospitals, financial institutions, law enforcement
authorities, courts, bus stands and more. The coast is 750m away from the development plot on
the east. The location used to be a marshy area and after the irrigation works in near side, the land
stood up from the water table and that land is now suitable for high-rise buildings and the water
table is 6.3m below existing ground level. The proposed development plot is adjacent to a newly
built residential building in one side and the reaming sides are adjacent to A4 grade roads.
GEOGRAPHY CHALLENGES
Location of the development gives lots of restrictions, compare to the other areas, since its
sits mid of an urban city surrounded by noise and pollution sensitive institutions such as
schools, parks, courts, hospitals etc., generates serious difficulties and limitations in
selection of construction method, working hours, difficulties in logistics, entry restrictions to
concrete trucks, noise control, high level of health and safety procedures and more. All
these limitations and difficulties may end up in cost and time overrun.
As well as the salty wind taken in to consideration when steel elements are on the building
needs high level and expensive of protective coatings. Hauling wind from sea shore need
some extra precaution steps as in the recent past a pile of steel sheet of shutter sweep to
damage properties and lives. Tower crane collapse etc.
Limitations on method of construction due to its surroundings for an example driven pilling
subterranean services not interrupted and sheeting piles to be placed to adjacent roads
preventing from collapsing.
A dense built environment (the need to perform deep excavation, height limits for
buildings)
The height of the structures is restricted by urban zoning and determined in the spatial
development plan of the city. Oftentimes, this result in the necessity of building several
subterranean levels those are to use as parking lots and the logistics hub of a building.
Financial difficulties
Natural disasters (Tsunami effected area)
Oftentimes, malls are not tall structures and it does not need heavy subterranean construction as
may other constructions needs. The critical roles of shopping malls are as town centers and
promoters for area development. When the shopping malls built, it creates jobs; the retailers will
employ people from the direct community. This area badly need for a shopping mall because of
the existing one across the street already ran out of space to accommodate more shops, weakened
structure, old look and costly utility bills to the tenants in lacking to adopt sustainable and soft
landing approach when the structure was on the drawings gives an opportunity to property
developers a chance to yield more return on their investment.
The "need to do something for recreation" is a vital element of human biology and psychology.
Cinema and amusement parks offers such recreational and relaxing service. For last 15 years in this
area, there is no technologically advanced cinema (the cinemas in this area operate with outdated
technologies and equipment) and no single amusement park in the near vicinity. A research report
says that lacking of recreational entertainment in this area made an impact on people living in this
vicinity, specially kids and young that they have to travel miles and spend hours in traveling to see
cinema or to do recreational activity in neighbor cities. This lack of supply triggers the opportunity
for such developments as well.
Mount Lavinia is becoming popular for quiet and calm working and living environment. The area,
neighborhood, surroundings and the easy transportation provides a perfect living and working
environment. The law supply of commercial and office spaces and already congested neighbor
cities offers, as the development plot well located near the capital and commercial city of
Colombo, with 360 degree transportation services, to property developers an opportunity to build
a commercial or office block through which a nice return is appreciated while supplying the
required development to boost the country’s economy.
Ali, M. and Aksamija, A. (2008). Towards better urban life: Integration of cities and tall buildings. [ebook] Available at:
Ofori, G. (2018). Challenges of Construction Industries in Developing Countries: Lessons from Various Countries. [ebook]
Tradingeconomics.com. (2018). Urban population growth (annual %) in Sri Lanka. [online] Available at:
https://tradingeconomics.com/sri-lanka/urban-population-growth-annual-percent-wb-data.html [Accessed 10 May
2018].
Zielina, E. and Kania, E. (2017). Problems in Carrying Out Construction Projects in Large Urban Agglomerations on the
Example of the Construction of the Axis and High5ive Office Buildings in Krakow. [ebook] Available at:
https://www.matec-conferences.org/articles/matecconf/pdf/2017/31/matecconf_rsp2017_00144.pdf [Accessed 10 May
2018].