You are on page 1of 510

NATIONAL HIGHWAY AUTHORITY

MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE
OF RATES-2022

PUNJAB

MAY 2022

A JOINT VENTURE OF
PRIME ENGINEERING &
TESTING CONSULTANTS (PVT.)
LTD. AND
REPUBLIC ENGINEERING
CORPORATION
CONTENTS

1. Foreword
2. General
3. List of Manpower
4. List of Material
5. List of Plant and Equipment
6. List of Quarries in Punjab
7. District wise Composite Schedule of Rates for Punjab

(i)
FOREWORD
The main objective of CSR (Composite Schedule of Rates) is to provide a realistic
reference base for preparing Cost Estimate/PC-1 and evaluation of Bids for National
Highway Authority Projects in particular and in general for various Government
Departments and Construction Industry.

Subsequent to the difference in prices of Materials, Manpower, and Plant &


Equipment in the year 2014-15 and after, revision/updation of CSR 2014 has
become imperative. So the past year the unit rates of basic materials like Cement,
Steel, Bitumen, POL, and hence transport have gone up considerably. Worked-out
rates are still uncertain as the unit rates of components are not stable. We have
carried out a general revision of all prices up to 2022 in consultation with leading
manufacturers suppliers and specialist contractors.

In preparing CSR 2022, realistic and in-depth efforts have been made to enquire
rates of Materials, Plant & Equipment rentals, Manpower, and transport from each of
the 156 districts of the country which hitherto in CSR 2014 covered only 109 districts.

The prices, rates, and outputs included in the resources and unit cost calculations,
including allowances for wastage, normal productivity, and efficiency are not only
based on international reference books of estimation but has been compared on with
network of roads and bridges under execution all over the country as NHA Projects.
However, unit rates are average for a particular district and not project-specific.

The unit rates have been developed using NHA Rate-analysis, formulae revised for
prevision CSRs with substantial improvement wherever necessary. Variation in
proposed rates is anticipated in certain cases which may be due to varying
degrees/levels of price differences and particularly at the regional level and also from
day-to-day changes in particular to the rates of POL in the country.

While all efforts have been made to ensure the accuracy of the data and information
used in updating the CSR 2014, neither NHA or authors of the CSR-2022 can in any
way accept the liability for loss of any kind resulting from the use of CSR 2022,
suffered by any person, institution, company, department, etc.

Our gratitude to the Chairman, Member (Planning), G.M (Design), and Director
(Design) of NHA without whose support it would not have been possible to finalize
this uphill task.

National Highway Authority:

1. Capt (Retd) Muhammad Khurram Agha (Chairman)


2. Asim Amin (Member-Planning)
3. Sohail Ahmad (GM-Design)

(ii)
4. Nand Kumar Soofi (Ex-Director-Design QS)
5. Atta-ul-Mohsin (Director-Design)
6. Ayesha Mahmood (Dy. Director-Design QS)
7. Farah Tahir (Asst. Director-Design QS)

Consultant:

1. Lt. Col. (R) Naseer Ahmed (Project Manager)


2. Yasir Fahad (Senior QS)
3. Ahmer Hasan (Market Data Collector)
4. Sajjad Hussain Sheikh (AQS)

Amir A. Ghori
CEO & Director
Prime Engineering & Testing Consultants (Pvt.) Ltd.
in J.V. with
Republic Engineering Corporation (Pvt.) Ltd.

(iii)
1. GENERAL

For many years National Highway Authority has been compiling/updating the
Composite Schedule of Rates for use in the Civil Engineering Industry. The
Civil Engineering Industry uses this Schedule of Rates for pricing work by the
application of unit rates to the quantities measured from the designer‟s
drawings. The main objective of CSR is to provide a realistic reference base
for cost estimates. One has to understand no two projects are the same,
some variables affect the price of the project i.e., the volume of work below
ground, embankment height, cut & fill, increased exposure to weather, and
the tremendous variety of the projects, in terms of type, complexity, and scale
makes the straight forward use of unit rates less reliable. This uncertainty is
compounded by the lower number of bill of items generated in Civil
Engineering Projects as compared to Building Works so that the precise
nature of work is less apparent from bill descriptions and the statistical effect
of „swings and roundabout‟ has less scope to average out extremes of pricing.

To prepare a price for a Civil Engineering project, then, it is necessary to have


regard to the method to be adopted in executing the work, draw up a detailed
program and then cost out the resources necessary to execute the chosen
method. In the first part of this process in the field of construction planner,
there has been a tendency to postpone detailed estimating until the tendering
stage itself, with the employer relying, up to that point, upon an estimate
prepared on a „Thumb Rule‟ basis.

There is increasing growing pressure on the part of project sponsors for an


improvement to budgetary advice so that a decision to commit expenditure to
a particular project is taken on firmer grounds. The absence of a detailed price
method during the pre-contract phase also inhibits the accurate costing of
alternative designs and regular cost checking to ensure that the design is
being developed within the employer‟s budget. The CSR gives unit rates for
use when quantities can be taken from available drawings. To take some note
of the range of unit rates that might apply to an item, the rates themselves are
in some cases related to the working method – for example by identifying the
different types of equipment that would suit varying circumstances.
Nonetheless, it would be a folly to propose that all types of Civil Engineering
work could be covered by the use of CSR. While developing these unit rates,
we had in mind the type and scale of work to be commissioned by NHA.

The CSR does embrace the great majority of work undertaken by NHA.
Although almost all projects will have individual features that require careful
attention in pricing, there will be some projects that are so specialist that they
will not conform to standard pricing information at all. But for most projects,
within the range of work covered, this CSR should provide a firm foundation
for:

(iv)
 Preparing Project Cost Estimate and PC-1
 Evaluating Tender / Bids
 Evaluating Claims and Variation Order
 Arbitration Matters

To prepare an authentic Composite Schedule of Rates and to keep it


effective, the basic requirements are as under:

 Collection of first-hand, prudent, and legitimate information for inputs


(Manpower, Material & Equipment) in the rate analysis.

 Merging the above information in proper proportion according to Design


Specifications and Constructional requirements to create the rate of a work
item.

 Updating the data inputs every year or from time to time, to revalidate the
item rates.

2. GENERAL METHODOLOGY

a) Composite Schedule of Rates was originally published in the year 1991


and subsequent revisions were carried out in 1995, 2000, 2005, 2006,
2008, 2009, 2011, and 2014. There are total of 156 Districts considered
and their Province wise breakdown is as under:

No. of Districts
PROVINCE
CSR 2014 CSR 2022
Punjab 36 36
Sindh 20 29
Khyber Pakhtunkhwa (inl. 10 Districts of FATA) 24 39
Baluchistan 29 32
AJK - 10
Gilgit Baltistan - 10
All Disctricts 109 156

Specifications and Methodology for Construction items have been adopted


as given in General Specification of National Highway Authority (1998) and
its addenda. Items of work for construction have been given the same
numbers as appearing in the General Specifications of the National
Highway Authority. Some items have been added in CSR-2022, which
were necessary but are not covered under General Specifications 1998.
Hence, it has become imperative to revise and update the Specifications.

b) These rates are based on the revised formulae and equipment efficiency

(v)
levels used in the preparation of the previous CSR 2014.

c) The rates analysis of individual items of CSR 2022 consists of four basic
inputs, which have been assigned the new codes numbers.

i) Manpower code starting from LS, LT and LX


ii) Material code starting from MS, MR, ME and MX
iii) Equipment code starting from PS, PR, PE and PX
iv) Overheads, Profits, Preliminaries & Taxes

d) For the preparation of rates following documents have been referred:

i) General Specifications 1998


ii) NHA Composite Schedule of Rates 2014
iii) Statistical Bulletins by Federal Bureau of Statistics
iv) Current Market rates study

Code list of Manpower, Material and Equipment appear at the end of the
chapter for the convenience of the users.

2.1 MANPOWER

a) Allocation of Code Numbers:

Costs of manpower engaged on Plant & Equipment have been included in


owning and operating cost of Plant & Equipment and only site supervisory
staff has been considered under the heading of Manpower.

Code numbers are allocated accordingly to such manpower that is directly


charged to the items of work. Manpower cost for top supervision,
administration, and other non-productive works of support services have
been considered under overhead charges.

b) Formulation of Rates:

Manpower basic rates collected from districts have been first scrutinized,
to eliminate irrational information and the following overheads are applied
to include fringe benefits and other charges:

i) Social Security Payment


ii) E.O.B.I. Payment
iii) Education Cess Payment
iv) Yearly Leave Salary (Earned, casual and sick)
v) Bonus (Compulsory)
vi) Provident Fund (Contribution of Employer) or Gratuity
vii) Mess Expenses (Site Staff)

(vi)
viii)Entertainment Allowance (Provisional)
ix) Group Life Insurance
x) Site Staff Accommodation

After including the above overheads, manpower rates for each of the 156
districts have been calculated and separate records developed for use by
the Computer Program.

2.2 CONSTRUCTION MATERIAL:

a) Allocation of Code Numbers to Materials:

The list of materials required for road construction has been first prepared
from the construction items appearing in the General Specifications of the
National Highway Authority. After arranging the construction material list in
order, code numbers have been allocated.

b) Formulation of Rates:

Considering the location of each district, Engineers decided the most


appropriate source of construction materials for all the code numbers. The
cost of material at source has been established from field data and
transportation rates calculated, to arrive at the landed cost of material at
the district headquarters.

c) Cost of Material

To arrive at a “Material at sources” rate, the following considerations have


been made.

i) Material royalty at the quarry (actual or estimated)


ii) Cost of Preparation of material
iii) Loading of material in truck/trailer etc.

In the case of quarry materials, the source of materials for embankment,


Sub- Base or Base Course can be more than one; however, the most
appropriate source from the point of view of quality and economy has been
used for preparing the Composite Schedule of Rates – 2022.

d) Cost of Transportation

 Rates at the district are derived by adding the ex-factory rates and
transportation costs from the factory to the district.
 Haulage rate data has been collected from the supplier and
transporters to calculate the transportation cost. Transportation cost
data has been analyzed for transporting material to different districts

(vii)
 Transportation cost at the district is calculated by multiplying the travel
distance from the factory to the considered district by the haulage rate
to the corresponding district.
 Material rates at the district are selected from the minimum of the
derived rates for the respective factory as follows:-
 MATERIAL RATE AT DISTRICT = MINIMUM (EX-FACTORY RATE1 +
HAULAGE RATE*DISTANCE1, EX-FACTORY RATE2 + HAULAGE
RATE*DISTANCE2, ……… , EX-FACTORY RATEn + HAULAGE
RATE*DISTANCEn)

2.3 PLANT AND EQUIPMENT

a) Allocation of Code Numbers

The list of plant and equipment includes major equipment whereas small
equipment, tools and attachments are ignored, as these have been
charged under the item of overhead. After arranging the list in order, code
numbers have been allocated.

b) Power, Performance, and Maintenance of Plant & Equipment

To decide for choosing the right horsepower, appropriate performance


level, and reasonable maintenance charges, the recommendation of well-
known suppliers has been considered. In order to decide the price level of
any equipment, the average cost has been used, which includes C&F
price, plus duties and taxes, etc.

c) Formulation of Rates of Plant and Equipment

 Equipment rates are computed by calculating the owning cost (i-e fixed
cost) and operating & maintenance cost (variable cost) for the
respective Equipment.
 Owning costs or fixed costs are those which can be predetermined as
accumulating with the passage of time, rather than with the rate of
work. They do not stop when the work stops and spread over the hours
of work during the year. Commonly included in fixed costs are capital
costs after deducting salvage value spread over the economic life of
the equipment, equipment depreciation, interest on investment, taxes,
storage, transportation, and insurance cost. Salvage value is calculated
at the end of the economic life of the Equipment using a discount rate.
 The purchase price is the CIF price for imported Equipment and the ex-
factory price for the locally manufactured or refurbished Equipment
including all applicable taxes.
 Operating costs vary directly with the rate of work. These costs include

(viii)
the labor costs (operator and mechanic), costs of fuel, lubricants (Oils
and lube), tires (tracks), equipment maintenance, and repairs.
 Rates at the district are derived by dividing the owning and operating
costs by the roughness factor assigned to each district. The roughness
factor is based on the Terrain/Soil type present, weather/climate &
temperature prevailing, and accessibility to that district.

Fuel consumption, working efficiency, and maintenance costs have


been fixed after consulting the recommendation of the manufacturers.
Equipment economical life and tire life have been fixed after consulting
several organizations using heavy and light equipment in the present
indigenous conditions.

2.4 FORMULAE FOR CONSTRUCTION ITEMS

All the basic inputs have been updated in the individual rate analysis. These
formulae have been created by appropriate quantitative inputs of the following
items:

Manpower Hour and Number


Material Weight, Volume, Length, and Unit
Plant & Equipment Hour and Number
Overheads, profit, preliminaries, and 25 percent
taxes

2.5 OVERHEADS, PROFIT & PRELIMINARIES

a) Profit

The level of profit is governed by the degree of competition applicable to


the job which is, in turn, a function of the industry‟s current workload. The
appropriate addition is highly discretionary and thus variable.

b) Head Office Overheads

An addition to the estimate needs to be made to the net estimate to cover


all costs incurred in operating the central services provided by head office.
Apart from general management and accountancy, this will normally
include the departments dealing with:

 Tendering / Estimating
 Planning & Design
 Wages and Bonus

Finance Cost: Some companies would include finance costs with head
office overheads, but this will vary from contractor to contractor.

(ix)
The appropriate addition varies with the extent of services provided
centrally and company to company, rather than on-site, and with the size
of the organization.

c) Preliminaries

Preliminaries cost in Civil Engineering works are indirectly related to the


actual quantity of work being carried out. It comprises a definition of
method-related charges, a checklist of items to be accounted for on a
typical Civil Engineering Contract.

Generally, the contract document gives detailed requirements for the


facilities and equipment to be provided for the employer and the
Engineer‟s Representative given in the Bill of Quantities. Thus General
Items given in the BOQ are excluded from the checklist of preliminaries.

The following checklist is representative but not exhaustive which is not


covered in the BOQ or General items section. The list describes the major
preliminaries which are included, implicitly or explicitly, in a typically Civil
Engineering Contract.

 Contractor’s site on costs


 Temporary works (other than those included in unit cost)
 General-purpose plant (other than those included in unit cost)
 Other services, charges and fees

 Site Staff Salaries

All non-productive supervisory staff on site i.e., agents, clerks,


computer operators, security guards, storemen, drivers for staff
vehicles, cleaners, general labour for general clearance, etc.

 Plant Maintenance

Fitters, electricians, and assistants engaged in general plant


maintenance on site (excludes drivers who are provided in the unit
costs)

 Site Transport for Staff and General Use

Vehicles/buses provided for use of staff and others including O & M


costs etc.

 Contractor’s offices rental/ construction/ site huts and associated


running costs.

(x)
 Canteen, welfare / medical

 General office expenditure

 Provision of postage, stationery, and other consumables for


general office use.

 Mobilization and demobilization of resources

 Telecommunications

 Furniture and equipment

 Small tools

 Traffic Control, traffic diversion, and signs

 Fencing

 Protective clothing Health and safety Road lighting

 Cleaning roads etc.

 Progress photographs

 Water Supply

 Electric connection

 Notice boards and signs

 Insurances / bonds / bank guarantees / Employees liabilities


insurance etc.

There will be many other items of preliminaries that may have to be


considered, which probably will be project and site-specific. Preliminaries
percentage can vary from project to project.

d) Tax

Tax has been included as per Government rules.

In the CSR, 25% is added on the estimated unit cost of the items which
includes overheads, taxes, preliminaries, and profit, however, this will vary
with the promulgation of new taxes by Federal and Provincial
Governments from project to project and contractor to contractor.

(xi)
2.6 VARIABLES AFFECTING THE RATE ANALYSIS

Rate Analysis in CSR has been prepared based on the policy explained here
above. However, certain factors are to be considered while deciding about
more realistic rates in special situations.

a) Price Escalation

General and Special escalation have been considered as published by


Government Agencies. However, care is to be exercised to consider
Government Legislation, which may create the condition of Special
Escalation.

b) Double Taxation

In International tenders, a factor is to be considered which may handicap


the contractors from such countries, whose governments have no
agreement with the Government of Pakistan to avoid double taxation. The
effect of this item will be equal to the limit of tax level in such a country.

c) Service Roads

No provision has been made in this rate analysis for road diversion cost or
service road, which the contractor has to construct or maintain as per the
specified scope of works.

d) Extra Overhead for Expatriate Staff

International tenders will require a factor to employ expatriate staff on the


project. The effect of this will be equal to the actual expenses on such
items.

e) Other Factors

Some of the items mentioned in the above text included as overhead Cost
in Estimates of CSR may appear as a B.O.Q item in a tender, the cost of
such items are to be adjusted from the total estimate of the project.

(xii)
LIST OF MANPOWER

S. No. CODE DESCRIPTION UNIT


1 LS-001 Site Engineer Hr
2 LS-002 Asphalt Plant Engineer Hr
3 LS-003 Concrete Plant Engineer Hr
4 LS-004 Foreman Asphalt Hr
5 LS-005 Foreman Earthwork Hr
6 LS-006 Foreman Concrete Hr
7 LS-007 General Foreman Hr
8 LS-008 Supervisor Hr
9 LT-011 Surveyor Hr
10 LT-012 Assistant Surveyor Hr
11 LT-013 Mason (Stone) Hr
12 LT-014 Mason (Brick Work) Hr
13 LT-015 Mason (General) Hr
14 LT-016 Carpenter Hr
15 LT-017 Painter Hr
16 LT-018 Steel Binder /Cutter Hr
17 LT-019 Carpenter Helper Hr
18 LT-020 Scaffolder (Khalasi) Hr
19 LT-021 Welder Hr
20 LT-022 Highly Skilled Labour Hr
21 LX-031 Helper Hr
22 LX-032 Labour Hr
23 LX-033 Heavy Machinery Mechanic Hr
24 LX-034 Vehicle Mechanic Hr
25 LX-035 Operator Plant / Equipment Hr
26 LX-036 Driver Light Vehicle Hr
27 LX-037 Driver Heavy Vehicle Hr
28 LX-038 Assistant Operator Plant / Equipment Hr
29 LX-039 Electrician / Motor Attendant Hr
30 LX-040 Gardner (Mali) Hr

Notes:
Cost of following Manpower has been included elsewhere as under

1. Top Management and Senior Engineers etc., included in the overhead of the
project.
2. All indirect Manpower such as clerk, Typist, Accountant, Lab staff, Workshop
Staff, Store Staff, etc. is included under overhead.
3. All operators of Light and Heavy Duty equipment and plant included in the
hourly rate of the equipment

(xiii)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MS-001 Rock (50 Kgs) Cu.m
MS-002 Stone Random Class "A" Cu.m
MS-003 Stone Random Class "B" Cu.m
MS-004 Stone Random Class "C" Cu.m
MS-005 Stone Random Class "D" Cu.m
MS-006 Stone Dressed Cu.m
MS-007 Crushed Aggregates 2 1/2" down Cu.m
MS-008 Coarse Sand For Cement Works Cu.m
MS-009 Fine Sand For Cement Works Cu.m
MS-010 Aggregate 2" - 1-1/2" For Cement Works Cu.m
MS-011 Aggregate 1-1/2"-3/4" For Cement Works Cu.m
MS-012 Aggregate 3/4" - 3/8" For Cement Works Cu.m
MS-013 Aggregate 3/8"- No. 4 For Cement Works Cu.m
MS-014 Aggregate No. 4 - N0. 200 For Cement Works Cu.m
MR-015 Filler Material (Rock Dust) For Cement Works Cu.m
MR-016 Coarse Sand for Asphalt Works Cu.m
MR-017 Fine Sand for Asphalt Works Cu.m
MR-018 Aggregate 2" - 1-1/2" for Asphalt Works Cu.m
MR-019 Aggregate 1-1/2"-3/4" for Asphalt Works Cu.m
MR-020 Aggregate 3/4" - 3/8" for Asphalt Works Cu.m
MR-021 Aggregate 3/8"- No. 4 for Asphalt Works Cu.m
MR-022 Aggregate No. 4 - N0. 200 for Asphalt Works Cu.m
ME-023 Filler Material (Rock Dust) for Asphalt Works Cu.m
ME-024 Crushed / Natural Aggregate Base "A" Cu.m
ME-025 Crushed / Natural Aggregate Base "B" Cu.m
ME-027 Granular Sub Base (A) Cu.m
ME-028 Granular Sub Base (B) Cu.m
ME-029 Soil Class - A 1 (A) Cu.m
ME-030 Soil Class - A 1 (B) Cu.m
ME-031 Soil Class - A 2 (4) Cu.m
ME-032 Soil Class - A 2 (5) Cu.m
ME-033 Soil Class - A 2 (6) Cu.m
ME-034 Soil Class - A 2 (7) Cu.m
ME-035 Soil Class - A 3 Cu.m
ME-036 Soil Class - A 4 Cu.m
ME-037 Soil Class - A 5 Cu.m
ME-038 Soil Class - A 6 Cu.m
ME-039 Soil Class - A 7-5 Cu.m

(xiv)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


ME-040 Soil Class - A 7-6 Cu.m
ME-041 Sweet Soil for Plantation (Bhal) Cu.m
ME-042 Blasting Material Cu.m
ME-043 Electric Charges Commercial kWh
ME-044 Gelatinous Explosive Kg
ME-045 Emulsion Explosive Kg
ME-046 Powder Explosive Kg
ME-047 Detonating Cord M
ME-048 Plain Detonator No 8 Each
ME-049 Safety Fuse M
ME-050 Connecting Wire M
MS-051 Shotcrete Accelerator Kg
MR-052 Asphalt Grade 60/70 Ton
MR-053 Asphalt Grade 60/70 Cu.m
MR-054 Asphalt Grade 80/100 Ton
MR-055 Asphalt Grade 80/100 Cu.m
MR-056 Asphalt M.C 70 Ton
MR-057 Asphalt M.C 70 Cu.m
MR-058 Asphalt M.C 250 Ton
MR-059 Asphalt M.C 250 Cu.m
MR-060 Asphalt M.C 800 Ton
MR-061 Asphalt M.C 800 Cu.m
MR-062 Asphalt R.C 70 Ton
MR-063 Asphalt R.C. 70 Cu.m
MR-064 Asphalt R.C 250 Ton
MR-065 Asphalt R.C. 250 Cu.m
MR-066 Asphalt R.C 800 Ton
MR-067 Asphalt R.C 800 Cu.m
MR-068 Asphalt SS 1 Ton
MR-069 Asphalt SS 1 Cu.m
MR-070 Asphalt SS 1H Ton
MR-071 Asphalt SS 1H Cu.m
MR-072 Asphalt R.S.1 Ton
MR-073 Asphalt R.S.1 Cu.m
MR-074 Asphalt R.S.2 Ton
MR-075 Asphalt R.S.2 Cu.m
MR-076 Heavy Oil L
MS-077 Cement Type - 1 (OPC) BAG

(xv)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MS-078 Cement Type - II (Low SR) BAG
MS-082 Admixture Type A (Water Reducing) L
MS-083 Admixture Type B (Retarder) L
MS-084 Admixture Type C (Accelerator) L
MS-085 Admixture Type D (Water Reducing & Retarding) L
MS-086 Admixture Type E (Water Reducing & Accelerating) L
MS-087 Admixture Type F (Water Reducing High Range) L
MS-088 Admixture Type G (Water Reducing High Range & Retarding) L
MS-089 Curing Compound L
MS-090 Steel Grade 40 Ton
MS-091 Steel Grade 60 Ton
MS-092 Prestressing Strand 3/8 " , 1/2 " Ton
MS-093 Steel Wire Mesh 4" x 4",guage 9 Kg
MS-094 Cold Steel Wire AASHTO M-32 (reinforcement binder) Ton
MS-095 Structures Shapes ASTM A-36 Ton
MS-096 Concrete Pipe Non Reinf. 150 mm Ø M
MS-097 Concrete Pipe Non Reinf. 200 mm Ø M
MS-098 Concrete Pipe Non Reinf. 250 mm Ø M
MS-099 RCC Pipe Class II 310 mm Ø (AASHTO M-170) M
MS-100 RCC Pipe Class II 380 mm Ø (AASHTO M-170) M
MS-101 RCC Pipe Class II 460 mm Ø (AASHTO M-170) M
MS-102 RCC Pipe Class II 610 mm Ø (AASHTO M-170) M
MS-103 RCC Pipe Class II 760 mm Ø (AASHTO M-170) M
MS-104 RCC Pipe Class II 910 mm Ø (AASHTO M-170) M
MS-105 RCC Pipe Class II 1070 mm Ø (AASHTO M-170) M
MS-106 RCC Pipe Class II 1220 mm Ø (AASHTO M-170) M
MS-107 RCC Pipe Class II 1520 mm Ø (AASHTO M-170) M
MS-108 RCC Pipe Class IV 310 mm Ø (AASHTO M-170) M
MS-109 RCC Pipe Class IV 380 mm Ø (AASHTO M-170) M
MS-110 RCC Pipe Class IV 460 mm Ø (AASHTO M-170) M
MS-111 RCC Pipe Class IV 610 mm Ø (AASHTO M-170) M
MS-112 RCC Pipe Class IV 760 mm Ø (AASHTO M-170) M
MS-113 RCC Pipe Class IV 910 mm Ø (AASHTO M-170) M
MS-114 RCC Pipe Class IV 1070 mm Ø (AASHTO M-170) M
MS-115 RCC Pipe Class IV 1220 mm Ø (AASHTO M-170) M
MS-116 RCC Pipe Class IV 1520 mm Ø (AASHTO M-170) M
MS-117 Steel / Metal Bearing Devices Kg
MS-118 Bitumen Impregnated Fiber Board 12 mm Sq.m

(xvi)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MS-119 Neoprene Rubber Sheet 6mm thcik Sq.m
MS-120 Asphalt felt 3 Ply Sq.m
MS-121 PVC Water Stops (6"wide) 12 mm thcik M
MS-122 Polysulphide Joint Sealant Kg
Elastomeric Bearing pad M-183.local (Pakistan make),PSQCA
MS-123 Cu.cm
Certified
Bridge Expansion Joint with Two Extruded Aluminum Alloy
MS-124 Sections (50 mm Movement) Imported (European/ American M
make)
Bridge Expansion Joint with Cast Aluminum Alloy Cantilever
MS-125 Teeth (110 mm Movement) - Imported (European/ American M
make)
Bridge Expansion Joint with Cast Aluminum Alloy Cantilever
MS-126 Teeth (300 mm Movement) - Imported (European/American) M
make)
65 mm-Expansion Joint -Nosing-Molded Vulcanized Elastomeric
MS-127 Single Section (One Piece, Monoblock) -Imported M
(European/American make)
MS-128 Steel Expansion Joint (Local) Kg
MS-129 Steel Block C150x100x5 (Length 350mm) Each
MS-130 Steel Post C150x100x5 (Length 1830mm) Each
MS-131 W6x15 Steel Post (Length 1830mm) Each
MS-132 Steel Backing Plate 318 x 270 x 12 Each
MS-133 Metal Beam Rail 310 mm Wide M
MS-134 Metal Rail End Piece Each
MS-135 Cementitious Grout (High Strength) Cu.m
MS-136 PVC Water Stopper (width 8") 12 mm thick M
MS-137 Brick Class "A" Each
MS-138 Brick Class "B" Each
MS-139 Bitumen Impregnated Fiber Board 25 mm Sq.m
MX-140 Warning Tape (3" Wide). M
MS-142 Precast Pre-Stressed Fence Post (140x140x2400)mm Each
Precast RCC Lateral Fence Post (200x200x2100)mm incl Steel
MS-143 Each
U-Strips (3x150x2400)
MX-144 Coolant L
Elastomeric Bearing Pads (According to size and thickness
MS-145 Cu.cm
Imported (Asian Make)
MS-152 Trumpets/bearing Plate (240x240)mm for (10-11-12) Each
MS-153 Wedges 5" Imported Each
MR-154 Rectangular Concrete Paver - 60 mm (200mmx100mmx60mm) Sq.m
MR-155 Rectangular Concrete Paver - 80 mm (200mmx100mmx80mm) Sq.m

(xvii)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MX-156 Welded Reinforcement Concrete Mesh 4"x4" dia 6mm Sq.m
MS-157 Shuttering A Cu.m
MS-158 Shuttering B Cu.m
MS-159 Shuttering C Cu.m
MS-160 Shuttering D Cu.m
MS-161 Shuttering E Cu.m
MS-162 Scaffolding (A) Cu.m
MS-163 Scaffolding (B) Sq.m
MS-164 Mobilization of 30 Ton Trailer for Pilling Equipment M
MS-165 Mobilization of Confirmatory Boring Equipment M
MS-166 Reinforcement G-60 (404b) Composite Ton
MS-167 Polythene Sheet Sq.m
MS-168 Bitumastic Joint Sealant Kg
MS-169 Mobilization of Piling Equipment (1.1m to 2 m dia) M
MS-170 Steel Casing for Piles (8-10)mm thick Ton
MS-171 Bentonite Powder Kg
MS-172 Plat Form (Shuttering) for Pile Test 120 Tons LS
MS-173 Plat Form (Shuttering) 240 Tons LS
MS-174 Plat Form (Shuttering) 360 Tons LS
MS-175 Plat Form (Shuttering) 550 Tons LS
MS-176 Plat Form (Shuttering) Test 800 Tons LS
MS-177 Plat Form (Shuttering) Test 1000 Tons LS
MS-178 Plat Form (Shuttering) Test 1200 Tons LS
MX-179 G.I Pipe 3" Outer Dia 8 Guage thickness M
MX-180 CR Reflective Paint for Kerb Stone L
MX-181 Epoxy Adhesive (2 Components) L
MX-182 Cats-Eye Single (Raised Profile) - Plastic 100x100 mm Each
MX-183 Cats-Eye Double (Raised Profile) - Plastic 100x100 mm Each
MX-184 Cats-Eye Single (Raised Profile) - Aluminum 100x100 mm Each
MX-185 Cats-Eye Double (Raised Profile) - Aluminum 100x100 m Each
Traffic Sign Cat 1i - 90 cm Sign Boards in high intensity
MX-186 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Cat 2i- 90 cm Sign Boards in high intensity
MX-187 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Category 3C- Sign Boards in high intensity
MX-188 Sq.m
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
MX-189 Pavement Marking Non Reflecting (TP) Paint Kg
MX-190 Pavement Marking Non Reflecting (CR) Paint L
MR-191 Pre-Cast Concrete Kerb Stone (457hx152wx300L)mm Each

(xviii)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MX-192 Pavement Marking Reflecting (CR) Paint L
MX-193 Steel Bit Each
MX-194 Diamond Bit Each
MX-195 Tungsten Carbide Bits SET
MX-196 Red Oxide Paint L
MX-197 Quick Lime Kg
MX-198 Precast Concrete Blocks (4'x4') Each
MX-199 Synthetic Enamel Paint L
MX-200 GMS Barbed Wire 12 guage/14g Kg
MX-201 Angle Iron Assorted Kg
MX-202 Steel Channels Kg
MX-203 Corrugated MS duct (sheath)(2.5"-3" Dia) M
MX-204 Stressing Block Anchor Head (10-11-12 strands) 12/.5" holes Each
MX-205 G.I Pipe 6" Outer Dia Schedule 40 M
MX-206 Steel Sheath Casing M
MX-207 GMS Screw, Nuts, Bolts and Washers Kg
MX-208 Rubber Speed Ramp (w345xh40) mm M
MX-209 Pavement Marking Reflecting (TP) Paint Kg
MX-210 Galvanized Flat Steel Fasteners and Washers Kg
MX-211 Galvanized U-Bolts Clamp with 2 Nuts and Tie Bolts Kg
MX-212 Galvanized Supporting Hooks Cast in Precast Posts Each
MX-213 Galvanized Chain Link Wire mesh Fabric Sq.m
MX-214 Galvanized Wire 3.76mm Ø Tension, 3mm Ø Stirrups Kg
MX-215 MS Sheet (Plates) 2.5-3mm thick Kg
MX-216 Galvanization Kg
Galvanized Wire Mesh Fence 10 SWG (50 mm x 50 mm) 3mm
MX-217 Sq.m
thick
MX-218 Welding Rods Each
MX-219 Water 1000 L
MX-220 High speed Diesel L
MX-221 Super Gasoline L
MX-222 Regular Gasoline L
MX-223 Engine Oil (All Type) L
MX-224 Grease Kg
MX-225 MS Scaffolding Pipe 2" Dia Kg
MX-226 Scaffolding Clamps Each
MX-227 Safety Cone Plastic Small with Reflective Strips 18" Each
MX-228 Safety Cone Plastic Large with Reflective Strips 28" Each

(xix)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MX-229 Guard Rail Reflector (Butterfly type) size 120x70mm Each
MX-230 Concrete Barrier Reflector Single side size 155x75mm Each
MX-231 Plantation Trees (local inhabitant) Each
MX-232 Grass Sod / Turf (Korean / American / ) 1' x 1' size Sq.m
MX-233 Shrubs / Hedges (Sanatha or any local) Sq.m
MX-234 Grass Sod / Turf (Local / Dakha) 1' x 1' size Sq.m
MX-235 Axle & Transmission oils L
MX-236 Hydraulic Oil/fluids L
MX-237 Fertilizer DAP (18% nitrogen & 46% phosphorus) Kg
MX-238 Aluminum Speed Ramp 335x330x40 mm Each
MX-239 Aluminum Divider Size 150x90x30mm with single side Reflector Each
Aluminum Divider Size 150x90x30mm with double side
MX-240 Each
Reflector
MX-241 Aluminum Divider Size 150x90x45mm with Single side Reflector Each
Aluminum Divider Size 150x90x45mm with Double side
MX-242 Each
Reflector
Traffic Sign Cat 3a- Sign Boards in high intensity Reflective
MX-243 Each
Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Cat 3b- Sign Boards in high intensity Reflective
MX-244 Each
Sheeting Laminated on 1.8 mm thick G.I Sheets
MX-245 Plastic Moulded Antiglare Shield (w200mmxh800 mm) Each
MX-246 Tubular Markers(Delineator Post) h 90cm Each
MX-247 Tubular Markers Post h 45cm Each
MX-248 Coarse Sand for Dry Works Cu.m
MX-249 Fine Sand for Dry Works Cu.m
MX-250 Aggregate 2" - 1-1/2" for Dry Works Cu.m
MX-251 Aggregate 1-1/2"-3/4" for Dry Works Cu.m
MX-252 Aggregate 3/4" - 3/8" for Dry Works Cu.m
MX-253 Aggregate 3/8"- No. 4 for Dry Works Cu.m
MX-254 Aggregate No. 4 - N0. 200 Dry Works Cu.m
MX-255 Filler (Rock Dust) Material Dry Works Cu.m
MX-256 Geotextile 136 gm/sm Sq.m
MX-257 Geotextile 320gm/sm Sq.m
MX-258 Neoprene Rubber Sheet 12mm thick Sq.m
MX-259 LPG Kg
MR-260 Royalty Cost Cu.m
MX-261 Axle oils/Swing machinery Oil L
MX-262 Final Drive Oil L
MX-263 Damper case Oil L

(xx)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


MX-264 Borehole Sample Testing in Soil Strata M
MX-265 Cementitious Grout (High Strength) Kg
MS-266 PVC Water Stopper (width 6") 12 mm thick M
MX-267 Borehole Sample Testing in Gravel Strata M
MX-268 Borehole Sample Testing in Rock Strata M
Elastomeric Bearing Pads (According to size and thickness)
MS-269 Cu.cm
Important (Europe/American make)
MS-270 Plat Form (Shuttering) Test 1500 Tons LS
MS-271 Plat Form (Shuttering) Test 2000 Tons LS
MS-272 Plat Form (Shuttering) Test 2500 Tons LS
50 mm-Expansion Joint-Nosing type with two Aluminum Alloy
MS-273 M
Sections and Elastomeric Profile Imported (Asian Make)
110 mm-Expansion Joint -Cantilever Saw teeth with Aluminum
MS-274 M
Alloy Sections Imported (Asian Make)
65 mm-Expansion Joint -Nosing-Molded Vulcanized Elastomeric
MS-275 M
Single Section (One Piece, Monoblock) Imported (Asian Make)
MX-276 G.I Pipe 8" Outer Dia Schedule 40 M
Traffic Sign Cat 1ii - 105 cm Sign Boards in HIP Grade
MX-277 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Cat 2ii- 105 cm Sign Boards in HIP Grade
MX-278 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Cat 1iii - 120 cm Sign Boards in HIP Grade
MX-279 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
Traffic Sign Cat 2iii- 120 cm Sign Boards in HIP Grade
MX-280 Each
Reflective Sheeting Laminated on 1.8 mm thick G.I Sheets
MX-281 G.I Pipe 4" Outer Dia 8 Guage M
Bridge Expansion Joint 50 mm Movement Joint Two Profile
MS-282 Alloy Aluminum 6063 T 6 Continuous CR Profile, Sockets Studs M
Local (Pakistan Make), PSQCA Certified
Bridge Expansion Joint 65 mm Movement W Section CR
MS-283 Vulcanized Molded Nosing Expansion Joint Local (Pakistan M
Make), PSQCA Certified
Digital Printing Sign Traffic Cat 1i - 90 cm Sign Boards in high
MX-284 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 1ii - 105 cm Sign Boards in high
MX-285 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 1iii - 120 cm Sign Boards in high
MX-286 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 2i- 90 cm Sign Boards in high
MX-287 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets

(xxi)
LIST OF MATERIAL

CODE DESCRIPTION UNIT


Digital Printing Traffic Sign Cat 2ii- 105 cm Sign Boards in high
MX-288 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 2iii- 120 cm Sign Boards in high
MX-289 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 3a- Sign Boards in high
MX-290 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic Sign Cat 3b- Sign Boards in high
MX-291 intensity Reflective Sheeting Laminated on 1.8 mm thick G.I Each
Sheets
Digital Printing Traffic sign Category 3C Sign Boards
MX-292 in high intensity Reflective Sheeting Sq.m
Signs Laminated on 1.8 mm thick G.I Sheets
Bridge Expansion Joint 50 mm Movement Indigenous
MS-293 Expansion Joint 15 mm thick two vertical Steel Plates welded 10 M
mm round steel bars, Local (Pakistan Make), PSQCA Certified
Bridge Expansion Joint 110 mm Movement Saw teeth Four
MS-294 profile aluminum alloy 6063-T 6 continuous CR Profile noise M
free Local (Pakistan Make), PSQCA Certified
Bridge Expansion Joint 80 mm Steel Grade EN10025 Sound
MS-295 isolated Silent Type Expansion Joint with SINUS Plates M
Imported (Asian Make)
Fiber glass Reinforced Polyester Grating Size (600 mm x 600
MS-297 Each
mm) Class-D 400 with Frame (Imported)
Fiber glass Reinforced Polyester Grating Size (876 mm x 603
Ms-298 mm x 250 mm ) Class-C 250 with Frame - Side Walk Type Each
(Imported)

(xxii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Attock Bahawal Bahawal Bhakkar Chakwal


nagar pur
PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,303.53 8,287.50 8,280.97 8,289.02 8,300.80
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,481.86 6,470.02 6,465.20 6,471.15 6,479.84
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,442.53 5,435.48 5,432.61 5,436.15 5,441.32
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,111.92 6,102.61 6,098.82 6,103.49 6,110.33
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,164.30 5,156.56 5,153.40 5,157.29 5,162.98
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,568.52 4,562.40 4,559.90 4,562.98 4,567.48
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,352.74 2,345.11 2,342.00 2,345.83 2,351.44
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,159.19 2,154.72 2,152.90 2,155.15 2,158.43
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,592.62 5,580.37 5,575.38 5,581.53 5,590.53
PE-011 Compressor 300 CFM Rs/Hr 3,738.47 3,737.31 3,736.84 3,737.42 3,738.27
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.77 429.76 429.74 429.76 429.77
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 461.16 461.16 461.15 461.16 461.16
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.90 399.88 399.87 399.88 399.89
PE-016 Plate Compactor Rs/Hr 671.43 671.03 670.86 671.07 671.36
PE-017 Pugmill 40 Tons per hour Rs/Hr 5,013.60 4,902.67 4,857.45 4,913.18 4,994.67
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,181.83 5,174.95 5,172.16 5,175.61 5,180.65
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,099.03 4,092.36 4,089.64 4,092.99 4,097.89
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,024.81 4,018.49 4,015.92 4,019.09 4,023.73
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,891.84 5,878.73 5,873.39 5,879.98 5,889.61
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,306.14 7,288.33 7,281.07 7,290.02 7,303.10
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,149.14 9,125.25 9,115.50 9,127.51 9,145.07
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
429.00 425.84 424.55 426.14 428.47
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
609.62 604.22 602.01 604.73 608.70
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,765.41 5,749.66 5,743.25 5,751.16 5,762.72
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,262.57 7,251.52 7,247.02 7,252.57 7,260.69
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,154.86 6,145.73 6,142.00 6,146.59 6,153.30
PR-033 Tandem Roller 12 T Rs/Hr 3,913.66 3,907.01 3,904.30 3,907.63 3,912.53
PR-034 Tandem Roller 8 T Rs/Hr 3,373.25 3,367.89 3,365.71 3,368.40 3,372.34
PR-035 Tandem Roller 6 T Rs/Hr 2,539.18 2,533.82 2,531.64 2,534.33 2,538.27
PR-036 Tandem Roller 1.50 T Rs/Hr 1,703.28 1,702.29 1,701.89 1,702.39 1,703.11
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 891.02 891.02 891.02 891.02 891.02
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 890.81 890.81 890.81 890.81 890.81
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,500.70 3,486.89 3,481.26 3,488.20 3,498.34
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,426.91 3,413.16 3,407.56 3,414.47 3,424.56
PR-042 Static Tandem Roller 12 T Rs/Hr 2,006.84 1,998.81 1,995.53 1,999.57 2,005.46
PR-043 Tandem Roller 10 T Rs/Hr 3,607.51 3,602.03 3,599.80 3,602.56 3,606.58
PR-044 Power Broom Rs/Hr 299.72 292.27 289.23 292.97 298.45
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 891.02 891.02 891.02 891.02 891.02
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-048 Asphalt Plant 140 T Rs/Hr 29,070.82 28,904.42 28,836.59 28,920.19 29,042.44
PR-049 Asphalt Plant 120 T Rs/Hr 23,060.55 22,956.96 22,914.73 22,966.77 23,042.88
PR-050 Asphalt Plant 40 T Rs/Hr 9,762.55 9,682.57 9,649.97 9,690.16 9,748.91
PR-051 Asphalt Plant 20 T Rs/Hr 5,972.88 5,917.59 5,895.05 5,922.83 5,963.45
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,650.30 11,637.32 11,632.04 11,638.55 11,648.08
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,603.99 10,579.73 10,569.84 10,582.03 10,599.85
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 891.02 891.02 891.02 891.02 891.02
PR-057 Asphalt Cutter Rs/Hr 406.75 406.64 406.60 406.65 406.73
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 891.56 891.56 891.56 891.56 891.56
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 891.02 891.02 891.02 891.02 891.02
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
891.56 891.56 891.56 891.56 891.56
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,775.64 5,769.35 5,766.78 5,769.94 5,774.57
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.56 891.56 891.56 891.56 891.56
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 891.02 891.02 891.02 891.02 891.02
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,207.18 1,197.09 1,192.98 1,198.04 1,205.46
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,425.07 6,405.75 6,397.87 6,407.57 6,421.78
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,256.30 1,246.65 1,242.71 1,247.57 1,254.66
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 676.90 667.24 663.31 668.16 675.26
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,148.20 3,139.61 3,136.11 3,140.42 3,146.73
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,347.52 2,340.36 2,337.44 2,341.04 2,346.30
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,028.69 1,027.23 1,026.64 1,027.37 1,028.44

(xxiii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Attock Bahawal Bahawal Bhakkar Chakwal


nagar pur
PS-077 Concrete Cutter Rs/Hr 406.75 406.64 406.60 406.65 406.73
PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,543.53 16,199.99 16,059.96 16,232.55 16,484.91
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,229.97 34,081.38 34,020.82 34,095.46 34,204.62
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.92 427.91 427.91 427.91 427.92
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,604.99 7,519.11 7,484.10 7,527.24 7,590.33
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,623.78 9,426.25 9,345.74 9,444.97 9,590.08
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,542.20 7,283.28 7,177.74 7,307.82 7,498.03
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 681.60 670.15 665.48 671.23 679.65
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,556.24 1,554.24 1,553.42 1,554.42 1,555.91
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,741.38 15,718.48 15,709.15 15,720.65 15,737.48
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,435.76 8,414.57 8,405.94 8,416.58 8,432.14
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,097.77 1,088.11 1,084.16 1,089.02 1,096.13
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,142.16 1,128.49 1,122.90 1,129.78 1,139.82
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.90 82.80 82.76 82.82 82.89
PX-091 Tractor 80 HP Rs/Hr 1,451.65 1,449.46 1,448.57 1,449.67 1,451.28
PX-092 Tractor 50 HP Rs/Hr 1,011.00 1,009.82 1,009.34 1,009.93 1,010.80
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,328.85 3,315.96 3,310.71 3,317.19 3,326.65
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,198.78 1,192.58 1,190.06 1,193.17 1,197.72
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,922.69 2,919.48 2,918.17 2,919.78 2,922.14
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.87 1,174.96 1,174.58 1,175.04 1,175.72
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.80 1,069.06 1,068.76 1,069.13 1,069.67
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,557.42 1,555.97 1,555.38 1,556.11 1,557.18
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,049.17 1,047.72 1,047.13 1,047.86 1,048.92
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 523.14 522.67 522.48 522.72 523.06
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 882.21 881.63 881.40 881.69 882.11
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,501.86 3,494.30 3,491.22 3,495.02 3,500.57
PX-103 Crane up to 55 Ton Rs/Hr 6,862.64 6,838.66 6,828.88 6,840.93 6,858.55
PX-104 Crane Upto 25 ton Rs/Hr 5,602.84 5,584.01 5,576.34 5,585.80 5,599.63
PX-105 Electric Diaphragm Pump Rs/Hr 117.18 116.67 116.47 116.72 117.09
PX-106 Sand Blasting Machine Rs/Hr 864.20 863.75 863.56 863.79 864.12
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,888.76 5,881.89 5,879.09 5,882.54 5,887.59
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,431.82 1,430.18 1,429.51 1,430.34 1,431.54
PX-109 Welding Plant Rs/Hr 69.07 68.98 68.94 68.98 69.05
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,502.43 3,500.83 3,500.17 3,500.98 3,502.16
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,216.96 5,214.68 5,213.76 5,214.90 5,216.57
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,132.00 4,111.96 4,103.79 4,113.86 4,128.58
PX-113 Forging /Shape Machine Rs/Hr 467.93 467.57 467.43 467.60 467.86
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,363.51 1,362.72 1,362.39 1,362.79 1,363.39
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,378.36 2,364.04 2,358.21 2,365.40 2,375.91
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,910.49 1,903.52 1,900.68 1,904.18 1,909.30
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.74 1,058.20 1,057.99 1,058.26 1,058.66
PX-118 Diesel Generator 5 KVA Rs/Hr 552.75 552.69 552.66 552.70 552.74
PX-119 Steel Rolling Machine Rs/Hr 359.56 356.38 355.07 356.67 359.00
PX-120 Diesel Generator 13 KVA Rs/Hr 801.07 801.00 800.97 801.02 801.06

(xxiv)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Chiniot D.G.Khan Faisalabad Gujranwala Gujrat

PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,294.26 8,281.23 8,294.00 8,300.15 8,300.83
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,475.02 6,465.40 6,474.82 6,479.36 6,479.87
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,438.45 5,432.73 5,438.34 5,441.04 5,441.34
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,106.54 6,098.97 6,106.38 6,109.95 6,110.35
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,159.82 5,153.53 5,159.70 5,162.67 5,163.00
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,564.98 4,560.00 4,564.88 4,567.23 4,567.49
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,348.33 2,342.12 2,348.20 2,351.13 2,351.46
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,156.61 2,152.98 2,156.53 2,158.25 2,158.44
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,585.54 5,575.58 5,585.33 5,590.04 5,590.56
PE-011 Compressor 300 CFM Rs/Hr 3,737.80 3,736.86 3,737.78 3,738.22 3,738.27
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76 429.74 429.76 429.77 429.77
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 461.16 461.15 461.16 461.16 461.16
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.89 399.87 399.89 399.89 399.89
PE-016 Plate Compactor Rs/Hr 671.21 670.87 671.19 671.35 671.36
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,949.46 4,859.29 4,947.62 4,990.21 4,994.94
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,177.85 5,172.27 5,177.74 5,180.37 5,180.66
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,095.17 4,089.75 4,095.06 4,097.63 4,097.91
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,021.15 4,016.03 4,021.05 4,023.48 4,023.75
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,884.26 5,873.61 5,884.05 5,889.08 5,889.64
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,295.84 7,281.37 7,295.55 7,302.38 7,303.14
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,135.33 9,115.90 9,134.93 9,144.10 9,145.12
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
427.18 424.61 427.12 428.33 428.47
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
606.50 602.10 606.41 608.49 608.72
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,756.31 5,743.51 5,756.04 5,762.09 5,762.76
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,256.18 7,247.20 7,256.00 7,260.24 7,260.71
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,149.58 6,142.16 6,149.43 6,152.93 6,153.32
PR-033 Tandem Roller 12 T Rs/Hr 3,909.82 3,904.40 3,909.71 3,912.25 3,912.55
PR-034 Tandem Roller 8 T Rs/Hr 3,370.16 3,365.80 3,370.06 3,372.12 3,372.35
PR-035 Tandem Roller 6 T Rs/Hr 2,536.09 2,531.73 2,535.99 2,538.06 2,538.28
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.71 1,701.91 1,702.69 1,703.07 1,703.12
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,336.30 4,330.78 4,336.19 4,338.79 4,339.08
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,005.71 4,000.29 4,005.61 4,008.17 4,008.45
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,939.17 3,934.03 3,939.06 3,941.48 3,941.76
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,492.72 3,481.49 3,492.49 3,497.79 3,498.37
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,418.96 3,407.79 3,418.73 3,424.01 3,424.59
PR-042 Static Tandem Roller 12 T Rs/Hr 2,002.18 1,995.66 2,002.05 2,005.14 2,005.48
PR-043 Tandem Roller 10 T Rs/Hr 3,604.35 3,599.89 3,604.26 3,606.36 3,606.59
PR-044 Power Broom Rs/Hr 295.41 289.36 295.28 298.15 298.45
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 845.20 843.99 845.18 845.75 845.81
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 440.11 437.96 440.06 441.08 441.19
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,119.42 1,111.99 1,119.27 1,122.79 1,123.18
PR-048 Asphalt Plant 140 T Rs/Hr 28,974.61 28,839.35 28,971.85 29,035.73 29,042.83
PR-049 Asphalt Plant 120 T Rs/Hr 23,000.65 22,916.44 22,998.93 23,038.71 23,043.12
PR-050 Asphalt Plant 40 T Rs/Hr 9,716.30 9,651.31 9,714.98 9,745.69 9,749.09
PR-051 Asphalt Plant 20 T Rs/Hr 5,940.90 5,895.96 5,939.99 5,961.21 5,963.57
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,560.25 11,547.97 11,560.01 11,565.80 11,566.45
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,642.80 11,632.25 11,642.57 11,647.55 11,648.11
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,589.96 10,570.24 10,589.56 10,598.87 10,599.91
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 949.82 948.48 949.80 950.43 950.51
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,642.80 11,632.25 11,642.57 11,647.55 11,648.11
PR-057 Asphalt Cutter Rs/Hr 406.69 406.60 406.68 406.73 406.73
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,625.78 9,547.25 9,624.18 9,661.27 9,665.40
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,045.34 32,011.91 32,044.66 32,060.45 32,062.21
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,695.37 1,683.96 1,695.14 1,700.53 1,701.12
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,772.00 5,766.88 5,771.90 5,774.32 5,774.58
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.25 890.81 891.24 891.45 891.47
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,095.59 1,092.68 1,095.53 1,096.90 1,097.06
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,201.35 1,193.14 1,201.18 1,205.05 1,205.48
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,413.89 6,398.19 6,413.58 6,420.99 6,421.82
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,250.73 1,242.87 1,250.57 1,254.26 1,254.68
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 671.31 663.47 671.17 674.87 675.28
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,143.23 3,136.25 3,143.09 3,146.39 3,146.75
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,343.38 2,337.56 2,343.26 2,346.01 2,346.31
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.85 1,026.66 1,027.82 1,028.38 1,028.45

(xxv)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Chiniot D.G.Khan Faisalabad Gujranwala Gujrat

PS-077 Concrete Cutter Rs/Hr 406.69 406.60 406.68 406.73 406.73


PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,344.90 16,065.66 16,339.20 16,471.08 16,485.74
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,144.05 34,023.28 34,141.59 34,198.63 34,204.96
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91 427.91 427.91 427.92 427.92
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,555.34 7,485.53 7,553.91 7,586.88 7,590.54
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,509.57 9,349.01 9,506.29 9,582.13 9,590.56
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,392.50 7,182.04 7,388.20 7,487.60 7,498.64
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 674.98 665.67 674.79 679.18 679.67
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,555.09 1,553.45 1,555.04 1,555.82 1,555.91
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,728.14 15,709.53 15,727.76 15,736.55 15,737.53
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,423.51 8,406.29 8,423.16 8,431.29 8,432.19
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,092.18 1,084.33 1,092.02 1,095.73 1,096.14
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,134.25 1,123.14 1,134.04 1,139.27 1,139.87
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.85 82.76 82.85 82.89 82.89
PX-091 Tractor 80 HP Rs/Hr 1,450.38 1,448.60 1,450.35 1,451.19 1,451.28
PX-092 Tractor 50 HP Rs/Hr 1,010.32 1,009.36 1,010.30 1,010.75 1,010.80
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,321.40 3,310.93 3,321.18 3,326.13 3,326.68
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,195.20 1,190.16 1,195.09 1,197.47 1,197.74
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,920.83 2,918.23 2,920.78 2,922.01 2,922.15
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.34 1,174.60 1,175.33 1,175.68 1,175.72
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.37 1,068.77 1,069.36 1,069.64 1,069.67
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.58 1,555.40 1,556.56 1,557.12 1,557.18
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,048.33 1,047.15 1,048.31 1,048.87 1,048.93
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.87 522.49 522.86 523.04 523.06
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.87 881.41 881.87 882.08 882.11
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,497.49 3,491.35 3,497.37 3,500.27 3,500.59
PX-103 Crane up to 55 Ton Rs/Hr 6,848.77 6,829.28 6,848.37 6,857.58 6,858.60
PX-104 Crane Upto 25 ton Rs/Hr 5,591.96 5,576.65 5,591.64 5,598.87 5,599.68
PX-105 Electric Diaphragm Pump Rs/Hr 116.88 116.48 116.88 117.06 117.09
PX-106 Sand Blasting Machine Rs/Hr 863.94 863.57 863.93 864.11 864.13
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,884.79 5,879.20 5,884.67 5,887.31 5,887.60
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.87 1,429.54 1,430.85 1,431.48 1,431.55
PX-109 Welding Plant Rs/Hr 69.02 68.94 69.01 69.05 69.05
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.51 3,500.20 3,501.48 3,502.09 3,502.16
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,215.63 5,213.80 5,215.61 5,216.47 5,216.57
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,120.41 4,104.13 4,120.08 4,127.78 4,128.63
PX-113 Forging /Shape Machine Rs/Hr 467.72 467.43 467.71 467.85 467.87
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,363.05 1,362.40 1,363.04 1,363.34 1,363.39
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,370.08 2,358.45 2,369.84 2,375.34 2,375.95
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,906.46 1,900.80 1,906.34 1,909.02 1,909.31
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.44 1,057.99 1,058.42 1,058.63 1,058.66
PX-118 Diesel Generator 5 KVA Rs/Hr 552.71 552.66 552.71 552.74 552.74
PX-119 Steel Rolling Machine Rs/Hr 357.71 355.13 357.65 358.88 359.02
PX-120 Diesel Generator 13 KVA Rs/Hr 801.03 800.97 801.03 801.06 801.06

(xxvi)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Hafizabad Jhang Jhelum Kasur Khanewal

PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,297.72 8,290.88 8,300.80 8,294.30 8,284.88
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,477.57 6,472.52 6,479.84 6,475.04 6,468.09
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,439.97 5,436.97 5,441.32 5,438.47 5,434.33
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,108.54 6,104.57 6,110.33 6,106.56 6,101.09
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,161.49 5,158.19 5,162.98 5,159.84 5,155.29
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,566.30 4,563.69 4,567.48 4,564.99 4,561.39
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,349.97 2,346.72 2,351.44 2,348.35 2,343.86
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,157.57 2,155.67 2,158.43 2,156.62 2,153.99
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,588.18 5,582.95 5,590.53 5,585.57 5,578.37
PE-011 Compressor 300 CFM Rs/Hr 3,738.05 3,737.56 3,738.27 3,737.80 3,737.12
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.77 429.76 429.77 429.76 429.76
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 461.16 322.64 335.79 283.94 300.15
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.89 399.88 399.89 399.89 399.88
PE-016 Plate Compactor Rs/Hr 671.29 671.11 671.36 671.21 670.96
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,973.38 4,926.06 4,994.67 4,949.72 4,884.53
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,179.33 5,176.41 5,180.65 5,177.86 5,173.83
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,096.61 4,093.76 4,097.89 4,095.19 4,091.27
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,022.52 4,019.83 4,023.73 4,021.17 4,017.46
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,887.09 5,881.50 5,889.61 5,884.29 5,876.59
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,299.68 7,292.09 7,303.10 7,295.89 7,285.42
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,140.48 9,130.29 9,145.07 9,135.38 9,121.34
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
427.86 426.50 428.47 427.18 425.33
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
607.68 605.35 608.70 606.50 603.33
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,759.70 5,752.98 5,762.72 5,756.34 5,747.09
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,258.57 7,253.85 7,260.69 7,256.21 7,249.72
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,151.55 6,147.65 6,153.30 6,149.60 6,144.23
PR-033 Tandem Roller 12 T Rs/Hr 3,911.25 3,908.41 3,912.53 3,909.83 3,905.92
PR-034 Tandem Roller 8 T Rs/Hr 3,371.31 3,369.02 3,372.34 3,370.17 3,367.01
PR-035 Tandem Roller 6 T Rs/Hr 2,537.24 2,534.95 2,538.27 2,536.10 2,532.94
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.92 1,702.50 1,703.11 1,702.71 1,702.13
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,337.76 4,334.87 4,339.07 4,336.32 4,332.33
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,007.16 4,004.31 4,008.44 4,005.73 4,001.81
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,940.52 3,937.83 3,941.74 3,939.18 3,935.47
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,495.69 3,489.80 3,498.34 3,492.75 3,484.64
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,421.92 3,416.06 3,424.56 3,418.99 3,410.92
PR-042 Static Tandem Roller 12 T Rs/Hr 2,003.92 2,000.50 2,005.46 2,002.20 1,997.49
PR-043 Tandem Roller 10 T Rs/Hr 3,605.53 3,603.20 3,606.58 3,604.36 3,601.14
PR-044 Power Broom Rs/Hr 297.02 293.84 298.45 295.43 291.04
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 845.52 844.89 845.81 845.21 844.33
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 440.68 439.54 441.18 440.11 438.55
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,121.40 1,117.49 1,123.15 1,119.44 1,114.06
PR-048 Asphalt Plant 140 T Rs/Hr 29,010.49 28,939.52 29,042.44 28,975.00 28,877.21
PR-049 Asphalt Plant 120 T Rs/Hr 23,022.99 22,978.80 23,042.88 23,000.89 22,940.01
PR-050 Asphalt Plant 40 T Rs/Hr 9,733.55 9,699.44 9,748.91 9,716.50 9,669.50
PR-051 Asphalt Plant 20 T Rs/Hr 5,952.83 5,929.25 5,963.45 5,941.04 5,908.55
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,563.52 11,557.07 11,566.42 11,560.30 11,551.42
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,645.59 11,640.05 11,648.08 11,642.83 11,635.21
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,595.19 10,584.84 10,599.85 10,590.02 10,575.76
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 950.18 949.47 950.50 949.83 948.85
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,645.59 11,640.05 11,648.08 11,642.83 11,635.21
PR-057 Asphalt Cutter Rs/Hr 406.71 406.66 406.73 406.69 406.62
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,646.62 9,605.40 9,665.17 9,626.01 9,569.22
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,054.21 32,036.67 32,062.11 32,045.44 32,021.26
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,698.40 1,692.41 1,701.09 1,695.40 1,687.15
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,773.36 5,770.67 5,774.57 5,772.02 5,768.32
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.37 891.14 891.47 891.25 890.94
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,096.36 1,094.83 1,097.05 1,095.60 1,093.49
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,203.52 1,199.22 1,205.46 1,201.37 1,195.44
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,418.06 6,409.83 6,421.78 6,413.95 6,402.59
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,252.81 1,248.69 1,254.66 1,250.74 1,245.07
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 673.41 669.28 675.26 671.34 665.66
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,145.08 3,141.42 3,146.73 3,143.25 3,138.21
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,344.92 2,341.87 2,346.30 2,343.40 2,339.19
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,028.16 1,027.54 1,028.44 1,027.85 1,026.99

(xxvii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Hafizabad Jhang Jhelum Kasur Khanewal

PS-077 Concrete Cutter Rs/Hr 406.71 406.66 406.73 406.69 406.62


PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,418.97 16,272.44 16,484.91 16,345.71 16,143.81
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,176.09 34,112.71 34,204.62 34,144.41 34,057.09
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.92 427.91 427.92 427.91 427.91
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,573.85 7,537.22 7,590.33 7,555.53 7,505.06
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,552.17 9,467.92 9,590.08 9,510.04 9,393.95
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,448.33 7,337.88 7,498.03 7,393.11 7,240.94
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 677.45 672.56 679.65 675.01 668.28
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,555.52 1,554.66 1,555.91 1,555.09 1,553.90
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,733.08 15,723.31 15,737.48 15,728.20 15,714.74
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,428.08 8,419.04 8,432.14 8,423.56 8,411.11
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,094.26 1,090.15 1,096.13 1,092.21 1,086.53
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,137.19 1,131.36 1,139.82 1,134.27 1,126.24
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.87 82.83 82.89 82.85 82.79
PX-091 Tractor 80 HP Rs/Hr 1,450.86 1,449.92 1,451.28 1,450.39 1,449.10
PX-092 Tractor 50 HP Rs/Hr 1,010.57 1,010.07 1,010.80 1,010.32 1,009.62
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,324.18 3,318.68 3,326.65 3,321.43 3,313.86
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,196.53 1,193.89 1,197.72 1,195.21 1,191.57
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,921.52 2,920.16 2,922.14 2,920.84 2,918.96
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.54 1,175.15 1,175.72 1,175.35 1,174.81
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.53 1,069.21 1,069.67 1,069.37 1,068.94
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.90 1,556.28 1,557.18 1,556.59 1,555.73
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,048.65 1,048.03 1,048.92 1,048.34 1,047.48
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.97 522.77 523.06 522.87 522.60
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 882.00 881.75 882.11 881.88 881.54
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,499.12 3,495.90 3,500.57 3,497.51 3,493.07
PX-103 Crane up to 55 Ton Rs/Hr 6,853.94 6,843.71 6,858.55 6,848.83 6,834.74
PX-104 Crane Upto 25 ton Rs/Hr 5,596.02 5,587.98 5,599.63 5,592.00 5,580.93
PX-105 Electric Diaphragm Pump Rs/Hr 116.99 116.79 117.09 116.88 116.59
PX-106 Sand Blasting Machine Rs/Hr 864.04 863.84 864.12 863.94 863.67
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,886.27 5,883.34 5,887.59 5,884.80 5,880.77
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,431.23 1,430.53 1,431.54 1,430.88 1,429.91
PX-109 Welding Plant Rs/Hr 69.04 69.00 69.05 69.02 68.97
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.86 3,501.16 3,502.16 3,501.51 3,500.56
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,216.13 5,215.16 5,216.57 5,215.65 5,214.31
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,124.74 4,116.19 4,128.58 4,120.46 4,108.69
PX-113 Forging /Shape Machine Rs/Hr 467.80 467.64 467.86 467.72 467.51
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,363.22 1,362.89 1,363.39 1,363.05 1,362.58
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,373.17 2,367.06 2,375.91 2,370.11 2,361.70
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,907.96 1,904.99 1,909.30 1,906.48 1,902.38
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.55 1,058.32 1,058.66 1,058.44 1,058.12
PX-118 Diesel Generator 5 KVA Rs/Hr 552.73 552.70 552.74 552.71 552.67
PX-119 Steel Rolling Machine Rs/Hr 358.41 357.04 359.00 357.72 355.85
PX-120 Diesel Generator 13 KVA Rs/Hr 801.04 801.02 801.06 801.03 800.99

(xxviii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Khushab Lahore Layyah Lodhran Mandi


Bahaudin
PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,293.43 8,295.86 8,286.17 8,281.12 8,299.81
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,474.40 6,476.19 6,469.04 6,465.31 6,479.11
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,438.09 5,439.16 5,434.90 5,432.68 5,440.89
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,106.05 6,107.46 6,101.84 6,098.91 6,109.76
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,159.42 5,160.59 5,155.92 5,153.48 5,162.50
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,564.66 4,565.59 4,561.89 4,559.96 4,567.10
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,347.93 2,349.09 2,344.48 2,342.07 2,350.97
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,156.37 2,157.05 2,154.35 2,152.95 2,158.15
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,584.90 5,586.76 5,579.36 5,575.50 5,589.78
PE-011 Compressor 300 CFM Rs/Hr 3,737.74 3,737.91 3,737.22 3,736.85 3,738.20
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76 429.77 429.76 429.74 429.77
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 305.41 300.87 276.67 306.14 295.64
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.88 399.89 399.88 399.87 399.89
PE-016 Plate Compactor Rs/Hr 671.18 671.24 671.00 670.87 671.35
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,943.68 4,960.50 4,893.47 4,858.50 4,987.84
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,177.49 5,178.53 5,174.39 5,172.22 5,180.23
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,094.83 4,095.84 4,091.80 4,089.70 4,097.48
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,020.83 4,021.79 4,017.97 4,015.98 4,023.35
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,883.58 5,885.57 5,877.65 5,873.51 5,888.80
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,294.91 7,297.62 7,286.86 7,281.24 7,302.00
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,134.08 9,137.70 9,123.26 9,115.73 9,143.59
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
427.01 427.48 425.58 424.59 428.26
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
606.22 607.03 603.76 602.06 608.38
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,755.48 5,757.87 5,748.36 5,743.40 5,761.75
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,255.61 7,257.28 7,250.61 7,247.12 7,260.01
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,149.10 6,150.49 6,144.97 6,142.09 6,152.74
PR-033 Tandem Roller 12 T Rs/Hr 3,909.46 3,910.47 3,906.45 3,904.36 3,912.11
PR-034 Tandem Roller 8 T Rs/Hr 3,369.87 3,370.69 3,367.45 3,365.76 3,372.01
PR-035 Tandem Roller 6 T Rs/Hr 2,535.80 2,536.62 2,533.38 2,531.69 2,537.94
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.66 1,702.80 1,702.21 1,701.90 1,703.05
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,335.95 4,336.98 4,332.87 4,330.73 4,338.65
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,005.37 4,006.38 4,002.34 4,000.24 4,008.03
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,938.84 3,939.80 3,935.97 3,933.99 3,941.35
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,491.99 3,494.09 3,485.74 3,481.39 3,497.49
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,418.24 3,420.33 3,412.02 3,407.69 3,423.71
PR-042 Static Tandem Roller 12 T Rs/Hr 2,001.77 2,002.99 1,998.14 1,995.60 2,004.96
PR-043 Tandem Roller 10 T Rs/Hr 3,604.06 3,604.89 3,601.58 3,599.85 3,606.24
PR-044 Power Broom Rs/Hr 295.01 296.15 291.65 289.31 297.98
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 845.12 845.35 844.45 843.98 845.72
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 439.97 440.37 438.76 437.93 441.03
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,118.95 1,120.33 1,114.81 1,111.92 1,122.59
PR-048 Asphalt Plant 140 T Rs/Hr 28,965.94 28,991.17 28,890.62 28,838.18 29,032.18
PR-049 Asphalt Plant 120 T Rs/Hr 22,995.25 23,010.96 22,948.36 22,915.71 23,036.49
PR-050 Asphalt Plant 40 T Rs/Hr 9,712.15 9,724.27 9,675.94 9,650.74 9,743.98
PR-051 Asphalt Plant 20 T Rs/Hr 5,938.02 5,946.41 5,913.00 5,895.57 5,960.04
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,559.47 11,561.77 11,552.63 11,547.86 11,565.49
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,642.12 11,644.09 11,636.24 11,632.16 11,647.28
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,588.70 10,592.38 10,577.71 10,570.07 10,598.35
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 949.74 949.99 948.99 948.46 950.40
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,642.12 11,644.09 11,636.24 11,632.16 11,647.28
PR-057 Asphalt Cutter Rs/Hr 406.68 406.70 406.63 406.60 406.72
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,620.74 9,635.40 9,577.01 9,546.56 9,659.22
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,043.20 32,049.44 32,024.58 32,011.61 32,059.58
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,694.64 1,696.77 1,688.28 1,683.86 1,700.23
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,771.67 5,772.63 5,768.82 5,766.84 5,774.18
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.22 891.31 890.98 890.81 891.44
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,095.40 1,095.95 1,093.78 1,092.66 1,096.83
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,200.82 1,202.35 1,196.25 1,193.07 1,204.84
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,412.89 6,415.82 6,404.15 6,398.06 6,420.59
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,250.21 1,251.69 1,245.84 1,242.80 1,254.06
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 670.82 672.29 666.44 663.40 674.66
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,142.78 3,144.09 3,138.90 3,136.19 3,146.20
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,343.01 2,344.09 2,339.77 2,337.51 2,345.85
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.77 1,027.99 1,027.11 1,026.65 1,028.35

(xxix)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Khushab Lahore Layyah Lodhran Mandi


Bahaudin
PS-077 Concrete Cutter Rs/Hr 406.68 406.70 406.63 406.60 406.72
PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,326.99 16,379.09 16,171.50 16,063.22 16,463.75
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,136.31 34,158.84 34,069.06 34,022.23 34,195.45
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91 427.91 427.91 427.91 427.92
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,550.85 7,563.89 7,511.99 7,484.91 7,585.05
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,499.27 9,529.24 9,409.87 9,347.60 9,577.91
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,379.00 7,418.27 7,261.81 7,180.20 7,482.07
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 674.38 676.12 669.20 665.59 678.94
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,554.98 1,555.28 1,554.07 1,553.43 1,555.78
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,726.95 15,730.42 15,716.58 15,709.36 15,736.07
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,422.40 8,425.62 8,412.82 8,406.14 8,430.84
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,091.68 1,093.14 1,087.31 1,084.26 1,095.52
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,133.53 1,135.61 1,127.34 1,123.04 1,138.98
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.85 82.86 82.80 82.76 82.89
PX-091 Tractor 80 HP Rs/Hr 1,450.27 1,450.60 1,449.28 1,448.59 1,451.14
PX-092 Tractor 50 HP Rs/Hr 1,010.25 1,010.43 1,009.72 1,009.35 1,010.72
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,320.73 3,322.68 3,314.90 3,310.84 3,325.86
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,194.87 1,195.81 1,192.07 1,190.11 1,197.34
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,920.67 2,921.15 2,919.21 2,918.20 2,921.94
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.30 1,175.44 1,174.88 1,174.59 1,175.66
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.33 1,069.44 1,069.00 1,068.77 1,069.62
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.51 1,556.73 1,555.85 1,555.39 1,557.09
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,048.26 1,048.48 1,047.60 1,047.14 1,048.83
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.84 522.91 522.63 522.49 523.03
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.84 881.93 881.59 881.41 882.07
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,497.10 3,498.24 3,493.68 3,491.29 3,500.11
PX-103 Crane up to 55 Ton Rs/Hr 6,847.52 6,851.16 6,836.67 6,829.11 6,857.07
PX-104 Crane Upto 25 ton Rs/Hr 5,590.97 5,593.83 5,582.45 5,576.51 5,598.47
PX-105 Electric Diaphragm Pump Rs/Hr 116.86 116.94 116.63 116.48 117.06
PX-106 Sand Blasting Machine Rs/Hr 863.92 863.98 863.71 863.57 864.10
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,884.43 5,885.47 5,881.32 5,879.15 5,887.16
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.79 1,431.04 1,430.05 1,429.53 1,431.44
PX-109 Welding Plant Rs/Hr 69.01 69.02 68.97 68.94 69.05
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.43 3,501.66 3,500.69 3,500.19 3,502.07
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,215.52 5,215.87 5,214.49 5,213.77 5,216.43
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,119.37 4,122.41 4,110.30 4,103.98 4,127.35
PX-113 Forging /Shape Machine Rs/Hr 467.70 467.76 467.54 467.43 467.84
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,363.01 1,363.14 1,362.65 1,362.40 1,363.33
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,369.33 2,371.50 2,362.85 2,358.34 2,375.03
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,906.10 1,907.15 1,902.94 1,900.75 1,908.87
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.41 1,058.49 1,058.16 1,057.99 1,058.62
PX-118 Diesel Generator 5 KVA Rs/Hr 552.71 552.73 552.69 552.66 552.74
PX-119 Steel Rolling Machine Rs/Hr 357.54 358.03 356.11 355.10 358.81
PX-120 Diesel Generator 13 KVA Rs/Hr 801.03 801.04 801.00 800.97 801.06

(xxx)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Mianwali Multan Muzaffar Nankana Narowal


garh Sahib
PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,293.16 8,283.02 8,282.26 8,295.25 8,300.11
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,474.20 6,466.72 6,466.15 6,475.75 6,479.34
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,437.97 5,433.51 5,433.18 5,438.89 5,441.02
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,105.90 6,100.01 6,099.57 6,107.11 6,109.93
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,159.29 5,154.39 5,154.03 5,160.30 5,162.65
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,564.56 4,560.68 4,560.39 4,565.36 4,567.22
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,347.80 2,342.97 2,342.61 2,348.80 2,351.11
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,156.30 2,153.47 2,153.26 2,156.88 2,158.24
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,584.70 5,576.95 5,576.37 5,586.29 5,590.01
PE-011 Compressor 300 CFM Rs/Hr 3,737.72 3,736.99 3,736.94 3,737.87 3,738.22
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76 429.76 429.74 429.77 429.77
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 275.36 306.15 291.10 261.03 277.61
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.88 399.87 399.87 399.89 399.89
PE-016 Plate Compactor Rs/Hr 671.18 670.92 670.90 671.22 671.35
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,941.84 4,871.65 4,866.39 4,956.29 4,989.94
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,177.38 5,173.04 5,172.71 5,178.28 5,180.36
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,094.71 4,090.49 4,090.17 4,095.58 4,097.61
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,020.72 4,016.72 4,016.43 4,021.55 4,023.46
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,883.36 5,875.07 5,874.44 5,885.07 5,889.05
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,294.62 7,283.35 7,282.51 7,296.94 7,302.34
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,133.68 9,118.56 9,117.43 9,136.80 9,144.05
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
426.95 424.95 424.82 427.37 428.33
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
606.13 602.71 602.44 606.83 608.47
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,755.22 5,745.26 5,744.52 5,757.28 5,762.05
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,255.42 7,248.43 7,247.91 7,256.86 7,260.22
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,148.95 6,143.17 6,142.74 6,150.14 6,152.91
PR-033 Tandem Roller 12 T Rs/Hr 3,909.35 3,905.15 3,904.83 3,910.22 3,912.24
PR-034 Tandem Roller 8 T Rs/Hr 3,369.78 3,366.39 3,366.14 3,370.48 3,372.11
PR-035 Tandem Roller 6 T Rs/Hr 2,535.71 2,532.32 2,532.07 2,536.41 2,538.04
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.64 1,702.01 1,701.97 1,702.77 1,703.07
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,335.83 4,331.54 4,331.22 4,336.72 4,338.78
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,005.26 4,001.03 4,000.72 4,006.13 4,008.15
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,938.73 3,934.74 3,934.44 3,939.55 3,941.47
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,491.76 3,483.03 3,482.38 3,493.57 3,497.75
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,418.02 3,409.32 3,408.67 3,419.81 3,423.97
PR-042 Static Tandem Roller 12 T Rs/Hr 2,001.64 1,996.55 1,996.18 2,002.68 2,005.12
PR-043 Tandem Roller 10 T Rs/Hr 3,603.97 3,600.51 3,600.24 3,604.68 3,606.35
PR-044 Power Broom Rs/Hr 294.90 290.19 289.84 295.86 298.13
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 845.10 844.16 844.09 845.29 845.75
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 439.93 438.25 438.12 440.26 441.07
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,118.80 1,113.00 1,112.57 1,119.98 1,122.76
PR-048 Asphalt Plant 140 T Rs/Hr 28,963.18 28,857.89 28,850.00 28,984.87 29,035.34
PR-049 Asphalt Plant 120 T Rs/Hr 22,993.53 22,927.98 22,923.07 23,007.03 23,038.45
PR-050 Asphalt Plant 40 T Rs/Hr 9,710.81 9,660.20 9,656.42 9,721.24 9,745.49
PR-051 Asphalt Plant 20 T Rs/Hr 5,937.11 5,902.13 5,899.50 5,944.31 5,961.08
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,559.22 11,549.66 11,548.94 11,561.18 11,565.77
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,641.90 11,633.69 11,633.08 11,643.59 11,647.52
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,588.29 10,572.94 10,571.79 10,591.46 10,598.81
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 949.71 948.66 948.58 949.93 950.43
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,641.90 11,633.69 11,633.08 11,643.59 11,647.52
PR-057 Asphalt Cutter Rs/Hr 406.68 406.61 406.61 406.69 406.73
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,619.15 9,558.01 9,553.43 9,631.73 9,661.04
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,042.52 32,016.49 32,014.54 32,047.88 32,060.36
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,694.40 1,685.52 1,684.86 1,696.23 1,700.49
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,771.57 5,767.58 5,767.29 5,772.39 5,774.30
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.21 890.87 890.85 891.29 891.45
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,095.34 1,093.08 1,092.91 1,095.81 1,096.90
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,200.65 1,194.27 1,193.79 1,201.97 1,205.03
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,412.57 6,400.34 6,399.43 6,415.09 6,420.95
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,250.05 1,243.95 1,243.49 1,251.32 1,254.25
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 670.65 664.54 664.08 671.91 674.85
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,142.64 3,137.21 3,136.80 3,143.76 3,146.37
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,342.89 2,338.36 2,338.02 2,343.82 2,345.99
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.75 1,026.82 1,026.75 1,027.94 1,028.38

(xxxi)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Mianwali Multan Muzaffar Nankana Narowal


garh Sahib
PS-077 Concrete Cutter Rs/Hr 406.68 406.61 406.61 406.69 406.73
PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,321.29 16,103.93 16,087.65 16,366.07 16,470.26
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,133.85 34,039.84 34,032.79 34,153.21 34,198.27
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91 427.91 427.91 427.91 427.92
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,549.43 7,495.10 7,491.02 7,560.62 7,586.67
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,496.00 9,371.02 9,361.66 9,521.74 9,581.66
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,374.70 7,210.88 7,198.61 7,408.44 7,486.99
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 674.19 666.95 666.40 675.68 679.16
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,554.95 1,553.67 1,553.57 1,555.21 1,555.82
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,726.57 15,712.08 15,710.99 15,729.55 15,736.50
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,422.05 8,408.65 8,407.65 8,424.81 8,431.24
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,091.52 1,085.41 1,084.95 1,092.78 1,095.71
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,133.32 1,124.64 1,124.00 1,135.09 1,139.25
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.85 82.78 82.78 82.86 82.89
PX-091 Tractor 80 HP Rs/Hr 1,450.23 1,448.85 1,448.74 1,450.52 1,451.18
PX-092 Tractor 50 HP Rs/Hr 1,010.23 1,009.49 1,009.43 1,010.39 1,010.75
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,320.51 3,312.36 3,311.75 3,322.19 3,326.10
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,194.77 1,190.85 1,190.55 1,195.58 1,197.46
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,920.61 2,918.58 2,918.43 2,921.03 2,922.00
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.28 1,174.70 1,174.66 1,175.40 1,175.68
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.32 1,068.85 1,068.82 1,069.42 1,069.64
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.48 1,555.56 1,555.50 1,556.67 1,557.11
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,048.23 1,047.31 1,047.24 1,048.42 1,048.86
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.84 522.54 522.52 522.90 523.04
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.84 881.47 881.45 881.91 882.08
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,496.97 3,492.19 3,491.83 3,497.96 3,500.25
PX-103 Crane up to 55 Ton Rs/Hr 6,847.12 6,831.95 6,830.82 6,850.25 6,857.52
PX-104 Crane Upto 25 ton Rs/Hr 5,590.66 5,578.75 5,577.85 5,593.12 5,598.83
PX-105 Electric Diaphragm Pump Rs/Hr 116.86 116.54 116.51 116.91 117.06
PX-106 Sand Blasting Machine Rs/Hr 863.91 863.62 863.60 863.97 864.10
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,884.31 5,879.97 5,879.64 5,885.21 5,887.29
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.76 1,429.72 1,429.64 1,430.98 1,431.47
PX-109 Welding Plant Rs/Hr 69.01 68.96 68.96 69.02 69.05
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.40 3,500.38 3,500.30 3,501.61 3,502.09
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,215.48 5,214.05 5,213.94 5,215.77 5,216.47
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,119.04 4,106.36 4,105.41 4,121.65 4,127.73
PX-113 Forging /Shape Machine Rs/Hr 467.70 467.47 467.45 467.74 467.85
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,363.00 1,362.48 1,362.45 1,363.11 1,363.34
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,369.10 2,360.04 2,359.36 2,370.96 2,375.30
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,905.98 1,901.57 1,901.24 1,906.89 1,909.00
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.39 1,058.06 1,058.03 1,058.46 1,058.63
PX-118 Diesel Generator 5 KVA Rs/Hr 552.71 552.67 552.66 552.73 552.74
PX-119 Steel Rolling Machine Rs/Hr 357.49 355.47 355.33 357.91 358.88
PX-120 Diesel Generator 13 KVA Rs/Hr 801.03 800.99 800.97 801.04 801.06

(xxxii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Okara Pakpattan Rahim Yar Rajanpur Rawalpindi


Khan
PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,290.88 8,289.17 8,273.71 8,276.60 8,302.24
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,472.52 6,471.26 6,459.84 6,461.98 6,480.91
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,436.97 5,436.22 5,429.43 5,430.69 5,441.96
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,104.57 6,103.58 6,094.61 6,096.28 6,111.17
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,158.19 5,157.37 5,149.90 5,151.29 5,163.68
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,563.69 4,563.03 4,557.13 4,558.23 4,568.03
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,346.72 2,345.90 2,338.54 2,339.92 2,352.13
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,155.67 2,155.19 2,150.88 2,151.69 2,158.83
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,582.95 5,581.65 5,569.84 5,572.04 5,591.63
PE-011 Compressor 300 CFM Rs/Hr 3,737.56 3,737.43 3,736.32 3,736.53 3,738.37
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76 429.76 429.74 429.74 429.77
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 324.97 282.90 294.71 286.20 373.27
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.88 399.88 399.86 399.87 399.89
PE-016 Plate Compactor Rs/Hr 671.11 671.07 670.68 670.75 671.40
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,926.06 4,914.23 4,807.24 4,827.22 5,004.66
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,176.41 5,175.67 5,169.05 5,170.29 5,181.27
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,093.76 4,093.06 4,086.62 4,087.82 4,098.49
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,019.83 4,019.15 4,013.06 4,014.20 4,024.30
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,881.50 5,880.10 5,867.45 5,869.82 5,890.79
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,292.09 7,290.19 7,273.01 7,276.22 7,304.70
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,130.29 9,127.74 9,104.69 9,108.99 9,147.22
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
426.50 426.18 423.14 423.70 428.75
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
605.35 604.78 599.57 600.53 609.19
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,752.98 5,751.31 5,736.12 5,738.96 5,764.14
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,253.85 7,252.68 7,242.02 7,244.01 7,261.68
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,147.65 6,146.68 6,137.87 6,139.52 6,154.12
PR-033 Tandem Roller 12 T Rs/Hr 3,908.41 3,907.70 3,901.27 3,902.48 3,913.12
PR-034 Tandem Roller 8 T Rs/Hr 3,369.02 3,368.45 3,363.28 3,364.25 3,372.82
PR-035 Tandem Roller 6 T Rs/Hr 2,534.95 2,534.38 2,529.21 2,530.18 2,538.75
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.50 1,702.40 1,701.44 1,701.61 1,703.20
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,334.87 4,334.14 4,327.59 4,328.82 4,339.68
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,004.31 4,003.60 3,997.16 3,998.36 4,009.04
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,937.83 3,937.16 3,931.07 3,932.20 3,942.31
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,489.80 3,488.33 3,475.01 3,477.50 3,499.59
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,416.06 3,414.60 3,401.34 3,403.82 3,425.80
PR-042 Static Tandem Roller 12 T Rs/Hr 2,000.50 1,999.64 1,991.89 1,993.34 2,006.19
PR-043 Tandem Roller 10 T Rs/Hr 3,603.20 3,602.61 3,597.32 3,598.30 3,607.08
PR-044 Power Broom Rs/Hr 293.84 293.05 285.87 287.21 299.12
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 844.89 844.73 843.29 843.56 845.94
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 439.54 439.26 436.71 437.18 441.43
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,117.49 1,116.52 1,107.69 1,109.33 1,123.98
PR-048 Asphalt Plant 140 T Rs/Hr 28,939.52 28,921.78 28,761.28 28,791.25 29,057.42
PR-049 Asphalt Plant 120 T Rs/Hr 22,978.80 22,967.76 22,867.84 22,886.49 23,052.21
PR-050 Asphalt Plant 40 T Rs/Hr 9,699.44 9,690.91 9,613.78 9,628.18 9,756.11
PR-051 Asphalt Plant 20 T Rs/Hr 5,929.25 5,923.35 5,870.03 5,879.99 5,968.43
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,557.07 11,555.45 11,540.87 11,543.60 11,567.78
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,640.05 11,638.67 11,626.16 11,628.50 11,649.25
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,584.84 10,582.26 10,558.86 10,563.23 10,602.03
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 949.47 949.30 947.70 948.00 950.65
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,640.05 11,638.67 11,626.16 11,628.50 11,649.25
PR-057 Asphalt Cutter Rs/Hr 406.66 406.65 406.55 406.57 406.74
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,605.40 9,595.10 9,501.91 9,519.32 9,673.86
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,036.67 32,032.28 31,992.60 32,000.01 32,065.81
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,692.41 1,690.91 1,677.37 1,679.90 1,702.35
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,770.67 5,770.00 5,763.93 5,765.06 5,775.14
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.14 891.08 890.56 890.66 891.52
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,094.83 1,094.45 1,091.00 1,091.65 1,097.37
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,199.22 1,198.14 1,188.41 1,190.23 1,206.37
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,409.83 6,407.76 6,389.12 6,392.60 6,423.52
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,248.69 1,247.65 1,238.33 1,240.08 1,255.53
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 669.28 668.25 658.94 660.68 676.13
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,141.42 3,140.51 3,132.22 3,133.77 3,147.51
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,341.87 2,341.11 2,334.20 2,335.49 2,346.94
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.54 1,027.38 1,025.98 1,026.24 1,028.57

(xxxiii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Okara Pakpattan Rahim Yar Rajanpur Rawalpindi


Khan
PS-077 Concrete Cutter Rs/Hr 406.66 406.65 406.55 406.57 406.74
PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,272.44 16,235.81 15,904.47 15,966.35 16,515.86
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,112.71 34,096.87 33,953.58 33,980.34 34,218.00
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91 427.91 427.91 427.91 427.92
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,537.22 7,528.07 7,445.22 7,460.70 7,598.07
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,467.92 9,446.84 9,256.33 9,291.91 9,607.87
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,337.88 7,310.28 7,060.55 7,107.19 7,521.34
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 672.56 671.34 660.30 662.36 680.68
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,554.66 1,554.45 1,552.50 1,552.86 1,556.09
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,723.31 15,720.87 15,698.78 15,702.90 15,739.54
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,419.04 8,416.78 8,396.35 8,400.17 8,434.05
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,090.15 1,089.12 1,079.79 1,081.53 1,096.99
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,131.36 1,129.90 1,116.71 1,119.17 1,141.06
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.83 82.82 82.72 82.73 82.90
PX-091 Tractor 80 HP Rs/Hr 1,449.92 1,449.69 1,447.58 1,447.97 1,451.47
PX-092 Tractor 50 HP Rs/Hr 1,010.07 1,009.94 1,008.80 1,009.01 1,010.90
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,318.68 3,317.31 3,304.88 3,307.20 3,327.81
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,193.89 1,193.23 1,187.25 1,188.37 1,198.28
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,920.16 2,919.81 2,916.72 2,917.30 2,922.43
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.15 1,175.05 1,174.17 1,174.33 1,175.80
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.21 1,069.14 1,068.42 1,068.56 1,069.74
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.28 1,556.12 1,554.72 1,554.98 1,557.31
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,048.03 1,047.87 1,046.47 1,046.73 1,049.05
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.77 522.72 522.27 522.36 523.10
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.75 881.69 881.14 881.24 882.16
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,495.90 3,495.09 3,487.80 3,489.16 3,501.25
PX-103 Crane up to 55 Ton Rs/Hr 6,843.71 6,841.16 6,818.03 6,822.35 6,860.71
PX-104 Crane Upto 25 ton Rs/Hr 5,587.98 5,585.98 5,567.81 5,571.20 5,601.33
PX-105 Electric Diaphragm Pump Rs/Hr 116.79 116.73 116.24 116.34 117.13
PX-106 Sand Blasting Machine Rs/Hr 863.84 863.79 863.36 863.44 864.17
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,883.34 5,882.60 5,875.98 5,877.22 5,888.21
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.53 1,430.35 1,428.77 1,429.06 1,431.69
PX-109 Welding Plant Rs/Hr 69.00 68.98 68.90 68.91 69.07
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.16 3,500.99 3,499.45 3,499.74 3,502.30
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,215.16 5,214.93 5,212.73 5,213.13 5,216.77
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,116.19 4,114.05 4,094.72 4,098.33 4,130.39
PX-113 Forging /Shape Machine Rs/Hr 467.64 467.61 467.26 467.33 467.90
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,362.89 1,362.80 1,362.02 1,362.16 1,363.46
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,367.06 2,365.53 2,351.73 2,354.31 2,377.20
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,904.99 1,904.25 1,897.53 1,898.78 1,909.93
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.32 1,058.26 1,057.74 1,057.84 1,058.70
PX-118 Diesel Generator 5 KVA Rs/Hr 552.70 552.70 552.63 552.64 552.75
PX-119 Steel Rolling Machine Rs/Hr 357.04 356.70 353.64 354.21 359.30
PX-120 Diesel Generator 13 KVA Rs/Hr 801.02 801.02 800.95 800.96 801.07

(xxxiv)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Sahiwal Sargodha Sheikhu Sialkot Toba Tek


pura Singh
PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,289.44 8,293.84 8,298.10 8,300.57 8,288.91
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,471.45 6,474.71 6,477.85 6,479.67 6,471.06
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,436.33 5,438.27 5,440.14 5,441.22 5,436.10
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,103.74 6,106.29 6,108.76 6,110.20 6,103.43
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,157.49 5,159.62 5,161.68 5,162.87 5,157.24
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,563.14 4,564.82 4,566.45 4,567.39 4,562.93
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,346.03 2,348.13 2,350.16 2,351.33 2,345.78
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,155.26 2,156.49 2,157.68 2,158.36 2,155.11
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,581.85 5,585.22 5,588.47 5,590.36 5,581.45
PE-011 Compressor 300 CFM Rs/Hr 3,737.45 3,737.77 3,738.08 3,738.25 3,737.41
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76 429.76 429.77 429.77 429.76
PE-013 Electric Saw Rs/Hr 386.13 386.13 386.13 386.13 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 306.94 311.91 261.03 296.06 280.58
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.88 399.89 399.89 399.89 399.88
PE-016 Plate Compactor Rs/Hr 671.08 671.19 671.30 671.36 671.07
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,916.07 4,946.57 4,976.01 4,993.10 4,912.39
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,175.79 5,177.67 5,179.49 5,180.55 5,175.56
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,093.17 4,095.00 4,096.77 4,097.80 4,092.94
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,019.25 4,020.99 4,022.67 4,023.64 4,019.05
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,880.32 5,883.92 5,887.40 5,889.42 5,879.88
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,290.48 7,295.38 7,300.11 7,302.85 7,289.89
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,128.13 9,134.70 9,141.05 9,144.73 9,127.34
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
426.22 427.09 427.94 428.41 426.12
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
604.88 606.35 607.79 608.62 604.69
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,751.57 5,755.90 5,760.07 5,762.50 5,751.04
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,252.86 7,255.90 7,258.83 7,260.53 7,252.49
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,146.83 6,149.34 6,151.76 6,153.17 6,146.53
PR-033 Tandem Roller 12 T Rs/Hr 3,907.81 3,909.64 3,911.40 3,912.44 3,907.59
PR-034 Tandem Roller 8 T Rs/Hr 3,368.54 3,370.01 3,371.44 3,372.26 3,368.37
PR-035 Tandem Roller 6 T Rs/Hr 2,534.47 2,535.94 2,537.37 2,538.19 2,534.30
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.41 1,702.68 1,702.94 1,703.10 1,702.38
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,334.26 4,336.12 4,337.93 4,338.97 4,334.03
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,003.71 4,005.54 4,007.31 4,008.34 4,003.49
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,937.27 3,939.00 3,940.68 3,941.65 3,937.06
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,488.56 3,492.35 3,496.02 3,498.14 3,488.10
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,414.82 3,418.60 3,422.25 3,424.37 3,414.37
PR-042 Static Tandem Roller 12 T Rs/Hr 1,999.77 2,001.98 2,004.12 2,005.35 1,999.51
PR-043 Tandem Roller 10 T Rs/Hr 3,602.70 3,604.21 3,605.66 3,606.50 3,602.52
PR-044 Power Broom Rs/Hr 293.16 295.22 297.19 298.34 292.92
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 844.75 845.16 845.56 845.79 844.70
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 439.30 440.04 440.74 441.15 439.22
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,116.67 1,119.19 1,121.61 1,123.02 1,116.37
PR-048 Asphalt Plant 140 T Rs/Hr 28,924.54 28,970.27 29,014.43 29,040.07 28,919.02
PR-049 Asphalt Plant 120 T Rs/Hr 22,969.47 22,997.95 23,025.45 23,041.41 22,966.03
PR-050 Asphalt Plant 40 T Rs/Hr 9,692.24 9,714.23 9,735.46 9,747.77 9,689.59
PR-051 Asphalt Plant 20 T Rs/Hr 5,924.27 5,939.46 5,954.15 5,962.65 5,922.44
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,555.71 11,559.86 11,563.88 11,566.21 11,555.21
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,638.88 11,642.45 11,645.90 11,647.90 11,638.46
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,582.66 10,589.33 10,595.77 10,599.50 10,581.85
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 949.33 949.78 950.22 950.48 949.27
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,638.88 11,642.45 11,645.90 11,647.90 11,638.46
PR-057 Asphalt Cutter Rs/Hr 406.65 406.68 406.71 406.73 406.65
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,596.71 9,623.27 9,648.90 9,663.79 9,593.50
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,032.96 32,044.27 32,055.19 32,061.53 32,031.60
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,691.14 1,695.00 1,698.73 1,700.89 1,690.68
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40 382.40 382.40 382.40 382.40
PR-063 Crawler Rock driller Rs/Hr 5,770.11 5,771.84 5,773.51 5,774.48 5,769.90
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 891.09 891.24 891.38 891.46 891.07
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,094.51 1,095.50 1,096.45 1,097.00 1,094.39
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,198.31 1,201.08 1,203.76 1,205.31 1,197.97
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,408.09 6,413.39 6,418.52 6,421.49 6,407.44
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,247.81 1,250.47 1,253.04 1,254.52 1,247.49
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 668.41 671.07 673.64 675.12 668.09
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,140.65 3,143.01 3,145.29 3,146.61 3,140.36
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,341.22 2,343.19 2,345.09 2,346.19 2,340.99
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.41 1,027.81 1,028.20 1,028.42 1,027.36

(xxxv)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Sahiwal Sargodha Sheikhu Sialkot Toba Tek


pura Singh
PS-077 Concrete Cutter Rs/Hr 406.65 406.68 406.71 406.73 406.65
PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,241.51 16,335.95 16,427.12 16,480.04 16,230.11
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,099.33 34,140.18 34,179.61 34,202.50 34,094.41
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91 427.91 427.92 427.92 427.91
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,529.49 7,553.09 7,575.89 7,589.12 7,526.64
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,450.13 9,504.43 9,556.85 9,587.27 9,443.57
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,314.57 7,385.74 7,454.46 7,494.34 7,305.98
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 671.53 674.68 677.72 679.48 671.15
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,554.47 1,555.03 1,555.56 1,555.88 1,554.41
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,721.25 15,727.54 15,733.62 15,737.15 15,720.49
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,417.13 8,422.96 8,428.58 8,431.84 8,416.43
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,089.27 1,091.93 1,094.49 1,095.98 1,088.96
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,130.14 1,133.89 1,137.52 1,139.63 1,129.69
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.82 82.85 82.87 82.89 82.82
PX-091 Tractor 80 HP Rs/Hr 1,449.72 1,450.33 1,450.91 1,451.24 1,449.65
PX-092 Tractor 50 HP Rs/Hr 1,009.96 1,010.28 1,010.60 1,010.78 1,009.92
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,317.52 3,321.06 3,324.48 3,326.47 3,317.09
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,193.33 1,195.03 1,196.68 1,197.63 1,193.12
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,919.87 2,920.75 2,921.60 2,922.09 2,919.76
PX-096 Sedan Car 1300 cc Rs/Hr 1,175.07 1,175.32 1,175.56 1,175.70 1,175.04
PX-097 Sedan Car 1000 cc Rs/Hr 1,069.15 1,069.35 1,069.55 1,069.66 1,069.12
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,556.15 1,556.55 1,556.93 1,557.16 1,556.10
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,047.89 1,048.29 1,048.68 1,048.90 1,047.85
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.73 522.86 522.98 523.05 522.71
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.70 881.86 882.01 882.10 881.68
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,495.22 3,497.29 3,499.30 3,500.46 3,494.97
PX-103 Crane up to 55 Ton Rs/Hr 6,841.56 6,848.15 6,854.51 6,858.20 6,840.76
PX-104 Crane Upto 25 ton Rs/Hr 5,586.29 5,591.46 5,596.46 5,599.36 5,585.66
PX-105 Electric Diaphragm Pump Rs/Hr 116.73 116.87 117.01 117.08 116.72
PX-106 Sand Blasting Machine Rs/Hr 863.80 863.93 864.05 864.12 863.79
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,882.72 5,884.61 5,886.43 5,887.49 5,882.49
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.38 1,430.83 1,431.27 1,431.52 1,430.33
PX-109 Welding Plant Rs/Hr 69.00 69.01 69.04 69.05 68.98
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,501.02 3,501.47 3,501.88 3,502.13 3,500.97
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,214.95 5,215.58 5,216.18 5,216.54 5,214.88
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,114.38 4,119.89 4,125.21 4,128.30 4,113.72
PX-113 Forging /Shape Machine Rs/Hr 467.61 467.71 467.80 467.86 467.60
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,362.82 1,363.04 1,363.25 1,363.37 1,362.79
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,365.77 2,369.71 2,373.51 2,375.71 2,365.30
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,904.36 1,906.28 1,908.13 1,909.20 1,904.13
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.27 1,058.42 1,058.56 1,058.64 1,058.26
PX-118 Diesel Generator 5 KVA Rs/Hr 552.70 552.71 552.73 552.74 552.69
PX-119 Steel Rolling Machine Rs/Hr 356.75 357.63 358.48 358.96 356.65
PX-120 Diesel Generator 13 KVA Rs/Hr 801.02 801.03 801.06 801.06 801.02

(xxxvi)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Vehari

PE-001 Bulldozer-264 HP (Crawler Dozer-Track Type) with Blade Capacity 7 cum Rs/Hr 8,285.90
PE-002 Bulldozer-200 HP (Crawler Dozer-Track Type) with Blade Capacity 4.4 cum Rs/Hr 6,468.85
PE-003 Bulldozer-130 HP (Crawler Dozer-Track Type) with Blade Capacity 2.7 cum Rs/Hr 5,434.78
PE-004 Wheel Loader 187HP with Bucket Capacity 3.3 cum Rs/Hr 6,101.69
PE-005 Wheel Loader 166 HP with Bucket Capacity 2.8 cum Rs/Hr 5,155.79
PE-006 Wheel Loader 135 HP with Bucket Capacity 1.90 cum Rs/Hr 4,561.79
PE-008 Dumper loading Capacity 18 T Rs/Hr 2,344.35
PE-009 Dumper loading Capacity 10 T Rs/Hr 2,154.28
PE-010 Excavator (Track Type) 100 HP Rs/Hr 5,579.15
PE-011 Compressor 300 CFM Rs/Hr 3,737.20
PE-012 Rock Driller -Pneumatic-plug Rs/Hr 429.76
PE-013 Electric Saw Rs/Hr 386.13
PE-014 Petrol Motorized Chain Saw Rs/Hr 270.10
PE-015 Electric Breaker (Demolition Hammer) Rs/Hr 399.88
PE-016 Plate Compactor Rs/Hr 670.98
PE-017 Pugmill 40 Tons per hour Rs/Hr 4,891.63
PR-018 Combination Roller 18 T Single drum Pad/Sheep Foot Compactor Rs/Hr 5,174.28
PR-019 Combination Roller 12 T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,091.69
PR-020 Combination Roller 8T (Single drum Pad/Sheep Foot Compactor) Rs/Hr 4,017.87
PE-021 Excavator (Track Type) 168 HP with Bucket Capacity 0.8 cum Rs/Hr 5,877.43
PE-022 Excavator (Track Type) 250 HP with Bucket Capacity 1.4 cum Rs/Hr 7,286.56
PE-023 Excavator (Track Type) 345 HP with Bucket Capacity 2.2 cum Rs/Hr 9,122.87
PE-024 Jack Hammer side type for Excavator (Track Type) 168 HP with Bucket Rs/Hr
425.54
Capacity 0.9 cum
PE-025 Jack Hammer side type for Excavator (Track Type) 265/340 HP with Bucket Rs/Hr
603.69
Capacity 1.6/2.3 cum
PS-026 Pipe Layer with lifting weight upto 25 Ton Rs/Hr 5,748.10
PR-031 Motor Grader 250HP with Blade length 4.32m Rs/Hr 7,250.42
PR-032 Motor Grader 218HP with Blade length 4.32m Rs/Hr 6,144.82
PR-033 Tandem Roller 12 T Rs/Hr 3,906.34
PR-034 Tandem Roller 8 T Rs/Hr 3,367.35
PR-035 Tandem Roller 6 T Rs/Hr 2,533.29
PR-036 Tandem Roller 1.50 T Rs/Hr 1,702.19
PR-037 Combination Roller 18 T Single drum Plain Compactor Rs/Hr 4,332.76
PR-038 Combination Roller 12 T (Single drum Plain Compactor) Rs/Hr 4,002.23
PR-039 Combination Roller 8T( Single drum Plain Compactor) Rs/Hr 3,935.87
PR-040 P.T.R. (8 - Wheeler) 24 T Rs/Hr 3,485.51
PR-041 P.T.R. (8 - Wheeler) 18 T Rs/Hr 3,411.80
PR-042 Static Tandem Roller 12 T Rs/Hr 1,998.00
PR-043 Tandem Roller 10 T Rs/Hr 3,601.49
PR-044 Power Broom Rs/Hr 291.54
PR-045 Bitumen Dist. Tow Type 2000 Liter Rs/Hr 844.43
PR-046 Bitumen Sprayer (Manual) 250 gallon Rs/Hr 438.72
PR-047 Chip Spreader up to 3M Wide (attachment) Rs/Hr 1,114.66
PR-048 Asphalt Plant 140 T Rs/Hr 28,887.86
PR-049 Asphalt Plant 120 T Rs/Hr 22,946.64
PR-050 Asphalt Plant 40 T Rs/Hr 9,674.62
PR-051 Asphalt Plant 20 T Rs/Hr 5,912.09
PR-052 Asphalt Paver basic width 3m,max 5.9m Wide Rs/Hr 11,552.38
PR-053 Asphalt Paver ( width 2.4-4.7 m) Rs/Hr 11,636.03
PR-054 Cold Milling Machine 2 M Wide Rs/Hr 10,577.31
PR-055 Hand Push high Pressure Cold and Rubber Paint Marking Machine Rs/Hr 948.96
PR-056 Aggregate Spreader Up to 3M Wide Rs/Hr 11,636.03
PR-057 Asphalt Cutter Rs/Hr 406.63
PR-058 Rock Crushing & Screening (200 T/Hr) Rs/Hr 9,575.41
PR-060 Asphalt Recycling Machine 0 to 60mm depth - 3 to 4m width| 120 tons/hr Rs/Hr 32,023.90
PR-061 Hand Push Thermoplastic Road Marking Machine with double cylinder Rs/Hr
1,688.05
preheater
PR-062 Cordless Drill Machine Rs/Hr 382.40
PR-063 Crawler Rock driller Rs/Hr 5,768.72
PS-064 Grouting Machine(electric) out put 3.6 cum/hr Rs/Hr 890.97
PS-065 Hydraulic jack with pump upto 2000 Ton Rs/Hr 1,093.72
PR-066 Guard Rail Pile Driver Machine Rs/Hr 1,196.08
PS-071 Concrete Batching Plant 25m3/hr Rs/Hr 6,403.82
PS-072 Concrete Static Mixer 1 Cum Rs/Hr 1,245.68
PS-073 Concrete Static Mixer 1/4 Cum Rs/Hr 666.28
PS-074 Concrete Transit Mixer 6 Cum Rs/Hr 3,138.75
PS-075 Concrete Transit Mixer 4 Cum Rs/Hr 2,339.65
PS-076 Stressing Equipment for 6500 KN force with electric power Rs/Hr 1,027.09

(xxxvii)
OWNING AND OPERATING RATES FOR PLANT AND EQUIPMENT

Codes Description Unit Vehari

PS-077 Concrete Cutter Rs/Hr 406.63


PS-078 Piling Rig (dia up to 1m) Rs/Hr 16,165.80
PS-079 Piling Rig (Dia 1m to 2m) Rs/Hr 34,066.59
PS-080 Vibrator (Poker 1.5 ") Rs/Hr 427.91
PS-081 Percussion Boring Rig (Diesel) Rs/Hr 7,510.56
PS-082 Concrete Pump 33 m with tuck chassis Rs/Hr 9,406.58
PS-083 Girder Launcher (Erecting Capacity max 200 ton Rs/Hr 7,257.51
PS-084 Tripod & Chain Pulley (20 Ton) Rs/Hr 669.01
PS-085 Shotcrete Machine 5-8 cum/hr Rs/Hr 1,554.03
PS-086 Concrete Slip form Paver 2 to 6m for Road Pavement Rs/Hr 15,716.20
PS-087 Concrete Slip form Paver for Barrier,curbs,sidewalk up to 3 m Rs/Hr 8,412.46
PR-088 Asphalt Static Mixer 1 Cum Rs/Hr 1,087.15
PS-089 Straight Rotary machine up to 250 mm dia with all tools Rs/Hr 1,127.13
PX-090 Submersible Slug Pump with 65 ft Head Rs/Hr 82.80
PX-091 Tractor 80 HP Rs/Hr 1,449.24
PX-092 Tractor 50 HP Rs/Hr 1,009.70
PX-093 Water Tank Bowser Type 12000 Liter Rs/Hr 3,314.68
PX-094 Water Tank Tow Type 4000 Liter (Including Tractor) Rs/Hr 1,191.96
PX-095 Flat Body Truck pay load upto 8 ton Rs/Hr 2,919.16
PX-096 Sedan Car 1300 cc Rs/Hr 1,174.87
PX-097 Sedan Car 1000 cc Rs/Hr 1,068.99
PX-098 Pickup 2800 cc 4 x 4 Rs/Hr 1,555.83
PX-099 Pickup 2200 cc 4 x 2 Rs/Hr 1,047.57
PX-100 Pickup 800 cc 4 x 2 Rs/Hr 522.63
PX-101 Jeep 1300 cc 4 x 4 Rs/Hr 881.58
PX-102 Trailer Low Bed 30 ton Rs/Hr 3,493.55
PX-103 Crane up to 55 Ton Rs/Hr 6,836.27
PX-104 Crane Upto 25 ton Rs/Hr 5,582.14
PX-105 Electric Diaphragm Pump Rs/Hr 116.63
PX-106 Sand Blasting Machine Rs/Hr 863.70
PX-107 Dump Truck 30 ton (18 cum) Rs/Hr 5,881.20
PX-108 Tractor with Trolley (8 ton) Rs/Hr 1,430.02
PX-109 Welding Plant Rs/Hr 68.97
PX-110 Generator (Diesel) 150 kVa Rs/Hr 3,500.68
PX-111 Generator (Diesel) 250 kVa Rs/Hr 5,214.45
PX-112 Diesel Tanker 25000 Liter with Pump Rs/Hr 4,109.97
PX-113 Forging /Shape Machine Rs/Hr 467.53
PX-114 Generator(Diesel) 50 KVA Rs/Hr 1,362.64
PX-115 Diesel Tanker 12000 Liter with Pump Rs/Hr 2,362.62
PX-116 Diesel Tanker 5000 Liter with Pump Rs/Hr 1,902.83
PX-117 Diesel Generator 20 KVA Rs/Hr 1,058.16
PX-118 Diesel Generator 5 KVA Rs/Hr 552.69
PX-119 Steel Rolling Machine Rs/Hr 356.06
PX-120 Diesel Generator 13 KVA Rs/Hr 801.00

(xxxviii)
LIST OF QUARRY
PUNJAB
CODES & DESCRIPTION OF MATERIAL

MR-015

MR-016

MR-017

MR-018

MR-019

MR-020

MR-021

MR-022
MS-001

MS-002

MS-003

MS-004

MS-005

MS-006

MS-007

MS-008

MS-009

MS-010

MS-011

MS-012

MS-013

MS-014

ME-023

ME-024

ME-025

ME-027

ME-028

MX-248

MX-249

MX-250

MX-251

MX-252

MX-253

MX-254

MX-255
Filler Material (Rock Dust) for Cement

Aggregate No. 4 - N0. 200 for Asphalt

Filler Material (Rock Dust) for Asphalt


Aggregate 1-1/2"-3/4" for Cement Works

Aggregate 3/8"- No. 4 for Asphalt Works


Aggregate 1-1/2"-3/4" for Asphalt Works
Aggregate 3/8"-No. 4 for Cement Works

Aggregate 2" - 1-1/2" for Asphalt Works

Aggregate 3/4" - 3/8" for Asphalt Works


Aggregate No.4-200 for Cement Works

Crushed / Natural Aggregate Base "A"

Crushed / Natural Aggregate Base "B"


Aggregate 2"-1-1/2" for Cement Works

Aggregate 3/4"-3/8" for Cement Works

Filler (Rock Dust) Material Dry Works


Aggregate No. 4 - N0. 200 Dry Works
Aggregate 3/8"- No. 4 for Dry Works
Aggregate 1-1/2"-3/4" for Dry Works
Aggregate 2" - 1-1/2" for Dry Works

Aggregate 3/4" - 3/8" for Dry Works


Crushed Aggregates 2 1/2" down

Coarse Sand For Cement Works


S. No. District Quarry Code Quarry Name Easting Northing

Coarse Sand for Asphalt Works


Fine Sand For Cement Works

Fine Sand for Asphalt Works

Coarse Sand for Dry Works


Stone Random Class "C"

Stone Random Class "D"


Stone Random Class "A"

Stone Random Class "B"

Fine Sand for Dry Works


Granular Sub Base (A)

Granular Sub Base (B)


Stone Dressed
Rock (50 Kgs)

Works

Works

Works
1 Bahawalnagar PUN-001 Borrow Area Near Bahawalnagar (Ravi River) 73°11'22.98" 30° 4'41.58"                                
  
2 Bahawalpur PUN-011 Borrow Area Near Hasil Pur 72°35'24.13" 29°41'33.01"                             
     
3 Bahawalpur PUN-012 Borrow Area Near Head Islam 72°32'11.46" 29°49'30.54"                                   
4 Bahawalpur PUN-013 Cholistan Desert Quarry 72° 4'13.08" 29° 8'24.10"                                
  
5 Bahawalpur PUN-014 Sharifabad Borrow 71°36'28.08" 29°25'8.49"                                
  
6 Rahim Yar Khan PUN-021 Ahmad Pur East 71°10'56.22" 29°18'44.31"                             
     
7 D.G.Khan PUN-031 Khopi Nullah 70°31'26.22" 30°17'38.24"                                   
8 D.G.Khan PUN-032 Mitha Koh Nullah Quarry 70°33'49.55" 30° 1'1.53"                                
  
9 D.G.Khan PUN-033 SakhiSarwar Quarry 70°16'27.20" 29°58'26.36"                             
     
10 Layyah PUN-041 Chak No. 431 Quarry 71°13'54.09" 30°46'25.79"                             
     
11 Muzaffargarh PUN-051 Chenab River Bed 71°15'34.01" 30° 3'22.24"                                
  
12 Muzaffargarh PUN-052 Indus River Bed Quarry 70°49'54.00" 30° 5'2.46"                                
  
13 Chiniot PUN-071 Chenab River Bed Quarry 72°57'29.23" 31°44'39.82"                                
  
14 Chiniot PUN-072 Chenab Nagar/ Chiniot 72°55'25.97" 31°45'33.83"                             
     
15 Jhang PUN-091 Rasulpur 72°15'39.00" 31°28'18.00"                             
     
16 Toba Tek Singh PUN-101 Chak-284 Soil Quarry 72°33'23.77" 30°53'2.47"                             
     
17 Gujranwala PUN-111 Chenab River Bank Quarry 74° 3'23.62" 32°28'45.40"                                   
18 Gujrat PUN-121 Bhimber Nullah Quarry 74° 6'17.29" 32°54'54.25"                             
     
19 Sialkot PUN-161 Chenab River Quarry 74°13'10.89" 32°33'5.84"                                
  
20 Sialkot PUN-162 Tawwi River Quarry 74°31'6.30" 32°40'21.86"                                
  
21 Lahore PUN-181 Ravi River Sand Quarry 74°16'56.10" 31°35'48.78"                                
  
22 Khanewal PUN-191 River Ravi Quarry 71°52'56.58" 30°13'59.57"                                
  
23 Attock PUN-231 Faqirabad Quarry 72°28'42.76" 33°49'30.45"                                   
24 Attock PUN-232 Jhang Chowk Quarry 72°41'19.41" 33°40'49.26"                             
     
25 Attock PUN-233 Qibla Bandi 72°35'16.12" 33°54'9.87"                                   
26 Attock PUN-234 Sanjwal Quarry 72°27'25.45" 33°45'24.56"                             
     
27 Attock PUN-235 Hassan Abdal Quarry 72°38'39.46" 33°47'43.54"                             
     
28 Attock PUN-236 Haro River Shahyya 72°45'37.61" 33°52'0.55"                             
     
29 Chakwal PUN-241 Kallar Kahar Quarry 72°45'58.72" 32°44'6.86"                             
     
30 Jhelum PUN-251 Daulat Chak Quarry 73°45'19.71" 33° 1'0.53"                                   
31 Jhelum PUN-252 Jhelum River Quarry 73°44'15.18" 32°55'47.29"                                   
32 Jhelum PUN-253 Maloot Quarry 73°36'31.13" 32°57'12.02"                             
     
33 Jhelum PUN-254 Qilla Rohtas Quarry 73°36'14.05" 32°59'42.45"                             
     
34 Jhelum PUN-255 Dina North Quarry 73°33'48.94" 33° 3'2.96"                             
     
35 Rawalpindi PUN-261 Kahuta Road Aliot Quarry 73°17'47.25" 33°35'4.62"                             
     
36 Rawalpindi PUN-262 Margalla Quarry 72°48'2.93" 33°42'2.36"                             
     
37 Rawalpindi PUN-263 Sangjani Quarry 72°50'3.27" 33°42'29.30"                             
     
38 Rawalpindi PUN-264 Por Miana / Wah Quarry 72°45'44.77" 33°49'56.27"                             
     
39 Okara PUN-271 Dipal Pur 40 D 73°35'5.28" 30°43'56.32"                                
  
40 Khushab PUN-311 Jehlum River Borrow Area 72°24'4.76" 32°18'4.75"                                
  
41 Khushab PUN-312 Katta Nullah Quarry 72°26'26.21" 32°30'33.31"                             
     
42 Mianwali PUN-321 Esa Khel Quarry 71°34'46.83" 32°48'20.70"                             
     
43 Mianwali PUN-322 Pai Khel Quarry 71°34'36.94" 32°47'37.96"                             
     
44 Mianwali PUN-323 Shahbaz Khel Borrow Area 71°30'57.04" 32°36'47.19"                                
  
45 Sargodha PUN-331 Kariana Hills Chack 116 72°41'15.28" 31°54'43.69"                             
     
46 Sargodha PUN-332 Kariana Hills Chak 119 72°40'37.04" 31°54'0.72"                             
     
47 Sargodha PUN-333 Kariana Hills Chak 123 72°39'32.44" 31°54'46.64"                             
     
48 Sargodha PUN-334 Kariana Hills Chak 126 72°40'41.02" 31°53'4.07"                             
     
49 Sargodha PUN-335 Kariana Hills Chak 47 72°42'56.15" 31°51'11.10"                             
     

(xxxix)
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

PUNJAB
NAME OF DISTRICTS

PUNJAB
S/N NAME OF DISTRICT DISTRICT CODE
1 ATTOCK 3
2 BAHAWALNAGAR 7
3 BAHAWALPUR 8
4 BHAKKAR 13
5 CHAKWAL 17
6 CHINIOT 19
7 D.G.KHAN 23
8 FAISALABAD 26
9 GUJRANWALA 37
10 GUJRAT 38
11 HAFIZABAD 40
12 JHANG 51
13 JHELUM 52
14 KASUR 62
15 KHANEWAL 65
16 KHUSHAB 68
17 LAHORE 78
18 LAYYAH 82
19 LODHRAN 84
20 MANDI BAHAUDDIN 90
21 MIANWALI 95
22 MULTAN 99
23 MUZAFFARGARH 102
24 NANKANA SAHIB 104
25 NAROWAL 105
26 OKARA 112
27 PAKPATTAN 114
28 RAHIM YAR KHAN 121
29 RAJANPUR 122
30 RAWALPINDI 123
31 SAHIWAL 124
32 SARGODHA 126
33 SHEIKHUPURA 129
34 SIALKOT 133
35 TOBA TEK SINGH 148
36 VEHARI 153

Page 1 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

ATTOCK

Page 2 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.84 19.72 - 5.39 26.95

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 47.11 568.09 31.57 161.69 808.46

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 87.02 876.11 142.05 276.30 1,381.48

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 417.69 1,783.42 757.59 739.68 3,698.38

103 STRIPPING Cu.m 9.86 273.92 - 70.95 354.73

104 COMPACTION OF NATURAL GROUND Sq.m 1.70 18.55 1.76 5.50 27.51

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 15.16 304.69 - 79.96 399.81

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 53.66 786.21 38.22 219.52 1,097.61

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 40.24 612.62 - 163.22 816.08

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 31.17 435.72 - 116.72 583.61

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 15.16 304.69 - 79.96 399.81

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 53.66 786.21 38.22 219.52 1,097.61

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 40.24 612.62 - 163.22 816.08

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 31.17 435.72 - 116.72 583.61

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 29.80 279.31 - 77.28 386.39

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 206.13 688.15 209.37 275.91 1,379.55
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 53.66 776.72 38.22 217.15 1,085.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 40.31 603.01 - 160.83 804.14
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 31.17 426.18 - 114.34 571.69
MATERIAL

107d GRANULAR BACKFILL Cu.m 120.41 292.78 1,078.22 372.85 1,864.26

107e COMMON BACK FILL Cu.m 93.88 126.53 11.70 58.03 290.14

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 28.03 311.20 11.70 87.73 438.66
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 64.20 972.76 38.22 268.80 1,343.98
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 49.01 785.23 11.70 211.49 1,057.43
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 42.91 599.45 11.70 163.52 817.58
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 27.55 297.59 60.13 96.32 481.60
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 27.19 166.08 11.70 51.24 256.21
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 47.51 206.47 11.70 66.42 332.10
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.12 80.08 3.51 22.18 110.88

Page 3 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.36 70.70 3.12 19.30 96.48
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 24.83 327.78 363.95 179.14 895.70

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.02 22.20 1.76 6.74 33.71

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.31 22.61 11.20 9.53 47.65

201 GRANULAR SUBBASE Cu.m 39.02 265.49 1,272.62 394.29 1,971.43

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 59.37 518.95 1,364.44 485.69 2,428.45

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 59.37 408.29 1,364.44 458.03 2,290.14

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 202.64 1,852.10 13,219.95 3,818.67 19,093.36

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 202.64 1,852.10 13,624.01 3,919.69 19,598.44

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 202.64 1,851.53 13,219.95 3,818.53 19,092.65
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 202.64 1,851.53 13,499.64 3,888.45 19,442.26
"B")

204b CEMENT STABILIZED BASE Cu.m 99.22 568.23 1,687.50 588.74 2,943.68

204c CEMENT CONTENT Ton 408.16 - 13,965.00 3,593.29 17,966.45

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 840.14 2,293.97 109,718.12 28,213.06 141,065.28

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 840.14 2,293.97 104,747.77 26,970.47 134,852.34
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 342.12 144.43 1,204.01 422.64 2,113.20
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 188.96 2,440.62 12,718.67 3,837.06 19,185.31
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 376.32 107.69 1,471.66 488.92 2,444.59
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.85 39.32 79.66 31.21 156.03

207b DEEP PATCHING (15-30 cm) Sq.m 5.85 39.32 79.66 31.21 156.03

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.56 106.98 0.98 28.63 143.14

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 15.89 467.00 6.50 122.35 611.74
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.18 60.83 0.97 16.25 81.24

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.04 1.10 112.89 28.76 143.79

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.00 1.27 106.82 27.28 136.38
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.42 0.75 45.98 11.79 58.93

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.42 0.75 42.72 10.97 54.85
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.17 34.58 200.31 59.26 296.31

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.17 33.84 128.36 41.09 205.45

304bi DOUBLE SURFACE TREATMENT Sq.m 3.56 42.09 407.02 113.17 565.83

Page 4 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.56 41.17 335.07 94.95 474.74

304ci TRIPLE SURFACE TREATMENT Sq.m 6.48 46.77 480.72 133.49 667.46

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.48 45.79 408.62 115.22 576.11

304d SEAL COAT Sq.m 2.69 10.10 56.94 17.43 87.15

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 177.95 1,943.90 14,225.45 4,086.83 20,434.13
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 177.95 1,943.90 14,535.75 4,164.40 20,822.00
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 696.94 873.17 12,540.79 3,527.73 17,638.63

307b OPEN GRADED HOT BIT-MAC Cu.m 696.94 873.17 12,377.77 3,486.97 17,434.86

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 104.37 1,469.18 3,347.59 1,230.29 6,151.43
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 272.11 1,331.32 102,360.18 25,990.90 129,954.51

309a COLD MILLING, 0 - 30 mm Sq.m 2.13 32.47 60.40 23.75 118.75

309b COLD MILLING, 0 - 50 mm Sq.m 4.22 53.53 100.13 39.47 197.35

309c COLD MILLING, 0 - 70 mm Sq.m 7.99 72.28 139.72 55.00 274.99

309d COLD MILLING, 0 - 100 mm Sq.m 9.22 97.76 200.62 76.90 384.49

309e COLD MILLING, 0 - 130 mm Sq.m 11.98 127.09 260.80 99.97 499.84

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 351.02 3,664.55 11,841.29 3,964.22 19,821.09
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,164.97 2,616.55 6,945.24 2,681.69 13,408.45

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,164.97 2,616.95 8,203.61 2,996.39 14,981.93

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,164.97 2,616.55 8,620.45 3,100.49 15,502.46

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,164.97 2,617.01 7,456.33 2,809.58 14,047.90

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,164.97 2,723.61 8,714.70 3,150.82 15,754.10

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,214.29 2,616.95 9,131.54 3,240.70 16,203.49

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,164.97 2,616.55 7,787.39 2,892.23 14,461.14

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,164.97 2,723.61 9,045.76 3,233.59 16,167.93

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,214.29 2,617.01 9,462.60 3,323.48 16,617.39

401b CONCRETE CLASS "B" Cu.m 1,490.95 1,302.43 5,539.69 2,083.27 10,416.33

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,120.20 2,733.78 6,458.11 2,578.02 12,890.11

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,153.08 2,732.85 7,726.11 2,903.01 14,515.05

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,153.08 2,732.85 8,133.32 3,004.81 15,024.06

401di CONCRETE CLASS "D1" Cu.m 1,816.35 2,885.89 11,131.27 3,958.38 19,791.89

401dii CONCRETE CLASS "D2" Cu.m 1,816.35 2,886.35 11,953.53 4,164.06 20,820.29

Page 5 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,816.35 2,886.35 12,618.53 4,330.31 21,651.54

401e CONCRETE CLASS "Y" Cu.m 1,164.97 1,706.56 8,937.47 2,952.25 14,761.26

401f LEAN CONCRETE Cu.m 975.52 1,028.93 4,174.22 1,544.67 7,723.34

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,765.35 1,503.26 7,942.19 3,052.70 15,263.50

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,765.35 1,503.26 8,941.60 3,302.55 16,512.76

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,765.35 1,792.38 6,633.52 2,797.81 13,989.06

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,970.83 2,886.35 11,189.05 4,011.56 20,057.79

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,970.83 2,886.35 12,011.30 4,217.12 21,085.61

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,970.83 2,886.35 12,676.30 4,383.37 21,916.86

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,316.34 1,276.50 4,080.05 1,668.23 8,341.13
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,338.79 816.54 182,716.99 47,218.08 236,090.40

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,338.79 816.54 186,916.99 48,268.08 241,340.40

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,951.86 1,854.11 213,735.14 54,635.28 273,176.39
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,612.28 7,790.30 358,852.02 93,313.65 466,568.25
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 204.08 1,022.04 - 306.53 1,532.65

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 376.43 - 1,581.31 489.43 2,447.16
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 253.97 - 4,079.17 1,083.29 5,416.44
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 26.50 4.19 246.81 69.37 346.86
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 918.37 - 48,693.00 12,402.84 62,014.21
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 918.37 - 44,193.00 11,277.84 56,389.21
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 918.37 - 140,417.25 35,333.91 176,669.53


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 918.37 - 115,437.95 29,089.08 145,445.40


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 918.37 - 43,472.98 11,097.84 55,489.19


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 918.37 - 38,432.48 9,837.71 49,188.56


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 6 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 918.37 - 34,088.76 8,751.78 43,758.91
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 918.37 - 26,366.86 6,821.31 34,106.54


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 918.37 - 31,855.58 8,193.49 40,967.44
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 918.37 - 105,696.26 26,653.66 133,268.29
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 857.14 - 68,758.80 17,403.99 87,019.93
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 224.50 - 979.84 301.09 1,505.43

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 224.50 - 1,261.24 371.44 1,857.18

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 88.78 - 464.82 138.40 692.00

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 476.50 3,931.27 305.12 1,178.22 5,891.11
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,133.66 5,204.12 407.04 1,686.21 8,431.03
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 521.77 4,527.53 343.33 1,348.16 6,740.80
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,308.63 6,138.45 502.57 1,987.42 9,937.08
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 666.80 9,534.55 872.10 2,768.36 13,841.81
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,848.91 13,585.42 872.13 4,326.62 21,633.08
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 987.58 13,630.15 1,344.75 3,990.62 19,953.11
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,083.62 19,799.85 1,344.75 6,307.06 31,535.29
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 465.31 1,603.49 3,728.29 1,449.27 7,246.36
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 930.61 3,170.42 2,838.28 1,734.83 8,674.14
SIZE) INCLUDING TESTING AND REPORTING

Page 7 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,861.22 6,276.70 982.78 2,280.18 11,400.88
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 22,040.72 99,181.44 864,521.40 246,435.89 1,232,179.45

407t PILE LOAD TEST UPTO 800 TON Each 26,938.64 109,259.84 1,257,500.76 348,424.81 1,742,124.05

407u PILE LOAD TEST UPTO 1000 TON Each 26,938.64 109,259.84 1,571,917.44 427,028.98 2,135,144.90

407v PILE LOAD TEST UPTO 1200 TON Each 26,938.64 109,259.84 1,838,278.80 493,619.32 2,468,096.60

407w PILE LOAD TEST UPTO 1500 TON Each 26,938.64 109,259.84 2,222,820.84 589,754.83 2,948,774.15

407x PILE LOAD TEST UPTO 2000 TON Each 26,938.64 109,259.84 2,627,820.84 691,004.83 3,455,024.15

407y PILE LOAD TEST UPTO 2500 TON Each 26,938.64 135,603.68 3,032,820.84 798,840.79 3,994,203.95

407l PERMANENT PILE CASING FOR PILES Ton 1,678.58 8,347.07 227,972.59 59,499.56 297,497.80

410 BRICK WORK Cu.m 999.18 449.79 8,383.27 2,458.06 12,290.30

411a STONE MASONRY RANDOM DRY Cu.m 797.96 250.57 1,425.89 618.61 3,093.03

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 848.98 354.26 3,284.86 1,122.03 5,610.13

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,257.14 250.57 1,596.71 776.11 3,880.53

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,481.63 354.26 3,377.56 1,303.36 6,516.81
MORTAR

411g ROLL POINTING Sq.m 167.75 23.98 168.46 90.05 450.24

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,920.40 533.24 3,377.56 1,457.80 7,289.00
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 329.59 1,240.60 1,171.55 685.44 3,427.18
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 340.82 1,251.78 1,488.04 770.16 3,850.80
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 553.06 1,268.56 2,424.36 1,061.50 5,307.48
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 617.81 1,279.53 3,640.88 1,384.56 6,922.79
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 686.46 1,250.77 6,035.91 1,993.29 9,966.43
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 793.13 1,311.34 9,151.74 2,814.05 14,070.26
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 919.57 1,477.43 10,024.27 3,105.32 15,526.59
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,116.62 1,674.06 12,068.39 3,714.77 18,573.84
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,438.77 1,966.01 24,001.21 6,851.50 34,257.50
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 329.59 1,240.60 1,688.15 814.59 4,072.93
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 340.82 1,251.78 2,062.04 913.66 4,568.30
DIA 380 mm

Page 8 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 553.06 1,268.56 2,752.36 1,143.50 5,717.48
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 617.81 1,279.53 4,296.88 1,548.56 7,742.79
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 686.46 1,250.77 7,675.91 2,403.29 12,016.43
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 793.13 1,311.34 12,021.74 3,531.55 17,657.76
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 919.57 1,477.43 14,124.27 4,130.32 20,651.59
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,116.62 1,674.06 16,596.84 4,846.88 24,234.40
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,438.77 1,966.01 29,864.19 8,317.25 41,586.23
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 331.97 221.50 1,063.67 404.29 2,021.44
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,681.42 1,012.21 5,539.69 2,058.33 10,291.65
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 17.18 - 239.63 64.20 321.01

507b ROCK FILL IN GABIONS Cu.m 326.53 - 804.32 282.71 1,413.56

508a BRICK PAVING (SINGLE COURSE) Sq.m 347.35 12.44 586.09 236.47 1,182.35

508b BRICK PAVING (DOUBLE COURSE) Sq.m 612.65 23.22 1,172.13 452.00 2,260.00

509a RIP RAP CLASS "A" Cu.m 1,014.69 102.78 876.78 498.56 2,492.80

509b RIP RAP CLASS "B" Cu.m 1,079.91 65.03 898.61 510.89 2,554.43

509c RIP RAP CLASS "C" Cu.m 1,132.65 51.78 927.99 528.10 2,640.51

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 697.28 529.95 985.10 553.08 2,765.40

509d GROUTED RIP RAP CLASS "A" Cu.m 1,226.93 175.18 3,149.33 1,137.86 5,689.30

509e GROUTED RIP RAP CLASS "B" Cu.m 1,528.85 137.43 3,027.89 1,173.54 5,867.70

509f GROUTED RIP RAP CLASS "C" Cu.m 1,756.45 112.11 2,923.99 1,198.14 5,990.70

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,756.45 715.16 2,948.83 1,355.11 6,775.56

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,624.73 795.43 6,742.79 2,290.74 11,453.69
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 172.54 280.09 1,064.03 379.17 1,895.83

510 DISMANTLING OF STRUCTURE AND Cu.m 585.71 857.95 - 360.92 1,804.59


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 273.47 71.59 154.67 124.93 624.66

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 312.54 81.82 198.89 148.31 741.56

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 261.22 48.83 1,057.96 342.01 1,710.03
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 298.54 55.81 1,320.94 418.82 2,094.11
BITUMEN JOINTS

Page 9 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 239.80 84.63 648.82 243.31 1,216.55
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 274.05 96.72 802.41 293.30 1,466.48
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 416.32 713.50 39,787.04 10,229.22 51,146.09
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 416.32 713.50 45,842.96 11,743.20 58,715.99
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 325.19 1,026.69 5,966.71 1,829.65 9,148.24
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 325.19 1,146.27 6,585.72 2,014.30 10,071.48
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 134.76 1,108.11 4,250.41 1,373.32 6,866.60
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 134.76 1,124.64 4,685.74 1,486.29 7,431.43
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 87.35 114.55 937.37 284.82 1,424.08
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 226.13 498.12 8,360.14 2,271.10 11,355.48
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 226.13 482.59 9,138.18 2,461.72 12,308.61
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 29.59 - 117.12 36.68 183.39

604a METAL GUARD RAIL M 92.37 37.68 4,278.43 1,102.12 5,510.60

604b METAL GUARD RAIL END PIECES Each 306.12 143.18 3,780.15 1,057.36 5,286.81

604d STEEL POST FOR METAL GUARD RAIL Each 175.51 131.95 5,219.53 1,381.75 6,908.74

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,134.71 497.77 29,358.46 8,497.74 42,488.68
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,134.71 497.77 29,265.76 8,474.56 42,372.80
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 911.57 388.84 15,715.70 4,254.03 21,270.13
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 911.57 388.84 17,786.90 4,771.83 23,859.13
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 10 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 911.57 388.84 19,905.90 5,301.58 26,507.88
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 911.57 388.84 16,313.83 4,403.56 22,017.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 911.57 388.84 18,589.00 4,972.35 24,861.75
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 911.57 388.84 20,919.90 5,555.08 27,775.38
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,006.81 272.21 19,914.03 5,298.26 26,491.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,006.81 272.21 23,534.53 6,203.39 31,016.93
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,006.81 272.21 27,070.53 7,087.39 35,436.93
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,006.81 272.21 20,927.38 5,551.60 27,757.99
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,006.81 272.21 24,909.93 6,547.24 32,736.18
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,006.81 272.21 27,204.92 7,120.98 35,604.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,006.81 490.66 25,103.76 6,650.31 33,251.53
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,006.81 490.66 26,533.76 7,007.81 35,039.03
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 11 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,006.81 490.66 43,287.26 11,196.18 55,980.90
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,006.81 490.66 46,147.26 11,911.18 59,555.90
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 354.54 293.01 40,785.01 10,358.14 51,790.70
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 433.47 163.79 36,148.95 9,186.55 45,932.76
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 502.05 168.33 34,531.35 8,800.43 44,002.16
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 557.83 172.76 35,680.69 9,102.82 45,514.10
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 354.54 293.01 36,785.01 9,358.14 46,790.70
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 433.47 163.79 32,148.95 8,186.55 40,932.76
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 502.05 168.33 30,531.35 7,800.43 39,002.16
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 557.83 172.76 31,680.69 8,102.82 40,514.10
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 461.22 - 4,680.00 1,285.31 6,426.53
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 461.22 - 3,960.00 1,105.31 5,526.53
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 12 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 461.22 - 7,020.00 1,870.31 9,351.53
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 461.22 - 5,940.00 1,600.31 8,001.53
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 17.28 14.77 869.83 225.47 1,127.34
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.92 3.58 30.03 9.38 46.90


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.92 5.08 93.50 25.63 128.13


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.92 3.58 36.03 10.88 54.40


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.92 4.40 114.69 30.75 153.76


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 148.57 159.76 220.74 132.27 661.35
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 247.62 366.64 687.23 325.37 1,626.85
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.90 3.99 39.03 11.98 59.90
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.90 5.50 135.22 36.41 182.03
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.90 3.99 46.83 13.93 69.65
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.90 5.50 165.77 44.04 220.20
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 148.57 159.76 327.81 159.04 795.19
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 247.62 309.85 945.95 375.86 1,879.28
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 74.29 79.88 366.31 130.12 650.59
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 74.29 109.99 998.11 295.60 1,477.99
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 74.29 79.88 476.11 157.57 787.84
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 108.57 51.10 1,373.87 383.39 1,916.94
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 37.55 38.89 501.22 144.42 722.08
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 24.29 10.46 279.56 78.58 392.89
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 13 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: ATTOCK

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 37.55 38.89 601.22 169.42 847.08
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 24.29 10.46 304.56 84.83 424.14
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 285.04 239.10 1,481.07 501.30 2,506.51
DRAWING

610c KILOMETER POST Each 367.35 572.73 3,196.86 1,034.24 5,171.18

610d TEN KILOMETER POST Each 734.70 1,145.46 8,472.57 2,588.18 12,940.91

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 465.30 114.55 2,189.47 692.33 3,461.65
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 435.13 1,155.97 22.00 403.28 2,016.38
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 15.30 22.78 28.46 16.63 83.16

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 15.30 22.78 94.29 33.09 165.45

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.46 4.64 34.05 10.04 50.19

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.05 8.99 3.00 4.26 21.30
PER ADDITIONAL MONTH

Page 14 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

BAHAWALNAGAR

Page 15 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.68 - 5.35 26.76

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 567.15 31.48 160.76 803.78

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 874.62 141.62 274.56 1,372.79

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,778.80 755.33 731.93 3,659.64

103 STRIPPING Cu.m 9.29 273.51 - 70.70 353.51

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.48 1.76 5.46 27.30

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.69 - 79.49 397.46

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 782.56 38.65 217.94 1,089.70

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.15 - 162.02 810.09

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 433.95 - 115.83 579.16

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.69 - 79.49 397.46

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 782.56 38.65 217.94 1,089.70

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.15 - 162.02 810.09

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 433.95 - 115.83 579.16

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.51 - 76.65 383.24

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.36 211.51 272.53 1,362.63
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 773.08 38.65 215.57 1,077.86
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.55 - 159.63 798.16
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.43 - 113.45 567.25
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.27 1,500.85 476.65 2,383.23

107e COMMON BACK FILL Cu.m 88.46 125.98 11.70 56.54 282.68

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.19 11.70 87.08 435.38
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.10 38.65 267.06 1,335.30
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 781.44 11.70 209.83 1,049.15
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.43 11.70 162.14 810.70
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.52 60.14 95.66 478.29
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.47 11.70 50.70 253.49
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.05 11.70 65.63 328.15
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.81 3.51 22.04 110.18

Page 16 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.48 3.12 19.19 95.95
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.30 634.48 246.04 1,230.21

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.13 1.76 6.68 33.41

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.54 11.17 9.44 47.21

201 GRANULAR SUBBASE Cu.m 36.77 264.67 2,338.31 659.94 3,299.69

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.27 2,567.85 785.27 3,926.33

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.54 2,567.85 757.58 3,787.91

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,844.70 14,484.24 4,129.97 20,649.85

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,844.70 14,879.78 4,228.86 21,144.28

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,844.14 14,484.24 4,129.83 20,649.15
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,844.14 14,758.32 4,198.35 20,991.75
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.16 3,147.85 951.87 4,759.36

204c CEMENT CONTENT Ton 384.60 - 14,900.13 3,821.18 19,105.91

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,288.42 107,951.87 27,757.98 138,789.91

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,288.42 102,698.87 26,444.73 132,223.66
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.90 2,412.62 719.72 3,598.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,432.11 13,876.42 4,121.65 20,608.24
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.38 2,678.84 785.21 3,926.03
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.19 149.08 48.45 242.24

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.19 149.08 48.45 242.24

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.47 0.98 28.41 142.04

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.17 6.50 121.66 608.30
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.66 0.97 16.16 80.79

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 110.84 28.23 141.14

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 104.77 26.75 133.73
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.16 11.57 57.86

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.90 10.76 53.79
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.45 204.62 60.28 301.39

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.71 133.98 42.43 212.16

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.94 422.82 117.03 585.14

Page 17 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.02 352.17 99.14 495.68

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.61 499.33 138.01 690.06

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.63 428.55 120.07 600.35

304d SEAL COAT Sq.m 2.53 10.04 58.40 17.75 88.73

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,936.23 15,466.24 4,392.54 21,962.69
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,936.23 15,767.22 4,467.78 22,338.91
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.03 13,805.22 3,832.99 19,164.96

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.03 13,650.83 3,794.39 18,971.96

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.47 3,344.19 1,227.25 6,136.25
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.53 100,566.63 25,537.39 127,686.95

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.36 60.29 23.67 118.34

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.35 99.96 39.32 196.61

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.83 139.48 54.71 273.55

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.16 200.28 76.53 382.65

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.30 260.36 99.49 497.44

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,656.11 13,353.95 4,335.21 21,676.03
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,590.93 8,302.16 2,997.70 14,988.51

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,591.33 9,575.76 3,316.21 16,581.03

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,590.93 10,001.81 3,422.62 17,113.08

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,591.39 8,856.26 3,136.35 15,681.73

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,697.85 10,129.86 3,481.36 17,406.79

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,591.33 10,555.91 3,572.86 17,864.30

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,590.93 9,209.59 3,224.56 16,122.80

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,697.85 10,483.19 3,569.69 17,848.45

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,591.39 10,909.24 3,661.21 18,306.03

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,288.06 6,734.17 2,356.78 11,783.89

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,706.63 7,791.25 2,888.35 14,441.75

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,704.79 9,074.67 3,216.49 16,082.46

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,705.71 9,490.90 3,320.78 16,603.89

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,859.10 12,663.96 4,308.64 21,543.21

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,859.57 13,532.27 4,525.84 22,629.18

Page 18 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,859.57 14,241.80 4,703.22 23,516.09

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,694.48 10,351.93 3,286.04 16,430.18

401f LEAN CONCRETE Cu.m 919.20 1,014.73 5,297.85 1,807.95 9,039.74

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,487.00 9,305.79 3,349.63 16,748.13

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,487.00 10,372.00 3,616.18 18,080.88

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,777.73 7,712.88 3,024.08 15,120.40

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,859.57 12,722.93 4,359.89 21,799.45

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,859.57 13,591.24 4,576.97 22,884.84

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,859.57 14,300.77 4,754.35 23,771.75

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,266.41 5,248.20 1,938.74 9,693.69
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.21 183,813.65 47,415.14 237,075.68

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.21 187,677.73 48,381.16 241,905.78

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.15 214,199.29 54,708.48 273,542.40
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,781.65 357,420.97 92,858.28 464,291.42
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,007.67 - 299.99 1,499.96

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,574.08 482.19 2,410.95
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,062.95 1,075.57 5,377.83
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 249.00 69.54 347.69
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,595.10 12,365.11 61,825.56
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,095.10 11,240.11 56,200.56
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,115.28 35,245.16 176,225.79


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,116.25 28,995.40 144,977.00


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,477.73 11,085.77 55,428.85


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,401.72 9,816.77 49,083.84


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 19 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,962.24 8,706.90 43,534.49
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,303.36 6,792.18 33,960.89


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,840.39 8,176.44 40,882.18
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,488.20 26,588.39 132,941.94
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,072.91 17,470.14 87,350.71
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 975.01 296.64 1,483.19

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,256.41 366.99 1,834.94

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 472.56 139.05 695.26

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,876.13 393.37 1,179.62 5,898.11
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,161.56 497.89 1,681.92 8,409.59
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,463.30 432.56 1,346.88 6,734.39
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,087.14 595.86 1,979.02 9,895.10
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,495.78 974.20 2,774.57 13,872.86
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,465.13 974.23 4,280.95 21,404.74
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,574.66 1,458.80 3,991.01 19,955.03
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,622.04 1,458.80 6,232.18 31,160.88
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,594.49 3,814.80 1,461.94 7,309.68
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,152.62 2,924.79 1,738.57 8,692.86
SIZE) INCLUDING TESTING AND REPORTING

Page 20 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,241.43 1,069.29 2,266.12 11,330.61
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,884.40 932,551.50 263,051.08 1,315,255.38

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,921.60 1,356,455.10 372,690.08 1,863,450.38

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,921.60 1,695,614.40 457,479.90 2,287,399.50

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,921.60 1,986,713.00 530,254.55 2,651,272.75

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,921.60 2,408,360.90 635,666.53 3,178,332.63

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,921.60 2,813,360.90 736,916.53 3,684,582.63

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,179.52 3,218,360.90 844,731.01 4,223,655.03

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,326.82 229,089.69 59,749.54 298,747.71

410 BRICK WORK Cu.m 941.51 448.12 8,463.05 2,463.17 12,315.85

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.28 2,594.37 899.14 4,495.69

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.44 4,790.27 1,485.92 7,429.61

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.28 2,857.76 1,073.16 5,365.78

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.44 4,882.97 1,658.13 8,290.65
MORTAR

411g ROLL POINTING Sq.m 158.07 23.85 178.27 90.05 450.24

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.21 4,882.97 1,806.19 9,030.93
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,234.64 1,286.67 707.97 3,539.84
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.59 1,647.96 804.42 4,022.11
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.33 2,645.47 1,107.99 5,539.93
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.29 4,038.02 1,474.11 7,370.56
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.46 6,477.39 2,092.92 10,464.61
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.37 9,720.87 2,943.40 14,717.00
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,472.85 10,596.99 3,234.08 16,170.41
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,668.82 12,861.15 3,895.53 19,477.66
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,960.92 25,322.82 7,159.87 35,799.33
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,234.64 1,803.27 837.12 4,185.59
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.59 2,221.96 947.92 4,739.61
DIA 380 mm

Page 21 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.33 2,973.47 1,189.99 5,949.93
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.29 4,694.02 1,638.11 8,190.56
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.46 8,117.39 2,502.92 12,514.61
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.37 12,590.87 3,660.90 18,304.50
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,472.85 14,696.99 4,259.08 21,295.41
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,668.82 17,390.84 5,027.96 25,139.78
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,960.92 31,185.80 8,625.61 43,128.05
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.11 1,536.52 517.61 2,588.04
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,002.15 6,734.17 2,330.17 11,650.85
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.46 63.66 318.30

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,884.31 548.00 2,739.99

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.39 583.05 230.69 1,153.43

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.11 1,166.06 441.62 2,208.09

509a RIP RAP CLASS "A" Cu.m 956.12 102.04 2,024.65 770.70 3,853.51

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.35 2,046.38 782.08 3,910.39

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.21 2,085.11 800.90 4,004.50

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.22 2,157.65 835.48 4,177.39

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.64 4,155.43 1,371.05 6,855.24

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.95 4,015.15 1,397.68 6,988.38

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.05 3,914.13 1,419.81 7,099.06

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.76 3,938.97 1,576.20 7,881.01

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.56 8,057.43 2,594.98 12,974.91
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.26 1,548.76 497.65 2,488.25

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.58 - 352.37 1,761.85


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.51 357.17 171.59 857.95

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.72 459.28 208.88 1,044.38

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.72 1,252.47 386.84 1,934.18
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.68 1,569.80 476.70 2,383.49
BITUMEN JOINTS

Page 22 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.48 942.57 313.25 1,566.25
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.55 1,174.25 382.26 1,911.30
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,857.58 10,240.85 51,204.23
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,933.19 11,759.75 58,798.74
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,018.10 6,501.07 1,956.40 9,781.99
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,136.52 7,174.81 2,154.44 10,772.18
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.28 4,790.93 1,505.55 7,527.74
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.44 5,283.14 1,632.64 8,163.19
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.41 1,038.15 308.72 1,543.59
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.95 8,808.58 2,379.65 11,898.26
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.33 9,634.81 2,582.05 12,910.26
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.64 4,284.47 1,102.29 5,511.44

604b METAL GUARD RAIL END PIECES Each 288.45 143.02 3,769.90 1,050.34 5,251.70

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.36 5,227.48 1,381.06 6,905.28

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.10 30,822.74 8,803.21 44,016.06
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.10 30,728.11 8,779.56 43,897.79
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 380.47 16,091.73 4,332.79 21,663.93
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 380.47 18,139.66 4,844.77 24,223.84
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 23 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 380.47 20,245.66 5,371.27 26,856.34
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 380.47 16,694.93 4,483.59 22,417.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 380.47 18,943.06 5,045.62 25,228.09
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 380.47 21,259.66 5,624.77 28,123.84
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.77 20,248.27 5,366.93 26,834.65
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.77 23,875.27 6,273.68 31,368.40
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.77 27,411.27 7,157.68 35,788.40
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.77 21,260.97 5,620.11 28,100.53
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.77 25,250.67 6,617.53 33,087.65
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.77 27,411.27 7,157.68 35,788.40
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.25 25,650.12 6,771.52 33,857.58
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.25 27,080.12 7,129.02 35,645.08
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 24 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.25 43,852.18 11,322.03 56,610.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.25 46,712.18 12,037.03 60,185.15
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.74 41,124.30 10,437.28 52,186.39
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.07 36,602.89 9,293.60 46,468.01
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.35 34,960.76 8,900.30 44,501.48
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.73 36,107.60 9,201.24 46,006.20
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.74 37,124.30 9,437.28 47,186.39
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.07 32,602.89 8,293.60 41,468.01
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.35 30,960.76 7,900.30 39,501.48
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.73 32,107.60 8,201.24 41,006.20
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 25 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.28 225.08 1,125.40
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.80


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.56 220.74 130.08 650.38
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.64 687.23 321.30 1,606.49
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.56 327.81 156.84 784.20
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.32 945.95 371.90 1,859.50
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.78 366.31 129.02 645.10
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.39 998.11 294.38 1,471.88
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.78 476.11 156.47 782.35
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.68 1,373.87 381.72 1,908.58
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.12 144.10 720.48
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.80 78.29 391.43
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 26 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALNAGAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.12 169.10 845.48
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.80 84.54 422.68
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 236.78 1,598.52 525.97 2,629.85
DRAWING

610c KILOMETER POST Each 346.14 572.07 3,413.09 1,082.83 5,414.14

610d TEN KILOMETER POST Each 692.29 1,144.14 8,957.42 2,698.46 13,492.31

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.41 2,407.83 740.17 3,700.86
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,149.99 19.00 394.75 1,973.75
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.66 28.46 16.38 81.91

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.66 94.29 32.84 164.20

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.94 9.99 49.94

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.94 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 27 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

BAHAWALPUR

Page 28 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.66 - 5.35 26.74

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 566.87 31.45 160.68 803.39

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 873.72 141.49 274.30 1,371.50

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,774.99 754.59 730.79 3,653.94

103 STRIPPING Cu.m 9.29 273.35 - 70.66 353.30

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.44 1.76 5.45 27.25

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.39 - 79.42 397.10

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 781.73 38.73 217.76 1,088.78

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 608.75 - 161.67 808.34

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.89 - 115.57 577.84

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.39 - 79.42 397.10

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 781.73 38.73 217.76 1,088.78

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 608.75 - 161.67 808.34

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.89 - 115.57 577.84

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.71 - 76.45 382.24

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 681.65 212.20 272.02 1,360.09
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.26 38.73 215.39 1,076.94
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 599.16 - 159.29 796.43
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.37 - 113.19 565.94
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.83 1,392.85 449.54 2,247.68

107e COMMON BACK FILL Cu.m 88.46 125.85 11.70 56.50 282.51

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.89 11.70 87.00 435.00
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 967.17 38.73 266.60 1,333.00
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 780.34 11.70 209.56 1,047.78
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 595.58 11.70 161.93 809.64
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.19 60.14 95.57 477.86
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.14 11.70 50.62 253.08
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.71 11.70 65.55 327.74
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.69 3.51 22.01 110.03

Page 29 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.39 3.12 19.17 95.84
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.69 575.08 231.04 1,155.21

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.08 1.76 6.67 33.34

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.48 11.16 9.43 47.13

201 GRANULAR SUBBASE Cu.m 36.77 264.19 2,104.32 601.32 3,006.60

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 516.45 2,196.14 692.14 3,460.68

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.14 2,196.14 664.56 3,322.78

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,841.93 14,600.38 4,158.31 20,791.56

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,841.93 14,989.18 4,255.52 21,277.58

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.37 14,600.38 4,158.17 20,790.86
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.37 14,868.82 4,225.28 21,126.41
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 564.84 3,333.68 998.00 4,990.01

204c CEMENT CONTENT Ton 384.60 - 14,648.97 3,758.39 18,791.96

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,286.17 107,116.78 27,548.65 137,743.23

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,286.17 101,863.78 26,235.40 131,176.98
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.68 2,177.63 660.92 3,304.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,426.31 13,974.59 4,144.74 20,723.69
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.26 2,317.00 694.72 3,473.58
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.13 127.64 43.07 215.35

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.13 127.64 43.07 215.35

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.32 0.98 28.37 141.85

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.27 6.50 121.44 607.18
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.57 0.97 16.14 80.68

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 110.01 28.02 140.09

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 103.94 26.53 132.66
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.83 11.49 57.45

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.56 10.68 53.38
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.41 204.04 60.13 300.63

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.67 133.93 42.41 212.06

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.89 422.53 116.94 584.71

Page 30 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.97 352.42 99.19 495.93

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.55 498.89 137.89 689.43

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.58 428.64 120.08 600.40

304d SEAL COAT Sq.m 2.53 10.01 58.31 17.71 88.56

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.83 15,571.88 4,418.35 22,091.75
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.83 15,871.46 4,493.25 22,466.23
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 868.98 13,923.17 3,862.22 19,311.08

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 868.98 13,766.22 3,822.98 19,114.89

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,465.44 3,342.82 1,226.65 6,133.25
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,322.37 99,726.68 25,326.36 126,631.81

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.31 60.25 23.64 118.21

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.27 99.89 39.29 196.43

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.49 139.38 54.60 273.00

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.06 200.14 76.47 382.35

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.18 260.18 99.41 497.06

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,650.75 13,041.03 4,255.64 21,278.18
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,581.56 8,025.00 2,926.07 14,630.35

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,581.96 9,303.58 3,245.82 16,229.09

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,581.56 9,731.39 3,352.67 16,763.34

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,582.02 8,565.37 3,061.28 15,306.39

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,688.41 9,843.95 3,407.52 17,037.61

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,581.96 10,271.76 3,499.48 17,497.40

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,581.56 8,912.86 3,148.04 15,740.18

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,688.41 10,191.44 3,494.39 17,471.96

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,582.02 10,619.25 3,586.37 17,931.83

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,281.22 6,459.49 2,286.40 11,431.99

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,695.78 7,518.36 2,817.42 14,087.09

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,693.94 8,806.89 3,146.84 15,734.18

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,694.86 9,224.75 3,251.53 16,257.65

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,849.43 12,352.01 4,228.24 21,141.19

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,849.89 13,209.80 4,442.80 22,214.00

Page 31 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,849.89 13,907.37 4,617.19 23,085.96

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,689.35 10,070.87 3,214.49 16,072.44

401f LEAN CONCRETE Cu.m 919.20 1,008.84 5,037.63 1,741.42 8,707.09

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,479.41 9,034.20 3,279.83 16,399.15

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,479.41 10,082.28 3,541.85 17,709.25

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,770.46 7,470.72 2,961.72 14,808.60

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,849.89 12,411.70 4,279.66 21,398.31

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,849.89 13,269.49 4,494.11 22,470.55

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,849.89 13,967.06 4,668.50 23,342.51

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,261.13 4,987.05 1,872.13 9,360.66
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.07 184,147.07 47,498.46 237,492.28

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.07 188,126.98 48,493.43 242,467.16

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.75 214,636.81 54,817.76 274,088.80
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,778.18 358,744.28 93,188.24 465,941.22
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,001.49 - 298.45 1,492.24

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,578.83 483.38 2,416.90
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,077.31 1,079.16 5,395.78
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.29 69.86 349.30
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,731.87 12,399.31 61,996.53
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,231.87 11,274.31 56,371.53
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,445.96 35,327.83 176,639.14


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,443.04 29,077.10 145,385.49


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,564.49 11,107.46 55,537.30


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,481.48 9,836.71 49,183.54


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 32 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,102.29 8,741.91 43,709.55
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,383.96 6,812.33 34,061.64


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 32,046.05 8,227.85 41,139.25
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,902.10 26,691.86 133,459.31
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,135.70 17,485.84 87,429.20
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 980.18 297.93 1,489.64

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.58 368.28 1,841.39

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 477.32 140.24 701.21

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,853.65 323.35 1,156.50 5,782.49
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,144.20 432.29 1,661.18 8,305.89
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,437.12 364.19 1,323.24 6,616.20
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,066.21 534.39 1,958.42 9,792.11
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,479.98 927.30 2,758.90 13,794.48
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,416.08 927.32 4,256.96 21,284.79
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,552.03 1,432.05 3,978.66 19,893.30
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,549.54 1,432.05 6,207.36 31,036.80
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,590.81 3,754.42 1,445.92 7,229.60
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,145.33 2,864.40 1,721.65 8,608.27
SIZE) INCLUDING TESTING AND REPORTING

Page 33 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,226.99 1,008.90 2,247.42 11,237.09
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,763.36 916,618.80 259,037.64 1,295,188.20

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,783.68 1,333,279.92 366,861.80 1,834,309.00

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,783.68 1,666,644.48 450,202.94 2,251,014.70

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,783.68 1,951,949.60 521,529.22 2,607,646.10

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,783.68 2,364,907.28 624,768.64 3,123,843.20

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,783.68 2,769,907.28 726,018.64 3,630,093.20

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,006.56 3,174,907.28 833,824.36 4,169,121.80

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,318.57 229,416.38 59,829.16 299,145.78

410 BRICK WORK Cu.m 941.51 447.43 8,439.15 2,457.02 12,285.11

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.16 2,371.79 843.46 4,217.31

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.10 4,298.32 1,362.85 6,814.25

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.16 2,617.18 1,012.98 5,064.91

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.10 4,391.02 1,535.06 7,675.30
MORTAR

411g ROLL POINTING Sq.m 158.07 23.80 173.30 88.79 443.96

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.79 4,391.02 1,683.09 8,415.46
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,232.76 1,190.16 683.37 3,416.85
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,246.70 1,513.48 770.33 3,851.65
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,263.42 2,459.09 1,060.91 5,304.56
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,274.42 3,703.33 1,389.97 6,949.86
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,245.58 6,104.91 1,999.33 9,996.65
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,303.44 9,241.42 2,823.05 14,115.26
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,471.28 10,115.49 3,113.31 15,566.56
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,667.04 12,191.69 3,727.72 18,638.60
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,958.85 24,208.22 6,880.70 34,403.49
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,232.76 1,706.76 812.52 4,062.60
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,246.70 2,087.48 913.83 4,569.15
DIA 380 mm

Page 34 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,263.42 2,787.09 1,142.91 5,714.56
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,274.42 4,359.33 1,553.97 7,769.86
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,245.58 7,744.91 2,409.33 12,046.65
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,303.44 12,111.42 3,540.55 17,702.76
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,471.28 14,215.49 4,138.31 20,691.56
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,667.04 16,721.05 4,860.06 24,300.30
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,958.85 30,071.20 8,346.44 41,732.21
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.95 1,419.52 488.32 2,441.60
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,000.35 6,459.49 2,261.05 11,305.25
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.71 63.98 319.88

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,674.32 495.50 2,477.50

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.37 583.05 230.68 1,153.40

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.07 1,166.06 441.61 2,208.03

509a RIP RAP CLASS "A" Cu.m 956.12 101.98 1,801.46 714.89 3,574.45

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.31 1,823.21 726.28 3,631.38

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.18 1,860.13 744.65 3,723.23

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.93 1,929.67 778.41 3,892.04

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 171.48 3,795.28 1,280.72 6,403.60

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 133.81 3,666.85 1,310.32 6,551.58

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.10 3,573.46 1,334.41 6,672.05

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 709.49 3,598.30 1,490.72 7,453.59

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 789.98 7,757.93 2,519.71 12,598.55
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.07 1,429.42 467.77 2,338.84

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.42 - 352.33 1,761.65


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.48 317.80 161.74 808.70

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.69 408.65 196.21 981.04

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.68 1,154.81 362.41 1,812.05
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.63 1,448.13 446.27 2,231.35
BITUMEN JOINTS

Page 35 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.42 830.24 285.15 1,425.76
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.48 1,034.52 347.31 1,736.54
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,922.49 10,257.07 51,285.35
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,007.82 11,778.40 58,892.01
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,014.60 6,404.19 1,931.30 9,656.51
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,132.54 7,068.04 2,126.75 10,633.75
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,102.56 4,682.40 1,477.98 7,389.91
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,119.24 5,163.08 1,602.33 8,011.63
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.36 1,013.39 302.52 1,512.58
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.47 8,714.23 2,355.94 11,779.71
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.86 9,529.96 2,555.72 12,778.61
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.62 4,307.93 1,108.15 5,540.74

604b METAL GUARD RAIL END PIECES Each 288.45 142.95 3,784.61 1,054.00 5,270.01

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.12 5,256.65 1,388.29 6,941.44

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 490.95 30,601.72 8,747.17 43,735.86
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 490.95 30,505.96 8,723.23 43,616.16
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 376.58 16,152.41 4,346.98 21,734.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 376.58 18,208.95 4,861.12 24,305.59
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 36 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 376.58 20,314.95 5,387.62 26,938.09
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 376.58 16,750.54 4,496.52 22,482.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 376.58 19,012.35 5,061.97 25,309.84
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 376.58 21,328.95 5,641.12 28,205.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.18 20,317.29 5,384.04 26,920.20
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.18 23,944.29 6,290.79 31,453.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.18 27,480.29 7,174.79 35,873.95
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.18 21,329.99 5,637.22 28,186.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.18 25,319.69 6,634.64 33,173.20
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.18 27,480.29 7,174.79 35,873.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.19 25,682.35 6,779.31 33,896.54
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.19 27,112.35 7,136.81 35,684.04
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 37 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.19 43,895.34 11,332.56 56,662.78
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.19 46,755.34 12,047.56 60,237.78
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 289.87 41,130.32 10,438.57 52,192.84
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.77 36,555.21 9,281.61 46,408.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.05 34,888.49 8,882.15 44,410.76
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.42 36,030.69 9,181.94 45,909.68
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 289.87 37,130.32 9,438.57 47,192.84
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.77 32,555.21 8,281.61 41,408.05
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.05 30,888.49 7,882.15 39,410.76
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.42 32,030.69 8,181.94 40,909.68
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 38 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.24 225.32 1,126.60
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.04 93.50 25.56 127.79


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.44


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.47 220.74 130.05 650.26
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 363.82 687.23 321.10 1,605.48
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 135.22 36.32 181.61
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 165.77 43.96 219.80
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.47 327.81 156.82 784.10
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.70 945.95 371.74 1,858.71
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.74 366.31 129.01 645.05
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.15 998.11 294.32 1,471.58
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.74 476.11 156.46 782.30
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.51 1,373.87 381.67 1,908.36
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.69 144.24 721.19
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.97 78.33 391.64
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 39 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BAHAWALPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.69 169.24 846.19
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.97 84.58 422.89
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 235.60 1,575.21 519.85 2,599.24
DRAWING

610c KILOMETER POST Each 346.14 571.80 3,363.04 1,070.25 5,351.24

610d TEN KILOMETER POST Each 692.29 1,143.61 8,842.05 2,669.49 13,347.43

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.36 2,429.38 745.55 3,727.73
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,147.56 19.00 394.14 1,970.71
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 28.44 16.37 81.84

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 94.29 32.83 164.14

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.91 9.98 49.89

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.93 3.00 4.17 20.85
PER ADDITIONAL MONTH

Page 40 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

BHAKKAR

Page 41 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.68 - 5.35 26.76

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 567.22 31.48 160.77 803.86

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 874.72 141.65 274.59 1,372.96

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,779.04 755.49 732.03 3,660.14

103 STRIPPING Cu.m 9.29 273.55 - 70.71 353.56

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.48 1.76 5.46 27.31

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.75 - 79.51 397.55

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.48 38.53 218.14 1,090.71

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.30 - 162.06 810.28

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.05 - 115.86 579.29

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.75 - 79.51 397.55

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.48 38.53 218.14 1,090.71

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.30 - 162.06 810.28

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.05 - 115.86 579.29

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.58 - 76.67 383.33

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.54 211.28 272.51 1,362.55
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.01 38.53 215.78 1,078.88
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.69 - 159.67 798.34
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.53 - 113.48 567.38
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.32 1,065.60 367.85 1,839.23

107e COMMON BACK FILL Cu.m 88.46 126.01 11.70 56.54 282.71

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.32 11.70 87.11 435.54
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.28 38.53 267.08 1,335.38
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.13 11.70 210.00 1,050.01
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.57 11.70 162.18 810.88
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.60 60.14 95.68 478.39
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.50 11.70 50.71 253.53
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.09 11.70 65.64 328.20
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.82 3.51 22.04 110.19

Page 42 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.49 3.12 19.20 95.98
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.44 365.57 178.85 894.25

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.68 33.41

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.54 11.17 9.44 47.21

201 GRANULAR SUBBASE Cu.m 36.77 264.74 1,278.97 395.12 1,975.59

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.60 1,370.79 486.08 2,430.41

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.63 1,370.79 458.34 2,291.70

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,845.99 13,302.75 3,834.92 19,174.60

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,845.99 13,700.86 3,934.45 19,672.24

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.43 13,302.75 3,834.78 19,173.90
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.43 13,578.50 3,903.72 19,518.59
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.31 1,918.54 644.59 3,222.93

204c CEMENT CONTENT Ton 384.60 - 14,510.37 3,723.74 18,618.71

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,288.95 108,150.94 27,807.88 139,039.40

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,288.95 102,897.94 26,494.63 132,473.15
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.95 1,394.86 465.29 2,326.46
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,432.74 12,813.65 3,856.11 19,280.56
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.41 1,492.78 488.70 2,443.49
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.20 80.02 31.19 155.93

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.20 80.02 31.19 155.93

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.60 0.98 28.44 142.20

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.28 6.50 121.69 608.44
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.70 0.97 16.17 80.84

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.04 28.28 141.39

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 104.97 26.80 133.98
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.24 11.59 57.96

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.98 10.78 53.89
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 198.48 58.75 293.73

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.72 127.71 40.87 204.35

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.96 404.56 112.47 562.34

Page 43 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.04 333.79 94.55 472.73

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.62 477.83 132.64 663.19

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.64 406.92 114.67 573.33

304d SEAL COAT Sq.m 2.53 10.06 56.42 17.25 86.26

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.53 14,291.56 4,099.20 20,495.98
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.53 14,595.08 4,175.07 20,875.36
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.28 12,622.16 3,537.29 17,686.44

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.28 12,465.82 3,498.21 17,491.03

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.71 3,344.50 1,227.39 6,136.95
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.72 100,760.83 25,585.99 127,929.95

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.37 60.30 23.67 118.35

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.36 99.98 39.33 196.64

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.85 139.50 54.72 273.59

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.19 200.31 76.55 382.73

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.34 260.40 99.51 497.54

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,656.86 12,348.66 4,084.07 20,420.35
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,592.20 7,356.79 2,761.68 13,808.40

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,592.61 8,628.99 3,079.83 15,399.15

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,592.20 9,052.56 3,185.62 15,928.11

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,592.66 7,891.16 2,895.39 14,476.94

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,699.13 9,163.36 3,240.06 16,200.28

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,592.61 9,586.93 3,330.94 16,654.68

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,592.20 8,235.21 2,981.28 14,906.41

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,699.13 9,507.41 3,326.07 16,630.33

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,592.66 9,930.98 3,416.96 17,084.80

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,289.98 5,892.26 2,146.78 10,733.90

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,707.94 6,853.99 2,654.37 13,271.83

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,706.10 8,136.09 2,982.18 14,910.88

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,707.02 8,549.76 3,085.82 15,429.11

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,860.45 11,652.82 4,056.19 20,280.95

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,860.91 12,503.74 4,269.04 21,345.18

Page 44 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,860.91 13,194.71 4,441.78 22,208.89

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,695.37 9,386.26 3,044.84 15,224.20

401f LEAN CONCRETE Cu.m 919.20 1,017.36 4,481.05 1,604.40 8,022.01

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,489.30 8,357.64 3,113.16 15,565.81

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,489.30 9,396.01 3,372.76 16,863.78

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,778.82 6,971.23 2,838.94 14,194.70

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,860.91 11,712.27 4,107.56 20,537.80

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,860.91 12,563.19 4,320.29 21,601.45

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,860.91 13,254.16 4,493.03 22,465.16

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,267.88 4,381.17 1,722.35 8,611.76
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.24 183,462.98 47,327.48 236,637.38

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.24 187,662.98 48,377.48 241,887.38

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.22 214,482.44 54,779.29 273,896.43
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,782.50 358,344.85 93,089.47 465,447.34
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,008.93 - 300.31 1,501.54

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,579.45 483.54 2,417.68
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,077.08 1,079.10 5,395.49
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 249.87 69.76 348.78
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,638.12 12,375.87 61,879.34
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,138.12 11,250.87 56,254.34
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,238.21 35,275.89 176,379.45


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,244.49 29,027.46 145,137.30


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,485.62 11,087.74 55,438.71


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,419.16 9,821.13 49,105.64


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 45 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,028.11 8,723.37 43,616.83
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,342.00 6,801.84 34,009.19


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,950.70 8,204.01 41,020.06
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,696.07 26,640.36 133,201.78
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,034.15 17,460.45 87,302.26
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 979.71 297.81 1,489.06

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.11 368.16 1,840.81

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 476.53 140.05 700.23

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,881.36 395.76 1,181.53 5,907.64
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,165.59 504.30 1,684.53 8,422.64
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,469.39 436.46 1,349.38 6,746.88
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,092.00 606.03 1,982.78 9,913.90
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,499.46 997.58 2,781.34 13,906.68
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,476.52 997.60 4,289.64 21,448.20
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,579.91 1,500.50 4,002.74 20,013.71
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,638.88 1,500.50 6,246.81 31,234.05
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,595.35 3,821.16 1,463.74 7,318.69
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,154.30 2,931.15 1,740.58 8,702.92
SIZE) INCLUDING TESTING AND REPORTING

Page 46 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,244.77 1,075.65 2,268.55 11,342.74
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,912.64 878,430.90 249,527.99 1,247,639.93

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,953.68 1,277,733.06 353,017.59 1,765,087.93

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,953.68 1,597,208.64 432,886.48 2,164,432.40

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,953.68 1,868,627.80 500,741.27 2,503,706.35

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,953.68 2,260,756.54 598,773.46 2,993,867.28

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,953.68 2,665,756.54 700,023.46 3,500,117.28

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,219.76 3,070,756.54 807,839.98 4,039,199.88

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,328.74 228,731.56 59,660.49 298,302.46

410 BRICK WORK Cu.m 941.51 448.28 8,442.39 2,458.05 12,290.23

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.31 1,617.46 654.92 3,274.59

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.52 3,611.09 1,191.15 5,955.73

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.31 1,802.99 809.47 4,047.35

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.52 3,703.85 1,363.37 6,816.85
MORTAR

411g ROLL POINTING Sq.m 158.07 23.86 173.39 88.83 444.15

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.31 3,703.85 1,511.43 7,557.15
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,234.94 1,273.32 704.71 3,523.54
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.90 1,629.85 799.97 3,999.86
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.64 2,620.83 1,101.90 5,509.50
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.59 3,993.99 1,463.18 7,315.91
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.78 6,428.27 2,080.72 10,403.59
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.70 9,657.01 2,927.52 14,637.59
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.22 10,531.62 3,217.83 16,089.15
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.24 12,772.94 3,873.58 19,367.91
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,961.41 25,178.05 7,123.80 35,618.98
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,234.94 1,789.92 833.86 4,169.29
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.90 2,203.85 943.47 4,717.36
DIA 380 mm

Page 47 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.64 2,948.83 1,183.90 5,919.50
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.59 4,649.99 1,627.18 8,135.91
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.78 8,068.27 2,490.72 12,453.59
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.70 12,527.01 3,645.02 18,225.09
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.22 14,631.62 4,242.83 21,214.15
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.24 17,302.11 5,005.88 25,029.39
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,961.41 31,041.03 8,589.54 42,947.70
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.15 1,053.37 396.83 1,984.16
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.28 5,892.26 2,120.48 10,602.38
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.60 63.95 319.74

507b ROCK FILL IN GABIONS Cu.m 307.68 - 975.07 320.69 1,603.44

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.39 585.41 231.28 1,156.38

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.12 1,170.76 442.80 2,213.98

509a RIP RAP CLASS "A" Cu.m 956.12 102.06 1,058.27 529.11 2,645.56

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.36 1,080.09 540.51 2,702.54

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.22 1,110.96 557.37 2,786.83

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.29 1,170.54 588.72 2,943.58

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.69 3,307.61 1,159.11 5,795.53

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.99 3,183.24 1,189.71 5,948.55

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.08 3,079.86 1,211.26 6,056.28

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.88 3,104.71 1,367.67 6,838.34

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.93 7,151.71 2,368.65 11,843.23
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.30 1,054.06 373.99 1,869.94

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.62 - 352.38 1,761.90


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.52 186.69 128.97 644.86

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.73 240.06 154.07 770.36

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.73 1,109.18 351.02 1,755.08
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.70 1,385.21 430.56 2,152.78
BITUMEN JOINTS

Page 48 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.49 717.30 256.94 1,284.69
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.56 888.12 310.73 1,553.65
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,898.92 10,251.18 51,255.90
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,980.83 11,771.66 58,858.29
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,018.91 6,140.12 1,866.37 9,331.83
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,137.44 6,776.91 2,055.19 10,275.96
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.55 4,420.84 1,413.09 7,065.46
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.72 4,874.01 1,530.43 7,652.14
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.43 958.65 288.85 1,444.24
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.06 8,458.33 2,292.12 11,460.58
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.44 9,246.70 2,485.05 12,425.26
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.64 4,304.43 1,107.28 5,536.39

604b METAL GUARD RAIL END PIECES Each 288.45 143.03 3,782.98 1,053.62 5,268.08

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.42 5,254.06 1,387.72 6,938.58

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.45 29,873.44 8,565.98 42,829.88
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.45 29,778.05 8,542.13 42,710.64
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 381.90 15,990.01 4,307.72 21,538.58
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 381.90 18,081.41 4,830.57 24,152.83
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 49 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 381.90 20,200.41 5,360.32 26,801.58
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 381.90 16,588.14 4,457.25 22,286.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 381.90 18,883.51 5,031.09 25,155.45
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 381.90 21,214.41 5,613.82 28,069.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.90 20,209.12 5,357.18 26,785.88
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.90 23,829.62 6,262.30 31,311.50
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.90 27,365.62 7,146.30 35,731.50
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.90 21,222.47 5,610.51 28,052.56
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.90 25,205.02 6,606.15 33,030.75
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.90 27,377.57 7,149.29 35,746.44
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.50 25,467.64 6,725.96 33,629.78
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.50 26,897.64 7,083.46 35,417.28
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 50 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.50 43,677.10 11,278.32 56,391.60
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.50 46,537.10 11,993.32 59,966.60
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.89 40,991.87 10,404.21 52,021.04
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.14 36,348.92 9,230.13 46,150.64
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.66 34,682.89 8,830.91 44,154.53
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.07 35,824.41 9,130.53 45,652.64
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.89 36,991.87 9,404.21 47,021.04
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.14 32,348.92 8,230.13 41,150.64
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.66 30,682.89 7,830.91 39,154.53
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.07 31,824.41 8,130.53 40,652.64
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 51 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.12 225.29 1,126.46
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.58 220.74 130.08 650.40
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.83 687.23 321.35 1,606.73
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.58 327.81 156.85 784.23
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.47 945.95 371.94 1,859.68
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.79 366.31 129.02 645.11
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.45 998.11 294.39 1,471.95
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.79 476.11 156.47 782.36
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.72 1,373.87 381.73 1,908.63
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 502.51 144.19 720.96
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.92 78.32 391.58
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 52 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: BHAKKAR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 602.51 169.19 845.96
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.92 84.57 422.83
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.18 1,518.21 506.00 2,529.98
DRAWING

610c KILOMETER POST Each 346.14 572.14 3,245.99 1,041.07 5,205.34

610d TEN KILOMETER POST Each 692.29 1,144.27 8,574.09 2,602.66 13,013.31

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.43 2,338.54 722.85 3,614.26
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,150.56 17.00 394.39 1,971.96
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 28.47 16.39 81.95

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 94.31 32.85 164.24

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.95 9.99 49.94

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 53 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

CHAKWAL

Page 54 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.81

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 567.97 31.54 160.97 804.86

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 875.92 141.90 274.95 1,374.76

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,782.98 756.77 733.33 3,666.65

103 STRIPPING Cu.m 9.29 273.85 - 70.79 353.93

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.54 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.57 - 79.71 398.56

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 785.96 38.27 218.70 1,093.48

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.57 - 79.71 398.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 785.96 38.27 218.70 1,093.48

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.17 - 76.81 384.06

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 686.76 209.63 272.66 1,363.28
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 776.47 38.27 216.32 1,081.61
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.59 - 160.14 800.71
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 425.99 - 113.84 569.21
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.69 1,289.28 423.86 2,119.29

107e COMMON BACK FILL Cu.m 88.46 126.48 11.70 56.66 283.29

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.92 11.70 87.26 436.29
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.92 38.27 267.67 1,338.35
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 784.14 11.70 210.51 1,052.53
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.66 11.70 162.70 813.49
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.45 60.13 95.89 479.44
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 166.02 11.70 50.84 254.18
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.40 11.70 65.72 328.59
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 80.05 3.51 22.10 110.48

Page 55 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.67 3.12 19.24 96.20
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.52 363.95 178.72 893.59

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.60 11.19 9.46 47.31

201 GRANULAR SUBBASE Cu.m 36.77 265.26 1,272.62 393.66 1,968.31

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.39 1,364.98 484.83 2,424.14

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 408.12 1,364.98 457.26 2,286.30

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,850.89 13,204.35 3,811.55 19,057.74

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,850.89 13,607.76 3,912.40 19,561.99

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.33 13,204.35 3,811.41 19,057.03
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.33 13,483.62 3,881.22 19,406.11
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.95 1,688.09 587.38 2,936.91

204c CEMENT CONTENT Ton 384.60 - 13,965.00 3,587.40 17,937.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,293.03 109,403.67 28,122.08 140,610.41

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,293.03 104,301.09 26,846.44 134,232.19
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.34 1,204.06 417.69 2,088.46
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,438.19 12,706.40 3,830.66 19,153.31
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.63 1,472.22 483.61 2,418.06
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.31 79.69 31.13 155.63

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.31 79.69 31.13 155.63

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.93 0.98 28.52 142.61

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 466.67 6.50 122.04 610.18
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.81 0.97 16.20 80.98

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.10 112.44 28.63 143.15

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.37 27.15 135.74
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.80 11.74 58.68

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.54 10.92 54.60
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.56 199.80 59.10 295.50

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.82 128.14 41.00 205.00

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.07 406.16 112.90 564.48

Page 56 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.14 334.50 94.75 473.74

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.75 479.74 133.15 665.74

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.77 407.93 114.95 574.76

304d SEAL COAT Sq.m 2.53 10.08 56.72 17.33 86.66

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.67 14,208.08 4,079.61 20,398.04
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.67 14,517.70 4,157.01 20,785.05
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 872.73 12,525.70 3,513.79 17,568.93

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 872.73 12,363.07 3,473.13 17,365.65

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.75 3,346.97 1,228.52 6,142.59
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.99 102,168.84 25,939.06 129,695.29

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.46 60.38 23.71 118.56

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.51 100.10 39.40 196.99

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 72.26 139.67 54.87 274.33

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.72 200.55 76.74 383.70

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 127.04 260.72 99.76 498.81

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,663.18 11,964.73 3,989.67 19,948.34
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,612.25 7,069.95 2,694.98 13,474.91

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,612.66 8,330.24 3,010.16 15,050.78

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,612.25 8,748.10 3,114.52 15,572.60

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,612.72 7,580.45 2,822.72 14,113.61

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,719.93 8,840.74 3,164.60 15,822.99

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,612.66 9,258.60 3,253.87 16,269.33

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,612.25 7,911.51 2,905.37 14,526.86

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,719.93 9,171.80 3,247.36 16,236.81

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,612.72 9,589.66 3,336.65 16,683.23

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,298.63 5,663.18 2,091.67 10,458.37

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,726.13 6,582.23 2,590.97 12,954.86

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,725.21 7,852.18 2,915.98 14,579.88

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,725.21 8,260.38 3,018.03 15,090.13

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,881.48 11,258.80 3,962.95 19,814.73

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,881.94 12,081.65 4,168.77 20,843.86

Page 57 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,881.94 12,746.65 4,335.02 21,675.11

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,704.95 9,064.32 2,966.75 14,833.74

401f LEAN CONCRETE Cu.m 919.20 1,026.36 4,296.32 1,560.47 7,802.36

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,500.30 8,062.91 3,042.23 15,211.14

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,500.30 9,062.32 3,292.08 16,460.40

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,790.43 6,740.36 2,784.13 13,920.63

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,881.94 11,316.82 4,013.96 20,069.78

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,881.94 12,139.67 4,219.67 21,098.34

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,881.94 12,804.67 4,385.92 21,929.59

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,274.64 4,169.92 1,671.23 8,356.14
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.48 182,769.36 47,154.13 235,770.65

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.48 186,969.36 48,204.13 241,020.65

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.92 213,795.73 54,607.78 273,038.91
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,788.85 357,789.19 92,952.14 464,760.70
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,019.46 - 302.94 1,514.70

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,577.20 482.97 2,414.86
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,068.69 1,077.00 5,385.00
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.26 69.11 345.53
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,590.32 12,363.92 61,819.59
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,090.32 11,238.92 56,194.59
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,154.27 35,254.91 176,274.53


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,172.81 29,009.54 145,047.70


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,422.91 11,072.07 55,360.33


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,378.53 9,810.97 49,054.85


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 58 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,985.21 8,712.64 43,563.20
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,311.18 6,794.13 33,970.66


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,775.35 8,160.18 40,800.88
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,460.05 26,581.35 132,906.75
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,795.24 17,400.73 87,003.63
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 976.41 296.99 1,484.93

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,257.81 367.34 1,836.68

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 466.49 137.54 687.68

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,921.87 322.97 1,173.46 5,867.28
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,196.86 428.69 1,673.44 8,367.21
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,516.58 362.60 1,342.71 6,713.54
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,129.71 527.77 1,972.64 9,863.21
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,527.94 909.73 2,766.50 13,832.48
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,564.92 909.76 4,289.78 21,448.89
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,620.69 1,399.71 3,987.74 19,938.71
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,769.55 1,399.71 6,254.28 31,271.40
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,601.96 3,751.37 1,447.94 7,239.72
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,167.40 2,861.35 1,726.41 8,632.05
SIZE) INCLUDING TESTING AND REPORTING

Page 59 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,270.72 1,005.85 2,257.59 11,287.93
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,130.80 862,118.85 245,504.51 1,227,522.56

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,202.16 1,254,006.09 347,147.96 1,735,739.81

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,202.16 1,567,548.96 425,533.68 2,127,668.40

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,202.16 1,833,036.70 491,905.62 2,459,528.08

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,202.16 2,216,268.31 587,713.52 2,938,567.59

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,202.16 2,621,268.31 688,963.52 3,444,817.59

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,531.36 3,026,268.31 796,795.82 3,983,979.09

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,343.63 228,034.85 59,490.04 297,450.19

410 BRICK WORK Cu.m 941.51 449.50 8,474.61 2,466.41 12,332.04

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.52 1,427.18 607.40 3,037.00

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 354.12 3,388.26 1,135.59 5,677.95

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.52 1,598.00 758.28 3,791.38

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 354.12 3,480.96 1,307.80 6,539.00
MORTAR

411g ROLL POINTING Sq.m 158.07 23.95 170.78 88.20 441.01

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 533.07 3,480.96 1,455.90 7,279.49
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,240.06 1,192.40 685.76 3,428.79
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,251.24 1,517.17 772.39 3,861.95
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,268.01 2,464.71 1,063.46 5,317.31
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.98 3,713.23 1,393.59 6,967.95
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,250.20 6,116.52 2,003.39 10,016.94
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,310.75 9,256.08 2,828.55 14,142.74
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.76 10,129.40 3,118.16 15,590.81
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,672.46 12,213.46 3,734.52 18,672.60
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,965.15 24,242.24 6,890.78 34,453.88
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,240.06 1,709.00 814.91 4,074.54
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,251.24 2,091.17 915.89 4,579.45
DIA 380 mm

Page 60 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,268.01 2,792.71 1,145.46 5,727.31
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.98 4,369.23 1,557.59 7,787.95
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,250.20 7,756.52 2,413.39 12,066.94
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,310.75 12,126.08 3,546.05 17,730.24
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.76 14,229.40 4,143.16 20,715.81
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,672.46 16,741.91 4,866.63 24,333.16
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,965.15 30,105.21 8,356.52 41,782.60
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.44 1,246.59 445.21 2,226.04
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,011.45 5,663.18 2,064.75 10,323.75
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.80 63.75 318.73

507b ROCK FILL IN GABIONS Cu.m 307.68 - 804.32 278.00 1,390.00

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.43 595.35 233.77 1,168.85

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.20 1,190.62 447.78 2,238.89

509a RIP RAP CLASS "A" Cu.m 956.12 102.75 876.78 483.91 2,419.56

509b RIP RAP CLASS "B" Cu.m 1,017.58 65.01 898.61 495.30 2,476.50

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.76 927.99 511.76 2,558.78

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 529.83 985.10 542.99 2,714.95

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.61 3,294.99 1,156.43 5,782.15

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.87 3,166.29 1,185.94 5,929.71

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.65 3,055.13 1,205.47 6,027.33

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 714.56 3,079.97 1,362.40 6,812.01

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.77 6,865.32 2,297.76 11,488.80
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.64 1,243.28 421.38 2,106.89

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.89 - 352.45 1,762.24


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.58 154.67 120.98 604.91

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.80 198.89 143.80 718.99

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.81 1,088.22 345.80 1,728.98
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.79 1,357.95 423.76 2,118.81
BITUMEN JOINTS

Page 61 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.60 676.47 246.76 1,233.79
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.69 836.19 297.78 1,488.89
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,793.55 10,224.84 51,124.19
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,854.15 11,739.99 58,699.94
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,025.23 6,015.75 1,836.85 9,184.25
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,144.60 6,639.78 2,022.70 10,113.51
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.62 4,294.86 1,382.36 6,911.81
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.81 4,734.89 1,496.42 7,482.10
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.52 936.83 283.42 1,417.08
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.92 8,339.55 2,262.64 11,313.18
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 482.39 9,115.53 2,452.75 12,263.74
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.67 4,281.07 1,101.45 5,507.24

604b METAL GUARD RAIL END PIECES Each 288.45 143.15 3,771.74 1,050.84 5,254.19

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.85 5,231.38 1,382.15 6,910.76

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 497.14 29,492.25 8,471.35 42,356.76
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 497.14 29,399.15 8,448.08 42,240.39
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 387.23 15,764.44 4,252.65 21,263.26
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 387.23 17,838.67 4,771.21 23,856.05
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 62 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 387.23 19,957.67 5,300.96 26,504.80
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 387.23 16,362.57 4,402.19 22,010.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 387.23 18,640.77 4,971.74 24,858.68
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 387.23 20,971.67 5,554.46 27,772.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.96 19,965.80 5,296.61 26,483.05
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.96 23,586.30 6,201.74 31,008.68
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.96 27,122.30 7,085.74 35,428.68
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.96 20,979.15 5,549.95 27,749.74
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.96 24,961.70 6,545.59 32,727.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.96 27,204.64 7,106.32 35,531.60
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 490.21 25,175.35 6,653.56 33,267.81
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 490.21 26,605.35 7,011.06 35,055.31
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 63 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 490.21 43,362.74 11,200.41 56,002.05
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 490.21 46,222.74 11,915.41 59,577.05
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.51 40,827.30 10,363.47 51,817.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.66 36,197.32 9,192.36 45,961.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 34,573.16 8,803.61 44,018.04
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 35,721.45 9,104.93 45,524.63
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.51 36,827.30 9,363.47 46,817.36
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.66 32,197.32 8,192.36 40,961.79
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 30,573.16 7,803.61 39,018.04
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 31,721.45 8,104.93 40,524.63
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 64 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.32 225.09 1,125.46
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.08 93.50 25.57 127.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.40 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.73 220.74 130.12 650.59
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 366.29 687.23 321.71 1,608.56
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.85
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.73 327.81 156.89 784.43
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.59 945.95 372.22 1,861.08
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.86 366.31 129.04 645.21
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.89 998.11 294.50 1,472.50
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.86 476.11 156.49 782.46
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 51.03 1,373.87 381.80 1,909.01
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 501.40 143.92 719.59
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.61 78.24 391.19
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 65 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHAKWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 601.40 168.92 844.59
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.61 84.49 422.44
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.63 1,491.60 499.70 2,498.51
DRAWING

610c KILOMETER POST Each 346.14 572.62 3,197.79 1,029.14 5,145.69

610d TEN KILOMETER POST Each 692.29 1,145.23 8,450.10 2,571.91 12,859.53

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.52 2,254.08 701.76 3,508.81
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,154.94 25.00 397.49 1,987.45
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 28.46 16.41 82.04

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 94.29 32.87 164.33

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.64 34.01 10.01 50.03

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.98 3.00 4.19 20.93
PER ADDITIONAL MONTH

Page 66 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

CHINIOT

Page 67 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.94 19.70 - 5.41 27.05

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 49.73 567.69 31.55 162.24 811.21

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 91.86 875.07 141.95 277.22 1,386.10

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 440.94 1,779.89 757.05 744.47 3,722.34

103 STRIPPING Cu.m 10.41 273.68 - 71.03 355.13

104 COMPACTION OF NATURAL GROUND Sq.m 1.80 18.51 1.76 5.52 27.58

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 16.01 304.27 - 80.07 400.35

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 56.64 783.97 38.45 219.77 1,098.84

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 42.48 610.80 - 163.32 816.60

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 32.91 434.41 - 116.83 584.15

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 16.01 304.27 - 80.07 400.35

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 56.64 783.97 38.45 219.77 1,098.84

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 42.48 610.80 - 163.32 816.60

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 32.91 434.41 - 116.83 584.15

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 31.45 278.85 - 77.58 387.88

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 217.60 685.11 210.51 278.30 1,391.51
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 56.64 774.49 38.45 217.40 1,086.99
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 42.55 601.19 - 160.94 804.68
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 32.91 424.88 - 114.45 572.24
MATERIAL

107d GRANULAR BACKFILL Cu.m 127.11 292.48 949.14 342.19 1,710.93

107e COMMON BACK FILL Cu.m 99.10 126.35 11.70 59.29 296.44

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 29.59 310.56 11.70 87.96 439.81
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 67.78 969.89 38.45 269.03 1,345.14
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 51.74 782.83 11.70 211.57 1,057.84
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 45.30 597.87 11.70 163.72 818.59
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 29.08 296.94 60.13 96.54 482.70
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 28.71 165.87 11.70 51.57 257.85
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 50.16 206.23 11.70 67.02 335.10
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.40 79.91 3.51 22.21 111.03

Page 68 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.55 70.54 3.12 19.30 96.51
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 26.21 326.92 328.99 170.53 852.65

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.18 22.17 1.76 6.78 33.89

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.55 22.58 11.19 9.58 47.90

201 GRANULAR SUBBASE Cu.m 41.19 264.97 1,134.90 360.27 1,801.33

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 62.67 517.95 1,364.44 486.27 2,431.34

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 62.67 407.33 1,364.44 458.61 2,293.06

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 213.92 1,847.83 13,134.74 3,799.12 18,995.61

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 213.92 1,847.83 13,535.56 3,899.33 19,496.64

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.27 13,134.74 3,798.98 18,994.91
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.27 13,412.29 3,868.37 19,341.85
"B")

204b CEMENT STABILIZED BASE Cu.m 104.74 566.93 1,688.09 589.94 2,949.70

204c CEMENT CONTENT Ton 430.88 - 14,387.52 3,704.60 18,523.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 886.91 2,290.76 108,809.21 27,996.72 139,983.60

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 886.91 2,290.76 103,563.10 26,685.19 133,425.96
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 361.16 144.12 1,204.06 427.34 2,136.69
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 199.48 2,435.03 12,656.91 3,822.86 19,114.28
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 397.27 107.51 1,471.73 494.13 2,470.64
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 6.18 39.27 79.66 31.28 156.38

207b DEEP PATCHING (15-30 cm) Sq.m 6.18 39.27 79.66 31.28 156.38

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.92 106.72 0.98 28.66 143.28

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 16.78 465.65 6.50 122.23 611.15
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.36 60.75 0.97 16.27 81.35

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.10 1.09 111.70 28.47 142.36

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.06 1.26 105.64 26.99 134.95
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.44 0.75 45.51 11.67 58.36

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.44 0.75 42.24 10.86 54.29
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.29 34.50 198.47 58.82 294.08

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.29 33.76 127.27 40.83 204.15

304bi DOUBLE SURFACE TREATMENT Sq.m 3.75 42.00 403.46 112.30 561.51

Page 69 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.75 41.08 332.26 94.27 471.36

304ci TRIPLE SURFACE TREATMENT Sq.m 6.84 46.66 476.54 132.51 662.55

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.84 45.69 405.20 114.43 572.16

304d SEAL COAT Sq.m 2.84 10.07 56.36 17.32 86.58

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.46 14,130.77 4,064.52 20,322.61
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.46 14,436.99 4,141.08 20,705.39
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 735.73 871.12 12,452.24 3,514.77 17,573.86

307b OPEN GRADED HOT BIT-MAC Cu.m 735.73 871.12 12,294.30 3,475.29 17,376.44

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 110.18 1,467.54 3,345.60 1,230.83 6,154.15
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 287.25 1,327.36 101,430.85 25,761.37 128,806.84

309a COLD MILLING, 0 - 30 mm Sq.m 2.25 32.39 60.34 23.75 118.73

309b COLD MILLING, 0 - 50 mm Sq.m 4.46 53.40 100.03 39.47 197.36

309c COLD MILLING, 0 - 70 mm Sq.m 8.43 71.91 139.58 54.98 274.90

309d COLD MILLING, 0 - 100 mm Sq.m 9.73 97.63 200.42 76.94 384.71

309e COLD MILLING, 0 - 130 mm Sq.m 12.65 126.92 260.54 100.03 500.13

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 370.56 3,659.92 12,297.40 4,081.97 20,409.85
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,229.81 2,599.24 7,341.69 2,792.69 13,963.43

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,229.81 2,599.65 8,608.29 3,109.44 15,547.18

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,229.81 2,599.24 9,030.18 3,214.81 16,074.04

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,229.81 2,599.70 7,874.55 2,926.02 14,630.08

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,229.81 2,706.22 9,141.14 3,269.29 16,346.46

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,281.88 2,599.65 9,563.04 3,361.14 16,805.70

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,229.81 2,599.24 8,215.66 3,011.18 15,055.89

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,229.81 2,706.22 9,482.26 3,354.57 16,772.86

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,281.88 2,599.70 9,904.15 3,446.43 17,232.16

401b CONCRETE CLASS "B" Cu.m 1,573.91 1,294.74 5,909.21 2,194.47 10,972.33

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,182.52 2,715.12 6,846.15 2,685.95 13,429.74

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,217.23 2,713.28 8,122.49 3,013.25 15,066.25

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,217.23 2,714.20 8,534.64 3,116.52 15,582.59

401di CONCRETE CLASS "D1" Cu.m 1,917.42 2,870.78 11,606.30 4,098.63 20,493.14

401dii CONCRETE CLASS "D2" Cu.m 1,917.42 2,871.24 12,447.04 4,308.93 21,544.64

Page 70 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,917.42 2,871.24 13,132.16 4,480.21 22,401.04

401e CONCRETE CLASS "Y" Cu.m 1,229.81 1,699.77 9,364.34 3,073.48 15,367.40

401f LEAN CONCRETE Cu.m 1,029.80 1,021.19 4,516.24 1,641.81 8,209.04

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,919.21 1,494.44 8,338.70 3,188.09 15,940.44

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,919.21 1,494.44 9,368.29 3,445.49 17,227.43

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,919.21 1,784.90 6,974.05 2,919.54 14,597.70

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,080.50 2,871.24 11,664.79 4,154.13 20,770.66

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,080.50 2,871.24 12,505.53 4,364.32 21,821.59

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,080.50 2,871.24 13,190.65 4,535.60 22,677.99

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,389.59 1,271.57 4,354.23 1,753.85 8,769.24
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,635.90 816.34 183,190.69 47,410.73 237,053.66

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,635.90 816.34 187,390.69 48,460.73 242,303.66

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,116.12 1,853.55 213,995.29 54,741.24 273,706.20
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,980.44 7,785.35 355,559.60 92,581.35 462,906.74
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 215.45 1,013.28 - 307.18 1,535.91

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 397.36 - 1,571.12 492.12 2,460.60
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 268.10 - 4,053.37 1,080.37 5,401.84
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 27.97 4.18 248.10 70.07 350.33
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 48,262.23 12,307.93 61,539.65
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 43,762.23 11,182.93 55,914.65
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 139,308.99 35,069.62 175,348.10


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 114,318.88 28,822.09 144,110.46


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 43,268.16 11,059.41 55,297.06


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 38,208.20 9,794.42 48,972.11


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 71 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 969.49 - 33,643.36 8,653.21 43,266.06
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 969.49 - 26,125.50 6,773.75 33,868.74


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 969.49 - 31,476.27 8,111.44 40,557.20
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 969.49 - 104,647.01 26,404.13 132,020.63
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 904.85 - 68,916.68 17,455.39 87,276.93
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 236.98 - 971.44 302.11 1,510.53

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 236.98 - 1,252.84 372.46 1,862.28

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 1.67 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 3.02 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 5.52 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 93.72 - 469.55 140.82 704.09

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 503.01 3,899.39 266.66 1,167.27 5,836.33
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,196.75 5,179.51 368.15 1,686.10 8,430.50
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 550.81 4,490.40 304.71 1,336.48 6,682.39
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,381.45 6,108.79 463.27 1,988.38 9,941.88
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 703.92 9,512.14 831.58 2,761.91 13,809.55
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,007.51 13,515.88 831.61 4,338.75 21,693.75
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,042.56 13,598.07 1,302.30 3,985.73 19,928.65
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,310.96 19,697.06 1,302.30 6,327.58 31,637.90
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 491.21 1,598.29 3,679.00 1,442.13 7,210.63
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 982.42 3,160.12 2,788.98 1,732.88 8,664.41
SIZE) INCLUDING TESTING AND REPORTING

Page 72 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,964.84 6,256.30 933.48 2,288.66 11,443.29
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 23,267.68 99,009.76 895,628.10 254,476.39 1,272,381.93

407t PILE LOAD TEST UPTO 800 TON Each 28,438.24 109,064.24 1,302,747.54 360,062.51 1,800,312.53

407u PILE LOAD TEST UPTO 1000 TON Each 28,438.24 109,064.24 1,628,477.76 441,495.06 2,207,475.30

407v PILE LOAD TEST UPTO 1200 TON Each 28,438.24 109,064.24 1,906,150.20 510,913.17 2,554,565.85

407w PILE LOAD TEST UPTO 1500 TON Each 28,438.24 109,064.24 2,307,658.86 611,290.34 3,056,451.68

407x PILE LOAD TEST UPTO 2000 TON Each 28,438.24 109,064.24 2,712,658.86 712,540.34 3,562,701.68

407y PILE LOAD TEST UPTO 2500 TON Each 28,438.24 135,358.40 3,117,658.86 820,363.88 4,101,819.38

407l PERMANENT PILE CASING FOR PILES Ton 1,772.01 8,335.39 228,471.48 59,644.72 298,223.60

410 BRICK WORK Cu.m 1,054.80 448.82 8,405.81 2,477.36 12,386.79

411a STONE MASONRY RANDOM DRY Cu.m 842.37 250.40 1,432.12 631.22 3,156.11

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 896.23 353.79 3,549.83 1,199.96 5,999.81

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,327.11 250.40 1,602.94 795.12 3,975.58

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,564.10 353.79 3,642.53 1,390.10 6,950.51
MORTAR

411g ROLL POINTING Sq.m 177.09 23.90 175.26 94.07 470.33

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,027.29 532.65 3,642.53 1,550.62 7,753.09
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 347.94 1,238.77 1,250.24 709.24 3,546.19
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 359.79 1,249.94 1,597.62 801.84 4,009.19
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 583.85 1,266.70 2,575.88 1,106.61 5,533.03
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 652.20 1,277.66 3,913.15 1,460.75 7,303.75
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 724.66 1,248.86 6,338.80 2,078.08 10,390.41
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 837.28 1,306.82 9,542.43 2,921.63 14,608.16
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 970.75 1,475.19 10,417.27 3,215.80 16,079.01
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,178.77 1,670.67 12,612.64 3,865.52 19,327.60
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,518.86 1,963.07 24,907.56 7,097.37 35,486.86
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 347.94 1,238.77 1,766.84 838.39 4,191.94
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 359.79 1,249.94 2,171.62 945.34 4,726.69
DIA 380 mm

Page 73 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 583.85 1,266.70 2,903.88 1,188.61 5,943.03
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 652.20 1,277.66 4,569.15 1,624.75 8,123.75
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 724.66 1,248.86 7,978.80 2,488.08 12,440.41
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 837.28 1,306.82 12,412.43 3,639.13 18,195.66
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 970.75 1,475.19 14,517.27 4,240.80 21,204.01
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,178.77 1,670.67 17,141.65 4,997.77 24,988.86
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,518.86 1,963.07 30,770.54 8,563.12 42,815.59
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 350.45 221.28 938.03 377.44 1,887.19
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,774.99 1,006.73 5,909.21 2,172.73 10,863.66
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 18.13 - 237.59 63.93 319.66

507b ROCK FILL IN GABIONS Cu.m 344.70 - 804.32 287.26 1,436.29

508a BRICK PAVING (SINGLE COURSE) Sq.m 366.68 12.41 583.22 240.58 1,202.89

508b BRICK PAVING (DOUBLE COURSE) Sq.m 646.75 23.16 1,166.39 459.08 2,295.38

509a RIP RAP CLASS "A" Cu.m 1,071.17 102.69 876.78 512.66 2,563.30

509b RIP RAP CLASS "B" Cu.m 1,140.02 64.39 898.61 525.76 2,628.78

509c RIP RAP CLASS "C" Cu.m 1,195.69 51.25 927.99 543.73 2,718.66

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 736.09 527.53 985.10 562.18 2,810.89

509d GROUTED RIP RAP CLASS "A" Cu.m 1,295.23 173.92 3,462.90 1,233.01 6,165.06

509e GROUTED RIP RAP CLASS "B" Cu.m 1,613.95 135.62 3,325.82 1,268.85 6,344.24

509f GROUTED RIP RAP CLASS "C" Cu.m 1,854.22 110.61 3,206.29 1,292.78 6,463.90

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,854.22 711.66 3,231.14 1,449.26 7,246.28

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,715.14 793.19 7,159.79 2,417.03 12,085.15
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 182.15 279.46 938.14 349.94 1,749.68

510 DISMANTLING OF STRUCTURE AND Cu.m 618.32 857.73 - 369.02 1,845.08


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 288.69 71.54 154.67 128.73 643.64

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 329.93 81.76 198.89 152.65 763.24

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 275.76 48.77 1,128.43 363.24 1,816.21
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 315.16 55.74 1,407.03 444.48 2,222.41
BITUMEN JOINTS

Page 74 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 253.14 84.54 718.89 264.15 1,320.73
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 289.31 96.62 888.00 318.48 1,592.40
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 39,790.60 10,235.90 51,179.50
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 45,859.49 11,753.13 58,765.63
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,021.72 6,128.10 1,873.28 9,366.38
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,140.63 6,763.64 2,061.89 10,309.45
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,105.50 4,409.16 1,414.23 7,071.14
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,121.68 4,861.25 1,531.30 7,656.48
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 92.21 114.47 981.64 297.08 1,485.40
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 497.44 8,575.84 2,328.00 11,640.00
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 480.81 9,376.70 2,524.06 12,620.28
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 31.24 - 117.12 37.09 185.45

604a METAL GUARD RAIL M 97.52 37.65 4,268.30 1,100.87 5,504.34

604b METAL GUARD RAIL END PIECES Each 323.17 143.09 3,759.76 1,056.51 5,282.53

604d STEEL POST FOR METAL GUARD RAIL Each 185.28 131.61 5,207.38 1,381.07 6,905.34

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,364.81 495.65 29,826.94 8,671.85 43,359.25
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,364.81 495.65 29,733.09 8,648.39 43,241.94
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 962.30 384.25 15,891.91 4,309.62 21,548.08
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 962.30 384.25 17,951.86 4,824.60 24,123.01
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 75 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 962.30 384.25 20,057.86 5,351.10 26,755.51
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 962.30 384.25 16,490.04 4,459.15 22,295.74
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 962.30 384.25 18,755.26 5,025.45 25,127.26
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 962.30 384.25 21,071.86 5,604.60 28,023.01
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,062.84 271.37 20,059.93 5,348.54 26,742.69
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,062.84 271.37 23,686.93 6,255.29 31,276.44
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,062.84 271.37 27,222.93 7,139.29 35,696.44
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,062.84 271.37 21,072.63 5,601.71 28,008.56
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,062.84 271.37 25,062.33 6,599.14 32,995.69
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,062.84 271.37 27,222.93 7,139.29 35,696.44
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,062.84 488.35 25,317.84 6,717.26 33,586.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,062.84 488.35 26,747.84 7,074.76 35,373.80
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 76 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,062.84 488.35 43,512.35 11,265.89 56,329.44
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,062.84 488.35 46,372.35 11,980.89 59,904.44
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 374.27 291.63 40,912.73 10,394.66 51,973.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.37 36,298.75 9,229.93 46,149.65
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.90 34,662.68 8,840.14 44,200.71
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.32 35,809.34 9,142.63 45,713.16
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 374.27 291.63 36,912.73 9,394.66 46,973.30
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.37 32,298.75 8,229.93 41,149.65
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.90 30,662.68 7,840.14 39,200.71
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.32 31,809.34 8,142.63 40,713.16
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 486.90 - 4,680.00 1,291.73 6,458.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 486.90 - 3,960.00 1,111.73 5,558.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 77 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 486.90 - 7,020.00 1,876.73 9,383.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 486.90 - 5,940.00 1,606.73 8,033.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 18.24 14.76 868.60 225.40 1,127.01
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 30.03 9.43 47.16


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 5.06 93.50 25.68 128.38


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 36.03 10.94 54.68


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 4.39 114.69 30.81 154.03


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 156.84 159.64 220.74 134.31 671.54
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 261.40 365.48 687.23 328.53 1,642.64
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 39.03 12.05 60.24
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 135.22 36.47 182.34
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 46.83 14.00 69.99
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 165.77 44.11 220.53
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 156.84 159.64 327.81 161.08 805.38
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 261.40 308.97 945.95 379.08 1,895.40
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 78.42 79.82 366.31 131.14 655.69
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 78.42 109.64 998.11 296.55 1,482.73
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 78.42 79.82 476.11 158.59 792.94
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 114.61 50.86 1,373.87 384.84 1,924.19
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 501.73 145.07 725.33
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 279.68 78.95 394.73
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 78 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: CHINIOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 601.73 170.07 850.33
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 304.68 85.20 425.98
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 300.90 237.81 1,517.56 514.07 2,570.34
DRAWING

610c KILOMETER POST Each 387.79 572.35 3,291.13 1,062.82 5,314.09

610d TEN KILOMETER POST Each 775.58 1,144.70 8,716.46 2,659.19 13,295.93

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 491.21 114.47 2,303.35 727.26 3,636.29
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 459.35 1,152.51 19.00 407.72 2,038.59
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.71 28.45 16.83 84.13

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.71 94.28 33.29 166.43

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.54 4.63 34.02 10.05 50.25

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.33 8.96 3.00 4.32 21.61
PER ADDITIONAL MONTH

Page 79 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

D.G.KHAN

Page 80 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.66 - 5.35 26.74

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 566.89 31.45 160.68 803.40

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 873.74 141.49 274.31 1,371.54

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,775.03 754.63 730.81 3,654.04

103 STRIPPING Cu.m 9.29 273.36 - 70.66 353.31

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.44 1.76 5.45 27.25

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.41 - 79.42 397.11

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 781.76 38.72 217.76 1,088.79

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 608.78 - 161.68 808.38

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.91 - 115.57 577.85

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.41 - 79.42 397.11

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 781.76 38.72 217.76 1,088.79

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 608.78 - 161.68 808.38

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.91 - 115.57 577.85

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.73 - 76.45 382.25

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 681.68 212.31 272.06 1,360.28
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.29 38.72 215.39 1,076.95
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 599.18 - 159.29 796.45
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.39 - 113.19 565.95
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.84 1,128.02 383.33 1,916.65

107e COMMON BACK FILL Cu.m 88.46 125.86 11.70 56.50 282.51

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.91 11.70 87.00 435.01
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 967.20 38.72 266.60 1,333.01
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 780.37 11.70 209.56 1,047.81
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 595.60 11.70 161.93 809.66
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.20 60.14 95.58 477.88
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.14 11.70 50.62 253.09
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.72 11.70 65.55 327.74
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.69 3.51 22.01 110.03

Page 81 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.39 3.12 19.17 95.85
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.72 329.00 169.53 847.64

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.08 1.76 6.67 33.35

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.48 11.16 9.43 47.13

201 GRANULAR SUBBASE Cu.m 36.77 264.20 1,134.90 358.97 1,794.84

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 516.47 1,226.72 449.78 2,248.91

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.15 1,226.72 422.21 2,111.03

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,842.03 13,942.51 3,993.87 19,969.35

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,842.03 14,336.96 4,092.48 20,462.41

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.47 13,942.51 3,993.73 19,968.65
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.47 14,215.85 4,062.07 20,310.33
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 564.87 2,633.16 822.88 4,114.39

204c CEMENT CONTENT Ton 384.60 - 13,965.00 3,587.40 17,937.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,286.26 107,417.80 27,623.92 138,119.61

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,286.26 102,164.80 26,310.67 131,553.36
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.69 1,204.06 417.53 2,087.65
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,426.42 13,390.19 3,998.67 19,993.34
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.26 1,344.60 451.62 2,258.08
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.13 71.71 29.09 145.44

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.13 71.71 29.09 145.44

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.33 0.98 28.37 141.85

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.28 6.50 121.44 607.20
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.57 0.97 16.14 80.68

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 110.31 28.09 140.46

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 104.24 26.61 133.04
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.95 11.52 57.60

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.68 10.71 53.53
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.41 200.94 59.35 296.74

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.67 130.63 41.59 207.94

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.89 412.92 114.54 572.70

Page 82 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.97 342.61 96.74 483.68

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.55 487.66 135.08 675.40

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.58 417.22 117.23 586.13

304d SEAL COAT Sq.m 2.53 10.01 57.27 17.45 87.26

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.93 14,922.12 4,255.93 21,279.66
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.93 15,222.53 4,331.04 21,655.18
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.02 13,268.21 3,698.49 18,492.43

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.02 13,112.05 3,659.45 18,297.23

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,465.48 3,342.87 1,226.68 6,133.38
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,322.40 100,032.55 25,402.84 127,014.19

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.31 60.26 23.65 118.23

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.27 99.89 39.29 196.43

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.49 139.39 54.60 273.01

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.06 200.15 76.47 382.36

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.18 260.19 99.42 497.08

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,650.88 12,377.27 4,089.73 20,448.64
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,581.78 7,471.76 2,787.82 13,939.08

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,582.18 8,751.25 3,107.79 15,538.94

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,581.78 9,178.75 3,214.56 16,072.81

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,582.24 7,979.13 2,914.77 14,573.86

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,688.64 9,258.61 3,261.24 16,306.21

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,582.18 9,686.12 3,353.13 16,765.63

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,581.78 8,310.19 2,997.42 14,987.11

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,688.64 9,589.67 3,344.01 16,720.04

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,582.24 10,017.18 3,435.90 17,179.51

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,281.32 5,998.80 2,171.25 10,856.25

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,698.61 6,980.91 2,683.76 13,418.80

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,696.77 8,270.40 3,013.42 15,067.09

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,697.69 8,687.90 3,118.02 15,590.11

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,849.66 11,686.84 4,062.00 20,310.01

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,850.12 12,512.83 4,268.62 21,343.08

Page 83 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,850.12 13,177.83 4,434.87 22,174.33

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,689.51 9,490.14 3,069.34 15,346.71

401f LEAN CONCRETE Cu.m 919.20 1,008.97 4,623.96 1,638.03 8,190.16

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,479.55 8,481.01 3,141.57 15,707.84

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,479.55 9,480.42 3,391.42 16,957.10

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,770.64 7,049.01 2,856.34 14,281.70

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,850.12 11,746.90 4,113.52 20,567.61

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,850.12 12,572.89 4,320.02 21,600.10

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,850.12 13,237.89 4,486.27 22,431.35

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,261.21 4,411.69 1,728.31 8,641.56
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.07 184,092.36 47,484.78 237,423.89

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.07 188,292.36 48,534.78 242,673.89

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.75 214,839.83 54,868.52 274,342.58
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,778.28 359,260.33 93,317.28 466,586.41
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,001.71 - 298.50 1,492.51

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,582.19 484.22 2,421.10
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,085.84 1,081.29 5,406.44
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.98 70.03 350.16
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,763.58 12,407.23 62,036.16
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,263.58 11,282.23 56,411.16
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,527.34 35,348.17 176,740.86


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,525.15 29,097.63 145,488.13


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,579.75 11,111.28 55,556.38


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,498.06 9,840.85 49,204.26


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 84 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,143.09 8,752.11 43,760.55
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,408.33 6,818.42 34,092.10


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 32,122.15 8,246.88 41,234.38
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 106,038.40 26,725.94 133,629.69
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,115.06 17,480.68 87,403.40
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 982.95 298.62 1,493.11

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,264.35 368.97 1,844.86

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 480.61 141.07 705.33

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,854.57 367.89 1,167.86 5,839.31
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,144.91 479.18 1,673.08 8,365.39
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,438.19 409.62 1,334.87 6,674.33
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,067.06 583.49 1,970.91 9,854.55
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,480.62 984.15 2,773.27 13,866.35
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,418.07 984.18 4,271.67 21,358.35
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,552.95 1,499.64 3,995.79 19,978.94
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,552.49 1,499.64 6,225.00 31,124.98
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,590.97 3,790.18 1,454.90 7,274.49
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,145.63 2,900.17 1,730.67 8,653.36
SIZE) INCLUDING TESTING AND REPORTING

Page 85 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,227.59 1,044.67 2,256.51 11,282.55
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,768.32 884,879.85 251,104.14 1,255,520.71

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,789.36 1,287,113.49 355,321.61 1,776,608.06

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,789.36 1,608,934.56 435,776.88 2,178,884.40

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,789.36 1,882,698.70 504,217.92 2,521,089.58

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,789.36 2,278,344.91 603,129.47 3,015,647.34

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,789.36 2,683,344.91 704,379.47 3,521,897.34

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,013.68 3,088,344.91 812,185.55 4,060,927.74

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,318.89 229,357.85 59,814.60 299,073.01

410 BRICK WORK Cu.m 941.51 447.46 8,445.18 2,458.54 12,292.69

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.17 1,439.43 610.38 3,051.88

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.12 3,321.13 1,118.56 5,592.79

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.17 1,610.25 761.25 3,806.25

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.12 3,413.83 1,290.77 6,453.83
MORTAR

411g ROLL POINTING Sq.m 158.07 23.80 171.97 88.46 442.31

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.81 3,413.83 1,438.80 7,194.00
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,232.81 1,227.67 692.76 3,463.81
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,246.75 1,566.60 783.63 3,918.13
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,263.48 2,533.45 1,079.52 5,397.58
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,274.48 4,358.70 1,553.83 7,769.15
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,245.63 6,833.41 2,181.47 10,907.35
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,303.50 9,432.48 2,870.83 14,354.15
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,471.34 11,051.02 3,347.21 16,736.06
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,667.11 12,460.15 3,794.86 18,974.28
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,958.94 26,396.31 7,427.74 37,138.71
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,232.81 1,744.27 821.91 4,109.56
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,246.75 2,140.60 927.13 4,635.63
DIA 380 mm

Page 86 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,263.48 2,861.45 1,161.52 5,807.58
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,274.48 4,493.01 1,587.41 7,937.04
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,245.63 8,473.41 2,591.47 12,957.35
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,303.50 13,047.43 3,774.57 18,872.84
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,471.34 15,151.02 4,372.21 21,861.06
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,667.11 16,988.61 4,926.97 24,634.84
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,958.94 30,518.94 8,458.40 42,291.99
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.96 1,093.06 406.71 2,033.53
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,000.42 5,998.80 2,145.90 10,729.48
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 240.38 64.14 320.71

507b ROCK FILL IN GABIONS Cu.m 307.68 - 804.32 278.00 1,390.00

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.37 591.06 232.68 1,163.41

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.07 1,182.06 445.61 2,228.03

509a RIP RAP CLASS "A" Cu.m 956.12 101.98 876.78 483.72 2,418.60

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.31 898.61 495.13 2,475.63

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.18 927.99 511.61 2,558.05

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.94 985.10 542.27 2,711.34

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 171.49 3,204.02 1,132.91 5,664.53

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 133.81 3,079.85 1,163.57 5,817.84

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.11 2,973.22 1,184.35 5,921.76

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 709.51 2,998.07 1,340.66 6,703.31

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 790.04 7,212.99 2,383.50 11,917.48
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.08 1,090.07 382.93 1,914.66

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.43 - 352.33 1,761.66


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.48 154.67 120.96 604.79

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.69 198.89 143.77 718.85

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.68 1,060.03 338.72 1,693.58
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.64 1,323.26 415.05 2,075.26
BITUMEN JOINTS

Page 87 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.42 654.97 241.34 1,206.69
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.48 809.93 291.16 1,455.80
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,953.94 10,264.94 51,324.68
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,044.52 11,787.58 58,937.89
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,014.74 6,196.27 1,879.36 9,396.79
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,132.70 6,838.84 2,069.49 10,347.45
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,102.60 4,454.60 1,421.05 7,105.23
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,119.29 4,911.26 1,539.38 7,696.91
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.36 968.72 291.35 1,456.74
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.49 8,512.89 2,305.61 11,528.06
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.88 9,306.75 2,499.93 12,499.63
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.62 4,320.54 1,111.30 5,556.51

604b METAL GUARD RAIL END PIECES Each 288.45 142.95 3,792.51 1,055.98 5,279.90

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.13 5,272.33 1,392.21 6,961.05

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 491.01 30,068.18 8,613.80 43,069.01
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 491.01 29,971.81 8,589.71 42,948.55
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 377.05 16,107.97 4,335.99 21,679.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 377.05 18,197.07 4,858.27 24,291.34
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 88 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 377.05 20,303.07 5,384.77 26,923.84
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 377.05 16,706.10 4,485.53 22,427.63
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 377.05 19,000.47 5,059.12 25,295.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 377.05 21,317.07 5,638.27 28,191.34
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.20 20,304.70 5,380.90 26,904.49
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.20 23,931.70 6,287.65 31,438.24
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.20 27,467.70 7,171.65 35,858.24
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.20 21,317.40 5,634.07 28,170.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.20 25,307.10 6,631.50 33,157.49
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.20 27,467.70 7,171.65 35,858.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.24 25,591.21 6,756.53 33,782.66
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.24 27,021.21 7,114.03 35,570.16
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 89 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.24 43,810.09 11,311.25 56,556.26
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.24 46,670.09 12,026.25 60,131.26
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 289.90 41,060.66 10,421.16 52,105.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.79 36,411.19 9,245.61 46,228.03
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.06 34,727.70 8,841.96 44,209.79
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.44 35,866.03 9,140.77 45,703.86
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 289.90 37,060.66 9,421.16 47,105.79
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.79 32,411.19 8,245.61 41,228.03
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.06 30,727.70 7,841.96 39,209.79
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.44 31,866.03 8,140.77 40,703.86
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 90 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.77 225.45 1,127.26
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.04 93.50 25.56 127.79


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.44


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.48 220.74 130.06 650.28
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 363.86 687.23 321.10 1,605.51
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 135.22 36.32 181.61
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 165.77 43.96 219.80
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.48 327.81 156.82 784.10
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.73 945.95 371.75 1,858.75
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.74 366.31 129.01 645.05
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.16 998.11 294.32 1,471.59
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.74 476.11 156.46 782.30
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.52 1,373.87 381.68 1,908.38
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 503.00 144.31 721.56
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 280.06 78.35 391.75
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 91 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: D.G.KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 603.00 169.31 846.56
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 305.06 84.60 423.00
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 235.62 1,527.99 508.05 2,540.24
DRAWING

610c KILOMETER POST Each 346.14 571.82 3,272.73 1,047.67 5,238.36

610d TEN KILOMETER POST Each 692.29 1,143.63 8,624.05 2,614.99 13,074.96

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.36 2,405.09 739.48 3,697.38
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,147.65 25.00 395.67 1,978.34
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 28.47 16.37 81.86

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 94.30 32.83 164.16

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.91 9.98 49.89

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.93 3.00 4.17 20.85
PER ADDITIONAL MONTH

Page 92 of 469
NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

FAISALABAD

Page 93 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.94 19.69 - 5.41 27.05

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 49.73 567.68 31.55 162.24 811.19

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 91.86 875.06 141.94 277.22 1,386.08

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 440.94 1,779.84 757.01 744.45 3,722.24

103 STRIPPING Cu.m 10.41 273.68 - 71.02 355.11

104 COMPACTION OF NATURAL GROUND Sq.m 1.80 18.51 1.76 5.52 27.58

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 16.01 304.26 - 80.07 400.34

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 56.64 783.95 38.49 219.77 1,098.85

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 42.48 610.77 - 163.31 816.56

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 32.91 434.39 - 116.83 584.13

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 16.01 304.26 - 80.07 400.34

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 56.64 783.95 38.49 219.77 1,098.85

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 42.48 610.77 - 163.31 816.56

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 32.91 434.39 - 116.83 584.13

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 31.45 278.83 - 77.57 387.86

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 217.60 685.09 210.58 278.32 1,391.58
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 56.64 774.47 38.49 217.40 1,087.00
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 42.55 601.16 - 160.93 804.64
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 32.91 424.86 - 114.44 572.21
MATERIAL

107d GRANULAR BACKFILL Cu.m 127.11 292.48 1,094.44 378.51 1,892.54

107e COMMON BACK FILL Cu.m 99.10 126.10 11.70 59.23 296.14

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 29.59 310.55 11.70 87.96 439.79
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 67.78 969.86 38.49 269.03 1,345.15
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 51.74 782.80 11.70 211.56 1,057.80
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 45.30 597.85 11.70 163.71 818.55
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 29.08 296.93 60.13 96.54 482.69
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 28.71 165.87 11.70 51.57 257.84
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 50.16 206.22 11.70 67.02 335.10
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.40 79.90 3.51 22.20 111.01

Page 94 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.55 70.54 3.12 19.30 96.51
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 26.21 326.90 364.51 179.41 897.03

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.18 22.17 1.76 6.78 33.89

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.55 22.58 11.19 9.58 47.90

201 GRANULAR SUBBASE Cu.m 41.19 264.96 1,274.82 395.24 1,976.21

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 62.67 517.93 1,504.36 521.24 2,606.21

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 62.67 407.32 1,504.36 493.59 2,467.94

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 213.92 1,847.74 13,297.25 3,839.73 19,198.64

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 213.92 1,847.74 13,697.70 3,939.84 19,699.20

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.18 13,297.25 3,839.59 19,197.94
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.18 13,574.56 3,908.91 19,544.56
"B")

204b CEMENT STABILIZED BASE Cu.m 104.74 566.90 1,857.82 632.37 3,161.83

204c CEMENT CONTENT Ton 430.88 - 14,510.37 3,735.31 18,676.56

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 886.91 2,290.67 108,716.97 27,973.64 139,868.18

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 886.91 2,290.67 103,529.11 26,676.67 133,383.36
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 361.16 144.11 1,344.58 462.46 2,312.31
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 199.48 2,434.91 12,803.16 3,859.39 19,296.95
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 397.27 107.50 1,612.08 529.21 2,646.06
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 6.18 39.27 87.73 33.29 166.46

207b DEEP PATCHING (15-30 cm) Sq.m 6.18 39.27 87.73 33.29 166.46

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.92 106.71 0.98 28.65 143.26

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 16.78 465.63 6.50 122.23 611.13
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.36 60.74 0.97 16.27 81.34

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.10 1.09 111.67 28.47 142.33

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.06 1.26 105.60 26.98 134.90
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.44 0.75 45.49 11.67 58.35

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.44 0.75 42.23 10.85 54.26
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.29 34.50 199.30 59.03 295.13

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.29 33.76 128.13 41.05 205.23

304bi DOUBLE SURFACE TREATMENT Sq.m 3.75 41.99 405.95 112.93 564.63

Page 95 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.75 41.08 334.78 94.90 474.51

304ci TRIPLE SURFACE TREATMENT Sq.m 6.84 46.66 479.48 133.25 666.23

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.84 45.68 408.16 115.17 575.85

304d SEAL COAT Sq.m 2.84 10.07 56.63 17.38 86.91

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.37 14,292.28 4,104.88 20,524.38
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.37 14,598.12 4,181.34 20,906.69
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 735.73 871.08 12,615.00 3,555.45 17,777.26

307b OPEN GRADED HOT BIT-MAC Cu.m 735.73 871.08 12,457.34 3,516.04 17,580.19

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 110.18 1,467.50 3,345.55 1,230.81 6,154.03
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 287.25 1,327.34 101,396.86 25,752.86 128,764.31

309a COLD MILLING, 0 - 30 mm Sq.m 2.25 32.39 60.34 23.75 118.73

309b COLD MILLING, 0 - 50 mm Sq.m 4.46 53.40 100.03 39.47 197.35

309c COLD MILLING, 0 - 70 mm Sq.m 8.43 71.90 139.57 54.98 274.89

309d COLD MILLING, 0 - 100 mm Sq.m 9.73 97.61 200.41 76.94 384.69

309e COLD MILLING, 0 - 130 mm Sq.m 12.65 126.90 260.54 100.02 500.10

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 370.56 3,659.78 12,478.33 4,127.17 20,635.84
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,229.81 2,599.02 7,504.02 2,833.21 14,166.06

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,229.81 2,599.42 8,771.02 3,150.06 15,750.31

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,229.81 2,599.02 9,193.67 3,255.63 16,278.13

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,229.81 2,599.48 8,043.24 2,968.13 14,840.66

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,229.81 2,705.99 9,310.23 3,311.51 16,557.54

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,281.88 2,599.42 9,732.89 3,403.55 17,017.74

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,229.81 2,599.02 8,387.28 3,054.03 15,270.14

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,229.81 2,705.99 9,654.27 3,397.52 16,987.60

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,281.88 2,599.48 10,076.93 3,489.57 17,447.86

401b CONCRETE CLASS "B" Cu.m 1,573.91 1,294.64 6,053.02 2,230.39 11,151.96

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,182.52 2,714.89 7,006.06 2,725.87 13,629.35

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,217.23 2,713.05 8,282.78 3,053.27 15,266.33

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,217.23 2,713.97 8,695.71 3,156.73 15,783.65

401di CONCRETE CLASS "D1" Cu.m 1,917.42 2,870.55 11,789.17 4,144.29 20,721.43

401dii CONCRETE CLASS "D2" Cu.m 1,917.42 2,871.01 12,635.25 4,355.92 21,779.60

Page 96 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,917.42 2,871.01 13,326.22 4,528.66 22,643.31

401e CONCRETE CLASS "Y" Cu.m 1,229.81 1,699.61 9,533.14 3,115.64 15,578.20

401f LEAN CONCRETE Cu.m 1,029.80 1,021.07 4,652.41 1,675.82 8,379.10

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,919.21 1,494.31 8,501.55 3,228.77 16,143.84

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,919.21 1,494.31 9,539.92 3,488.36 17,441.79

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,919.21 1,784.72 7,102.80 2,951.68 14,758.41

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,080.50 2,871.01 11,847.52 4,199.76 20,998.78

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,080.50 2,871.01 12,693.60 4,411.28 22,056.38

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,080.50 2,871.01 13,384.57 4,584.02 22,920.09

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,389.59 1,271.49 4,494.81 1,788.97 8,944.86
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,635.90 816.34 183,285.29 47,434.38 237,171.90

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,635.90 816.34 187,399.99 48,463.06 242,315.28

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,116.12 1,853.50 213,931.90 54,725.38 273,626.91
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,980.44 7,785.15 355,233.59 92,499.79 462,498.97
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 215.45 1,013.06 - 307.13 1,535.64

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 397.36 - 1,569.89 491.82 2,459.08
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 268.10 - 4,050.24 1,079.59 5,397.93
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 27.97 4.18 247.85 70.00 350.00
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 48,223.30 12,298.20 61,490.99
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 43,723.30 11,173.20 55,865.99
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 139,206.98 35,044.12 175,220.59


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 114,215.25 28,796.19 143,980.93


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 43,251.55 11,055.26 55,276.30


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 38,188.68 9,789.54 48,947.71


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 97 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 969.49 - 33,597.57 8,641.77 43,208.83
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 969.49 - 26,099.61 6,767.28 33,836.38


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 969.49 - 31,417.45 8,096.74 40,483.68
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 969.49 - 104,519.88 26,372.34 131,861.71
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 904.85 - 68,916.76 17,455.40 87,277.01
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 236.98 - 970.42 301.85 1,509.25

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 236.98 - 1,251.82 372.20 1,861.00

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 1.67 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 3.02 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 5.52 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 93.72 - 468.35 140.52 702.59

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 503.01 3,898.48 253.17 1,163.66 5,818.31
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,196.75 5,178.81 353.79 1,682.34 8,411.68
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 550.81 4,489.33 290.89 1,332.76 6,663.79
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,381.45 6,107.94 448.09 1,984.37 9,921.85
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 703.92 9,511.49 813.52 2,757.23 13,786.16
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,007.51 13,513.88 813.54 4,333.74 21,668.68
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,042.56 13,597.15 1,280.26 3,979.99 19,899.96
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,310.96 19,694.11 1,280.26 6,321.33 31,606.66
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 491.21 1,598.15 3,659.33 1,437.17 7,185.87
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 982.42 3,159.85 2,769.32 1,727.90 8,639.49
SIZE) INCLUDING TESTING AND REPORTING

Page 98 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,964.84 6,255.77 913.82 2,283.61 11,418.04
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 23,267.68 99,004.80 904,858.95 256,782.86 1,283,914.29

407t PILE LOAD TEST UPTO 800 TON Each 28,438.24 109,058.64 1,316,174.43 363,417.83 1,817,089.14

407u PILE LOAD TEST UPTO 1000 TON Each 28,438.24 109,058.64 1,645,261.92 445,689.70 2,228,448.50

407v PILE LOAD TEST UPTO 1200 TON Each 28,438.24 109,058.64 1,926,290.90 515,946.95 2,579,734.73

407w PILE LOAD TEST UPTO 1500 TON Each 28,438.24 109,058.64 2,332,834.37 617,582.81 3,087,914.06

407x PILE LOAD TEST UPTO 2000 TON Each 28,438.24 109,058.64 2,737,834.37 718,832.81 3,594,164.06

407y PILE LOAD TEST UPTO 2500 TON Each 28,438.24 135,351.36 3,142,834.37 826,655.99 4,133,279.96

407l PERMANENT PILE CASING FOR PILES Ton 1,772.01 8,335.00 228,566.69 59,668.43 298,342.13

410 BRICK WORK Cu.m 1,054.80 448.79 8,453.94 2,489.38 12,446.91

411a STONE MASONRY RANDOM DRY Cu.m 842.37 250.40 1,567.48 665.06 3,325.31

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 896.23 353.77 3,728.27 1,244.57 6,222.85

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,327.11 250.40 1,749.06 831.65 4,158.23

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,564.10 353.77 3,820.97 1,434.71 7,173.55
MORTAR

411g ROLL POINTING Sq.m 177.09 23.90 176.38 94.34 471.71

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,027.29 532.63 3,820.97 1,595.22 7,976.11
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 347.94 1,238.71 1,233.05 704.93 3,524.63
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 359.79 1,249.89 1,573.41 795.77 3,978.85
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 583.85 1,266.64 2,542.10 1,098.15 5,490.73
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 652.20 1,277.60 3,852.34 1,445.54 7,227.68
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 724.66 1,248.80 6,271.22 2,061.17 10,305.86
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 837.28 1,306.76 9,455.80 2,899.96 14,499.80
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 970.75 1,475.12 10,330.94 3,194.20 15,971.01
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,178.77 1,670.60 12,491.16 3,835.13 19,175.65
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,518.86 1,962.98 24,704.12 7,046.49 35,232.46
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 347.94 1,238.71 1,749.65 834.08 4,170.38
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 359.79 1,249.89 2,147.41 939.27 4,696.35
DIA 380 mm

Page 99 of 469
CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 583.85 1,266.64 2,870.10 1,180.15 5,900.73
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 652.20 1,277.60 4,508.34 1,609.54 8,047.68
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 724.66 1,248.80 7,911.22 2,471.17 12,355.86
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 837.28 1,306.76 12,325.80 3,617.46 18,087.30
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 970.75 1,475.12 14,430.94 4,219.20 21,096.01
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,178.77 1,670.60 17,020.33 4,967.43 24,837.13
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,518.86 1,962.98 30,567.10 8,512.24 42,561.18
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 350.45 221.27 1,077.95 412.42 2,062.09
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,774.99 1,006.65 6,053.02 2,208.67 11,043.33
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 18.13 - 237.35 63.87 319.35

507b ROCK FILL IN GABIONS Cu.m 344.70 - 929.89 318.65 1,593.25

508a BRICK PAVING (SINGLE COURSE) Sq.m 366.68 12.41 586.76 241.46 1,207.31

508b BRICK PAVING (DOUBLE COURSE) Sq.m 646.75 23.16 1,173.46 460.84 2,304.21

509a RIP RAP CLASS "A" Cu.m 1,071.17 102.68 1,010.24 546.02 2,730.11

509b RIP RAP CLASS "B" Cu.m 1,140.02 64.39 1,032.06 559.12 2,795.59

509c RIP RAP CLASS "C" Cu.m 1,195.69 51.25 1,062.53 577.37 2,886.83

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 736.09 527.51 1,121.43 596.26 2,981.29

509d GROUTED RIP RAP CLASS "A" Cu.m 1,295.23 173.91 3,566.26 1,258.85 6,294.25

509e GROUTED RIP RAP CLASS "B" Cu.m 1,613.95 135.61 3,427.68 1,294.31 6,471.55

509f GROUTED RIP RAP CLASS "C" Cu.m 1,854.22 110.60 3,309.16 1,318.50 6,592.49

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,854.22 711.64 3,334.00 1,474.97 7,374.84

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,715.14 793.13 7,320.15 2,457.11 12,285.53
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 182.15 279.45 1,078.06 384.92 1,924.58

510 DISMANTLING OF STRUCTURE AND Cu.m 618.32 857.73 - 369.01 1,845.06


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 288.69 71.54 178.22 134.61 673.06

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 329.93 81.76 229.17 160.22 801.08

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 275.76 48.77 1,153.29 369.46 1,847.28
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 315.16 55.73 1,438.74 452.41 2,262.04
BITUMEN JOINTS

Page 100 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 253.14 84.54 754.11 272.95 1,364.74
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 289.31 96.62 932.53 329.61 1,648.06
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 39,775.92 10,232.23 51,161.15
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 45,842.87 11,748.97 58,744.84
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,021.58 6,190.24 1,888.78 9,443.88
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,140.47 6,832.15 2,078.98 10,394.88
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,105.45 4,474.10 1,430.45 7,152.26
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,121.63 4,933.04 1,549.23 7,746.16
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 92.21 114.47 995.47 300.54 1,502.69
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 497.43 8,636.24 2,343.09 11,715.46
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 480.79 9,443.62 2,540.78 12,703.89
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 31.24 - 117.12 37.09 185.45

604a METAL GUARD RAIL M 97.52 37.65 4,263.64 1,099.70 5,498.51

604b METAL GUARD RAIL END PIECES Each 323.17 143.09 3,756.84 1,055.77 5,278.86

604d STEEL POST FOR METAL GUARD RAIL Each 185.28 131.60 5,201.59 1,379.62 6,898.09

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,364.81 495.59 29,991.19 8,712.90 43,564.48
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,364.81 495.59 29,897.57 8,689.49 43,447.46
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 962.30 384.22 15,910.75 4,314.32 21,571.60
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 962.30 384.22 17,951.13 4,824.42 24,122.08
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 101 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 962.30 384.22 20,057.13 5,350.92 26,754.58
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 962.30 384.22 16,510.75 4,464.32 22,321.60
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 962.30 384.22 18,754.53 5,025.27 25,126.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 962.30 384.22 21,071.13 5,604.42 28,022.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,062.84 271.35 20,059.34 5,348.38 26,741.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,062.84 271.35 23,686.34 6,255.13 31,275.66
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,062.84 271.35 27,222.34 7,139.13 35,695.66
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,062.84 271.35 21,072.04 5,601.56 28,007.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,062.84 271.35 25,061.74 6,598.98 32,994.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,062.84 271.35 27,222.34 7,139.13 35,695.66
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,062.84 488.31 25,340.30 6,722.87 33,614.33
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,062.84 488.31 26,770.30 7,080.37 35,401.83
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 102 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,062.84 488.31 43,532.64 11,270.95 56,354.75
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,062.84 488.31 46,392.64 11,985.95 59,929.75
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 374.27 291.61 40,930.85 10,399.19 51,995.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.36 36,339.61 9,240.14 46,200.71
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.89 34,709.44 8,851.83 44,259.14
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.31 35,857.35 9,154.63 45,773.15
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 374.27 291.61 36,930.85 9,399.19 46,995.93
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.36 32,339.61 8,240.14 41,200.71
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.89 30,709.44 7,851.83 39,259.14
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.31 31,857.35 8,154.63 40,773.15
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 486.90 - 4,680.00 1,291.73 6,458.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 486.90 - 3,960.00 1,111.73 5,558.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 103 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 486.90 - 7,020.00 1,876.73 9,383.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 486.90 - 5,940.00 1,606.73 8,033.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 18.24 14.76 868.41 225.35 1,126.76
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 30.03 9.43 47.16


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 5.06 93.50 25.68 128.38


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 36.03 10.94 54.68


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 4.39 114.69 30.80 154.01


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 156.84 159.64 220.74 134.31 671.54
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 261.40 365.45 687.23 328.52 1,642.60
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 39.03 12.05 60.24
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 135.22 36.47 182.34
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 46.83 14.00 69.99
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 165.77 44.11 220.53
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 156.84 159.64 327.81 161.07 805.36
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 261.40 308.94 945.95 379.07 1,895.36
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 78.42 79.82 366.31 131.14 655.69
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 78.42 109.63 998.11 296.54 1,482.71
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 78.42 79.82 476.11 158.59 792.94
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 114.61 50.85 1,373.87 384.84 1,924.18
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 501.62 145.04 725.18
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 279.65 78.94 394.68
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 104 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: FAISALABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 601.62 170.04 850.18
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 304.65 85.19 425.93
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 300.90 237.79 1,531.74 517.61 2,588.04
DRAWING

610c KILOMETER POST Each 387.79 572.34 3,319.84 1,069.99 5,349.96

610d TEN KILOMETER POST Each 775.58 1,144.68 8,783.36 2,675.91 13,379.53

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 491.21 114.47 2,319.81 731.37 3,656.86
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 459.35 1,152.41 19.00 407.69 2,038.45
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.71 28.44 16.83 84.13

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.71 94.28 33.28 166.41

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.54 4.63 34.02 10.05 50.24

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.33 8.96 3.00 4.32 21.61
PER ADDITIONAL MONTH

Page 105 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

GUJRANWALA

Page 106 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 2.18 19.71 - 5.47 27.36

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 55.72 567.94 31.62 163.82 819.10

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 102.92 875.88 142.28 280.27 1,401.35

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 494.01 1,782.87 758.84 758.93 3,794.66

103 STRIPPING Cu.m 11.67 273.83 - 71.38 356.88

104 COMPACTION OF NATURAL GROUND Sq.m 2.02 18.54 1.76 5.58 27.89

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 17.93 304.54 - 80.62 403.09

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 63.46 785.89 38.41 221.94 1,109.71

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 47.60 612.14 - 164.93 824.66

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 36.87 435.49 - 118.09 590.45

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 17.93 304.54 - 80.62 403.09

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 63.46 785.89 38.41 221.94 1,109.71

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 47.60 612.14 - 164.93 824.66

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 36.87 435.49 - 118.09 590.45

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 35.24 279.14 - 78.60 392.98

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 243.79 686.68 210.10 285.14 1,425.71
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 63.46 776.41 38.41 219.57 1,097.85
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 47.67 602.53 - 162.55 812.75
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 36.87 425.95 - 115.71 578.53
MATERIAL

107d GRANULAR BACKFILL Cu.m 142.41 292.67 1,261.65 424.18 2,120.91

107e COMMON BACK FILL Cu.m 111.03 126.46 11.70 62.30 311.50

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 33.15 310.89 11.70 88.94 444.68
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 75.93 971.84 38.41 271.55 1,357.74
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 57.97 784.06 11.70 213.43 1,067.16
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 50.75 598.60 11.70 165.26 826.31
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 32.59 297.32 60.13 97.51 487.54
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 32.16 166.00 11.70 52.47 262.34
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 56.19 206.38 11.70 68.57 342.84
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 6.05 79.97 3.51 22.38 111.91

Page 107 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.97 70.63 3.12 19.43 97.15
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 29.36 327.47 468.08 206.23 1,031.14

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.57 22.19 1.76 6.88 34.39

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 5.10 22.60 11.21 9.73 48.64

201 GRANULAR SUBBASE Cu.m 46.15 265.23 1,682.81 498.55 2,492.74

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 70.22 518.35 1,774.62 590.80 2,953.98

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 70.22 408.08 1,774.62 563.23 2,816.15

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 239.67 1,850.66 13,750.72 3,960.27 19,801.33

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 239.67 1,850.66 14,149.83 4,060.04 20,300.21

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 239.67 1,850.10 13,750.72 3,960.12 19,800.61
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 239.67 1,850.10 14,025.97 4,028.94 20,144.68
"B")

204b CEMENT STABILIZED BASE Cu.m 117.34 567.80 2,248.95 733.52 3,667.61

204c CEMENT CONTENT Ton 482.76 - 14,724.78 3,801.89 19,009.43

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 993.66 2,292.80 108,506.33 27,948.20 139,740.99

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 993.66 2,292.80 104,315.66 26,900.53 134,502.65
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 404.64 144.31 1,745.13 573.52 2,867.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 223.50 2,437.58 13,190.06 3,962.78 19,813.91
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 445.10 107.62 1,883.47 609.05 3,045.24
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 6.92 39.30 103.32 37.39 186.93

207b DEEP PATCHING (15-30 cm) Sq.m 6.92 39.30 103.32 37.39 186.93

208 REINSTATEMENT OF ROAD SURFACE Sq.m 7.76 106.92 0.98 28.92 144.58

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 18.79 466.62 6.50 122.98 614.90
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.76 60.80 0.97 16.38 81.91

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.23 1.10 112.46 28.70 143.48

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.19 1.27 106.39 27.21 136.05
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.49 0.75 45.81 11.76 58.81

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.49 0.75 42.54 10.95 54.73
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.56 34.56 202.74 59.97 299.83

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.56 33.81 131.07 41.86 209.31

304bi DOUBLE SURFACE TREATMENT Sq.m 4.21 42.06 414.80 115.27 576.33

Page 108 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 4.21 41.14 343.12 97.12 485.59

304ci TRIPLE SURFACE TREATMENT Sq.m 7.66 46.74 489.81 136.06 680.28

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 7.66 45.77 417.99 117.86 589.28

304d SEAL COAT Sq.m 3.18 10.08 57.68 17.74 88.68

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 210.47 1,942.38 14,749.65 4,225.63 21,128.14
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 210.47 1,942.38 15,059.51 4,303.09 21,515.46
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 824.29 872.63 13,066.33 3,690.81 18,454.05

307b OPEN GRADED HOT BIT-MAC Cu.m 824.29 872.63 12,903.18 3,650.03 18,250.13

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 123.44 1,468.65 3,346.84 1,234.73 6,173.66
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 321.84 1,330.91 102,183.41 25,959.04 129,795.20

309a COLD MILLING, 0 - 30 mm Sq.m 2.52 32.46 60.37 23.84 119.19

309b COLD MILLING, 0 - 50 mm Sq.m 5.00 53.50 100.09 39.65 198.24

309c COLD MILLING, 0 - 70 mm Sq.m 9.45 72.24 139.66 55.34 276.69

309d COLD MILLING, 0 - 100 mm Sq.m 10.90 97.71 200.54 77.29 386.44

309e COLD MILLING, 0 - 130 mm Sq.m 14.17 127.03 260.70 100.48 502.38

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 415.16 3,662.86 12,510.33 4,147.09 20,735.44
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,377.84 2,611.71 7,497.31 2,871.72 14,358.58

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,377.84 2,612.11 8,760.86 3,187.70 15,938.51

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,377.84 2,611.71 9,181.93 3,292.87 16,464.35

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,377.84 2,612.17 8,044.86 3,008.72 15,043.59

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,377.84 2,719.37 9,308.41 3,351.41 16,757.04

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,436.18 2,612.11 9,729.48 3,444.44 17,222.21

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,377.84 2,611.71 8,394.15 3,095.93 15,479.63

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,377.84 2,719.37 9,657.70 3,438.73 17,193.65

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,436.18 2,612.17 10,078.77 3,531.78 17,658.90

401b CONCRETE CLASS "B" Cu.m 1,763.36 1,298.37 6,002.31 2,266.01 11,330.04

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,324.87 2,722.91 6,992.44 2,760.06 13,800.28

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,363.76 2,721.98 8,265.64 3,087.85 15,439.23

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,363.76 2,721.98 8,677.06 3,190.70 15,953.50

401di CONCRETE CLASS "D1" Cu.m 2,148.21 2,880.90 11,815.27 4,211.10 21,055.48

401dii CONCRETE CLASS "D2" Cu.m 2,148.21 2,881.36 12,673.09 4,425.67 22,128.34

Page 109 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 2,148.21 2,881.36 13,374.27 4,600.96 23,004.81

401e CONCRETE CLASS "Y" Cu.m 1,377.84 1,704.57 9,529.34 3,152.94 15,764.68

401f LEAN CONCRETE Cu.m 1,153.77 1,025.36 4,583.67 1,690.70 8,453.50

401gi PRECAST CONCRETE CLASS "A1" Cu.m 3,270.60 1,499.95 8,495.70 3,316.56 16,582.81

401gii PRECAST CONCRETE CLASS "A3" Cu.m 3,270.60 1,499.95 9,549.19 3,579.93 17,899.66

401giii PRECAST CONCRETE CLASS "B" Cu.m 3,270.60 1,789.97 7,064.49 3,031.27 15,156.33

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,330.92 2,881.36 11,873.19 4,271.37 21,356.84

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,330.92 2,881.36 12,731.01 4,485.83 22,429.13

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,330.92 2,881.36 13,432.19 4,661.12 23,305.60

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,556.86 1,274.43 4,554.44 1,846.43 9,232.16
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 6,314.30 816.47 183,072.38 47,550.79 237,753.94

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 6,314.30 816.47 187,231.18 48,590.49 242,952.45

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,491.20 1,853.90 213,770.21 54,778.83 273,894.14
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 7,820.40 7,788.48 355,845.47 92,863.59 464,317.93
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 241.37 1,018.92 - 315.07 1,575.36

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 445.20 - 1,566.25 502.86 2,514.31
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 300.37 - 4,040.82 1,085.30 5,426.49
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 31.34 4.18 247.07 70.65 353.25
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,086.19 - 48,391.93 12,369.53 61,847.65
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,086.19 - 43,891.93 11,244.53 56,222.65
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,086.19 - 139,638.46 35,181.16 175,905.81


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,086.19 - 114,650.16 28,934.09 144,670.44


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,086.19 - 43,334.12 11,105.08 55,525.39


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,086.19 - 38,277.42 9,840.90 49,204.51


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 110 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 1,086.19 - 33,767.03 8,713.31 43,566.53
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 1,086.19 - 26,190.64 6,819.21 34,096.04


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 1,086.19 - 31,547.35 8,158.39 40,791.93
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 1,086.19 - 104,905.07 26,497.82 132,489.08
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 1,013.79 - 68,887.07 17,475.21 87,376.06
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 265.50 - 967.30 308.20 1,541.00

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 265.50 - 1,248.70 378.55 1,892.75

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 1.67 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 3.02 0.78 3.88
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 5.52 1.40 7.00
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 105.00 - 464.79 142.45 712.24

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 563.54 3,919.64 251.27 1,183.62 5,918.08
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,340.77 5,195.15 349.25 1,721.29 8,606.45
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 617.09 4,513.99 288.00 1,354.77 6,773.85
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,547.70 6,127.64 441.08 2,029.10 10,145.51
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 788.62 9,526.37 797.81 2,778.20 13,891.01
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,369.40 13,560.06 797.83 4,431.83 22,159.13
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,168.01 13,618.45 1,252.50 4,009.74 20,048.70
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,829.69 19,762.37 1,252.50 6,461.14 32,305.70
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 550.34 1,601.59 3,730.93 1,470.71 7,353.57
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 1,100.67 3,166.66 2,840.91 1,777.06 8,885.31
SIZE) INCLUDING TESTING AND REPORTING

Page 111 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 2,201.34 6,269.26 985.41 2,364.00 11,820.02
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 26,068.80 99,118.72 924,964.50 262,538.01 1,312,690.03

407t PILE LOAD TEST UPTO 800 TON Each 31,861.92 109,188.40 1,345,419.30 371,617.41 1,858,087.03

407u PILE LOAD TEST UPTO 1000 TON Each 31,861.92 109,188.40 1,681,819.20 455,717.38 2,278,586.90

407v PILE LOAD TEST UPTO 1200 TON Each 31,861.92 109,188.40 1,970,159.00 527,802.33 2,639,011.65

407w PILE LOAD TEST UPTO 1500 TON Each 31,861.92 109,188.40 2,387,668.70 632,179.76 3,160,898.78

407x PILE LOAD TEST UPTO 2000 TON Each 31,861.92 109,188.40 2,792,668.70 733,429.76 3,667,148.78

407y PILE LOAD TEST UPTO 2500 TON Each 31,861.92 135,514.00 3,197,668.70 841,261.16 4,206,305.78

407l PERMANENT PILE CASING FOR PILES Ton 1,985.31 8,342.80 228,358.39 59,671.63 298,358.13

410 BRICK WORK Cu.m 1,181.78 449.44 8,465.35 2,524.14 12,620.71

411a STONE MASONRY RANDOM DRY Cu.m 943.78 250.51 1,958.00 788.07 3,940.36

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 1,004.12 354.09 3,904.49 1,315.68 6,578.39

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,486.88 250.51 2,171.06 977.11 4,885.56

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,752.40 354.09 3,997.26 1,525.94 7,629.68
MORTAR

411g ROLL POINTING Sq.m 198.41 23.95 171.77 98.53 492.66

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,271.36 533.03 3,997.26 1,700.41 8,502.05
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 389.82 1,239.93 1,185.08 703.71 3,518.55
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 403.10 1,251.11 1,506.27 790.12 3,950.60
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 654.13 1,267.88 2,449.00 1,092.75 5,463.76
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 730.71 1,278.85 4,110.55 1,530.03 7,650.14
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 811.90 1,250.07 6,557.47 2,154.86 10,774.31
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 938.08 1,308.08 9,215.48 2,865.41 14,327.05
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,087.61 1,476.61 10,697.89 3,315.53 16,577.64
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,320.67 1,672.28 12,155.41 3,787.09 18,935.45
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,701.71 1,964.94 25,566.92 7,308.39 36,541.96
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 389.82 1,239.93 1,701.68 832.86 4,164.30
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 403.10 1,251.11 2,080.27 933.62 4,668.10
DIA 380 mm

Page 112 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 654.13 1,267.88 2,777.00 1,174.75 5,873.76
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 730.71 1,278.85 4,341.18 1,587.69 7,938.43
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 811.90 1,250.07 8,197.47 2,564.86 12,824.31
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 938.08 1,308.08 12,693.05 3,734.80 18,674.01
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,087.61 1,476.61 14,797.89 4,340.53 21,702.64
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,320.67 1,672.28 16,684.87 4,919.46 24,597.29
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,701.71 1,964.94 30,010.28 8,419.23 42,096.16
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 392.64 221.42 1,263.66 469.43 2,347.15
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,988.64 1,011.27 6,002.31 2,250.56 11,252.78
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 20.32 - 236.59 64.23 321.14

507b ROCK FILL IN GABIONS Cu.m 386.21 - 1,296.28 420.62 2,103.11

508a BRICK PAVING (SINGLE COURSE) Sq.m 410.82 12.43 585.83 252.27 1,261.36

508b BRICK PAVING (DOUBLE COURSE) Sq.m 724.62 23.20 1,171.61 479.86 2,399.29

509a RIP RAP CLASS "A" Cu.m 1,200.13 102.74 1,399.67 675.64 3,378.19

509b RIP RAP CLASS "B" Cu.m 1,277.27 65.01 1,421.47 690.94 3,454.69

509c RIP RAP CLASS "C" Cu.m 1,339.65 51.76 1,455.13 711.63 3,558.16

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 824.71 529.80 1,519.29 718.45 3,592.24

509d GROUTED RIP RAP CLASS "A" Cu.m 1,451.16 174.59 3,490.49 1,279.06 6,395.31

509e GROUTED RIP RAP CLASS "B" Cu.m 1,808.26 136.85 3,366.31 1,327.86 6,639.28

509f GROUTED RIP RAP CLASS "C" Cu.m 2,077.45 111.63 3,269.57 1,364.67 6,823.33

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 2,077.45 714.51 3,294.43 1,521.60 7,607.99

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,921.61 794.61 7,295.15 2,502.84 12,514.21
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 204.07 279.63 1,268.23 437.98 2,189.91

510 DISMANTLING OF STRUCTURE AND Cu.m 692.75 857.87 - 387.66 1,938.28


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 323.45 71.57 246.92 160.49 802.43

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 369.65 81.80 317.51 192.24 961.20

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 308.96 48.81 1,133.40 372.79 1,863.96
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 353.10 55.78 1,418.41 456.83 2,284.13
BITUMEN JOINTS

Page 113 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 283.62 84.60 764.77 283.25 1,416.23
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 324.13 96.68 949.98 342.70 1,713.50
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 492.41 713.50 39,762.17 10,242.02 51,210.11
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 492.41 713.50 45,823.26 11,757.30 58,786.48
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 384.61 1,024.88 6,183.80 1,898.32 9,491.61
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 384.61 1,144.21 6,825.04 2,088.47 10,442.33
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 159.38 1,107.50 4,479.42 1,436.58 7,182.88
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 159.38 1,123.70 4,938.98 1,555.51 7,777.56
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 103.31 114.52 1,018.82 309.16 1,545.81
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 267.44 497.87 8,776.32 2,385.41 11,927.04
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 267.44 481.23 9,598.51 2,586.80 12,933.98
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 35.00 - 117.12 38.03 190.15

604a METAL GUARD RAIL M 109.25 37.67 4,249.50 1,099.11 5,495.54

604b METAL GUARD RAIL END PIECES Each 362.06 143.15 3,747.98 1,063.30 5,316.49

604d STEEL POST FOR METAL GUARD RAIL Each 207.58 131.83 5,184.00 1,380.85 6,904.26

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,890.29 496.99 29,957.05 8,836.09 44,180.43
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,890.29 496.99 29,864.12 8,812.85 44,064.25
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 1,078.15 386.70 15,852.96 4,329.45 21,647.26
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 1,078.15 386.70 17,888.21 4,838.27 24,191.33
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 114 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 1,078.15 386.70 19,994.21 5,364.77 26,823.83
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 1,078.15 386.70 16,454.64 4,479.87 22,399.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 1,078.15 386.70 18,691.61 5,039.12 25,195.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 1,078.15 386.70 21,008.21 5,618.27 28,091.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,190.79 271.90 19,996.64 5,364.83 26,824.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,190.79 271.90 23,623.64 6,271.58 31,357.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,190.79 271.90 27,159.64 7,155.58 35,777.91
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,190.79 271.90 21,009.34 5,618.01 28,090.04
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,190.79 271.90 24,999.04 6,615.43 33,077.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,190.79 271.90 27,159.64 7,155.58 35,777.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,190.79 490.11 25,273.87 6,738.69 33,693.46
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,190.79 490.11 26,703.87 7,096.19 35,480.96
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 115 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,190.79 490.11 43,459.62 11,285.13 56,425.65
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,190.79 490.11 46,319.62 12,000.13 60,000.65
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 419.33 292.44 40,896.03 10,401.95 52,009.75
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 512.68 163.64 36,317.54 9,248.46 46,242.31
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 593.78 168.17 34,700.33 8,865.57 44,327.85
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 659.75 172.60 35,850.69 9,170.76 45,853.81
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 419.33 292.44 36,896.03 9,401.95 47,009.75
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 512.68 163.64 32,317.54 8,248.46 41,242.31
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 593.78 168.17 30,700.33 7,865.57 39,327.85
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 659.75 172.60 31,850.69 8,170.76 40,853.81
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 545.51 - 4,680.00 1,306.38 6,531.89
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 545.51 - 3,960.00 1,126.38 5,631.89
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 116 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 545.51 - 7,020.00 1,891.38 9,456.89
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 545.51 - 5,940.00 1,621.38 8,106.89
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 20.44 14.76 867.83 225.76 1,128.79
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.63 3.57 30.03 9.56 47.79


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.63 5.07 93.50 25.80 129.01


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.63 3.57 36.03 11.06 55.30


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.63 4.39 114.69 30.93 154.65


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 175.72 159.72 220.74 139.05 695.23
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 292.86 366.21 687.23 336.58 1,682.88
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.79 3.99 39.03 12.20 61.01
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.79 5.49 135.22 36.63 183.14
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.79 3.99 46.83 14.16 70.78
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.79 5.49 165.77 44.26 221.31
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 175.72 159.72 327.81 165.81 829.06
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 292.86 309.53 945.95 387.09 1,935.43
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 87.86 79.86 366.31 133.51 667.53
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 87.86 109.86 998.11 298.96 1,494.80
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 87.86 79.86 476.11 160.96 804.78
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 128.41 51.02 1,373.87 388.33 1,941.63
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 44.41 38.88 501.28 146.14 730.71
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 28.72 10.46 279.53 79.68 398.40
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 117 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRANWALA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 44.41 38.88 601.28 171.14 855.71
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 28.72 10.46 304.53 85.93 429.65
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 337.12 238.59 1,529.68 526.35 2,631.73
DRAWING

610c KILOMETER POST Each 434.47 572.59 3,359.78 1,091.71 5,458.56

610d TEN KILOMETER POST Each 868.94 1,145.18 8,933.30 2,736.86 13,684.29

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 550.34 114.52 2,299.97 741.21 3,706.03
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 514.65 1,154.70 21.00 422.59 2,112.94
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.09 22.75 28.44 17.32 86.60

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.09 22.75 94.28 33.78 168.90

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.73 4.64 34.10 10.12 50.59

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.97 8.98 3.00 4.49 22.44
PER ADDITIONAL MONTH

Page 118 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

GUJRAT

Page 119 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.81

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 567.97 31.54 160.98 804.88

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 875.93 141.90 274.96 1,374.78

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,782.98 756.77 733.33 3,666.66

103 STRIPPING Cu.m 9.29 273.85 - 70.79 353.93

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.54 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.57 - 79.72 398.58

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 785.96 38.36 218.72 1,093.60

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.57 - 79.72 398.58

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 785.96 38.36 218.72 1,093.60

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.18 - 76.81 384.06

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 686.76 210.11 272.78 1,363.88
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 776.47 38.36 216.35 1,081.74
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.59 - 160.14 800.71
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 426.00 - 113.84 569.21
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.69 1,204.59 402.69 2,013.43

107e COMMON BACK FILL Cu.m 88.46 126.48 11.70 56.66 283.30

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.92 11.70 87.26 436.29
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.92 38.36 267.70 1,338.48
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 784.14 11.70 210.51 1,052.54
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.66 11.70 162.70 813.49
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.45 60.13 95.89 479.44
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 166.02 11.70 50.84 254.18
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.40 11.70 65.72 328.59
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 80.05 3.51 22.10 110.48

Page 120 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.67 3.12 19.24 96.20
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.53 384.74 183.92 919.58

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.60 11.19 9.46 47.31

201 GRANULAR SUBBASE Cu.m 36.77 265.26 1,354.51 414.14 2,070.68

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.39 1,446.32 505.16 2,525.81

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 408.13 1,446.32 477.60 2,387.99

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,850.90 13,466.89 3,877.19 19,385.93

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,850.90 13,866.77 3,977.16 19,885.78

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.34 13,466.89 3,877.05 19,385.23
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.34 13,742.65 3,945.98 19,729.91
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.95 1,950.10 652.89 3,264.44

204c CEMENT CONTENT Ton 384.60 - 14,601.72 3,746.58 18,732.90

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,293.03 108,702.40 27,946.77 139,733.83

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,293.03 104,407.90 26,873.14 134,365.71
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.34 1,497.71 491.11 2,455.53
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,438.21 12,934.39 3,887.67 19,438.33
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.63 1,573.32 508.89 2,544.44
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.31 84.38 32.30 161.50

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.31 84.38 32.30 161.50

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.93 0.98 28.52 142.61

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 466.67 6.50 122.04 610.18
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.81 0.97 16.20 80.98

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.10 112.55 28.66 143.29

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.48 27.18 135.88
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.84 11.75 58.73

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.58 10.93 54.65
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.56 201.33 59.48 297.41

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.82 129.59 41.36 206.81

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.07 410.51 113.98 569.91

Page 121 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.14 338.77 95.82 479.09

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.75 484.76 134.40 672.01

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.78 412.88 116.19 580.95

304d SEAL COAT Sq.m 2.53 10.08 57.22 17.46 87.29

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.68 14,467.86 4,144.56 20,722.78
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.68 14,778.48 4,222.21 21,111.05
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 872.74 12,782.01 3,577.87 17,889.33

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 872.74 12,618.32 3,536.94 17,684.71

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.76 3,346.98 1,228.52 6,142.60
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.99 102,270.80 25,964.55 129,822.74

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.46 60.38 23.71 118.56

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.51 100.10 39.40 196.99

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 72.26 139.67 54.87 274.33

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.72 200.56 76.74 383.70

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 127.04 260.72 99.76 498.81

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,663.20 12,357.81 4,087.94 20,439.71
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,612.29 7,361.59 2,767.90 13,839.50

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,612.69 8,625.30 3,083.93 15,419.65

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,612.29 9,045.18 3,188.80 15,943.99

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,612.75 7,902.47 2,903.24 14,516.18

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,719.96 9,166.18 3,245.97 16,229.83

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,612.69 9,586.06 3,335.74 16,678.69

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,612.29 8,248.83 2,989.71 14,948.55

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,719.96 9,512.54 3,332.56 16,662.78

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,612.75 9,932.42 3,422.34 17,111.71

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,298.65 5,892.71 2,149.06 10,745.30

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,726.16 6,858.84 2,660.13 13,300.66

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,725.24 8,132.27 2,986.01 14,930.03

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,725.24 8,542.43 3,088.55 15,442.73

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,881.51 11,659.93 4,063.24 20,316.18

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,881.97 12,512.71 4,276.55 21,382.73

Page 122 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,881.97 13,208.03 4,450.38 22,251.88

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,704.97 9,386.75 3,047.36 15,236.81

401f LEAN CONCRETE Cu.m 919.20 1,026.38 4,480.89 1,606.62 8,033.09

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,500.32 8,358.82 3,116.21 15,581.05

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,500.32 9,403.52 3,377.39 16,886.93

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,790.46 6,966.99 2,840.79 14,203.95

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,881.97 11,718.26 4,114.32 20,571.61

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,881.97 12,571.03 4,327.52 21,637.59

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,881.97 13,266.35 4,501.35 22,506.74

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,274.65 4,392.76 1,726.94 8,634.71
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.49 182,974.12 47,205.32 236,026.61

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.49 187,174.12 48,255.32 241,276.61

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.94 213,921.92 54,639.33 273,196.66
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,788.90 356,535.08 92,638.62 463,193.12
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,019.49 - 302.95 1,514.74

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,569.70 481.10 2,405.49
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,049.74 1,072.26 5,361.31
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.81 69.24 346.20
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,461.82 12,331.79 61,658.96
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,961.82 11,206.79 56,033.96
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,820.46 35,171.45 175,857.26


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,834.65 28,925.00 144,625.00


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,365.14 11,057.62 55,288.11


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,312.93 9,794.57 48,972.85


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 123 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,851.07 8,679.11 43,395.53
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,238.91 6,776.07 33,880.33


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,668.90 8,133.56 40,667.81
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,151.63 26,504.25 132,521.23
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,882.39 17,422.51 87,112.56
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 970.25 295.45 1,477.24

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,251.65 365.80 1,828.99

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 468.16 137.95 689.76

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,922.00 276.30 1,161.82 5,809.11
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,196.97 376.78 1,660.49 8,302.45
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,516.73 313.97 1,330.59 6,652.95
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,129.83 470.95 1,958.47 9,792.33
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,528.03 835.90 2,748.06 13,740.29
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,565.21 835.93 4,271.39 21,356.96
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,620.82 1,301.99 3,963.34 19,816.71
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,769.97 1,301.99 6,229.96 31,149.78
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,602.00 3,771.27 1,452.93 7,264.64
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,167.46 2,881.25 1,731.40 8,657.00
SIZE) INCLUDING TESTING AND REPORTING

Page 124 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,270.84 1,025.75 2,262.59 11,312.96
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,131.60 879,063.15 249,740.79 1,248,703.94

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,202.96 1,278,652.71 353,309.82 1,766,549.09

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,202.96 1,598,358.24 433,236.20 2,166,181.00

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,202.96 1,870,007.30 501,148.47 2,505,742.33

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,202.96 2,262,480.89 599,266.86 2,996,334.31

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,202.96 2,667,480.89 700,516.86 3,502,584.31

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,532.40 3,072,480.89 808,349.22 4,041,746.11

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,343.69 228,255.90 59,545.32 297,726.58

410 BRICK WORK Cu.m 941.51 449.51 8,491.57 2,470.65 12,353.24

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.52 1,641.13 660.89 3,304.44

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 354.13 3,620.68 1,193.70 5,968.49

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.52 1,828.93 816.01 4,080.05

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 354.13 3,713.45 1,365.92 6,829.60
MORTAR

411g ROLL POINTING Sq.m 158.07 23.95 172.08 88.53 442.64

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 533.07 3,713.45 1,514.02 7,570.10
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,240.07 1,229.33 694.99 3,474.95
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,251.25 1,568.30 785.17 3,925.86
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,268.02 2,535.18 1,081.09 5,405.43
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.99 4,110.72 1,492.97 7,464.83
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,250.21 6,557.83 2,113.72 10,568.60
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,310.76 9,437.27 2,873.85 14,369.24
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.78 10,698.34 3,260.40 16,302.00
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,672.47 12,465.37 3,797.50 18,987.50
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,965.16 25,567.45 7,222.08 36,110.40
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,240.07 1,745.93 824.14 4,120.70
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,251.25 2,142.30 928.67 4,643.36
DIA 380 mm

Page 125 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,268.02 2,863.18 1,163.09 5,815.43
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.99 4,496.13 1,589.32 7,946.59
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,250.21 8,197.83 2,523.72 12,618.60
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,310.76 12,693.53 3,687.91 18,439.56
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.78 14,798.34 4,285.40 21,427.00
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,672.47 16,994.67 4,929.83 24,649.13
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,965.16 30,527.55 8,462.11 42,310.54
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.44 1,181.38 428.91 2,144.54
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,011.46 5,892.71 2,122.13 10,610.66
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.30 63.37 316.86

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,001.65 327.33 1,636.66

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.43 589.98 232.43 1,162.14

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.20 1,179.89 445.10 2,225.48

509a RIP RAP CLASS "A" Cu.m 956.12 102.75 1,086.53 536.35 2,681.75

509b RIP RAP CLASS "B" Cu.m 1,017.58 65.01 1,108.35 547.74 2,738.68

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.76 1,139.45 564.62 2,823.10

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 529.83 1,199.41 596.57 2,982.83

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.62 3,363.44 1,173.55 5,867.73

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.87 3,237.05 1,203.63 6,018.16

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.65 3,132.18 1,224.73 6,123.64

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 714.56 3,157.04 1,381.67 6,908.35

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.78 7,166.30 2,373.01 11,865.03
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.65 1,181.02 405.81 2,029.06

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.89 - 352.45 1,762.24


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.58 191.68 130.24 651.18

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.80 246.47 155.69 778.46

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.81 1,112.83 351.95 1,759.75
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.79 1,390.14 431.81 2,159.04
BITUMEN JOINTS

Page 126 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.60 718.48 257.26 1,286.30
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.69 889.88 311.20 1,556.00
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,799.67 10,226.37 51,131.84
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,866.32 11,743.03 58,715.15
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,025.25 6,131.29 1,865.74 9,328.69
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,144.63 6,767.15 2,054.55 10,272.75
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.63 4,423.63 1,414.56 7,072.80
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.82 4,877.26 1,532.02 7,660.08
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.52 959.92 289.19 1,445.94
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.93 8,453.11 2,291.03 11,455.14
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 482.40 9,241.24 2,484.18 12,420.89
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.67 4,262.91 1,096.91 5,484.53

604b METAL GUARD RAIL END PIECES Each 288.45 143.16 3,756.37 1,047.00 5,234.98

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.85 5,200.67 1,374.48 6,872.38

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 497.15 29,814.90 8,552.02 42,760.09
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 497.15 29,721.31 8,528.62 42,643.10
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 387.24 15,852.21 4,274.60 21,372.99
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 387.24 17,930.58 4,794.19 23,970.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 127 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 387.24 20,036.58 5,320.69 26,603.45
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 387.24 16,450.34 4,424.13 22,120.65
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 387.24 18,733.98 4,995.04 24,975.20
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 387.24 21,050.58 5,574.19 27,870.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.97 20,038.88 5,314.88 26,574.41
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.97 23,665.88 6,221.63 31,108.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.97 27,201.88 7,105.63 35,528.16
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.97 21,051.58 5,568.06 27,840.29
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.97 25,041.28 6,565.48 32,827.41
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.97 27,201.88 7,105.63 35,528.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 490.22 25,298.40 6,684.33 33,421.64
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 490.22 26,728.40 7,041.83 35,209.14
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 128 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 490.22 43,490.40 11,232.33 56,161.64
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 490.22 46,350.40 11,947.33 59,736.64
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.51 40,903.52 10,382.53 51,912.64
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.67 36,296.94 9,217.27 46,086.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 34,665.94 8,826.80 44,134.01
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 35,813.67 9,127.98 45,639.91
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.51 36,903.52 9,382.53 46,912.64
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.67 32,296.94 8,217.27 41,086.33
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 30,665.94 7,826.80 39,134.01
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 31,813.67 8,127.98 40,639.91
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 129 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.38 224.86 1,124.29
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.08 93.50 25.57 127.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.40 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.73 220.74 130.12 650.59
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 366.30 687.23 321.71 1,608.56
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.85
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.73 327.81 156.89 784.43
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.59 945.95 372.22 1,861.09
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.87 366.31 129.04 645.21
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.89 998.11 294.50 1,472.50
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.87 476.11 156.49 782.46
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 51.03 1,373.87 381.80 1,909.01
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 501.60 143.97 719.84
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.64 78.25 391.23
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 130 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: GUJRAT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 601.60 168.97 844.84
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.64 84.50 422.48
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.63 1,517.78 506.25 2,531.25
DRAWING

610c KILOMETER POST Each 346.14 572.62 3,244.29 1,040.77 5,203.83

610d TEN KILOMETER POST Each 692.29 1,145.24 8,570.29 2,601.96 13,009.78

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.52 2,286.69 709.91 3,549.56
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,154.96 19.00 395.99 1,979.96
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 28.45 16.41 82.03

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 94.28 32.86 164.31

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.64 34.01 10.01 50.03

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.98 3.00 4.19 20.93
PER ADDITIONAL MONTH

Page 131 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

HAFIZABAD

Page 132 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.80

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 567.84 31.52 160.94 804.69

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 875.72 141.83 274.89 1,374.43

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,782.48 756.42 733.12 3,665.60

103 STRIPPING Cu.m 9.29 273.77 - 70.77 353.84

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.52 1.76 5.47 27.35

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.43 - 79.68 398.40

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 784.88 38.45 218.47 1,092.36

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 611.91 - 162.46 812.29

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.64 - 116.01 580.03

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.43 - 79.68 398.40

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 784.88 38.45 218.47 1,092.36

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 611.91 - 162.46 812.29

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.64 - 116.01 580.03

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.02 - 76.78 383.88

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 685.49 210.30 272.50 1,362.51
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 775.40 38.45 216.10 1,080.50
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.30 - 160.07 800.35
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 425.11 - 113.62 568.10
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.59 1,356.58 440.66 2,203.29

107e COMMON BACK FILL Cu.m 88.46 126.42 11.70 56.64 283.21

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.78 11.70 87.22 436.11
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.56 38.45 267.63 1,338.13
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 783.65 11.70 210.38 1,051.91
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.18 11.70 162.58 812.89
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.12 60.13 95.81 479.03
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.95 11.70 50.82 254.09
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.32 11.70 65.70 328.49
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.95 3.51 22.07 110.35

Page 133 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.60 3.12 19.22 96.11
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.24 439.41 197.51 987.56

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.48

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.59 11.18 9.46 47.29

201 GRANULAR SUBBASE Cu.m 36.77 265.12 1,569.89 467.95 2,339.73

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.18 1,804.21 594.58 2,972.91

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 407.93 1,804.21 567.02 2,835.10

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,849.05 13,691.83 3,932.96 19,664.78

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,849.05 14,093.39 4,033.35 20,166.73

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,848.48 13,691.83 3,932.82 19,664.08
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,848.48 13,969.88 4,002.33 20,011.64
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.55 2,221.53 720.64 3,603.21

204c CEMENT CONTENT Ton 384.60 - 14,623.77 3,752.09 18,760.46

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,291.95 108,556.74 27,910.08 139,550.41

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,291.95 104,004.92 26,772.13 133,860.64
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.23 1,645.71 528.08 2,640.39
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,436.47 13,153.37 3,941.98 19,709.88
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.57 1,912.84 593.76 2,968.78
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.29 105.03 37.46 187.29

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.29 105.03 37.46 187.29

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.77 0.98 28.48 142.41

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.89 6.50 121.84 609.21
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.78 0.97 16.19 80.94

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 112.15 28.56 142.78

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.08 27.07 135.36
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.68 11.71 58.53

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.42 10.89 54.45
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.52 202.09 59.66 298.31

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.78 130.61 41.61 208.04

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.05 413.31 114.68 573.39

Page 134 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.13 341.83 96.58 482.89

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.71 488.15 135.24 676.21

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.74 416.53 117.10 585.48

304d SEAL COAT Sq.m 2.53 10.08 57.47 17.52 87.60

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,940.75 14,689.83 4,199.57 20,997.84
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,940.75 14,996.80 4,276.31 21,381.55
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 871.68 13,008.69 3,634.27 18,171.35

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 871.68 12,850.56 3,594.74 17,973.69

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.26 3,346.33 1,228.24 6,141.18
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.60 101,872.67 25,864.92 129,324.60

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.45 60.36 23.70 118.51

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.43 100.07 39.37 196.85

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.95 139.63 54.78 273.88

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.67 200.49 76.71 383.56

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.97 260.64 99.73 498.63

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,661.64 12,528.16 4,130.14 20,650.70
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,604.81 7,530.07 2,808.15 14,040.75

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,605.21 8,795.03 3,124.49 15,622.45

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,604.81 9,216.72 3,229.81 16,149.06

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,605.27 8,072.78 2,943.94 14,719.71

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,712.45 9,337.74 3,286.98 16,434.89

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,605.21 9,759.43 3,377.21 16,886.05

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,604.81 8,419.52 3,030.51 15,152.56

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,712.45 9,684.48 3,373.67 16,868.33

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,605.27 10,106.17 3,463.91 17,319.55

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,296.10 6,044.09 2,186.27 10,931.34

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,720.78 7,027.50 2,700.95 13,504.76

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,719.86 8,302.14 3,027.13 15,135.64

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,719.86 8,714.15 3,130.13 15,650.65

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,876.51 11,833.57 4,105.40 20,526.98

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,876.97 12,686.96 4,318.86 21,594.28

Page 135 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,876.97 13,383.33 4,492.95 22,464.74

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,701.80 9,558.80 3,089.58 15,447.91

401f LEAN CONCRETE Cu.m 919.20 1,022.94 4,631.79 1,643.48 8,217.41

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,497.15 8,525.28 3,157.04 15,785.18

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,497.15 9,571.74 3,418.65 17,093.25

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,788.23 7,095.41 2,872.34 14,361.68

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,876.97 11,891.68 4,156.43 20,782.14

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,876.97 12,745.06 4,369.77 21,848.86

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,876.97 13,441.43 4,543.87 22,719.33

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,272.67 4,558.27 1,767.82 8,839.11
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.42 183,156.36 47,250.87 236,254.34

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.42 187,285.96 48,283.27 241,416.33

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.78 213,821.92 54,614.29 273,071.46
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,787.18 356,079.44 92,524.28 462,621.42
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,016.91 - 302.30 1,511.51

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,567.77 480.62 2,403.08
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,044.80 1,071.03 5,355.14
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.40 69.14 345.70
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,429.91 12,323.82 61,619.08
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,929.91 11,198.82 55,994.08
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,729.52 35,148.72 175,743.59


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,739.87 28,901.31 144,506.53


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,359.01 11,056.09 55,280.45


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,299.88 9,791.31 48,956.54


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 136 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,804.97 8,667.58 43,337.90
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,212.43 6,769.45 33,847.23


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,602.22 8,116.89 40,584.46
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,016.37 26,470.43 132,352.15
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,868.94 17,419.15 87,095.75
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 968.64 295.04 1,475.21

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,250.04 365.39 1,826.96

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 466.27 137.48 687.41

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,911.28 280.10 1,160.09 5,800.46
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,188.69 379.20 1,659.03 8,295.14
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,504.25 317.26 1,328.29 6,641.45
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,119.85 472.08 1,956.26 9,781.28
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,520.49 832.50 2,745.32 13,726.61
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,541.81 832.52 4,264.69 21,323.45
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,610.03 1,292.31 3,958.23 19,791.13
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,735.38 1,292.31 6,218.89 31,094.44
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,600.22 3,740.68 1,444.84 7,224.19
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,163.95 2,850.66 1,722.87 8,614.37
SIZE) INCLUDING TESTING AND REPORTING

Page 137 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,263.89 995.16 2,253.21 11,266.03
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,073.76 888,420.45 252,065.65 1,260,328.26

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,137.12 1,292,263.53 356,696.06 1,783,480.31

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,137.12 1,615,372.32 437,473.26 2,187,366.30

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,137.12 1,890,423.90 506,236.16 2,531,180.78

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,137.12 2,288,001.27 605,630.50 3,028,152.49

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,137.12 2,693,001.27 706,880.50 3,534,402.49

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,449.76 3,098,001.27 814,708.66 4,073,543.29

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,339.76 228,440.14 59,590.39 297,951.96

410 BRICK WORK Cu.m 941.51 449.18 8,518.33 2,477.26 12,386.29

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.47 1,852.19 713.64 3,568.19

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.97 3,852.92 1,251.72 6,258.58

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.47 2,026.61 865.42 4,327.08

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.97 3,917.81 1,416.97 7,084.85
MORTAR

411g ROLL POINTING Sq.m 158.07 23.93 172.97 88.75 443.73

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.87 3,917.81 1,565.06 7,825.30
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,239.45 1,201.59 687.90 3,439.51
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,250.63 1,529.46 775.31 3,876.54
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,267.39 2,481.21 1,067.44 5,337.18
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.36 3,742.98 1,400.87 7,004.36
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,249.57 6,149.17 2,011.39 10,056.96
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,307.56 9,298.63 2,838.39 14,191.93
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.02 10,173.11 3,128.91 15,644.53
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,671.62 12,271.41 3,748.80 18,743.99
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,964.17 24,340.17 6,915.02 34,575.08
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,239.45 1,718.19 817.05 4,085.26
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,250.63 2,103.46 918.81 4,594.04
DIA 380 mm

Page 138 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,267.39 2,809.21 1,149.44 5,747.18
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.36 4,398.98 1,564.87 7,824.36
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,249.57 7,789.17 2,421.39 12,106.96
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,307.56 12,168.63 3,555.89 17,779.43
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.02 14,273.11 4,153.91 20,769.53
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,671.62 16,800.74 4,881.13 24,405.65
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,964.17 30,203.15 8,380.76 41,903.80
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.36 1,334.65 467.20 2,336.01
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,007.68 6,044.09 2,159.04 10,795.18
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 236.91 63.28 316.38

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,198.98 376.67 1,883.33

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.42 592.28 233.00 1,165.00

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.18 1,184.49 446.24 2,231.20

509a RIP RAP CLASS "A" Cu.m 956.12 102.72 1,293.89 588.18 2,940.91

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.99 1,309.11 597.92 2,989.60

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.75 1,335.23 613.56 3,067.80

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 528.16 1,384.34 642.39 3,211.93

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.51 3,543.42 1,218.51 6,092.56

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.78 3,410.10 1,246.87 6,234.36

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.57 3,301.98 1,267.16 6,335.79

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 712.80 3,319.37 1,421.81 7,109.06

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.03 7,325.34 2,412.58 12,062.89
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.56 1,335.53 444.42 2,222.09

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.82 - 352.43 1,762.15


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.56 228.26 139.38 696.88

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.78 293.51 167.45 837.24

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.79 1,140.01 358.74 1,793.69
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.76 1,425.47 440.64 2,203.18
BITUMEN JOINTS

Page 139 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.57 760.80 267.83 1,339.15
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.66 943.93 324.71 1,623.53
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,779.10 10,221.23 51,106.13
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,842.70 11,737.13 58,685.63
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,023.58 6,197.65 1,881.91 9,409.56
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,142.73 6,840.32 2,072.37 10,361.84
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.06 4,487.30 1,430.34 7,151.68
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.25 4,947.66 1,549.47 7,747.36
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.50 973.92 292.68 1,463.40
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.70 8,515.76 2,306.63 11,533.16
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 481.06 9,310.58 2,501.18 12,505.89
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.66 4,255.55 1,095.07 5,475.33

604b METAL GUARD RAIL END PIECES Each 288.45 143.12 3,751.77 1,045.84 5,229.18

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.74 5,191.53 1,372.16 6,860.81

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 496.44 29,997.45 8,597.48 42,987.38
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 496.44 29,904.22 8,574.17 42,870.85
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 385.14 15,881.32 4,281.35 21,406.75
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 385.14 17,918.77 4,790.71 23,953.56
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 140 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 385.14 20,024.77 5,317.21 26,586.06
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 385.14 16,481.45 4,431.38 22,156.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 385.14 18,722.17 4,991.56 24,957.81
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 385.14 21,038.77 5,570.71 27,853.56
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.69 20,027.09 5,311.86 26,559.31
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.69 23,654.09 6,218.61 31,093.06
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.69 27,190.09 7,102.61 35,513.06
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.69 21,039.79 5,565.04 27,825.19
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.69 25,029.49 6,562.46 32,812.31
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.69 27,190.09 7,102.61 35,513.06
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 488.92 25,310.37 6,686.99 33,434.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 488.92 26,740.37 7,044.49 35,222.46
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 141 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 488.92 43,498.94 11,234.14 56,170.68
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 488.92 46,358.94 11,949.14 59,745.68
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.21 40,916.31 10,385.65 51,928.25
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.53 36,335.72 9,226.93 46,134.63
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.06 34,713.25 8,838.60 44,192.98
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.48 35,862.65 9,140.19 45,700.95
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.21 36,916.31 9,385.65 46,928.25
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.53 32,335.72 8,226.93 41,134.63
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.06 30,713.25 7,838.60 39,192.98
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.48 31,862.65 8,140.19 40,700.95
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 142 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.08 224.78 1,123.90
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.07 93.50 25.57 127.83


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.39 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.69 220.74 130.11 650.54
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 365.91 687.23 321.62 1,608.09
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.84
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.69 327.81 156.88 784.38
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.30 945.95 372.14 1,860.71
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.84 366.31 129.04 645.19
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.77 998.11 294.47 1,472.35
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.84 476.11 156.49 782.44
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.95 1,373.87 381.78 1,908.91
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.42 143.92 719.61
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.58 78.23 391.15
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 143 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: HAFIZABAD

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.42 168.92 844.61
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.58 84.48 422.40
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.13 1,532.51 509.81 2,549.04
DRAWING

610c KILOMETER POST Each 346.14 572.49 3,274.61 1,048.31 5,241.56

610d TEN KILOMETER POST Each 692.29 1,144.98 8,638.07 2,618.84 13,094.18

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.50 2,312.13 716.27 3,581.34
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,153.80 19.00 395.70 1,978.51
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.73 28.45 16.40 82.00

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.73 94.28 32.86 164.29

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.99 10.00 50.00

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.97 3.00 4.18 20.91
PER ADDITIONAL MONTH

Page 144 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

JHANG

Page 145 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.69 - 5.36 26.78

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 563.13 31.49 159.75 798.76

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 867.15 141.69 272.71 1,363.54

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,751.64 755.68 725.23 3,626.13

103 STRIPPING Cu.m 9.29 273.60 - 70.72 353.61

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.50 1.76 5.47 27.33

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.95 - 79.56 397.79

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.66 38.51 218.18 1,090.91

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.48 - 162.10 810.49

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.18 - 115.89 579.45

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.95 - 79.56 397.79

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.66 38.51 218.18 1,090.91

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.48 - 162.10 810.49

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.18 - 115.89 579.45

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.68 - 76.69 383.44

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.75 210.94 272.48 1,362.40
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.18 38.51 215.81 1,079.06
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.87 - 159.71 798.56
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.65 - 113.51 567.54
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.38 1,393.94 449.94 2,249.71

107e COMMON BACK FILL Cu.m 88.46 126.04 11.70 56.55 282.75

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.41 11.70 87.13 435.65
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.49 38.51 267.13 1,335.63
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.45 11.70 210.08 1,050.41
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 597.46 11.70 162.40 812.00
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.77 60.14 95.72 478.59
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.64 11.70 50.74 253.71
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.14 11.70 65.65 328.26
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.84 3.51 22.04 110.21

Page 146 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.51 3.12 19.20 96.00
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.61 437.73 196.93 984.66

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.69 33.43

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.55 11.17 9.45 47.23

201 GRANULAR SUBBASE Cu.m 36.77 264.82 1,563.23 466.20 2,331.01

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.72 1,792.77 591.61 2,958.04

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.75 1,792.77 563.87 2,819.33

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,846.64 13,604.55 3,910.54 19,552.68

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,846.64 14,003.05 4,010.16 20,050.80

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.08 13,604.55 3,910.39 19,551.96
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.08 13,880.57 3,979.40 19,897.00
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.50 2,207.66 716.91 3,584.56

204c CEMENT CONTENT Ton 384.60 - 14,522.97 3,726.89 18,634.46

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,289.60 108,383.99 27,866.31 139,331.53

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,289.60 103,130.99 26,553.06 132,765.28
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.01 1,634.22 525.15 2,625.75
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,433.61 13,082.62 3,923.57 19,617.85
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.44 1,901.37 590.85 2,954.26
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.21 104.37 37.27 186.36

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.21 104.37 37.27 186.36

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.67 0.98 28.46 142.28

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.41 6.50 121.72 608.60
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.71 0.97 16.17 80.85

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.27 28.34 141.68

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.20 26.85 134.26
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.33 11.62 58.09

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 42.07 10.80 54.00
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 200.43 59.24 296.18

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.73 129.51 41.32 206.61

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.97 409.89 113.81 569.03

Page 147 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.06 338.97 95.85 479.23

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.63 484.11 134.21 671.06

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.65 413.05 116.20 581.01

304d SEAL COAT Sq.m 2.53 10.07 57.02 17.41 87.03

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,938.25 14,594.42 4,175.09 20,875.44
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,938.25 14,898.34 4,251.07 21,255.34
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.58 12,923.61 3,612.73 18,063.64

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.58 12,767.17 3,573.62 17,868.09

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,467.01 3,344.89 1,227.56 6,137.81
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.95 100,998.74 25,645.52 128,227.61

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.38 60.32 23.68 118.38

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.38 100.00 39.34 196.69

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.87 139.53 54.73 273.66

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.29 200.35 76.58 382.90

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.48 260.45 99.56 497.78

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,658.23 12,663.75 4,163.19 20,815.93
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,595.08 7,679.90 2,843.18 14,215.89

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,595.49 8,949.57 3,160.70 15,803.48

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,595.08 9,372.68 3,266.37 16,331.86

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,595.54 8,217.71 2,977.74 14,888.71

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,702.03 9,487.38 3,321.78 16,608.91

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,595.49 9,910.49 3,412.54 17,062.71

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,595.08 8,562.05 3,063.71 15,318.56

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,702.03 9,831.72 3,407.87 17,039.35

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,595.54 10,254.83 3,498.64 17,493.21

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,290.71 6,201.80 2,224.35 11,121.74

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,712.19 7,179.63 2,736.84 13,684.18

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,710.34 8,459.12 3,063.99 15,319.96

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,711.27 8,872.41 3,167.55 15,837.73

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,863.41 11,972.27 4,136.80 20,683.98

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,863.87 12,820.95 4,349.08 21,745.40

Page 148 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,863.87 13,512.52 4,521.97 22,609.86

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,696.47 9,710.14 3,126.08 15,630.41

401f LEAN CONCRETE Cu.m 919.20 1,018.30 4,795.80 1,683.33 8,416.63

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,490.30 8,679.64 3,193.91 15,969.55

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,490.30 9,718.90 3,453.73 17,268.64

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,780.15 7,235.48 2,905.34 14,526.68

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,863.87 12,031.19 4,188.03 20,940.15

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,863.87 12,879.87 4,400.20 22,001.01

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,863.87 13,571.44 4,573.10 22,865.48

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,268.47 4,670.95 1,794.94 8,974.71
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.27 183,372.36 47,304.83 236,524.14

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.27 187,572.36 48,354.83 241,774.14

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.34 214,171.49 54,701.58 273,507.90
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,783.50 356,509.13 92,630.79 463,153.94
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,010.47 - 300.69 1,503.46

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,574.13 482.20 2,411.01
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,062.27 1,075.40 5,376.98
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.90 69.51 347.56
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,395.72 12,315.27 61,576.34
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,895.72 11,190.27 55,951.34
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,635.14 35,125.12 175,625.61


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,642.41 28,876.94 144,384.70


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,349.34 11,053.67 55,268.36


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,284.68 9,787.51 48,937.54


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 149 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,778.25 8,660.90 43,304.50
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,201.89 6,766.81 33,834.05


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,651.41 8,129.19 40,645.95
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,023.38 26,472.18 132,360.91
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,993.02 17,450.17 87,250.85
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 974.61 296.54 1,482.69

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,256.01 366.89 1,834.44

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 472.55 139.05 695.25

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,887.76 306.26 1,160.75 5,803.75
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,170.54 410.46 1,662.30 8,311.51
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,476.85 345.32 1,328.46 6,642.29
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,097.96 508.12 1,959.79 9,798.96
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,503.96 885.37 2,754.41 13,772.04
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,490.51 885.39 4,265.09 21,325.43
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,586.36 1,368.47 3,971.35 19,856.75
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,659.56 1,368.47 6,218.97 31,094.86
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,596.39 3,731.41 1,441.56 7,207.81
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,156.37 2,841.40 1,718.66 8,593.31
SIZE) INCLUDING TESTING AND REPORTING

Page 150 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,248.87 985.90 2,247.13 11,235.67
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,946.96 896,892.60 254,151.99 1,270,759.95

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,992.80 1,304,586.84 359,740.81 1,798,704.05

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,992.80 1,630,776.96 441,288.34 2,206,441.70

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,992.80 1,908,909.20 510,821.40 2,554,107.00

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,992.80 2,311,107.56 611,370.99 3,056,854.95

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,992.80 2,716,107.56 712,620.99 3,563,104.95

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,268.72 3,121,107.56 820,439.97 4,102,199.85

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,331.10 228,648.41 59,640.30 298,201.48

410 BRICK WORK Cu.m 941.51 448.47 8,527.05 2,479.26 12,396.29

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.34 1,845.58 711.96 3,559.78

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.61 3,995.25 1,287.21 6,436.05

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.34 2,049.35 871.07 4,355.35

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.61 4,087.95 1,459.42 7,297.10
MORTAR

411g ROLL POINTING Sq.m 158.07 23.88 176.34 89.57 447.86

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.43 4,087.95 1,607.49 8,037.43
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,238.10 1,252.52 700.30 3,501.49
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,249.27 1,600.67 792.77 3,963.85
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,266.01 2,579.96 1,091.78 5,458.88
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.97 3,920.48 1,444.90 7,224.49
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,248.16 6,346.93 2,060.48 10,302.40
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,306.10 9,553.03 2,901.62 14,508.10
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.67 10,428.22 3,192.09 15,960.46
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.75 12,627.13 3,837.26 19,186.29
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,962.00 24,931.56 7,062.32 35,311.60
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,238.10 1,769.12 829.45 4,147.24
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,249.27 2,174.67 936.27 4,681.35
DIA 380 mm

Page 151 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,266.01 2,907.96 1,173.78 5,868.88
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.97 4,576.48 1,608.90 8,044.49
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,248.16 7,986.93 2,470.48 12,352.40
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,306.10 12,423.03 3,619.12 18,095.60
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.67 14,528.22 4,217.09 21,085.46
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.75 17,156.32 4,969.56 24,847.79
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,962.00 30,794.54 8,528.06 42,640.31
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.19 1,366.35 475.09 2,375.44
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.79 6,201.80 2,197.99 10,989.95
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.36 63.64 318.19

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,188.72 374.10 1,870.50

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.40 594.06 233.44 1,167.19

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.14 1,188.03 447.12 2,235.58

509a RIP RAP CLASS "A" Cu.m 956.12 102.07 1,285.33 585.88 2,929.41

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.37 1,307.13 597.27 2,986.35

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.23 1,339.84 614.59 3,072.93

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.38 1,402.44 646.71 3,233.56

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.75 3,711.68 1,260.14 6,300.69

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 135.04 3,573.35 1,287.25 6,436.26

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.13 3,460.30 1,306.38 6,531.89

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 711.02 3,485.14 1,462.81 7,314.04

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 792.38 7,472.86 2,449.05 12,245.23
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.36 1,366.47 452.10 2,260.51

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.65 - 352.39 1,761.95


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.53 226.75 138.99 694.95

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.74 291.57 166.95 834.76

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.75 1,175.93 367.71 1,838.54
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.71 1,469.10 451.53 2,257.65
BITUMEN JOINTS

Page 152 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.51 799.62 277.52 1,387.61
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.58 991.25 336.52 1,682.59
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,835.32 10,235.28 51,176.39
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,910.18 11,754.00 58,769.98
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,019.91 6,260.89 1,896.81 9,484.03
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,138.57 6,910.04 2,088.76 10,443.79
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.89 4,542.88 1,443.69 7,218.44
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,121.06 5,008.99 1,564.26 7,821.28
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.44 987.39 296.04 1,480.18
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.20 8,576.03 2,321.58 11,607.88
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.57 9,377.19 2,517.71 12,588.53
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.65 4,282.69 1,101.84 5,509.21

604b METAL GUARD RAIL END PIECES Each 288.45 143.05 3,768.79 1,050.07 5,250.36

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.49 5,225.27 1,380.54 6,902.68

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.87 30,187.63 8,644.63 43,223.15
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.87 30,093.09 8,621.00 43,104.98
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 382.58 15,983.21 4,306.18 21,530.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 382.58 18,056.16 4,824.42 24,122.10
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 153 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 382.58 20,162.16 5,350.92 26,754.60
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 382.58 16,581.34 4,455.72 22,278.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 382.58 18,859.56 5,025.27 25,126.35
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 382.58 21,176.16 5,604.42 28,022.10
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.07 20,164.37 5,346.03 26,730.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.07 23,791.37 6,252.78 31,263.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.07 27,327.37 7,136.78 35,683.91
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.07 21,177.07 5,599.21 27,996.04
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.07 25,166.77 6,596.63 32,983.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.07 27,327.37 7,136.78 35,683.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.80 25,474.46 6,727.74 33,638.69
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.80 26,904.46 7,085.24 35,426.19
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 154 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.80 43,675.69 11,278.05 56,390.23
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.80 46,535.69 11,993.05 59,965.23
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.31 41,007.93 10,408.33 52,041.64
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.22 36,418.23 9,247.48 46,237.38
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.75 34,771.93 8,853.19 44,265.93
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.16 35,917.20 9,153.75 45,768.74
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.31 37,007.93 9,408.33 47,041.64
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.22 32,418.23 8,247.48 41,237.38
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.75 30,771.93 7,853.19 39,265.93
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.16 31,917.20 8,153.75 40,768.74
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 155 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.21 225.06 1,125.31
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.06 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.46


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.60 220.74 130.09 650.43
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 365.06 687.23 321.40 1,607.01
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 165.77 43.97 219.83
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.60 327.81 156.85 784.26
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.65 945.95 371.98 1,859.90
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.80 366.31 129.03 645.13
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.52 998.11 294.41 1,472.04
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.80 476.11 156.48 782.38
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.77 1,373.87 381.74 1,908.69
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 502.08 144.09 720.43
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.79 78.28 391.41
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 156 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHANG

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 602.08 169.09 845.43
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.79 84.53 422.66
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.29 1,545.69 512.89 2,564.46
DRAWING

610c KILOMETER POST Each 346.14 572.21 3,305.59 1,055.99 5,279.93

610d TEN KILOMETER POST Each 692.29 1,144.42 8,705.46 2,635.54 13,177.71

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.44 2,337.40 722.57 3,612.86
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,151.25 23.00 396.07 1,980.33
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.68 28.46 16.39 81.94

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.68 94.29 32.85 164.24

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.96 9.99 49.95

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.89
PER ADDITIONAL MONTH

Page 157 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

JHELUM

Page 158 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.81

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 564.20 31.54 160.03 800.15

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 868.96 141.90 273.21 1,366.06

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,757.90 756.77 727.06 3,635.31

103 STRIPPING Cu.m 9.29 273.85 - 70.79 353.93

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.54 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.57 - 79.71 398.56

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 785.96 38.27 218.70 1,093.49

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.57 - 79.71 398.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 785.96 38.27 218.70 1,093.49

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 612.20 - 162.53 812.65

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 435.53 - 116.23 581.14

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.17 - 76.81 384.06

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 686.76 209.67 272.67 1,363.33
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 776.47 38.27 216.33 1,081.63
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.59 - 160.14 800.71
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 425.99 - 113.84 569.21
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.69 929.27 333.85 1,669.26

107e COMMON BACK FILL Cu.m 88.46 126.48 11.70 56.66 283.29

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.92 11.70 87.26 436.29
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.92 38.27 267.67 1,338.36
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 784.14 11.70 210.51 1,052.53
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.66 11.70 162.70 813.49
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.45 60.13 95.89 479.44
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 166.02 11.70 50.84 254.18
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.40 11.70 65.72 328.59
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 80.05 3.51 22.10 110.48

Page 159 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.67 3.12 19.24 96.20
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.52 328.99 169.98 849.89

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.60 11.19 9.46 47.31

201 GRANULAR SUBBASE Cu.m 36.77 265.26 1,134.90 359.23 1,796.16

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.39 1,272.62 461.74 2,308.69

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 408.12 1,272.62 434.17 2,170.86

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,850.89 13,122.42 3,791.06 18,955.31

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,850.89 13,523.36 3,891.30 19,456.49

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.33 13,122.42 3,790.92 18,954.61
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.33 13,398.87 3,860.04 19,300.18
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.95 1,584.32 561.44 2,807.20

204c CEMENT CONTENT Ton 384.60 - 14,393.82 3,694.61 18,473.03

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,293.03 108,945.14 28,007.45 140,037.25

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,293.03 104,388.48 26,868.29 134,341.44
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.34 1,194.87 415.40 2,076.98
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,438.19 12,623.79 3,810.01 19,050.05
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.63 1,376.25 459.62 2,298.11
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.31 74.36 29.80 148.98

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.31 74.36 29.80 148.98

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.93 0.98 28.52 142.61

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 466.67 6.50 122.04 610.18
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.81 0.97 16.20 80.98

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.10 112.53 28.65 143.26

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.46 27.17 135.85
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.84 11.74 58.71

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.57 10.93 54.64
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.56 199.55 59.04 295.19

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.82 127.82 40.92 204.60

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.07 405.28 112.68 563.38

Page 160 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.14 333.56 94.51 472.56

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.75 478.62 132.87 664.34

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.77 406.75 114.66 573.29

304d SEAL COAT Sq.m 2.53 10.08 56.59 17.30 86.50

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.67 14,126.20 4,059.14 20,295.69
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.67 14,437.87 4,137.05 20,685.26
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 872.73 12,436.86 3,491.58 17,457.88

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 872.73 12,272.42 3,450.47 17,252.34

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.75 3,346.97 1,228.52 6,142.59
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.99 102,412.47 25,999.97 129,999.83

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.46 60.38 23.71 118.56

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.51 100.10 39.40 196.99

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 72.26 139.67 54.87 274.33

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.72 200.55 76.74 383.70

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 127.04 260.72 99.76 498.81

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,663.18 11,974.27 3,992.05 19,960.26
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,612.25 7,010.29 2,680.07 13,400.34

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,612.66 8,270.89 2,995.32 14,976.60

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,612.25 8,688.92 3,099.73 15,498.63

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,612.72 7,540.78 2,812.81 14,064.03

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,719.93 8,801.39 3,154.76 15,773.80

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,612.66 9,219.41 3,244.07 16,220.34

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,612.25 7,882.20 2,898.04 14,490.21

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,719.93 9,142.80 3,240.11 16,200.56

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,612.72 9,560.83 3,329.44 16,647.18

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,298.63 5,578.48 2,070.50 10,352.49

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,726.13 6,512.00 2,573.42 12,867.08

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,725.21 7,782.28 2,898.50 14,492.49

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,725.21 8,190.63 3,000.59 15,002.94

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,881.48 11,270.74 3,965.93 19,829.65

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,881.94 12,114.10 4,176.89 20,884.43

Page 161 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,881.94 12,799.52 4,348.24 21,741.20

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,704.95 9,022.30 2,956.24 14,781.21

401f LEAN CONCRETE Cu.m 919.20 1,026.36 4,180.76 1,531.58 7,657.91

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,500.30 8,003.51 3,027.38 15,136.90

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,500.30 9,033.36 3,284.84 16,424.20

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,790.43 6,683.95 2,770.02 13,850.11

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,881.94 11,328.80 4,016.95 20,084.76

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,881.94 12,172.17 4,227.79 21,138.96

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,881.94 12,857.59 4,399.15 21,995.74

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,274.64 4,118.74 1,658.43 8,292.16
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.48 182,769.73 47,154.22 235,771.11

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.48 186,969.73 48,204.22 241,021.11

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.92 213,805.28 54,610.17 273,050.85
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,788.85 357,079.77 92,774.78 463,873.92
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,019.46 - 302.94 1,514.70

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,572.43 481.78 2,408.89
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,056.67 1,074.00 5,369.98
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.34 69.12 345.61
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,509.73 12,343.77 61,718.85
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,009.73 11,218.77 56,093.85
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,951.81 35,204.29 176,021.45


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,970.01 28,958.84 144,794.20


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,379.60 11,061.24 55,306.19


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,334.60 9,799.99 48,999.94


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 162 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,904.49 8,692.46 43,462.30
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,266.98 6,783.08 33,915.41


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,698.32 8,140.92 40,704.59
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,261.83 26,531.80 132,658.98
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,805.98 17,403.41 87,017.05
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 972.51 296.01 1,480.06

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,253.91 366.36 1,831.81

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 466.36 137.50 687.51

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,921.87 323.15 1,173.50 5,867.50
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,196.86 425.54 1,672.66 8,363.28
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,516.58 361.54 1,342.44 6,712.21
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,129.71 521.51 1,971.08 9,855.38
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,527.94 892.63 2,762.22 13,811.10
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,564.92 892.66 4,285.50 21,427.51
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,620.69 1,367.44 3,979.68 19,898.38
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,769.55 1,367.44 6,246.21 31,231.06
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,601.96 3,748.16 1,447.14 7,235.71
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,167.40 2,858.14 1,725.61 8,628.03
SIZE) INCLUDING TESTING AND REPORTING

Page 163 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,270.72 1,002.64 2,256.78 11,283.91
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,130.80 858,704.70 244,650.98 1,223,254.88

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,202.16 1,249,039.98 345,906.44 1,729,532.18

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,202.16 1,561,341.12 423,981.72 2,119,908.60

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,202.16 1,825,587.40 490,043.29 2,450,216.45

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,202.16 2,206,956.82 585,385.65 2,926,928.23

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,202.16 2,611,956.82 686,635.65 3,433,178.23

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,531.36 3,016,956.82 794,467.95 3,972,339.73

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,343.63 228,044.40 59,492.42 297,462.11

410 BRICK WORK Cu.m 941.51 449.50 8,393.26 2,446.07 12,230.35

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.52 1,473.74 619.04 3,095.20

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 354.12 3,351.41 1,126.38 5,631.89

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.52 1,658.29 773.35 3,866.74

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 354.12 3,453.38 1,300.91 6,504.53
MORTAR

411g ROLL POINTING Sq.m 158.07 23.95 169.41 87.86 439.30

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 533.07 3,453.38 1,449.00 7,245.01
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,240.06 1,195.82 686.61 3,433.06
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,251.24 1,521.70 773.52 3,867.60
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,268.01 2,470.76 1,064.98 5,324.89
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.98 3,724.29 1,396.36 6,981.78
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,250.20 6,128.29 2,006.33 10,031.65
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,310.75 9,271.31 2,832.36 14,161.78
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.76 10,144.91 3,122.04 15,610.20
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,672.46 12,233.90 3,739.63 18,698.15
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,965.15 24,279.12 6,900.00 34,499.99
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,240.06 1,712.42 815.76 4,078.81
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,251.24 2,095.70 917.02 4,585.10
DIA 380 mm

Page 164 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,268.01 2,798.76 1,146.98 5,734.89
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.98 4,380.29 1,560.36 7,801.78
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,250.20 7,768.29 2,416.33 12,081.65
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,310.75 12,141.31 3,549.86 17,749.28
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.76 14,244.91 4,147.04 20,735.20
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,672.46 16,762.92 4,871.89 24,359.43
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,965.15 30,142.10 8,365.74 41,828.70
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.44 920.80 363.76 1,818.81
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,011.45 5,578.48 2,043.58 10,217.88
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.85 63.51 317.55

507b ROCK FILL IN GABIONS Cu.m 307.68 - 845.53 288.30 1,441.51

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.43 582.34 230.52 1,152.60

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.20 1,164.65 441.29 2,206.43

509a RIP RAP CLASS "A" Cu.m 956.12 102.75 922.76 495.41 2,477.04

509b RIP RAP CLASS "B" Cu.m 1,017.58 65.01 946.78 507.34 2,536.71

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.76 978.76 524.45 2,622.25

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 529.83 1,041.02 556.97 2,784.85

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.61 3,210.17 1,135.23 5,676.13

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.87 3,088.14 1,166.41 5,832.03

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.65 2,984.62 1,187.84 5,939.18

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 714.56 3,011.94 1,345.40 6,726.98

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.77 6,822.99 2,287.18 11,435.89
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.64 921.26 340.87 1,704.36

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.89 - 352.45 1,762.24


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.58 162.79 123.01 615.06

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.80 209.32 146.41 732.03

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.81 1,066.59 340.39 1,701.94
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.79 1,331.92 417.25 2,086.26
BITUMEN JOINTS

Page 165 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.60 661.99 243.14 1,215.69
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.69 819.03 293.49 1,467.44
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,787.35 10,223.29 51,116.44
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,849.48 11,738.82 58,694.10
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,025.23 5,993.15 1,831.20 9,156.00
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,144.60 6,614.87 2,016.47 10,082.36
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.62 4,283.41 1,379.50 6,897.51
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.81 4,722.28 1,493.27 7,466.34
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.52 929.66 281.62 1,408.11
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.92 8,317.58 2,257.14 11,285.71
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 482.39 9,091.18 2,446.66 12,233.31
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.67 4,268.28 1,098.25 5,491.24

604b METAL GUARD RAIL END PIECES Each 288.45 143.15 3,761.72 1,048.33 5,241.65

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.85 5,213.39 1,377.66 6,888.28

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 497.14 29,434.05 8,456.80 42,284.01
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 497.14 29,340.88 8,433.51 42,167.55
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 387.23 15,762.46 4,252.16 21,260.80
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 387.23 17,837.16 4,770.84 23,854.18
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 166 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 387.23 19,956.16 5,300.59 26,502.93
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 387.23 16,360.59 4,401.69 22,008.46
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 387.23 18,639.26 4,971.36 24,856.80
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 387.23 20,970.16 5,554.09 27,770.43
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.96 19,964.74 5,296.35 26,481.73
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.96 23,585.24 6,201.47 31,007.35
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.96 27,121.24 7,085.47 35,427.35
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.96 20,978.09 5,549.68 27,748.41
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.96 24,960.64 6,545.32 32,726.60
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.96 27,162.17 7,095.70 35,478.51
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 490.21 25,164.73 6,650.91 33,254.54
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 490.21 26,594.73 7,008.41 35,042.04
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 167 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 490.21 43,352.73 11,197.91 55,989.54
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 490.21 46,212.73 11,912.91 59,564.54
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.51 40,819.77 10,361.59 51,807.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.66 36,181.87 9,188.50 45,942.49
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 34,555.60 8,799.22 43,996.08
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 35,703.71 9,100.49 45,502.45
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.51 36,819.77 9,361.59 46,807.95
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.66 32,181.87 8,188.50 40,942.49
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.20 30,555.60 7,799.22 38,996.08
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.63 31,703.71 8,100.49 40,502.45
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 168 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.69 224.94 1,124.68
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.08 93.50 25.57 127.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.40 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.73 220.74 130.12 650.59
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 366.29 687.23 321.71 1,608.56
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.85
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.73 327.81 156.89 784.43
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.59 945.95 372.22 1,861.08
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.86 366.31 129.04 645.21
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.89 998.11 294.50 1,472.50
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.86 476.11 156.49 782.46
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 51.03 1,373.87 381.80 1,909.01
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 501.41 143.92 719.60
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.60 78.24 391.18
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 169 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: JHELUM

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.89 601.41 168.92 844.60
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.60 84.49 422.43
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.63 1,487.42 498.66 2,493.28
DRAWING

610c KILOMETER POST Each 346.14 572.62 3,181.21 1,024.99 5,124.96

610d TEN KILOMETER POST Each 692.29 1,145.23 8,423.51 2,565.26 12,826.29

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.52 2,257.62 702.65 3,513.24
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,154.94 21.00 396.49 1,982.45
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 28.46 16.41 82.04

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.76 94.30 32.87 164.33

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.64 34.01 10.01 50.03

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.98 3.00 4.19 20.93
PER ADDITIONAL MONTH

Page 170 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

KASUR

Page 171 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 2.25 19.70 - 5.49 27.44

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 57.71 562.36 31.61 162.92 814.60

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 106.60 865.23 142.22 278.51 1,392.56

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 511.67 1,744.45 758.53 753.66 3,768.31

103 STRIPPING Cu.m 12.08 273.69 - 71.44 357.21

104 COMPACTION OF NATURAL GROUND Sq.m 2.09 18.51 1.76 5.59 27.94

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 18.57 304.28 - 80.71 403.56

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 65.73 783.98 38.53 222.06 1,110.30

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 49.30 610.80 - 165.03 825.13

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 38.19 434.41 - 118.15 590.75

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 18.57 304.28 - 80.71 403.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 65.73 783.98 38.53 222.06 1,110.30

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 49.30 610.80 - 165.03 825.13

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 38.19 434.41 - 118.15 590.75

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 36.50 278.85 - 78.84 394.19

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 252.50 685.11 210.27 286.97 1,434.85
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 65.73 774.50 38.53 219.69 1,098.45
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 49.38 601.19 - 162.64 813.21
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 38.19 424.88 - 115.77 578.84
MATERIAL

107d GRANULAR BACKFILL Cu.m 147.50 292.48 1,651.80 522.95 2,614.73

107e COMMON BACK FILL Cu.m 115.00 126.35 11.70 63.26 316.31

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 34.33 310.56 11.70 89.15 445.74
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 78.65 969.89 38.53 271.77 1,358.84
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.04 782.84 11.70 213.65 1,068.23
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 52.56 597.88 11.70 165.54 827.68
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 33.75 296.94 60.13 97.71 488.53
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 33.31 165.87 11.70 52.72 263.61
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 58.20 206.23 11.70 69.03 345.16
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 6.27 79.91 3.51 22.42 112.10

Page 172 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 4.12 70.54 3.12 19.45 97.23
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 30.41 326.93 589.23 236.64 1,183.21

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.69 22.17 1.76 6.91 34.53

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 5.28 22.58 11.21 9.77 48.84

201 GRANULAR SUBBASE Cu.m 47.80 264.97 2,160.11 618.22 3,091.10

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 72.73 517.95 2,389.65 745.08 3,725.41

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 72.73 407.33 2,389.65 717.43 3,587.14

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 248.24 1,847.85 14,350.23 4,111.58 20,557.89

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 248.24 1,847.85 14,749.30 4,211.35 21,056.73

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,847.28 14,350.23 4,111.44 20,557.19
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,847.28 14,626.64 4,180.54 20,902.70
"B")

204b CEMENT STABILIZED BASE Cu.m 121.54 566.93 2,931.68 905.04 4,525.20

204c CEMENT CONTENT Ton 500.00 - 14,904.96 3,851.24 19,256.20

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 1,029.17 2,290.78 108,399.38 27,929.83 139,649.16

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 1,029.17 2,290.78 103,611.65 26,732.90 133,664.50
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 419.10 144.12 2,233.65 699.22 3,496.09
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 231.48 2,435.04 13,748.14 4,103.67 20,518.33
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 461.00 107.51 2,500.09 767.15 3,835.75
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 7.17 39.27 138.80 46.31 231.55

207b DEEP PATCHING (15-30 cm) Sq.m 7.17 39.27 138.80 46.31 231.55

208 REINSTATEMENT OF ROAD SURFACE Sq.m 8.03 106.72 0.98 28.93 144.66

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 19.47 465.65 6.50 122.91 614.53
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.89 60.75 0.97 16.40 82.01

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.27 1.09 111.75 28.53 142.65

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.23 1.26 105.68 27.05 135.23
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.51 0.75 45.52 11.70 58.48

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.51 0.75 42.26 10.88 54.40
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.66 34.50 205.12 60.57 302.85

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.66 33.76 133.90 42.58 212.89

304bi DOUBLE SURFACE TREATMENT Sq.m 4.36 42.00 422.82 117.29 586.46

Page 173 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 4.36 41.08 351.59 99.26 496.28

304ci TRIPLE SURFACE TREATMENT Sq.m 7.94 46.66 499.34 138.49 692.43

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 7.94 45.69 427.97 120.40 601.99

304d SEAL COAT Sq.m 3.29 10.07 58.48 17.96 89.81

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,939.48 15,341.61 4,374.77 21,873.85
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,939.48 15,646.11 4,450.90 22,254.48
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 853.75 871.13 13,668.72 3,848.40 19,242.00

307b OPEN GRADED HOT BIT-MAC Cu.m 853.75 871.13 13,512.27 3,809.29 19,046.44

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 127.85 1,467.55 3,345.61 1,235.25 6,176.26
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 333.33 1,330.19 101,474.55 25,784.52 128,922.59

309a COLD MILLING, 0 - 30 mm Sq.m 2.61 32.39 60.34 23.84 119.18

309b COLD MILLING, 0 - 50 mm Sq.m 5.18 53.40 100.03 39.65 198.26

309c COLD MILLING, 0 - 70 mm Sq.m 9.78 71.91 139.58 55.32 276.59

309d COLD MILLING, 0 - 100 mm Sq.m 11.29 97.63 200.42 77.33 386.66

309e COLD MILLING, 0 - 130 mm Sq.m 14.68 126.92 260.54 100.53 502.66

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 430.00 3,659.94 13,177.56 4,316.87 21,584.36
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,427.08 2,599.27 8,139.78 3,041.54 15,207.68

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,427.08 2,599.68 9,404.27 3,357.76 16,788.80

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,427.08 2,599.27 9,827.84 3,463.55 17,317.75

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,427.08 2,599.73 8,697.49 3,181.08 15,905.38

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,427.08 2,706.25 9,961.98 3,523.83 17,619.15

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,487.50 2,599.68 10,385.55 3,618.18 18,090.90

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,427.08 2,599.27 9,050.92 3,269.32 16,346.60

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,427.08 2,706.25 10,315.42 3,612.19 18,060.94

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,487.50 2,599.73 10,738.98 3,706.56 18,532.78

401b CONCRETE CLASS "B" Cu.m 1,826.39 1,294.75 6,591.90 2,428.26 12,141.30

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,372.22 2,715.16 7,632.12 2,929.88 14,649.38

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,412.50 2,713.31 8,906.17 3,258.00 16,289.98

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,412.50 2,714.24 9,320.18 3,361.73 16,808.65

401di CONCRETE CLASS "D1" Cu.m 2,225.00 2,870.82 12,488.32 4,396.03 21,980.16

401dii CONCRETE CLASS "D2" Cu.m 2,225.00 2,871.28 13,353.48 4,612.44 23,062.20

Page 174 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 2,225.00 2,871.28 14,063.24 4,789.88 23,949.40

401e CONCRETE CLASS "Y" Cu.m 1,427.08 1,699.79 10,182.90 3,327.44 16,637.21

401f LEAN CONCRETE Cu.m 1,195.00 1,021.21 5,163.37 1,844.90 9,224.49

401gi PRECAST CONCRETE CLASS "A1" Cu.m 3,387.50 1,494.46 9,141.61 3,505.89 17,529.46

401gii PRECAST CONCRETE CLASS "A3" Cu.m 3,387.50 1,494.46 10,208.16 3,772.53 18,862.65

401giii PRECAST CONCRETE CLASS "B" Cu.m 3,387.50 1,784.93 7,581.15 3,188.40 15,941.98

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,414.24 2,871.28 12,545.63 4,457.79 22,288.93

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,414.24 2,871.28 13,410.80 4,674.08 23,370.39

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,414.24 2,871.28 14,120.56 4,851.52 24,257.59

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,612.50 1,271.58 5,106.02 1,997.53 9,987.63
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 6,540.00 816.34 183,423.32 47,694.92 238,474.58

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 6,540.00 816.34 187,077.55 48,608.47 243,042.36

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,616.00 1,853.55 213,626.68 54,774.06 273,870.29
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 8,100.00 7,785.35 354,882.67 92,692.00 463,460.02
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 250.00 1,013.31 - 315.83 1,579.14

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 461.11 - 1,561.27 505.60 2,527.98
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 311.11 - 4,027.55 1,084.67 5,423.33
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 32.46 4.18 245.96 70.65 353.25
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 48,290.85 12,353.96 61,769.81
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 43,790.85 11,228.96 56,144.81
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 139,370.05 35,123.76 175,618.81


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 114,376.33 28,875.33 144,376.66


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 43,294.63 11,104.91 55,524.54


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 38,228.17 9,838.29 49,191.46


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 175 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 1,125.00 - 33,640.35 8,691.34 43,456.69
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 1,125.00 - 26,117.88 6,810.72 34,053.60


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 1,125.00 - 31,364.13 8,122.28 40,611.41
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 1,125.00 - 104,533.39 26,414.60 132,072.99
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 1,050.00 - 68,878.87 17,482.22 87,411.09
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 275.00 - 962.85 309.46 1,547.31

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 275.00 - 1,244.25 379.81 1,899.06

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 1.67 0.44 2.18
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 3.03 0.78 3.89
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 5.53 1.40 7.01
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 108.75 - 459.87 142.16 710.78

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 583.70 3,899.52 272.54 1,188.94 5,944.69
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,388.71 5,179.61 366.72 1,733.76 8,668.79
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 639.16 4,490.55 307.85 1,359.39 6,796.94
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,603.04 6,108.90 454.99 2,041.73 10,208.66
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 816.82 9,512.23 799.19 2,782.06 13,910.30
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,489.88 13,516.14 799.21 4,451.31 22,256.55
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,209.77 13,598.20 1,236.53 4,011.13 20,055.63
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 5,002.39 19,697.45 1,236.53 6,484.09 32,420.46
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 570.00 1,598.30 3,682.11 1,462.60 7,313.01
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 1,140.00 3,160.15 2,792.09 1,773.06 8,865.30
SIZE) INCLUDING TESTING AND REPORTING

Page 176 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 2,280.00 6,256.35 936.59 2,368.24 11,841.19
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 27,000.00 99,010.48 968,463.30 273,618.45 1,368,092.23

407t PILE LOAD TEST UPTO 800 TON Each 33,000.00 109,065.12 1,408,691.22 387,689.09 1,938,445.43

407u PILE LOAD TEST UPTO 1000 TON Each 33,000.00 109,065.12 1,760,911.68 475,744.20 2,378,721.00

407v PILE LOAD TEST UPTO 1200 TON Each 33,000.00 109,065.12 2,065,068.60 551,783.43 2,758,917.15

407w PILE LOAD TEST UPTO 1500 TON Each 33,000.00 109,065.12 2,506,303.98 662,092.28 3,310,461.38

407x PILE LOAD TEST UPTO 2000 TON Each 33,000.00 109,065.12 2,911,303.98 763,342.28 3,816,711.38

407y PILE LOAD TEST UPTO 2500 TON Each 33,000.00 135,359.52 3,316,303.98 871,165.88 4,355,829.38

407l PERMANENT PILE CASING FOR PILES Ton 2,056.25 8,335.44 228,715.27 59,776.74 298,883.70

410 BRICK WORK Cu.m 1,224.00 448.83 8,559.40 2,558.06 12,790.29

411a STONE MASONRY RANDOM DRY Cu.m 977.50 250.40 2,419.37 911.82 4,559.09

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 1,040.00 353.79 4,583.62 1,494.35 7,471.76

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,540.00 250.40 2,669.05 1,114.87 5,574.33

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,815.00 353.79 4,676.32 1,711.28 8,556.39
MORTAR

411g ROLL POINTING Sq.m 205.50 23.90 176.83 101.56 507.80

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,352.50 532.65 4,676.32 1,890.37 9,451.84
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 403.75 1,238.78 1,134.81 694.34 3,471.68
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 417.50 1,249.95 1,435.45 775.73 3,878.63
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 677.50 1,266.71 2,350.20 1,073.60 5,368.01
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 756.82 1,277.67 3,507.32 1,385.45 6,927.26
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 840.91 1,248.87 5,887.56 1,994.34 9,971.68
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 971.59 1,306.83 8,961.97 2,810.10 14,050.49
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,126.47 1,475.20 9,836.82 3,109.62 15,548.11
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,367.86 1,670.68 11,800.89 3,709.86 18,549.29
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,762.50 1,963.08 23,551.34 6,819.23 34,096.15
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 403.75 1,238.78 1,651.41 823.49 4,117.43
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 417.50 1,249.95 2,009.45 919.23 4,596.13
DIA 380 mm

Page 177 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 677.50 1,266.71 2,678.20 1,155.60 5,778.01
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 756.82 1,277.67 4,163.32 1,549.45 7,747.26
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 840.91 1,248.87 7,527.56 2,404.34 12,021.68
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 971.59 1,306.83 11,831.97 3,527.60 17,637.99
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,126.47 1,475.20 13,936.82 4,134.62 20,673.11
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,367.86 1,670.68 16,330.60 4,842.28 24,211.41
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,762.50 1,963.08 29,414.32 8,284.98 41,424.88
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 406.67 221.28 1,649.52 569.37 2,846.83
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 2,059.72 1,006.73 6,591.90 2,414.59 12,072.94
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 21.04 - 235.51 64.14 320.69

507b ROCK FILL IN GABIONS Cu.m 400.00 - 1,724.38 531.10 2,655.48

508a BRICK PAVING (SINGLE COURSE) Sq.m 425.50 12.41 593.28 257.80 1,289.00

508b BRICK PAVING (DOUBLE COURSE) Sq.m 750.50 23.16 1,186.49 490.04 2,450.19

509a RIP RAP CLASS "A" Cu.m 1,243.00 102.69 1,854.67 800.09 4,000.45

509b RIP RAP CLASS "B" Cu.m 1,322.89 64.39 1,876.42 815.93 4,079.63

509c RIP RAP CLASS "C" Cu.m 1,387.50 51.25 1,913.76 838.13 4,190.64

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 854.17 527.53 1,984.02 841.43 4,207.14

509d GROUTED RIP RAP CLASS "A" Cu.m 1,503.00 173.92 4,065.71 1,435.66 7,178.29

509e GROUTED RIP RAP CLASS "B" Cu.m 1,872.85 135.62 3,925.26 1,483.43 7,417.16

509f GROUTED RIP RAP CLASS "C" Cu.m 2,151.67 110.61 3,820.85 1,520.78 7,603.90

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 2,151.67 711.67 3,845.69 1,677.26 8,386.28

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,990.28 793.20 7,917.22 2,675.17 13,375.86
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 211.36 279.46 1,655.92 536.69 2,683.43

510 DISMANTLING OF STRUCTURE AND Cu.m 717.50 857.74 - 393.81 1,969.05


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 335.00 71.54 327.18 183.43 917.16

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 382.86 81.76 420.72 221.34 1,106.68

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 320.00 48.77 1,234.93 400.93 2,004.63
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 365.71 55.74 1,546.92 492.10 2,460.48
BITUMEN JOINTS

Page 178 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 293.75 84.54 904.01 320.58 1,602.88
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 335.71 96.62 1,125.23 389.39 1,946.95
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 39,705.64 10,232.29 51,161.43
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 45,758.35 11,745.46 58,727.31
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,021.74 6,426.61 1,961.68 9,808.39
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,140.65 7,092.70 2,157.93 10,789.63
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,105.50 4,728.27 1,499.71 7,498.56
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,121.68 5,214.11 1,625.22 8,126.09
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 107.00 114.47 1,082.30 325.94 1,629.71
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 497.45 9,057.96 2,458.10 12,290.50
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 480.81 9,910.55 2,667.09 13,335.45
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 36.25 - 117.12 38.34 191.71

604a METAL GUARD RAIL M 113.16 37.65 4,229.29 1,095.03 5,475.13

604b METAL GUARD RAIL END PIECES Each 375.00 143.09 3,735.31 1,063.35 5,316.75

604d STEEL POST FOR METAL GUARD RAIL Each 215.00 131.61 5,158.88 1,376.37 6,881.86

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 5,065.00 495.65 30,583.09 9,035.94 45,179.68
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 5,065.00 495.65 30,491.13 9,012.95 45,064.73
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 1,116.67 384.26 15,849.72 4,337.66 21,688.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 1,116.67 384.26 17,877.64 4,844.64 24,223.20
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 179 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 1,116.67 384.26 19,983.64 5,371.14 26,855.70
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 1,116.67 384.26 16,452.92 4,488.46 22,442.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 1,116.67 384.26 18,681.04 5,045.49 25,227.45
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 1,116.67 384.26 20,997.64 5,624.64 28,123.20
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,233.33 271.38 19,986.25 5,372.74 26,863.70
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,233.33 271.38 23,613.25 6,279.49 31,397.45
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,233.33 271.38 27,149.25 7,163.49 35,817.45
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,233.33 271.38 20,998.95 5,625.92 28,129.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,233.33 271.38 24,988.65 6,623.34 33,116.70
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,233.33 271.38 27,149.25 7,163.49 35,817.45
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,233.33 488.36 25,355.15 6,769.21 33,846.05
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,233.33 488.36 26,785.15 7,126.71 35,633.55
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 180 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,233.33 488.36 43,531.48 11,313.29 56,566.46
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,233.33 488.36 46,391.48 12,028.29 60,141.46
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 434.31 291.64 40,963.58 10,422.38 52,111.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.37 36,476.69 9,292.77 46,463.84
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 167.90 34,884.61 8,916.88 44,584.40
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.32 36,040.07 9,223.93 46,119.66
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 434.31 291.64 36,963.58 9,422.38 47,111.91
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.37 32,476.69 8,292.77 41,463.84
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 167.90 30,884.61 7,916.88 39,584.40
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.32 32,040.07 8,223.93 41,119.66
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 565.00 - 4,680.00 1,311.25 6,556.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 565.00 - 3,960.00 1,131.25 5,656.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 181 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 565.00 - 7,020.00 1,896.25 9,481.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 565.00 - 5,940.00 1,626.25 8,131.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 21.17 14.76 866.99 225.73 1,128.65
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 30.03 9.60 48.00


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 5.06 93.50 25.84 129.20


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 36.03 11.10 55.50


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 4.39 114.69 30.97 154.85


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 182.00 159.65 220.74 140.60 702.99
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 303.33 365.49 687.23 339.01 1,695.05
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 39.03 12.26 61.28
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.48 135.22 36.68 183.38
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 46.83 14.21 71.03
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.48 165.77 44.31 221.56
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 182.00 159.65 327.81 167.37 836.83
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 303.33 308.97 945.95 389.56 1,947.81
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 91.00 79.82 366.31 134.28 671.41
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 91.00 109.65 998.11 299.69 1,498.45
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 91.00 79.82 476.11 161.73 808.66
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 133.00 50.86 1,373.87 389.43 1,947.16
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.88 500.79 146.42 732.09
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 279.38 79.90 399.49
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 182 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KASUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.88 600.79 171.42 857.09
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 304.38 86.15 430.74
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 349.17 237.81 1,584.94 542.98 2,714.90
DRAWING

610c KILOMETER POST Each 450.00 572.35 3,492.88 1,128.81 5,644.04

610d TEN KILOMETER POST Each 900.00 1,144.70 9,252.48 2,824.30 14,121.48

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 570.00 114.47 2,357.99 760.62 3,803.08
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 533.04 1,152.52 19.00 426.14 2,130.70
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.71 28.45 17.47 87.36

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.71 94.28 33.93 169.66

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.79 4.63 34.09 10.13 50.64

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 6.18 8.96 3.00 4.54 22.69
PER ADDITIONAL MONTH

Page 183 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

KHANEWAL

Page 184 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.67 - 5.35 26.75

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.20 31.46 159.51 797.56

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 865.49 141.57 272.26 1,361.31

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,746.18 755.02 723.69 3,618.46

103 STRIPPING Cu.m 9.29 273.45 - 70.69 353.43

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.45 1.76 5.45 27.26

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.57 - 79.47 397.33

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 782.31 38.66 217.88 1,089.41

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 609.12 - 161.76 808.80

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 433.16 - 115.63 578.16

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.57 - 79.47 397.33

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 782.31 38.66 217.88 1,089.41

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 609.12 - 161.76 808.80

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 433.16 - 115.63 578.16

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.91 - 76.50 382.49

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 682.07 211.87 272.04 1,360.21
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.84 38.66 215.52 1,077.58
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 599.52 - 159.38 796.88
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.63 - 113.25 566.26
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.19 1,616.49 505.54 2,527.68

107e COMMON BACK FILL Cu.m 88.46 125.93 11.70 56.52 282.61

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.07 11.70 87.05 435.23
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 967.93 38.66 266.77 1,333.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 780.78 11.70 209.67 1,048.34
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.05 11.70 162.05 810.24
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.39 60.14 95.62 478.11
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.31 11.70 50.66 253.29
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.82 11.70 65.57 327.86
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.76 3.51 22.02 110.11

Page 185 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.42 3.12 19.18 95.89
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.05 600.57 237.51 1,187.53

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.12 1.76 6.68 33.40

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.53 11.17 9.44 47.19

201 GRANULAR SUBBASE Cu.m 36.77 264.55 2,204.72 626.51 3,132.56

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.09 2,296.54 717.39 3,586.96

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.38 2,296.54 689.72 3,448.58

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,843.78 14,483.87 4,129.65 20,648.24

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,843.78 14,878.83 4,228.39 21,141.94

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.21 14,483.87 4,129.51 20,647.54
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.21 14,757.56 4,197.93 20,989.65
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 565.62 3,161.35 955.12 4,775.58

204c CEMENT CONTENT Ton 384.60 - 14,702.73 3,771.83 18,859.16

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,287.50 107,791.65 27,717.70 138,588.49

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,287.50 102,538.65 26,404.45 132,022.24
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.81 2,278.46 686.16 3,430.80
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,429.73 13,877.49 4,121.32 20,606.60
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.33 2,417.71 719.91 3,599.55
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.18 133.43 44.53 222.66

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.18 133.43 44.53 222.66

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.39 0.98 28.39 141.94

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.54 6.50 121.51 607.53
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.63 0.97 16.15 80.75

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 110.68 28.19 140.94

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 104.61 26.70 133.51
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.10 11.56 57.79

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.83 10.74 53.71
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.43 204.41 60.22 301.10

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.69 133.86 42.40 212.00

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.91 422.44 116.93 584.63

Page 186 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.99 351.90 99.06 495.30

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.58 498.88 137.89 689.46

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.61 428.20 119.98 599.90

304d SEAL COAT Sq.m 2.53 10.04 58.34 17.73 88.65

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.24 15,464.31 4,391.81 21,959.04
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.24 15,764.71 4,466.91 22,334.54
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.61 13,805.27 3,832.90 19,164.50

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.61 13,651.21 3,794.38 18,971.91

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.06 3,343.64 1,227.01 6,135.05
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.21 100,406.40 25,497.25 127,486.26

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.35 60.28 23.66 118.29

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.29 99.93 39.30 196.51

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.73 139.44 54.68 273.38

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.12 200.22 76.51 382.54

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.26 260.29 99.46 497.29

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,652.71 13,167.04 4,287.63 21,438.13
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,587.43 8,144.04 2,957.30 14,786.49

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,587.83 9,420.39 3,276.49 16,382.44

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,587.43 9,846.67 3,382.96 16,914.78

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,587.89 8,687.96 3,093.39 15,466.96

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,694.32 9,964.31 3,439.09 17,195.45

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,587.83 10,390.59 3,530.66 17,653.28

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,587.43 9,036.58 3,180.44 15,902.18

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,694.32 10,312.94 3,526.25 17,631.23

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,587.89 10,739.21 3,617.83 18,089.13

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,285.45 6,587.74 2,319.52 11,597.59

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,701.75 7,637.05 2,848.58 14,242.90

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,699.91 8,923.33 3,177.44 15,887.19

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,700.83 9,339.68 3,281.76 16,408.78

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,855.48 12,476.86 4,260.96 21,304.80

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,855.94 13,336.55 4,476.00 22,379.99

Page 187 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,855.94 14,036.68 4,651.03 23,255.15

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,691.64 10,187.93 3,244.32 16,221.61

401f LEAN CONCRETE Cu.m 919.20 1,011.99 5,163.40 1,773.65 8,868.24

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,482.98 9,149.95 3,309.66 16,548.29

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,482.98 10,202.05 3,572.69 17,863.43

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,773.24 7,581.45 2,990.10 14,950.50

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,855.94 12,536.50 4,312.38 21,561.89

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,855.94 13,396.19 4,527.30 22,636.50

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,855.94 14,096.32 4,702.33 23,511.66

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,265.58 5,106.60 1,903.13 9,515.66
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.14 183,866.08 47,428.23 237,141.14

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.14 188,066.08 48,478.23 242,391.14

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.99 214,615.64 54,812.53 274,062.65
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,780.25 358,227.20 93,059.49 465,297.46
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,004.74 - 299.26 1,496.30

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,579.31 483.50 2,417.50
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,077.36 1,079.17 5,395.84
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.23 69.85 349.23
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,620.57 12,371.48 61,857.40
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,120.57 11,246.48 56,232.40
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,177.39 35,260.69 176,303.43


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,177.83 29,010.80 145,053.98


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,493.34 11,089.67 55,448.36


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,416.36 9,820.43 49,102.14


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 188 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,999.09 8,716.11 43,580.55
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,327.05 6,798.10 33,990.50


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,939.94 8,201.32 41,006.61
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,641.27 26,626.66 133,133.28
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,144.92 17,488.15 87,440.73
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 979.94 297.87 1,489.35

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.34 368.22 1,841.10

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 477.72 140.34 701.71

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,867.11 289.56 1,151.42 5,757.08
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,154.59 398.28 1,655.27 8,276.36
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,452.80 330.33 1,318.70 6,593.48
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,078.74 500.19 1,953.00 9,765.01
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,489.45 892.39 2,752.54 13,762.68
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,445.44 892.41 4,255.57 21,277.86
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,565.59 1,396.14 3,973.07 19,865.36
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,592.94 1,396.14 6,209.24 31,046.19
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,593.01 3,716.60 1,437.01 7,185.07
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,149.68 2,826.58 1,713.29 8,566.44
SIZE) INCLUDING TESTING AND REPORTING

Page 189 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,235.61 971.08 2,240.12 11,200.59
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,835.76 923,447.10 260,762.82 1,303,814.08

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,866.24 1,343,212.14 369,365.50 1,846,827.48

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,866.24 1,679,060.16 453,327.50 2,266,637.50

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,866.24 1,966,848.20 525,274.51 2,626,372.55

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,866.24 2,383,530.26 629,445.03 3,147,225.13

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,866.24 2,788,530.26 730,695.03 3,653,475.13

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,110.00 3,193,530.26 838,505.97 4,192,529.83

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,323.53 229,135.94 59,760.28 298,801.41

410 BRICK WORK Cu.m 941.51 447.84 8,518.58 2,476.98 12,384.91

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.23 2,466.48 867.15 4,335.76

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.31 4,556.91 1,427.55 7,137.74

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.23 2,719.59 1,038.60 5,193.01

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.31 4,649.61 1,599.76 7,998.79
MORTAR

411g ROLL POINTING Sq.m 158.07 23.83 176.18 89.52 447.60

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.04 4,649.61 1,747.80 8,739.01
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,233.53 1,145.18 672.32 3,361.60
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,247.48 1,450.20 754.71 3,773.53
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,264.21 2,370.93 1,039.07 5,195.35
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,275.75 3,544.73 1,350.66 6,753.29
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,246.93 5,929.10 1,955.72 9,778.58
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,304.82 9,015.01 2,766.80 13,833.98
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,472.22 9,889.24 3,056.99 15,284.93
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,668.11 11,875.89 3,649.04 18,245.20
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,960.09 23,676.99 6,748.20 33,741.00
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,233.53 1,661.78 801.47 4,007.35
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,247.48 2,024.20 898.21 4,491.03
DIA 380 mm

Page 190 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,264.21 2,698.93 1,121.07 5,605.35
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,275.75 4,200.73 1,514.66 7,573.29
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,246.93 7,569.10 2,365.72 11,828.58
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,304.82 11,885.01 3,484.30 17,421.48
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,472.22 13,989.24 4,081.99 20,409.93
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,668.11 16,405.32 4,781.40 23,906.99
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,960.09 29,539.97 8,213.95 41,069.73
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.05 1,623.38 539.31 2,696.55
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,001.42 6,587.74 2,293.38 11,466.90
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.65 63.96 319.80

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,764.42 518.03 2,590.13

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.38 590.83 232.63 1,163.14

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.10 1,181.59 445.50 2,227.48

509a RIP RAP CLASS "A" Cu.m 956.12 102.02 1,897.22 738.84 3,694.20

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.33 1,918.97 750.22 3,751.10

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.20 1,956.66 768.79 3,843.93

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.11 2,027.49 802.91 4,014.54

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.08 3,989.76 1,329.49 6,647.44

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.39 3,854.26 1,357.32 6,786.58

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.59 3,755.60 1,380.07 6,900.34

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.17 3,780.45 1,536.43 7,682.13

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 790.92 7,889.87 2,552.93 12,764.66
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.18 1,631.20 518.24 2,591.21

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.51 - 352.35 1,761.76


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.50 334.69 165.97 829.84

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.71 430.37 201.65 1,008.23

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.71 1,213.29 377.04 1,885.19
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.66 1,520.70 464.42 2,322.09
BITUMEN JOINTS

Page 191 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.45 891.52 300.48 1,502.41
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.52 1,110.46 366.30 1,831.51
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,909.91 10,253.93 51,269.64
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,994.82 11,775.15 58,875.76
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,016.69 6,447.77 1,942.72 9,713.61
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,134.92 7,116.07 2,139.35 10,696.76
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,103.58 4,727.99 1,489.64 7,448.19
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,119.96 5,213.48 1,615.11 8,075.53
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.39 1,024.84 305.39 1,526.93
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.76 8,757.16 2,366.75 11,833.74
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.14 9,577.57 2,567.70 12,838.49
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.63 4,306.89 1,107.89 5,539.45

604b METAL GUARD RAIL END PIECES Each 288.45 142.99 3,783.94 1,053.85 5,269.23

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.27 5,255.35 1,388.00 6,940.00

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 491.84 30,712.74 8,775.15 43,875.75
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 491.84 30,617.04 8,751.23 43,756.13
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 378.74 16,141.15 4,344.71 21,723.55
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 378.74 18,218.84 4,864.13 24,320.66
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 192 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 378.74 20,324.84 5,390.63 26,953.16
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 378.74 16,739.28 4,494.24 22,471.21
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 378.74 19,022.24 5,064.98 25,324.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 378.74 21,338.84 5,644.13 28,220.66
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.53 20,327.25 5,386.62 26,933.08
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.53 23,954.25 6,293.37 31,466.83
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.53 27,490.25 7,177.37 35,886.83
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.53 21,339.95 5,639.79 28,198.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.53 25,329.65 6,637.22 33,186.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.53 27,490.25 7,177.37 35,886.83
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.83 25,709.68 6,786.30 33,931.49
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.83 27,139.68 7,143.80 35,718.99
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 193 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.83 43,922.19 11,339.43 56,697.13
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.83 46,782.19 12,054.43 60,272.13
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.49 41,149.23 10,443.45 52,217.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.95 36,588.55 9,289.99 46,449.94
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.23 34,923.99 8,891.07 44,455.35
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.61 36,066.66 9,190.98 45,954.88
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.49 37,149.23 9,443.45 47,217.24
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.95 32,588.55 8,289.99 41,449.94
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.23 30,923.99 7,891.07 39,455.35
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.61 32,066.66 8,190.98 40,954.88
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 194 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.20 225.31 1,126.55
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.80


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.52 220.74 130.07 650.33
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.31 687.23 321.22 1,606.09
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 135.22 36.33 181.63
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.52 327.81 156.83 784.16
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.08 945.95 371.84 1,859.19
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.76 366.31 129.02 645.09
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.29 998.11 294.35 1,471.75
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.76 476.11 156.47 782.34
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.61 1,373.87 381.70 1,908.49
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.67 144.23 721.16
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.97 78.33 391.64
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 195 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHANEWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.67 169.23 846.16
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.97 84.58 422.89
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 236.62 1,584.74 522.49 2,612.44
DRAWING

610c KILOMETER POST Each 346.14 571.96 3,385.08 1,075.80 5,378.99

610d TEN KILOMETER POST Each 692.29 1,143.93 8,891.04 2,681.82 13,409.08

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.39 2,402.94 738.94 3,694.71
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,149.01 24.00 395.76 1,978.79
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.64 28.45 16.38 81.88

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.64 94.28 32.84 164.18

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.93 9.98 49.91

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.94 3.00 4.17 20.86
PER ADDITIONAL MONTH

Page 196 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

KHUSHAB

Page 197 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.69 - 5.36 26.79

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.97 31.50 159.72 798.58

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 866.37 141.74 272.53 1,362.63

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,748.60 755.96 724.53 3,622.66

103 STRIPPING Cu.m 9.29 273.66 - 70.74 353.70

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.51 1.76 5.47 27.34

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.06 - 79.59 397.94

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.89 38.40 218.21 1,091.06

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.72 - 162.16 810.80

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.35 - 115.93 579.66

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.06 - 79.59 397.94

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.89 38.40 218.21 1,091.06

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.72 - 162.16 810.80

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.35 - 115.93 579.66

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.81 - 76.72 383.60

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 685.02 210.45 272.43 1,362.13
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.41 38.40 215.84 1,079.21
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 601.11 - 159.77 798.86
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.82 - 113.55 567.75
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.46 1,239.04 411.24 2,056.19

107e COMMON BACK FILL Cu.m 88.46 126.09 11.70 56.56 282.81

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.52 11.70 87.16 435.79
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.79 38.40 267.17 1,335.85
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.74 11.70 210.16 1,050.78
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 597.80 11.70 162.48 812.41
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.90 60.13 95.75 478.74
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.85 11.70 50.80 253.98
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.20 11.70 65.67 328.34
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.90 3.51 22.06 110.29

Page 198 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.53 3.12 19.21 96.03
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.84 328.99 169.81 849.04

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.17 1.76 6.69 33.46

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.58 11.18 9.46 47.28

201 GRANULAR SUBBASE Cu.m 36.77 264.93 1,134.90 359.15 1,795.75

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.89 1,364.44 484.57 2,422.85

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 407.28 1,364.44 456.92 2,284.59

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,847.54 13,139.20 3,794.42 18,972.10

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,847.54 13,539.89 3,894.59 19,472.96

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.98 13,139.20 3,794.28 18,971.40
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.98 13,416.66 3,863.65 19,318.23
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.84 1,688.09 587.11 2,935.53

204c CEMENT CONTENT Ton 384.60 - 13,965.00 3,587.40 17,937.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,290.46 108,786.97 27,967.27 139,836.33

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,290.46 103,533.97 26,654.02 133,270.08
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.09 1,204.06 417.63 2,088.16
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,434.67 12,654.63 3,816.84 19,084.20
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.49 1,471.73 483.46 2,417.28
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.26 79.66 31.11 155.54

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.26 79.66 31.11 155.54

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.70 0.98 28.47 142.33

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.59 6.50 121.77 608.83
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.74 0.97 16.18 80.89

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.68 28.44 142.19

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.61 26.96 134.78
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.49 11.66 58.29

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 42.23 10.84 54.21
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.49 198.41 58.74 293.68

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.75 127.23 40.76 203.78

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.99 403.34 112.17 560.84

Page 199 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.07 332.16 94.15 470.73

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.66 476.39 132.29 661.44

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.68 405.08 114.22 571.08

304d SEAL COAT Sq.m 2.53 10.07 56.34 17.24 86.18

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,939.16 14,135.69 4,060.63 20,303.16
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,939.16 14,442.59 4,137.36 20,686.79
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.99 12,462.50 3,497.55 17,487.76

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.99 12,301.39 3,457.28 17,286.38

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,467.41 3,345.43 1,227.80 6,138.98
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,327.26 101,396.86 25,745.13 128,725.65

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.39 60.33 23.68 118.41

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.39 100.02 39.35 196.75

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.90 139.57 54.75 273.74

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.61 200.40 76.67 383.36

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.89 260.52 99.68 498.38

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,659.50 12,092.53 4,020.70 20,103.48
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,598.54 7,198.07 2,723.59 13,617.93

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,598.94 8,464.31 3,040.25 15,201.23

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,598.54 8,885.09 3,145.34 15,726.70

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,599.00 7,708.07 2,851.20 14,255.99

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,705.51 8,974.31 3,194.39 15,971.93

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,598.94 9,395.09 3,284.56 16,422.79

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,598.54 8,039.13 2,933.85 14,669.24

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,705.51 9,305.37 3,277.15 16,385.75

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,599.00 9,726.15 3,367.34 16,836.68

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,294.41 5,790.30 2,122.40 10,611.99

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,714.40 6,709.85 2,619.94 13,099.71

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,712.55 7,985.88 2,946.24 14,731.18

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,713.47 8,396.87 3,049.21 15,246.06

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,870.04 11,394.46 3,994.00 19,970.00

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,870.50 12,217.82 4,199.96 20,999.78

Page 200 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,870.50 12,882.82 4,366.21 21,831.03

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,699.28 9,200.19 2,999.30 14,996.50

401f LEAN CONCRETE Cu.m 919.20 1,020.78 4,421.81 1,590.45 7,952.24

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,494.00 8,192.70 3,073.10 15,365.50

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,494.00 9,192.11 3,322.96 16,614.78

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,784.31 6,855.97 2,811.50 14,057.49

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,870.50 11,453.22 4,045.20 20,225.98

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,870.50 12,276.58 4,251.04 21,255.18

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,870.50 12,941.58 4,417.29 22,086.43

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,271.30 4,279.39 1,697.76 8,488.81
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.33 183,066.41 47,228.36 236,141.78

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.33 187,266.41 48,278.36 241,391.78

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.49 214,096.14 54,682.78 273,413.89
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,784.88 357,073.15 92,772.14 463,860.69
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,012.59 - 301.22 1,506.11

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,575.16 482.46 2,412.31
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,064.35 1,075.92 5,379.58
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.59 69.44 347.18
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,488.19 12,338.39 61,691.93
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,988.19 11,213.39 56,066.93
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,880.81 35,186.54 175,932.70


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,893.09 28,939.61 144,698.05


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,385.34 11,062.67 55,313.36


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,329.68 9,798.76 48,993.79


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 201 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,880.59 8,686.49 43,432.43
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,257.33 6,780.67 33,903.35


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,738.34 8,150.92 40,754.61
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,264.23 26,532.40 132,661.98
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,907.88 17,428.89 87,144.43
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 975.17 296.68 1,483.39

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,256.57 367.03 1,835.14

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 471.64 138.82 694.11

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,896.52 357.41 1,175.73 5,878.65
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,177.29 462.08 1,676.90 8,384.49
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,487.05 396.66 1,343.84 6,719.20
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,106.11 560.19 1,974.85 9,874.23
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,510.12 938.93 2,769.34 13,846.69
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,509.60 938.96 4,283.25 21,416.24
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,595.18 1,424.17 3,987.48 19,937.39
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,687.78 1,424.17 6,239.95 31,199.76
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,597.82 3,775.58 1,452.96 7,264.81
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,159.19 2,885.56 1,730.41 8,652.06
SIZE) INCLUDING TESTING AND REPORTING

Page 202 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,254.46 1,030.06 2,259.58 11,297.88
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,994.16 869,200.05 247,240.65 1,236,203.26

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,046.56 1,264,306.17 349,684.08 1,748,420.41

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,046.56 1,580,424.48 428,713.66 2,143,568.30

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,046.56 1,848,487.10 495,729.32 2,478,646.58

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,046.56 2,235,581.03 592,502.80 2,962,513.99

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,046.56 2,640,581.03 693,752.80 3,468,763.99

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,336.16 3,045,581.03 801,575.20 4,007,875.99

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,334.32 228,340.26 59,564.06 297,820.30

410 BRICK WORK Cu.m 941.51 448.73 8,484.04 2,468.57 12,342.85

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.39 1,491.67 623.49 3,117.45

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.75 3,557.50 1,177.81 5,889.03

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.39 1,637.32 768.07 3,840.36

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.75 3,622.39 1,343.06 6,715.30
MORTAR

411g ROLL POINTING Sq.m 158.07 23.90 173.71 88.92 444.60

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.59 3,622.39 1,491.14 7,455.68
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,238.60 1,281.85 707.75 3,538.76
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,249.77 1,642.13 803.26 4,016.31
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,266.53 2,638.26 1,106.48 5,532.41
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,277.49 4,025.07 1,471.18 7,355.88
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,248.69 6,463.39 2,089.73 10,448.64
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,306.64 9,701.97 2,938.99 14,694.95
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,474.99 10,576.19 3,229.42 16,147.08
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,670.44 12,836.86 3,889.87 19,449.33
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,962.80 25,282.14 7,150.17 35,750.83
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,238.60 1,798.45 836.90 4,184.51
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,249.77 2,216.13 946.76 4,733.81
DIA 380 mm

Page 203 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,266.53 2,966.26 1,188.48 5,942.41
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,277.49 4,681.07 1,635.18 8,175.88
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,248.69 8,103.39 2,499.73 12,498.64
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,306.64 12,571.97 3,656.49 18,282.45
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,474.99 14,676.19 4,254.42 21,272.08
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,670.44 17,365.31 5,021.98 25,109.89
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,962.80 31,145.11 8,615.91 43,079.54
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.25 1,189.27 430.83 2,154.17
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,006.49 5,790.30 2,095.29 10,476.44
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.50 63.67 318.35

507b ROCK FILL IN GABIONS Cu.m 307.68 - 867.21 293.72 1,468.61

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.41 595.93 233.91 1,169.55

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.15 1,191.78 448.06 2,240.29

509a RIP RAP CLASS "A" Cu.m 956.12 102.68 937.04 498.96 2,494.81

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.39 952.29 508.57 2,542.83

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.24 975.50 523.50 2,617.51

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.49 1,019.82 551.09 2,755.43

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 173.89 3,430.48 1,190.12 5,950.61

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 135.60 3,293.07 1,217.32 6,086.60

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.59 3,174.11 1,234.94 6,174.71

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 711.60 3,191.49 1,389.54 6,947.71

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 792.99 6,992.03 2,328.99 11,644.95
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.43 1,184.35 406.59 2,032.95

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.71 - 352.40 1,762.01


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.54 165.31 123.63 618.16

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.76 212.56 147.21 736.03

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.76 1,123.12 354.51 1,772.54
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.73 1,401.21 434.56 2,172.81
BITUMEN JOINTS

Page 204 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.53 715.47 256.49 1,282.45
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.61 884.51 309.84 1,549.19
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,834.00 10,234.95 51,174.75
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,906.17 11,752.99 58,764.96
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,021.28 6,071.35 1,849.76 9,248.81
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,140.12 6,701.09 2,036.91 10,184.54
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,105.35 4,342.61 1,393.74 6,968.68
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,121.52 4,787.64 1,509.04 7,545.18
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.46 947.76 286.13 1,430.65
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.38 8,391.15 2,275.40 11,377.00
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.75 9,172.51 2,466.58 12,332.91
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.65 4,283.13 1,101.96 5,509.79

604b METAL GUARD RAIL END PIECES Each 288.45 143.08 3,769.90 1,050.36 5,251.79

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.58 5,228.41 1,381.34 6,906.71

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 495.46 29,663.83 8,513.83 42,569.13
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 495.46 29,569.55 8,490.26 42,451.29
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 384.15 15,877.39 4,280.12 21,400.60
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 384.15 17,960.38 4,800.87 24,004.34
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 205 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 384.15 20,079.38 5,330.62 26,653.09
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 384.15 16,475.52 4,429.65 22,148.26
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 384.15 18,762.48 5,001.39 25,006.96
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 384.15 21,093.38 5,584.12 27,920.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.30 20,087.51 5,326.87 26,634.36
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.30 23,708.01 6,232.00 31,159.99
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.30 27,244.01 7,116.00 35,579.99
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.30 21,100.86 5,580.21 27,901.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.30 25,083.41 6,575.85 32,879.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.30 27,261.49 7,120.37 35,601.84
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 488.22 25,319.96 6,689.22 33,446.08
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 488.22 26,749.96 7,046.72 35,233.58
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 206 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 488.22 43,518.62 11,238.88 56,194.40
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 488.22 46,378.62 11,953.88 59,769.40
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.55 40,907.96 10,383.40 51,916.99
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.33 36,269.28 9,210.27 46,051.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.86 34,623.77 8,816.18 44,080.88
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.28 35,768.41 9,116.58 45,582.90
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.55 36,907.96 9,383.40 46,916.99
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.33 32,269.28 8,210.27 41,051.33
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.86 30,623.77 7,816.18 39,080.88
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.28 31,768.41 8,116.58 40,582.90
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 207 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.26 225.08 1,125.38
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.07 9.34 46.68


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.06 93.82 25.64 128.21


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.09 10.84 54.19


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 115.08 30.79 153.95


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.63 221.09 130.18 650.90
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 365.38 689.54 322.06 1,610.30
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.07 11.92 59.60
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 135.55 36.41 182.06
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.89 13.87 69.36
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 166.17 44.07 220.34
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.63 328.21 156.96 784.80
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.89 948.26 372.62 1,863.10
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.82 366.88 129.18 645.88
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.61 1,001.48 295.27 1,476.36
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.82 476.68 156.63 783.13
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.84 1,377.24 382.60 1,912.98
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.95 144.05 720.26
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.75 78.27 391.36
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 208 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: KHUSHAB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.95 169.05 845.26
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.75 84.52 422.61
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.76 1,503.70 502.51 2,512.55
DRAWING

610c KILOMETER POST Each 346.14 572.32 3,223.45 1,035.48 5,177.39

610d TEN KILOMETER POST Each 692.29 1,144.63 8,508.45 2,586.34 12,931.71

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.46 2,286.75 709.92 3,549.58
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,152.20 24.00 396.55 1,982.76
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.70 28.47 16.40 81.98

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.70 94.30 32.85 164.26

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.97 10.00 49.98

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.96 3.00 4.18 20.90
PER ADDITIONAL MONTH

Page 209 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

LAHORE

Page 210 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 2.25 19.70 - 5.49 27.44

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 57.71 562.94 31.62 163.07 815.33

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 106.60 866.28 142.25 278.78 1,393.91

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 511.67 1,750.12 758.69 755.12 3,775.59

103 STRIPPING Cu.m 12.08 273.72 - 71.45 357.26

104 COMPACTION OF NATURAL GROUND Sq.m 2.09 18.51 1.76 5.59 27.95

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 18.57 304.34 - 80.73 403.65

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 65.73 784.12 38.49 222.09 1,110.43

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 49.30 610.95 - 165.06 825.30

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 38.19 434.52 - 118.18 590.89

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 18.57 304.34 - 80.73 403.65

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 65.73 784.12 38.49 222.09 1,110.43

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 49.30 610.95 - 165.06 825.30

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 38.19 434.52 - 118.18 590.89

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 36.50 278.93 - 78.86 394.29

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 252.50 685.29 209.91 286.93 1,434.64
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 65.73 774.64 38.49 219.72 1,098.58
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 49.38 601.34 - 162.68 813.39
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 38.19 424.99 - 115.79 578.96
MATERIAL

107d GRANULAR BACKFILL Cu.m 147.50 292.53 1,443.59 470.91 2,354.54

107e COMMON BACK FILL Cu.m 115.00 126.38 11.70 63.27 316.35

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 34.33 310.70 11.70 89.18 445.91
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 78.65 970.07 38.49 271.80 1,359.01
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.04 783.01 11.70 213.69 1,068.44
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 52.56 598.01 11.70 165.57 827.85
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 33.75 297.02 60.13 97.73 488.63
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 33.31 165.91 11.70 52.73 263.65
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 58.20 206.27 11.70 69.04 345.21
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 6.27 79.92 3.51 22.43 112.13

Page 211 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 4.12 70.56 3.12 19.45 97.24
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 30.41 327.07 546.28 225.94 1,129.70

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.69 22.18 1.76 6.91 34.54

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 5.28 22.59 11.21 9.77 48.85

201 GRANULAR SUBBASE Cu.m 47.80 265.04 1,990.89 575.93 2,879.66

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 72.73 518.06 2,233.23 706.01 3,530.03

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 72.73 407.82 2,233.23 678.45 3,392.23

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 248.24 1,848.39 14,194.03 4,072.67 20,363.33

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 248.24 1,848.39 14,594.58 4,172.80 20,864.01

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,847.83 14,194.03 4,072.52 20,362.61
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,847.83 14,471.42 4,141.87 20,709.36
"B")

204b CEMENT STABILIZED BASE Cu.m 121.54 567.36 2,741.95 857.71 4,288.56

204c CEMENT CONTENT Ton 500.00 - 14,791.14 3,822.79 19,113.93

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 1,029.17 2,291.31 108,328.08 27,912.14 139,560.69

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 1,029.17 2,291.31 103,791.29 26,777.94 133,889.71
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 419.10 144.17 2,076.57 659.96 3,299.80
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 231.48 2,435.69 13,604.89 4,068.02 20,340.08
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 461.00 107.54 2,343.19 727.93 3,639.66
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 7.17 39.28 129.78 44.06 220.29

207b DEEP PATCHING (15-30 cm) Sq.m 7.17 39.28 129.78 44.06 220.29

208 REINSTATEMENT OF ROAD SURFACE Sq.m 8.03 106.74 0.98 28.94 144.69

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 19.47 465.76 6.50 122.93 614.66
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.89 60.76 0.97 16.41 82.04

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.27 1.09 111.93 28.58 142.88

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.23 1.27 105.86 27.09 135.45
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.51 0.75 45.60 11.71 58.56

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.51 0.75 42.33 10.90 54.49
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.66 34.51 204.63 60.45 302.25

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.66 33.77 133.29 42.43 212.15

304bi DOUBLE SURFACE TREATMENT Sq.m 4.36 42.01 421.03 116.85 584.25

Page 212 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 4.36 41.09 349.69 98.78 493.91

304ci TRIPLE SURFACE TREATMENT Sq.m 7.94 46.67 497.26 137.97 689.84

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 7.94 45.70 425.78 119.85 599.26

304d SEAL COAT Sq.m 3.29 10.07 58.25 17.91 89.53

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,940.08 15,189.37 4,336.86 21,684.31
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,940.08 15,495.35 4,413.36 22,066.79
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 853.75 871.38 13,511.49 3,809.16 19,045.78

307b OPEN GRADED HOT BIT-MAC Cu.m 853.75 871.38 13,354.13 3,769.82 18,849.08

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 127.85 1,467.97 3,345.94 1,235.44 6,177.20
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 333.33 1,330.38 101,814.41 25,869.53 129,347.65

309a COLD MILLING, 0 - 30 mm Sq.m 2.61 32.44 60.35 23.85 119.24

309b COLD MILLING, 0 - 50 mm Sq.m 5.18 53.42 100.05 39.66 198.30

309c COLD MILLING, 0 - 70 mm Sq.m 9.78 71.93 139.60 55.33 276.64

309d COLD MILLING, 0 - 100 mm Sq.m 11.29 97.65 200.45 77.35 386.74

309e COLD MILLING, 0 - 130 mm Sq.m 14.68 126.94 260.59 100.55 502.75

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 430.00 3,660.72 12,928.70 4,254.86 21,274.28
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,427.08 2,601.91 7,913.68 2,985.67 14,928.35

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,427.08 2,602.32 9,175.54 3,301.24 16,506.18

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,427.08 2,601.91 9,598.23 3,406.81 17,034.04

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,427.08 2,602.37 8,466.79 3,124.06 15,620.31

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,427.08 2,708.90 9,728.66 3,466.16 17,330.80

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,487.50 2,602.32 10,151.34 3,560.29 17,801.45

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,427.08 2,601.91 8,817.52 3,211.63 16,058.15

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,427.08 2,708.90 10,079.38 3,553.84 17,769.21

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,487.50 2,602.37 10,502.07 3,647.99 18,239.93

401b CONCRETE CLASS "B" Cu.m 1,826.39 1,295.37 6,387.61 2,377.34 11,886.71

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,372.22 2,719.16 7,409.56 2,875.24 14,376.19

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,412.50 2,717.31 8,680.91 3,202.68 16,013.40

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,412.50 2,718.24 9,094.11 3,306.21 16,531.06

401di CONCRETE CLASS "D1" Cu.m 2,225.00 2,873.53 12,239.28 4,334.45 21,672.26

401dii CONCRETE CLASS "D2" Cu.m 2,225.00 2,873.99 13,098.20 4,549.30 22,746.49

Page 213 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 2,225.00 2,873.99 13,802.54 4,725.38 23,626.91

401e CONCRETE CLASS "Y" Cu.m 1,427.08 1,700.71 9,950.12 3,269.48 16,347.40

401f LEAN CONCRETE Cu.m 1,195.00 1,022.01 4,969.22 1,796.56 8,982.78

401gi PRECAST CONCRETE CLASS "A1" Cu.m 3,387.50 1,495.30 8,914.48 3,449.32 17,246.60

401gii PRECAST CONCRETE CLASS "A3" Cu.m 3,387.50 1,495.30 9,972.90 3,713.93 18,569.63

401giii PRECAST CONCRETE CLASS "B" Cu.m 3,387.50 1,786.05 7,397.06 3,142.65 15,713.26

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,414.24 2,873.99 12,296.19 4,396.10 21,980.51

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,414.24 2,873.99 13,155.11 4,610.83 23,054.16

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,414.24 2,873.99 13,859.45 4,786.92 23,934.59

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,612.50 1,272.08 4,918.32 1,950.72 9,753.61
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 6,540.00 816.39 183,265.08 47,655.37 238,276.85

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 6,540.00 816.39 187,038.70 48,598.77 242,993.86

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,616.00 1,853.65 213,594.58 54,766.06 273,830.28
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 8,100.00 7,786.18 354,304.66 92,547.71 462,738.54
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 250.00 1,014.60 - 316.15 1,580.75

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 461.11 - 1,557.92 504.76 2,523.79
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 311.11 - 4,018.65 1,082.44 5,412.20
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 32.46 4.18 245.21 70.47 352.33
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 48,208.50 12,333.38 61,666.88
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 43,708.50 11,208.38 56,041.88
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 139,169.75 35,073.69 175,368.44


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 114,177.95 28,825.74 144,128.69


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 43,243.63 11,092.16 55,460.79


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 38,180.63 9,826.41 49,132.04


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 214 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 1,125.00 - 33,555.26 8,670.07 43,350.33
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 1,125.00 - 26,069.01 6,798.50 33,992.51


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 1,125.00 - 31,241.07 8,091.52 40,457.59
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 1,125.00 - 104,283.75 26,352.19 131,760.94
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 1,050.00 - 68,796.82 17,461.71 87,308.53
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 275.00 - 959.86 308.72 1,543.58

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 275.00 - 1,241.26 379.07 1,895.33

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 1.67 0.44 2.18
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 3.02 0.78 3.88
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 5.52 1.40 7.00
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 108.75 - 456.57 141.33 706.65

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 583.70 3,904.88 246.63 1,183.80 5,919.01
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,388.71 5,183.76 338.28 1,727.69 8,638.44
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 639.16 4,496.79 280.99 1,354.24 6,771.19
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,603.04 6,113.90 424.18 2,035.28 10,176.41
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 816.82 9,516.00 760.00 2,773.21 13,866.03
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,489.88 13,527.87 760.03 4,444.45 22,222.23
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,209.77 13,603.59 1,185.78 3,999.79 19,998.94
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 5,002.39 19,714.79 1,185.78 6,475.74 32,378.70
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 570.00 1,599.19 3,643.66 1,453.21 7,266.06
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 1,140.00 3,161.91 2,753.64 1,763.89 8,819.44
SIZE) INCLUDING TESTING AND REPORTING

Page 215 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 2,280.00 6,259.84 898.14 2,359.50 11,797.48
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 27,000.00 99,039.36 955,438.95 270,369.58 1,351,847.89

407t PILE LOAD TEST UPTO 800 TON Each 33,000.00 109,098.00 1,389,746.43 382,961.11 1,914,805.54

407u PILE LOAD TEST UPTO 1000 TON Each 33,000.00 109,098.00 1,737,229.92 469,831.98 2,349,159.90

407v PILE LOAD TEST UPTO 1200 TON Each 33,000.00 109,098.00 2,036,650.90 544,687.23 2,723,436.13

407w PILE LOAD TEST UPTO 1500 TON Each 33,000.00 109,098.00 2,470,782.37 653,220.09 3,266,100.46

407x PILE LOAD TEST UPTO 2000 TON Each 33,000.00 109,098.00 2,875,782.37 754,470.09 3,772,350.46

407y PILE LOAD TEST UPTO 2500 TON Each 33,000.00 135,400.80 3,280,782.37 862,295.79 4,311,478.96

407l PERMANENT PILE CASING FOR PILES Ton 2,056.25 8,337.39 228,560.45 59,738.52 298,692.61

410 BRICK WORK Cu.m 1,224.00 448.99 8,490.75 2,540.94 12,704.68

411a STONE MASONRY RANDOM DRY Cu.m 977.50 250.43 2,257.65 871.40 4,356.98

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 1,040.00 353.87 4,337.24 1,432.78 7,163.89

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,540.00 250.43 2,464.45 1,063.72 5,318.61

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,815.00 353.87 4,402.13 1,642.75 8,213.75
MORTAR

411g ROLL POINTING Sq.m 205.50 23.92 174.81 101.06 505.29

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,352.50 532.75 4,402.13 1,821.85 9,109.23
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 403.75 1,239.08 1,092.29 683.78 3,418.90
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 417.50 1,250.26 1,376.10 760.96 3,804.81
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 677.50 1,267.02 2,268.04 1,053.14 5,265.70
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 756.82 1,277.98 3,359.41 1,348.55 6,742.75
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 840.91 1,249.19 5,723.10 1,953.30 9,766.49
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 971.59 1,307.16 8,750.38 2,757.28 13,786.41
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,126.47 1,475.57 9,624.72 3,056.69 15,283.45
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,367.86 1,671.11 11,504.27 3,635.81 18,179.05
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,762.50 1,963.58 23,058.79 6,696.22 33,481.08
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 403.75 1,239.08 1,608.89 812.93 4,064.65
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 417.50 1,250.26 1,950.10 904.46 4,522.31
DIA 380 mm

Page 216 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 677.50 1,267.02 2,596.04 1,135.14 5,675.70
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 756.82 1,277.98 4,015.41 1,512.55 7,562.75
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 840.91 1,249.19 7,363.10 2,363.30 11,816.49
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 971.59 1,307.16 11,620.38 3,474.78 17,373.91
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,126.47 1,475.57 13,724.72 4,081.69 20,408.45
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,367.86 1,671.11 16,033.82 4,768.20 23,840.99
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,762.50 1,963.58 28,921.76 8,161.96 40,809.80
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 406.67 221.31 1,452.15 520.03 2,600.16
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 2,059.72 1,007.17 6,387.61 2,363.63 11,818.13
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 21.04 - 234.79 63.96 319.79

507b ROCK FILL IN GABIONS Cu.m 400.00 - 1,580.76 495.19 2,475.95

508a BRICK PAVING (SINGLE COURSE) Sq.m 425.50 12.42 587.58 256.37 1,281.86

508b BRICK PAVING (DOUBLE COURSE) Sq.m 750.50 23.17 1,175.09 487.19 2,435.95

509a RIP RAP CLASS "A" Cu.m 1,243.00 102.70 1,695.45 760.29 3,801.44

509b RIP RAP CLASS "B" Cu.m 1,322.89 64.98 1,710.64 774.63 3,873.15

509c RIP RAP CLASS "C" Cu.m 1,387.50 51.25 1,740.03 794.70 3,973.48

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 854.17 527.60 1,794.54 794.08 3,970.38

509d GROUTED RIP RAP CLASS "A" Cu.m 1,503.00 173.97 3,875.24 1,388.05 6,940.26

509e GROUTED RIP RAP CLASS "B" Cu.m 1,872.85 136.25 3,736.33 1,436.36 7,181.79

509f GROUTED RIP RAP CLASS "C" Cu.m 2,151.67 110.65 3,630.22 1,473.13 7,365.66

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 2,151.67 711.78 3,647.61 1,627.76 8,138.81

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,990.28 793.58 7,699.16 2,620.75 13,103.76
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 211.36 279.50 1,459.12 487.50 2,437.49

510 DISMANTLING OF STRUCTURE AND Cu.m 717.50 857.78 - 393.82 1,969.10


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 335.00 71.55 299.10 176.41 882.06

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 382.86 81.77 384.60 212.31 1,061.54

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 320.00 48.78 1,197.28 391.52 1,957.58
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 365.71 55.75 1,499.38 480.21 2,401.06
BITUMEN JOINTS

Page 217 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 293.75 84.56 852.99 307.83 1,539.13
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 335.71 96.64 1,061.10 373.36 1,866.81
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 39,667.68 10,222.80 51,113.98
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 45,714.75 11,734.56 58,672.81
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,022.58 6,338.87 1,939.95 9,699.75
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,141.60 6,995.98 2,133.98 10,669.91
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,106.73 4,639.72 1,477.88 7,389.40
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,121.97 5,116.29 1,600.84 8,004.18
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 107.00 114.48 1,062.91 321.10 1,605.49
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 497.56 8,973.46 2,437.01 12,185.03
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 480.92 9,816.94 2,643.72 13,218.58
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 36.25 - 117.12 38.34 191.71

604a METAL GUARD RAIL M 113.16 37.66 4,215.72 1,091.64 5,458.18

604b METAL GUARD RAIL END PIECES Each 375.00 143.10 3,726.80 1,061.23 5,306.13

604d STEEL POST FOR METAL GUARD RAIL Each 215.00 131.67 5,142.00 1,372.17 6,860.84

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 5,065.00 496.01 30,350.00 8,977.75 44,888.76
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 5,065.00 496.01 30,258.70 8,954.93 44,774.64
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 1,116.67 384.91 15,767.55 4,317.28 21,586.40
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 1,116.67 384.91 17,790.55 4,823.03 24,115.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 218 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 1,116.67 384.91 19,896.55 5,349.53 26,747.65
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 1,116.67 384.91 16,370.75 4,468.08 22,340.40
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 1,116.67 384.91 18,593.95 5,023.88 25,119.40
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 1,116.67 384.91 20,910.55 5,603.03 28,015.15
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,233.33 271.52 19,899.04 5,350.97 26,754.86
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,233.33 271.52 23,526.04 6,257.72 31,288.61
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,233.33 271.52 27,062.04 7,141.72 35,708.61
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,233.33 271.52 20,911.74 5,604.15 28,020.74
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,233.33 271.52 24,901.44 6,601.57 33,007.86
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,233.33 271.52 27,062.04 7,141.72 35,708.61
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,233.33 488.61 25,232.47 6,738.61 33,693.03
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,233.33 488.61 26,662.47 7,096.11 35,480.53
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 219 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,233.33 488.61 43,402.47 11,281.11 56,405.53
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,233.33 488.61 46,262.47 11,996.11 59,980.53
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 434.31 291.79 40,890.52 10,404.16 52,020.78
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.44 36,391.17 9,271.40 46,357.01
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 167.97 34,809.64 8,898.15 44,490.76
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.40 35,966.68 9,205.60 46,028.01
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 434.31 291.79 36,890.52 9,404.16 47,020.78
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.44 32,391.17 8,271.40 41,357.01
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 167.97 30,809.64 7,898.15 39,490.76
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.40 31,966.68 8,205.60 41,028.01
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 565.00 - 4,680.00 1,311.25 6,556.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 565.00 - 3,960.00 1,131.25 5,656.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 220 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 565.00 - 7,020.00 1,896.25 9,481.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 565.00 - 5,940.00 1,626.25 8,131.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 21.17 14.76 866.43 225.59 1,127.95
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 30.03 9.60 48.00


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 5.07 93.50 25.84 129.21


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 36.03 11.10 55.50


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 4.39 114.69 30.97 154.85


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 182.00 159.66 220.74 140.60 703.01
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 303.33 365.68 687.23 339.06 1,695.30
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 39.03 12.26 61.28
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.49 135.22 36.68 183.39
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 46.83 14.21 71.03
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.49 165.77 44.31 221.56
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 182.00 159.66 327.81 167.37 836.84
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 303.33 309.12 945.95 389.60 1,948.00
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 91.00 79.83 366.31 134.29 671.43
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 91.00 109.70 998.11 299.71 1,498.53
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 91.00 79.83 476.11 161.74 808.68
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 133.00 50.90 1,373.87 389.45 1,947.23
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.88 500.45 146.33 731.66
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 279.29 79.88 399.38
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 221 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAHORE

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.88 600.45 171.33 856.66
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 304.29 86.13 430.63
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 349.17 238.02 1,565.69 538.22 2,691.09
DRAWING

610c KILOMETER POST Each 450.00 572.42 3,452.23 1,118.66 5,593.30

610d TEN KILOMETER POST Each 900.00 1,144.83 9,157.87 2,800.68 14,003.38

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 570.00 114.48 2,328.28 753.19 3,765.96
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 533.04 1,153.10 21.00 426.79 2,133.93
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.72 28.44 17.48 87.38

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.72 94.28 33.93 169.66

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.79 4.63 34.10 10.13 50.65

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 6.18 8.97 3.00 4.54 22.69
PER ADDITIONAL MONTH

Page 222 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

LAYYAH

Page 223 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.67 - 5.35 26.76

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.55 31.47 159.35 796.76

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 864.28 141.60 271.97 1,359.84

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,741.69 755.18 722.61 3,613.05

103 STRIPPING Cu.m 9.29 273.48 - 70.70 353.48

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.46 1.76 5.46 27.28

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.63 - 79.48 397.39

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 782.43 38.59 217.90 1,089.49

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.03 - 161.99 809.94

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 433.86 - 115.81 579.05

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.63 - 79.48 397.39

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 782.43 38.59 217.90 1,089.49

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.03 - 161.99 809.94

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 433.86 - 115.81 579.05

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.97 - 76.51 382.56

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 683.14 211.66 272.26 1,361.29
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.96 38.59 215.53 1,077.64
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.43 - 159.60 798.01
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.34 - 113.43 567.14
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.23 1,490.22 473.98 2,369.89

107e COMMON BACK FILL Cu.m 88.46 125.95 11.70 56.53 282.64

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.13 11.70 87.06 435.30
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 968.76 38.59 266.96 1,334.81
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 781.29 11.70 209.79 1,048.96
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.32 11.70 162.11 810.56
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.46 60.14 95.64 478.20
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.44 11.70 50.69 253.45
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.01 11.70 65.62 328.10
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.79 3.51 22.03 110.15

Page 224 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.46 3.12 19.19 95.94
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.17 469.36 204.73 1,023.66

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.13 1.76 6.68 33.40

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.53 11.17 9.44 47.20

201 GRANULAR SUBBASE Cu.m 36.77 264.61 1,687.86 497.31 2,486.55

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.18 1,779.68 588.20 2,940.99

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.46 1,779.68 560.52 2,802.60

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,844.23 13,754.09 3,947.32 19,736.59

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,844.23 14,150.11 4,046.32 20,231.61

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.67 13,754.09 3,947.18 19,735.89
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.67 14,028.47 4,015.77 20,078.86
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 565.94 2,414.53 768.49 3,842.45

204c CEMENT CONTENT Ton 384.60 - 14,522.97 3,726.89 18,634.46

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,287.96 107,723.68 27,700.82 138,504.09

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,287.96 102,470.68 26,387.57 131,937.84
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.85 1,805.49 567.93 2,839.65
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,431.55 13,222.31 3,957.98 19,789.89
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.35 1,902.93 591.22 2,956.11
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.19 103.61 37.08 185.39

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.19 103.61 37.08 185.39

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.45 0.98 28.40 142.01

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.64 6.50 121.53 607.64
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.65 0.97 16.16 80.78

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 110.61 28.17 140.85

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 104.54 26.69 133.43
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.07 11.55 57.75

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.80 10.74 53.68
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.44 200.39 59.22 296.09

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.70 129.89 41.41 207.04

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.93 410.80 114.02 570.10

Page 225 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.01 340.30 96.17 480.83

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.59 485.17 134.47 672.34

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.62 414.53 116.57 582.83

304d SEAL COAT Sq.m 2.53 10.04 57.05 17.41 87.03

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.75 14,737.35 4,210.20 21,050.98
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.75 15,038.78 4,285.56 21,427.78
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.82 13,074.90 3,650.36 18,251.80

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.82 12,919.94 3,611.62 18,058.09

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.26 3,343.91 1,227.13 6,135.64
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.37 100,382.13 25,491.23 127,456.13

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.36 60.29 23.66 118.31

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.31 99.95 39.31 196.54

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.82 139.46 54.70 273.51

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.14 200.25 76.52 382.59

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.28 260.32 99.47 497.36

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,653.35 12,733.83 4,179.49 20,897.43
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,588.51 7,739.41 2,856.41 14,282.05

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,588.91 9,014.27 3,175.23 15,876.14

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,588.51 9,439.17 3,281.35 16,406.75

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,588.97 8,274.36 2,990.26 14,951.31

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,695.41 9,549.22 3,335.59 16,677.95

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,588.91 9,974.12 3,426.81 17,134.04

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,588.51 8,618.70 3,076.24 15,381.18

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,695.41 9,893.57 3,421.68 17,108.39

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,588.97 10,318.46 3,512.91 17,564.54

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,287.54 6,242.48 2,233.73 11,168.63

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,705.48 7,236.28 2,749.32 13,746.61

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,703.64 8,521.10 3,077.81 15,389.05

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,704.56 8,936.04 3,181.78 15,908.89

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,856.62 12,040.81 4,152.23 20,761.16

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,857.08 12,892.35 4,365.24 21,826.18

Page 226 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,857.08 13,583.92 4,538.13 22,690.64

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,692.40 9,773.11 3,140.81 15,704.04

401f LEAN CONCRETE Cu.m 919.20 1,014.07 4,830.10 1,690.84 8,454.21

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,486.29 8,743.60 3,208.90 16,044.50

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,486.29 9,782.86 3,468.72 17,343.58

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,776.79 7,277.63 2,915.03 14,575.16

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,857.08 12,100.52 4,203.67 21,018.34

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,857.08 12,952.07 4,416.55 22,082.76

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,857.08 13,643.64 4,589.45 22,947.23

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,265.99 4,737.78 1,811.03 9,055.15
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.18 183,675.21 47,380.52 236,902.60

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.18 187,875.21 48,430.52 242,152.60

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.07 214,657.70 54,823.06 274,115.31
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,780.95 358,459.81 93,117.82 465,589.10
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,005.81 - 299.53 1,497.64

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,579.77 483.62 2,418.08
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,078.74 1,079.51 5,397.56
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.36 69.88 349.39
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,648.17 12,378.38 61,891.90
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,148.17 11,253.38 56,266.90
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,255.09 35,280.11 176,400.55


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,258.52 29,030.97 145,154.84


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,499.60 11,091.24 55,456.19


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,428.02 9,823.34 49,116.71


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 227 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,035.75 8,725.28 43,626.38
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,347.55 6,803.23 34,016.13


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,982.84 8,212.05 41,060.24
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,738.99 26,651.09 133,255.43
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,108.99 17,479.16 87,395.81
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 980.44 298.00 1,489.98

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.84 368.35 1,841.73

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 478.19 140.46 702.30

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,871.56 345.50 1,166.51 5,832.56
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,158.03 454.66 1,670.23 8,351.13
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,457.98 386.43 1,334.02 6,670.08
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,082.88 556.97 1,968.24 9,841.18
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,492.57 950.58 2,767.86 13,839.31
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,455.16 950.60 4,272.55 21,362.75
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,570.06 1,456.32 3,989.23 19,946.16
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,607.30 1,456.32 6,227.87 31,139.35
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,593.74 3,775.11 1,451.82 7,259.12
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,151.12 2,885.09 1,728.28 8,641.38
SIZE) INCLUDING TESTING AND REPORTING

Page 228 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,238.47 1,029.59 2,255.46 11,277.30
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,859.76 900,306.75 254,983.73 1,274,918.64

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,893.52 1,309,552.95 360,957.52 1,804,787.59

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,893.52 1,636,984.80 442,815.48 2,214,077.40

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,893.52 1,916,358.50 512,658.91 2,563,294.53

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,893.52 2,320,419.05 613,674.04 3,068,370.21

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,893.52 2,725,419.05 714,924.04 3,574,620.21

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,144.24 3,130,419.05 822,736.72 4,113,683.61

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,325.14 228,943.92 59,712.68 298,563.41

410 BRICK WORK Cu.m 941.51 447.98 8,546.03 2,483.88 12,419.40

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.26 2,012.29 753.61 3,768.06

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.37 4,113.05 1,316.60 6,583.00

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.26 2,229.27 916.03 4,580.14

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.37 4,205.81 1,488.83 7,444.13
MORTAR

411g ROLL POINTING Sq.m 158.07 23.84 175.91 89.46 447.28

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.13 4,205.81 1,636.88 8,184.38
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,234.38 1,215.97 690.23 3,451.15
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.33 1,549.57 779.76 3,898.81
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.07 2,509.06 1,073.82 5,369.08
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.02 3,792.97 1,412.79 7,063.93
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.19 6,205.06 2,024.77 10,123.85
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.09 9,370.65 2,855.77 14,278.86
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,472.53 10,245.48 3,146.12 15,730.61
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,668.46 12,372.15 3,773.19 18,865.96
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,960.50 24,506.41 6,955.66 34,778.29
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,234.38 1,732.57 819.38 4,096.90
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.33 2,123.57 923.26 4,616.31
DIA 380 mm

Page 229 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.07 2,837.06 1,155.82 5,779.08
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.02 4,448.97 1,576.79 7,883.93
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.19 7,845.06 2,434.77 12,173.85
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.09 12,240.65 3,573.27 17,866.36
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,472.53 14,345.48 4,171.12 20,855.61
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,668.46 16,901.34 4,905.49 24,527.45
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,960.50 30,369.39 8,421.40 42,107.01
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.08 1,462.26 499.04 2,495.19
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,001.78 6,242.48 2,207.16 11,035.79
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.78 63.99 319.95

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,342.02 412.43 2,062.13

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.38 595.76 233.86 1,169.30

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.11 1,191.43 447.96 2,239.78

509a RIP RAP CLASS "A" Cu.m 956.12 102.03 1,448.28 626.61 3,133.04

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.34 1,470.08 638.00 3,190.00

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.21 1,504.13 655.65 3,278.25

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.17 1,568.94 688.29 3,441.43

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.12 3,706.50 1,258.69 6,293.43

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.43 3,572.88 1,286.98 6,434.90

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.62 3,467.63 1,308.08 6,540.41

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.27 3,492.48 1,464.46 7,322.29

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.23 7,512.14 2,458.58 12,292.89
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.22 1,462.95 476.19 2,380.94

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.55 - 352.36 1,761.81


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.50 255.49 146.17 730.85

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.72 328.53 176.19 880.94

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.72 1,175.43 367.57 1,837.86
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.67 1,470.00 451.75 2,258.74
BITUMEN JOINTS

Page 230 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.47 815.12 281.39 1,406.93
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.53 1,012.03 341.70 1,708.50
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,918.41 10,256.05 51,280.25
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,004.24 11,777.51 58,887.54
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,017.39 6,290.14 1,903.49 9,517.44
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,135.71 6,942.30 2,096.11 10,480.54
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.04 4,568.11 1,449.78 7,248.91
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.20 5,036.76 1,570.98 7,854.91
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.40 991.79 297.13 1,485.63
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.85 8,604.24 2,328.54 11,642.71
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.23 9,408.25 2,525.39 12,626.94
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.63 4,309.12 1,108.45 5,542.24

604b METAL GUARD RAIL END PIECES Each 288.45 143.01 3,785.34 1,054.20 5,271.00

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.32 5,258.12 1,388.70 6,943.51

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 493.80 30,284.24 8,668.52 43,342.58
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 493.80 30,188.43 8,644.56 43,222.81
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 379.35 16,075.89 4,328.55 21,642.73
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 379.35 18,171.27 4,852.39 24,261.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 231 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 379.35 20,285.42 5,380.93 26,904.64
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 379.35 16,674.02 4,478.08 22,390.39
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 379.35 18,973.37 5,052.92 25,264.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 379.35 21,299.42 5,634.43 28,172.14
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.65 20,287.63 5,376.74 26,883.70
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.65 23,914.63 6,283.49 31,417.45
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.65 27,450.63 7,167.49 35,837.45
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.65 21,300.33 5,629.92 28,149.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.65 25,290.03 6,627.34 33,136.70
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.65 27,450.63 7,167.49 35,837.45
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.04 25,610.80 6,761.63 33,808.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.04 27,040.80 7,119.13 35,595.65
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 232 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.04 43,824.34 11,315.02 56,575.08
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.04 46,684.34 12,030.02 60,150.08
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.61 41,081.64 10,426.58 52,132.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.01 36,473.34 9,261.20 46,305.99
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.29 34,802.86 8,860.80 44,304.01
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.67 35,943.97 9,160.32 45,801.58
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.61 37,081.64 9,426.58 47,132.91
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.01 32,473.34 8,261.20 41,305.99
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.29 30,802.86 7,860.80 39,304.01
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.67 31,943.97 8,160.32 40,801.58
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 233 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.29 225.33 1,126.66
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.80


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.54 220.74 130.07 650.35
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.47 687.23 321.26 1,606.29
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.63
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.54 327.81 156.84 784.19
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.20 945.95 371.87 1,859.34
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.77 366.31 129.02 645.09
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.34 998.11 294.36 1,471.81
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.77 476.11 156.47 782.34
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.65 1,373.87 381.71 1,908.54
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.73 144.25 721.23
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.98 78.33 391.65
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 234 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LAYYAH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.73 169.25 846.23
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.98 84.58 422.90
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 236.70 1,550.54 513.96 2,569.79
DRAWING

610c KILOMETER POST Each 346.14 572.02 3,315.83 1,058.50 5,292.49

610d TEN KILOMETER POST Each 692.29 1,144.04 8,731.80 2,642.03 13,210.15

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.40 2,372.49 731.34 3,656.68
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,149.50 19.00 394.63 1,973.14
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.65 28.46 16.38 81.91

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.65 94.30 32.84 164.20

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.94 9.99 49.93

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.94 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 235 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

LODHRAN

Page 236 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.66 - 5.35 26.74

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.22 31.45 159.51 797.56

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 865.12 141.49 272.15 1,360.76

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,744.01 754.63 723.05 3,615.26

103 STRIPPING Cu.m 9.29 273.35 - 70.66 353.31

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.44 1.76 5.45 27.25

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.40 - 79.42 397.11

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 781.75 38.71 217.76 1,088.78

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 608.77 - 161.67 808.36

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.90 - 115.57 577.85

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.40 - 79.42 397.11

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 781.75 38.71 217.76 1,088.78

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 608.77 - 161.67 808.36

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.90 - 115.57 577.85

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.72 - 76.45 382.25

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 681.67 212.13 272.01 1,360.04
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.28 38.71 215.39 1,076.94
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 599.17 - 159.29 796.44
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.38 - 113.19 565.95
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.83 1,460.10 466.35 2,331.74

107e COMMON BACK FILL Cu.m 88.46 125.85 11.70 56.50 282.51

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.90 11.70 87.00 435.01
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 967.19 38.71 266.60 1,333.00
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 780.35 11.70 209.56 1,047.80
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 595.59 11.70 161.93 809.65
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.19 60.14 95.58 477.88
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.14 11.70 50.62 253.08
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.72 11.70 65.55 327.74
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.69 3.51 22.01 110.03

Page 237 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.39 3.12 19.17 95.84
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.71 597.74 236.71 1,183.55

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.08 1.76 6.67 33.35

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.48 11.16 9.43 47.13

201 GRANULAR SUBBASE Cu.m 36.77 264.20 2,193.57 623.63 3,118.16

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 516.46 2,285.39 714.45 3,572.24

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.15 2,285.39 686.87 3,434.35

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,841.99 14,697.76 4,182.67 20,913.36

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,841.99 15,086.66 4,279.90 21,399.49

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.43 14,697.76 4,182.53 20,912.66
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,841.43 14,966.26 4,249.66 21,248.29
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 564.86 3,427.73 1,021.52 5,107.59

204c CEMENT CONTENT Ton 384.60 - 14,699.37 3,770.99 18,854.96

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,286.22 107,141.06 27,554.73 137,773.64

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,286.22 101,888.06 26,241.48 131,207.39
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.69 2,267.26 683.33 3,416.64
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,426.37 14,061.45 4,166.47 20,832.35
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.26 2,406.52 717.10 3,585.48
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.13 132.79 44.36 221.79

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.13 132.79 44.36 221.79

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.32 0.98 28.37 141.85

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.28 6.50 121.44 607.19
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.57 0.97 16.14 80.68

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 110.03 28.02 140.11

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 103.96 26.54 132.70
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.84 11.49 57.46

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.57 10.68 53.39
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.41 204.64 60.27 301.36

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.67 134.51 42.56 212.78

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.89 424.21 117.36 586.81

Page 238 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.97 354.08 99.60 498.00

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.55 500.87 138.38 691.90

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.58 430.60 120.57 602.85

304d SEAL COAT Sq.m 2.53 10.01 58.48 17.76 88.78

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.89 15,669.52 4,442.77 22,213.86
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,933.89 15,969.19 4,517.69 22,588.45
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.00 14,020.46 3,886.55 19,432.73

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.00 13,863.50 3,847.31 19,236.53

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,465.46 3,342.85 1,226.67 6,133.33
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,322.39 99,794.65 25,343.36 126,716.79

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.31 60.25 23.65 118.23

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.27 99.89 39.29 196.43

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.49 139.39 54.60 273.00

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.06 200.14 76.47 382.36

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.18 260.19 99.42 497.08

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,650.83 13,129.65 4,277.81 21,389.05
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,581.68 8,104.91 2,946.08 14,730.39

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,582.09 9,383.03 3,265.71 16,328.55

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,581.68 9,810.42 3,372.46 16,862.28

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,582.14 8,647.59 3,081.87 15,409.33

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,688.54 9,925.72 3,428.00 17,139.98

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,582.09 10,353.10 3,519.85 17,599.23

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,581.68 8,996.28 3,168.92 15,844.60

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,688.54 10,274.40 3,515.17 17,575.84

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,582.14 10,701.79 3,607.03 18,035.16

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,281.27 6,529.66 2,303.95 11,519.77

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,698.51 7,596.99 2,837.76 14,188.78

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,696.67 8,885.06 3,167.06 15,835.30

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,697.59 9,302.50 3,271.65 16,358.24

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,849.56 12,439.80 4,250.22 21,251.09

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,850.02 13,300.07 4,465.40 22,327.00

Page 239 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,850.02 14,000.04 4,640.39 23,201.96

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,689.44 10,151.69 3,234.72 16,173.58

401f LEAN CONCRETE Cu.m 919.20 1,008.91 5,104.01 1,758.03 8,790.15

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,479.49 9,113.40 3,299.65 16,498.25

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,479.49 10,165.07 3,562.57 17,812.84

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,770.56 7,532.66 2,977.23 14,886.16

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,850.02 12,499.53 4,301.66 21,508.28

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,850.02 13,359.80 4,516.72 22,583.61

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,850.02 14,059.77 4,691.72 23,458.58

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,261.18 5,060.14 1,890.42 9,452.09
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.07 184,067.25 47,478.50 237,392.50

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.07 188,153.36 48,500.03 242,500.14

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.75 214,662.42 54,824.16 274,120.81
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,778.23 358,777.06 93,196.45 465,982.26
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,001.62 - 298.48 1,492.40

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,579.21 483.48 2,417.38
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,078.29 1,079.40 5,397.00
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.37 69.88 349.40
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,727.60 12,398.24 61,991.19
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,227.60 11,273.24 56,366.19
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,438.08 35,325.86 176,629.29


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,436.12 29,075.37 145,376.84


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,559.29 11,106.16 55,530.80


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,478.01 9,835.84 49,179.20


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 240 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,101.36 8,741.68 43,708.39
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,383.69 6,812.26 34,061.30


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 32,049.28 8,228.66 41,143.29
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,903.83 26,692.30 133,461.48
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,151.13 17,489.70 87,448.49
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 980.50 298.01 1,490.05

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.90 368.36 1,841.80

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 477.69 140.34 701.68

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,854.17 303.50 1,151.67 5,758.33
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,144.60 412.69 1,656.38 8,281.89
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,437.73 344.44 1,318.46 6,592.28
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,066.70 515.03 1,953.70 9,768.51
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,480.35 908.76 2,754.36 13,771.78
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,417.21 908.79 4,252.61 21,263.04
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,552.56 1,414.66 3,974.45 19,872.24
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,551.22 1,414.66 6,203.44 31,017.18
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,590.90 3,733.21 1,440.64 7,203.20
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,145.51 2,843.20 1,716.40 8,582.00
SIZE) INCLUDING TESTING AND REPORTING

Page 241 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,227.35 987.70 2,242.21 11,211.03
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,766.24 921,171.00 260,176.41 1,300,882.05

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,787.04 1,339,901.40 368,518.01 1,842,590.05

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,787.04 1,674,921.60 452,273.06 2,261,365.30

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,787.04 1,961,882.00 524,013.16 2,620,065.80

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,787.04 2,377,322.60 627,873.31 3,139,366.55

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,787.04 2,782,322.60 729,123.31 3,645,616.55

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,010.88 3,187,322.60 836,929.27 4,184,646.35

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,318.74 229,335.80 59,809.05 299,045.26

410 BRICK WORK Cu.m 941.51 447.45 8,455.05 2,461.00 12,305.00

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.17 2,457.10 864.79 4,323.96

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.11 4,401.11 1,388.55 6,942.75

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.17 2,709.36 1,036.03 5,180.14

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.11 4,493.81 1,560.76 7,803.79
MORTAR

411g ROLL POINTING Sq.m 158.07 23.80 173.56 88.86 444.30

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.80 4,493.81 1,708.79 8,543.96
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,232.79 1,163.73 676.77 3,383.85
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,246.73 1,476.34 761.05 3,805.26
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,263.46 2,407.44 1,048.01 5,240.04
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,274.45 3,610.52 1,366.78 6,833.90
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,245.61 6,001.83 1,973.57 9,867.84
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,303.47 9,108.40 2,789.81 13,949.03
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,471.31 9,982.19 3,080.00 15,399.99
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,667.08 12,006.43 3,681.42 18,407.09
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,958.90 23,897.84 6,803.12 34,015.58
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,232.79 1,680.33 805.92 4,029.60
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,246.73 2,050.34 904.55 4,522.76
DIA 380 mm

Page 242 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,263.46 2,735.44 1,130.01 5,650.04
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,274.45 4,266.52 1,530.78 7,653.90
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,245.61 7,641.83 2,383.57 11,917.84
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,303.47 11,978.40 3,507.31 17,536.53
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,471.31 14,082.19 4,105.00 20,524.99
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,667.08 16,535.86 4,813.78 24,068.88
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,958.90 29,760.82 8,268.86 41,344.30
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.95 1,486.73 505.12 2,525.61
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,000.39 6,529.66 2,278.60 11,393.01
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.79 63.99 319.96

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,754.41 515.52 2,577.61

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.37 584.20 230.97 1,154.83

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.07 1,168.34 442.18 2,210.88

509a RIP RAP CLASS "A" Cu.m 956.12 101.98 1,886.59 736.17 3,680.86

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.31 1,908.33 747.56 3,737.78

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.18 1,945.94 766.10 3,830.49

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.94 2,016.62 800.15 4,000.74

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 171.48 3,849.15 1,294.19 6,470.94

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 133.81 3,720.36 1,323.69 6,618.46

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.10 3,628.21 1,348.10 6,740.50

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 709.50 3,653.06 1,504.41 7,522.04

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 790.01 7,834.83 2,538.95 12,694.73
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.08 1,497.06 484.68 2,423.40

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.42 - 352.33 1,761.66


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.48 332.82 165.50 827.48

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.69 427.96 201.04 1,005.18

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.68 1,168.08 365.73 1,828.64
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.64 1,465.22 450.54 2,252.70
BITUMEN JOINTS

Page 243 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.42 849.99 290.09 1,450.46
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.48 1,059.61 353.58 1,767.90
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,925.62 10,257.85 51,289.26
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,011.56 11,779.34 58,896.70
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,014.68 6,434.87 1,938.99 9,694.95
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,132.63 7,101.85 2,135.23 10,676.13
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,102.58 4,714.24 1,485.95 7,429.75
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,119.27 5,198.27 1,611.13 8,055.65
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.36 1,020.09 304.19 1,520.95
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.48 8,744.08 2,363.41 11,817.05
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.87 9,563.03 2,563.99 12,819.96
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.62 4,309.41 1,108.52 5,542.59

604b METAL GUARD RAIL END PIECES Each 288.45 142.95 3,785.53 1,054.23 5,271.16

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.13 5,258.49 1,388.75 6,943.75

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 490.98 30,684.18 8,767.80 43,838.98
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 490.98 30,588.35 8,743.84 43,719.19
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 376.60 16,158.66 4,348.55 21,742.75
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 376.60 18,225.16 4,865.18 24,325.88
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 244 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 376.60 20,331.16 5,391.68 26,958.38
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 376.60 16,756.79 4,498.08 22,490.41
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 376.60 19,028.56 5,066.03 25,330.13
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 376.60 21,345.16 5,645.18 28,225.88
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.19 20,333.56 5,388.11 26,940.55
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.19 23,960.56 6,294.86 31,474.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.19 27,496.56 7,178.86 35,894.30
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.19 21,346.26 5,641.29 28,206.43
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.19 25,335.96 6,638.71 33,193.55
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.19 27,496.56 7,178.86 35,894.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.22 25,710.60 6,786.38 33,931.88
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.22 27,140.60 7,143.88 35,719.38
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 245 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.22 43,924.28 11,339.80 56,698.98
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.22 46,784.28 12,054.80 60,273.98
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 289.89 41,148.23 10,443.05 52,215.25
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.78 36,580.70 9,287.99 46,439.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.06 34,913.36 8,888.37 44,441.86
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.43 36,055.55 9,188.15 45,940.76
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 289.89 37,148.23 9,443.05 47,215.25
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.78 32,580.70 8,287.99 41,439.93
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.06 30,913.36 7,888.37 39,441.86
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.43 32,055.55 8,188.15 40,940.76
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 246 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.30 225.34 1,126.68
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.04 93.50 25.56 127.79


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.44


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.48 220.74 130.06 650.28
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 363.85 687.23 321.10 1,605.50
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 135.22 36.32 181.61
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 165.77 43.96 219.80
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.48 327.81 156.82 784.10
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.72 945.95 371.75 1,858.74
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.74 366.31 129.01 645.05
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.15 998.11 294.32 1,471.58
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.74 476.11 156.46 782.30
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.52 1,373.87 381.67 1,908.36
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.73 144.25 721.23
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.98 78.33 391.65
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 247 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: LODHRAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.73 169.25 846.23
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.98 84.58 422.90
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 235.61 1,581.55 521.44 2,607.19
DRAWING

610c KILOMETER POST Each 346.14 571.81 3,376.04 1,073.50 5,367.50

610d TEN KILOMETER POST Each 692.29 1,143.62 8,872.27 2,677.05 13,385.23

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.36 2,426.48 744.82 3,724.11
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,147.61 19.00 394.16 1,970.78
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 28.44 16.37 81.84

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.61 94.29 32.83 164.14

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.91 9.98 49.89

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.93 3.00 4.17 20.85
PER ADDITIONAL MONTH

Page 248 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

MANDI BAHAUDDIN

Page 249 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.80

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.95 31.53 159.72 798.59

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 866.66 141.87 272.63 1,363.16

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,749.71 756.66 724.99 3,624.93

103 STRIPPING Cu.m 9.29 273.82 - 70.78 353.90

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.54 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.52 - 79.70 398.51

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 785.86 38.35 218.69 1,093.46

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 612.11 - 162.51 812.54

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 435.46 - 116.21 581.05

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.52 - 79.70 398.51

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 785.86 38.35 218.69 1,093.46

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 612.11 - 162.51 812.54

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 435.46 - 116.21 581.05

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.13 - 76.80 384.00

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 686.65 210.18 272.77 1,363.83
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 776.38 38.35 216.32 1,081.61
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.49 - 160.12 800.59
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 425.93 - 113.83 569.13
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.66 1,206.11 403.06 2,015.28

107e COMMON BACK FILL Cu.m 88.46 126.46 11.70 56.66 283.28

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.88 11.70 87.25 436.24
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.80 38.35 267.66 1,338.31
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 784.03 11.70 210.48 1,052.39
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.57 11.70 162.68 813.38
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.30 60.13 95.85 479.24
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 166.00 11.70 50.83 254.15
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.37 11.70 65.71 328.55
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.97 3.51 22.08 110.38

Page 250 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.62 3.12 19.23 96.14
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.43 396.67 186.87 934.36

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.60 11.19 9.46 47.30

201 GRANULAR SUBBASE Cu.m 36.77 265.21 1,401.49 425.87 2,129.35

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.32 1,539.21 528.37 2,641.85

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 408.06 1,539.21 500.81 2,504.03

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,850.54 13,414.10 3,863.90 19,319.49

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,850.54 13,813.57 3,963.76 19,818.81

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,849.98 13,414.10 3,863.76 19,318.78
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,849.98 13,689.58 3,932.63 19,663.13
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.76 1,907.70 642.24 3,211.19

204c CEMENT CONTENT Ton 384.60 - 14,453.67 3,709.57 18,547.84

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,292.67 109,002.10 28,021.60 140,108.01

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,292.67 104,296.24 26,845.14 134,225.68
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.30 1,462.60 482.32 2,411.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,437.44 12,888.17 3,875.92 19,379.58
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.61 1,643.66 526.47 2,632.35
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.30 89.74 33.64 168.19

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.30 89.74 33.64 168.19

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.81 0.98 28.49 142.46

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 466.60 6.50 122.02 610.09
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.80 0.97 16.19 80.96

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.10 112.44 28.63 143.14

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.37 27.15 135.73
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.80 11.74 58.68

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.53 10.92 54.59
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.53 200.87 59.36 296.81

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.79 129.21 41.26 206.30

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.06 409.37 113.70 568.48

Page 251 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.14 337.71 95.55 477.75

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.74 483.41 134.07 670.33

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.77 411.61 115.87 579.35

304d SEAL COAT Sq.m 2.53 10.08 57.09 17.43 87.14

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.26 14,413.97 4,130.98 20,654.89
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.26 14,724.17 4,208.53 21,042.64
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 872.57 12,729.53 3,564.70 17,823.51

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 872.57 12,566.05 3,523.83 17,619.16

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.59 3,346.77 1,228.43 6,142.14
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.86 102,134.86 25,930.53 129,652.65

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.45 60.37 23.71 118.54

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.49 100.09 39.39 196.95

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 72.24 139.66 54.86 274.28

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.71 200.53 76.73 383.66

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 127.02 260.69 99.75 498.75

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,662.69 12,254.26 4,061.93 20,309.64
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,611.42 7,279.64 2,747.20 13,735.99

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,611.82 8,543.91 3,063.36 15,316.81

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,611.42 8,963.70 3,168.21 15,841.06

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,611.88 7,812.73 2,880.58 14,402.91

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,719.08 9,076.99 3,223.45 16,117.24

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,611.82 9,496.79 3,313.20 16,566.01

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,611.42 8,155.57 2,966.18 14,830.89

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,719.08 9,419.83 3,309.16 16,545.79

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,611.88 9,839.63 3,398.93 16,994.63

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,298.24 5,822.54 2,131.42 10,657.08

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,722.61 6,779.68 2,639.45 13,197.26

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,721.68 8,053.68 2,965.47 14,827.34

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,721.68 8,463.74 3,067.98 15,339.90

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,880.59 11,554.67 4,036.69 20,183.45

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,881.05 12,401.14 4,248.43 21,242.13

Page 252 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,881.05 13,089.41 4,420.49 22,102.46

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,703.03 9,298.74 3,024.88 15,124.38

401f LEAN CONCRETE Cu.m 919.20 1,025.18 4,419.66 1,591.01 7,955.05

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,499.76 8,274.01 3,094.87 15,474.35

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,499.76 9,308.14 3,353.40 16,767.01

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,789.72 6,899.79 2,823.81 14,119.03

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,881.05 11,613.18 4,087.83 20,439.13

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,881.05 12,459.65 4,299.44 21,497.21

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,881.05 13,147.92 4,471.51 22,357.55

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,274.32 4,362.36 1,719.26 8,596.29
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.46 182,970.37 47,204.38 236,021.89

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.46 187,170.37 48,254.38 241,271.89

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.89 214,005.27 54,660.16 273,300.80
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,788.30 357,038.90 92,764.43 463,822.15
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,018.64 - 302.74 1,513.68

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,572.93 481.90 2,409.51
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,057.90 1,074.30 5,371.51
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.15 69.33 346.63
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,529.87 12,348.81 61,744.03
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,029.87 11,223.81 56,119.03
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,991.12 35,214.12 176,070.59


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,005.51 28,967.72 144,838.58


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,402.00 11,066.84 55,334.19


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,350.14 9,803.87 49,019.36


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 253 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,923.11 8,697.12 43,485.58
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,279.47 6,786.21 33,931.03


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,758.08 8,155.86 40,779.29
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,348.38 26,553.43 132,767.16
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,895.84 17,425.88 87,129.38
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 972.90 296.11 1,480.55

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,254.30 366.46 1,832.30

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 469.91 138.39 691.96

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,918.47 321.97 1,172.36 5,861.79
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,194.24 424.73 1,671.80 8,358.99
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,512.62 360.50 1,341.19 6,705.96
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,126.55 521.03 1,970.17 9,850.84
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,525.55 893.47 2,761.83 13,809.15
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,557.51 893.50 4,283.86 21,419.30
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,617.27 1,369.96 3,979.45 19,897.24
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,758.60 1,369.96 6,244.11 31,220.53
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,601.41 3,794.15 1,458.50 7,292.51
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,166.30 2,904.13 1,736.83 8,684.15
SIZE) INCLUDING TESTING AND REPORTING

Page 254 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,268.54 1,048.63 2,267.74 11,338.69
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,112.56 874,258.05 248,534.75 1,242,673.76

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,181.36 1,271,663.37 351,557.08 1,757,785.41

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,181.36 1,589,621.28 431,046.56 2,155,232.80

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,181.36 1,859,523.10 498,522.02 2,492,610.08

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,181.36 2,249,375.83 595,985.20 2,979,925.99

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,181.36 2,654,375.83 697,235.20 3,486,175.99

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,505.28 3,059,375.83 805,066.18 4,025,330.89

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,342.38 228,247.73 59,542.94 297,714.71

410 BRICK WORK Cu.m 941.51 449.40 8,467.42 2,464.59 12,322.93

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.50 1,732.35 683.69 3,418.44

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 354.07 3,685.81 1,209.97 6,049.83

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.50 1,937.40 843.12 4,215.61

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 354.07 3,787.79 1,384.49 6,922.46
MORTAR

411g ROLL POINTING Sq.m 158.07 23.95 171.47 88.37 441.85

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 533.00 3,787.79 1,532.59 7,662.94
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,239.87 1,252.17 700.65 3,503.25
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,251.05 1,600.40 793.15 3,965.74
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,267.81 2,579.92 1,092.22 5,461.09
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.78 3,920.63 1,445.39 7,226.95
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,250.00 6,346.67 2,060.88 10,304.38
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,308.00 9,552.14 2,901.87 14,509.36
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.53 10,426.35 3,192.34 15,961.70
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,672.19 12,626.36 3,837.68 19,188.38
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,964.83 24,933.65 7,063.55 35,317.75
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,239.87 1,768.77 829.80 4,149.00
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,251.05 2,174.40 936.65 4,683.24
DIA 380 mm

Page 255 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,267.81 2,907.92 1,174.22 5,871.09
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.78 4,576.63 1,609.39 8,046.95
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,250.00 7,986.67 2,470.88 12,354.38
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,308.00 12,422.14 3,619.37 18,096.86
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.53 14,526.35 4,217.34 21,086.70
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,672.19 17,155.46 4,969.95 24,849.76
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,964.83 30,796.63 8,529.30 42,646.48
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.41 1,187.39 430.40 2,152.01
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,011.18 5,822.54 2,104.52 10,522.60
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.95 63.54 317.68

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,084.78 348.12 1,740.58

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.43 589.09 232.21 1,161.03

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.20 1,178.12 444.65 2,223.26

509a RIP RAP CLASS "A" Cu.m 956.12 102.74 1,177.05 558.98 2,794.89

509b RIP RAP CLASS "B" Cu.m 1,017.58 65.01 1,201.04 570.91 2,854.54

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.76 1,235.10 588.53 2,942.66

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 529.78 1,300.78 621.90 3,109.49

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.58 3,438.64 1,192.33 5,961.66

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.84 3,312.16 1,222.40 6,112.01

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.62 3,208.99 1,243.93 6,219.63

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 714.48 3,236.32 1,401.47 7,007.35

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.53 7,078.77 2,351.06 11,755.30
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.62 1,187.85 407.51 2,037.56

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.87 - 352.44 1,762.21


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.57 207.64 134.23 671.13

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.80 267.00 160.83 804.13

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.81 1,113.90 352.22 1,761.08
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.78 1,392.34 432.36 2,161.78
BITUMEN JOINTS

Page 256 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.59 727.38 259.48 1,297.41
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.68 901.78 314.18 1,570.88
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,820.47 10,231.57 51,157.84
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,889.37 11,748.79 58,743.95
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,024.70 6,100.22 1,857.83 9,289.16
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,144.00 6,732.90 2,045.83 10,229.15
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.44 4,387.08 1,405.38 7,026.88
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.63 4,836.83 1,521.86 7,609.30
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.52 952.88 287.43 1,437.13
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.85 8,421.46 2,283.10 11,415.48
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 481.20 9,206.16 2,475.11 12,375.55
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.67 4,273.41 1,099.53 5,497.65

604b METAL GUARD RAIL END PIECES Each 288.45 143.14 3,763.59 1,048.80 5,243.98

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.81 5,215.63 1,378.21 6,891.03

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 496.92 29,731.92 8,531.22 42,656.08
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 496.92 29,638.05 8,507.75 42,538.73
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 386.66 15,854.49 4,275.02 21,375.11
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 386.66 17,934.52 4,795.03 23,975.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 257 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 386.66 20,053.52 5,324.78 26,623.90
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 386.66 16,452.62 4,424.56 22,122.78
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 386.66 18,736.62 4,995.56 24,977.78
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 386.66 21,067.52 5,578.28 27,891.40
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.87 20,062.16 5,320.68 26,603.40
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.87 23,682.66 6,225.81 31,129.03
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.87 27,218.66 7,109.81 35,549.03
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.87 21,075.51 5,574.02 27,870.09
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.87 25,058.06 6,569.66 32,848.28
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.87 27,231.50 7,113.02 35,565.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 490.05 25,304.34 6,685.77 33,428.85
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 490.05 26,734.34 7,043.27 35,216.35
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 258 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 490.05 43,499.20 11,234.49 56,172.43
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 490.05 46,359.20 11,949.49 59,747.43
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.41 40,903.35 10,382.46 51,912.29
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.62 36,281.67 9,213.44 46,067.18
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.16 34,644.22 8,821.36 44,106.80
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.58 35,790.66 9,122.22 45,611.09
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.41 36,903.35 9,382.46 46,912.29
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.62 32,281.67 8,213.44 41,067.18
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.16 30,644.22 7,821.36 39,106.80
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.58 31,790.66 8,122.22 40,611.09
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 259 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.84 224.97 1,124.86
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.07 93.50 25.57 127.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.39 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.72 220.74 130.12 650.58
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 366.17 687.23 321.68 1,608.41
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.84
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.72 327.81 156.88 784.40
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.50 945.95 372.19 1,860.96
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.86 366.31 129.04 645.20
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.85 998.11 294.49 1,472.45
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.86 476.11 156.49 782.45
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 51.01 1,373.87 381.80 1,908.99
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.75 144.01 720.03
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.69 78.26 391.29
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 260 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MANDI BAHAUDDIN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.75 169.01 845.03
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.69 84.51 422.54
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.57 1,510.41 504.39 2,521.95
DRAWING

610c KILOMETER POST Each 346.14 572.58 3,230.32 1,037.26 5,186.30

610d TEN KILOMETER POST Each 692.29 1,145.15 8,535.74 2,593.30 12,966.48

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.52 2,285.49 709.61 3,548.06
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,154.58 23.00 396.90 1,984.49
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.75 28.46 16.41 82.03

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.75 94.29 32.87 164.33

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 34.00 10.01 50.03

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.98 3.00 4.18 20.91
PER ADDITIONAL MONTH

Page 261 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

MIANWALI

Page 262 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.69 - 5.36 26.79

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.05 31.50 159.49 797.43

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 864.68 141.74 272.10 1,360.51

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,742.55 755.96 723.02 3,615.10

103 STRIPPING Cu.m 9.29 273.66 - 70.74 353.69

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.51 1.76 5.47 27.34

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.05 - 79.59 397.93

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.87 38.42 218.21 1,091.06

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.69 - 162.15 810.76

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.34 - 115.93 579.64

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.05 - 79.59 397.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.87 38.42 218.21 1,091.06

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.69 - 162.15 810.76

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.34 - 115.93 579.64

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.79 - 76.72 383.59

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 685.00 210.56 272.45 1,362.24
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.39 38.42 215.84 1,079.21
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 601.08 - 159.77 798.83
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.80 - 113.55 567.73
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.45 995.39 350.33 1,751.63

107e COMMON BACK FILL Cu.m 88.46 126.09 11.70 56.56 282.81

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.51 11.70 87.16 435.78
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.76 38.42 267.17 1,335.84
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.71 11.70 210.15 1,050.74
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 597.77 11.70 162.48 812.39
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.88 60.14 95.75 478.74
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.85 11.70 50.79 253.96
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.20 11.70 65.67 328.34
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.90 3.51 22.06 110.29

Page 263 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.53 3.12 19.21 96.03
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.82 329.00 169.80 849.01

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.17 1.76 6.69 33.46

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.58 11.18 9.45 47.26

201 GRANULAR SUBBASE Cu.m 36.77 264.92 1,134.90 359.15 1,795.74

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.88 1,364.44 484.57 2,422.83

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 407.26 1,364.44 456.91 2,284.56

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,847.44 13,138.79 3,794.30 18,971.48

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,847.44 13,539.46 3,894.46 19,472.31

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.88 13,138.79 3,794.15 18,970.76
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.88 13,416.24 3,863.52 19,317.59
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.82 1,688.09 587.10 2,935.50

204c CEMENT CONTENT Ton 384.60 - 13,965.00 3,587.40 17,937.00

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,290.37 108,811.24 27,973.31 139,866.56

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,290.37 103,558.24 26,660.06 133,300.31
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.08 1,204.06 417.63 2,088.15
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,434.56 12,654.31 3,816.73 19,083.66
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.49 1,471.73 483.46 2,417.28
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.26 79.66 31.11 155.54

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.26 79.66 31.11 155.54

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.70 0.98 28.47 142.33

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.57 6.50 121.76 608.80
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.73 0.97 16.18 80.88

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.70 28.44 142.21

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.63 26.96 134.80
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.50 11.66 58.30

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 42.24 10.85 54.23
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.49 198.42 58.74 293.69

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.75 127.23 40.76 203.78

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.98 403.34 112.17 560.84

Page 264 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.07 332.14 94.14 470.71

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.65 476.39 132.29 661.44

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.67 405.06 114.21 571.04

304d SEAL COAT Sq.m 2.53 10.07 56.35 17.24 86.20

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,939.07 14,135.23 4,060.50 20,302.48
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,939.07 14,442.12 4,137.22 20,686.09
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.95 12,462.10 3,497.44 17,487.20

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.95 12,301.00 3,457.17 17,285.84

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,467.37 3,345.37 1,227.77 6,138.85
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,327.23 101,392.01 25,743.91 128,719.54

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.39 60.33 23.68 118.41

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.39 100.02 39.35 196.74

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.90 139.56 54.75 273.73

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.60 200.39 76.67 383.35

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.88 260.51 99.67 498.36

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,659.37 12,043.96 4,008.52 20,042.61
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,598.31 7,144.62 2,710.17 13,550.83

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,598.72 8,411.65 3,027.02 15,135.11

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,598.31 8,832.84 3,132.22 15,661.10

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,598.77 7,653.33 2,837.46 14,187.29

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,705.28 8,920.36 3,180.84 15,904.21

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,598.72 9,341.55 3,271.12 16,355.58

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,598.31 7,984.39 2,920.11 14,600.53

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,705.28 9,251.42 3,263.61 16,318.04

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,598.77 9,672.61 3,353.90 16,769.48

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,292.98 5,734.27 2,108.03 10,540.16

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,714.17 6,655.11 2,606.20 13,031.00

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,712.32 7,931.94 2,932.69 14,663.46

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,713.24 8,343.33 3,035.77 15,178.85

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,869.80 11,343.24 3,981.14 19,905.69

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,870.26 12,167.88 4,187.41 20,937.06

Page 265 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,870.26 12,832.88 4,353.66 21,768.31

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,697.80 9,146.57 2,985.53 14,927.63

401f LEAN CONCRETE Cu.m 919.20 1,019.44 4,363.13 1,575.44 7,877.21

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,492.35 8,139.35 3,059.35 15,296.76

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,492.35 9,138.76 3,309.21 16,546.03

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,784.11 6,808.56 2,799.60 13,997.98

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,870.26 11,402.09 4,032.36 20,161.78

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,870.26 12,226.73 4,238.52 21,192.58

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,870.26 12,891.73 4,404.77 22,023.83

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,270.22 4,230.42 1,685.25 8,426.24
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.33 183,111.66 47,239.67 236,198.34

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.33 187,311.66 48,289.67 241,448.34

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.49 214,134.53 54,692.38 273,461.88
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,784.73 358,031.21 93,011.61 465,058.06
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,012.37 - 301.17 1,505.84

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,578.42 483.28 2,416.38
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,073.06 1,078.09 5,390.46
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.77 69.48 347.41
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,608.71 12,368.52 61,842.58
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,108.71 11,243.52 56,217.58
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,179.73 35,261.27 176,306.35


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,191.20 29,014.14 145,070.69


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,454.03 11,079.85 55,399.23


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,396.92 9,815.57 49,077.84


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 266 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,000.77 8,716.53 43,582.65
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,323.91 6,797.32 33,986.58


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,867.30 8,183.16 40,915.81
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,573.21 26,609.64 133,048.20
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,915.86 17,430.88 87,154.40
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 978.11 297.41 1,487.06

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,259.51 367.76 1,838.81

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 472.41 139.02 695.08

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,895.60 407.30 1,187.97 5,939.86
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,176.59 514.47 1,689.82 8,449.10
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,485.99 447.48 1,356.28 6,781.40
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,105.26 614.91 1,988.32 9,941.58
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,509.48 1,001.82 2,784.90 13,924.50
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,507.62 1,001.84 4,298.47 21,492.36
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,594.26 1,498.44 4,005.82 20,029.08
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,684.85 1,498.44 6,257.79 31,288.94
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,597.68 3,836.47 1,468.15 7,340.75
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,158.92 2,946.45 1,745.57 8,727.84
SIZE) INCLUDING TESTING AND REPORTING

Page 267 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,253.93 1,090.95 2,274.66 11,373.32
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,989.20 866,038.80 246,449.10 1,232,245.50

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,040.88 1,259,707.92 348,533.10 1,742,665.50

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,040.88 1,574,676.48 427,275.24 2,136,376.20

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,040.88 1,841,589.60 494,003.52 2,470,017.60

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,040.88 2,226,959.28 590,345.94 2,951,729.70

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,040.88 2,631,959.28 691,595.94 3,457,979.70

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,329.04 3,036,959.28 799,417.98 3,997,089.90

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,333.95 228,379.49 59,573.78 297,868.89

410 BRICK WORK Cu.m 941.51 448.71 8,464.70 2,463.73 12,318.64

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.38 1,477.78 620.02 3,100.08

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.73 3,494.23 1,161.98 5,809.91

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.38 1,662.33 774.32 3,871.61

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.73 3,596.20 1,336.51 6,682.55
MORTAR

411g ROLL POINTING Sq.m 158.07 23.90 172.85 88.71 443.53

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.58 3,596.20 1,484.59 7,422.93
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,238.55 1,294.37 710.87 3,554.36
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,249.72 1,659.69 807.64 4,038.19
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,266.48 2,662.76 1,112.59 5,562.96
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,277.43 4,069.11 1,482.17 7,410.86
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,248.63 6,512.21 2,101.92 10,509.59
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,306.58 9,764.53 2,954.62 14,773.08
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,474.92 10,638.60 3,245.00 16,225.00
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,670.37 12,924.51 3,911.76 19,558.80
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,962.72 25,429.43 7,186.97 35,934.84
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,238.55 1,810.97 840.02 4,200.11
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,249.72 2,233.69 951.14 4,755.69
DIA 380 mm

Page 268 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,266.48 2,990.76 1,194.59 5,972.96
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,277.43 4,725.11 1,646.17 8,230.86
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,248.63 8,152.21 2,511.92 12,559.59
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,306.58 12,634.53 3,672.12 18,360.58
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,474.92 14,738.60 4,270.00 21,350.00
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,670.37 17,452.96 5,043.87 25,219.36
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,962.72 31,292.41 8,652.71 43,263.56
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.25 978.11 378.04 1,890.21
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,006.42 5,734.27 2,081.26 10,406.31
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.21 63.85 319.25

507b ROCK FILL IN GABIONS Cu.m 307.68 - 845.53 288.30 1,441.51

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.41 585.25 231.24 1,156.19

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.15 1,170.44 442.72 2,213.60

509a RIP RAP CLASS "A" Cu.m 956.12 102.68 922.76 495.39 2,476.95

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.39 946.78 507.19 2,535.93

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.24 978.76 524.32 2,621.60

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.48 1,041.02 556.38 2,781.91

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 173.88 3,328.41 1,164.60 5,823.01

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 135.59 3,200.51 1,194.18 5,970.88

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.58 3,091.10 1,214.19 6,070.95

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 711.58 3,118.43 1,371.27 6,856.36

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 792.92 6,933.50 2,314.34 11,571.71
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.42 977.43 354.86 1,774.29

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.71 - 352.40 1,762.01


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.54 162.79 123.00 615.01

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.76 209.32 146.39 731.96

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.76 1,107.87 350.69 1,753.46
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.73 1,382.43 429.87 2,149.34
BITUMEN JOINTS

Page 269 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.53 699.58 252.52 1,262.58
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.61 864.93 304.94 1,524.71
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,853.36 10,239.79 51,198.94
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,926.29 11,758.02 58,790.11
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,021.13 6,051.98 1,844.88 9,224.41
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,139.96 6,679.73 2,031.53 10,157.64
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,105.30 4,323.02 1,388.82 6,944.11
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,121.47 4,765.94 1,503.60 7,518.00
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.46 942.18 284.74 1,423.69
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.36 8,371.70 2,270.53 11,352.66
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.73 9,150.93 2,461.18 12,305.91
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.65 4,293.86 1,104.64 5,523.20

604b METAL GUARD RAIL END PIECES Each 288.45 143.08 3,777.71 1,052.31 5,261.54

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.57 5,245.02 1,385.49 6,927.46

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 495.39 29,613.50 8,501.23 42,506.14
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 495.39 29,519.08 8,477.62 42,388.11
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 382.87 15,883.50 4,281.33 21,406.64
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 382.87 17,967.63 4,802.36 24,011.80
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 270 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 382.87 20,086.63 5,332.11 26,660.55
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 382.87 16,481.63 4,430.86 22,154.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 382.87 18,769.73 5,002.89 25,014.43
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 382.87 21,100.63 5,585.61 27,928.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.28 20,094.76 5,328.68 26,643.39
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.28 23,715.26 6,233.80 31,169.01
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.28 27,251.26 7,117.80 35,589.01
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.28 21,108.11 5,582.02 27,910.08
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.28 25,090.66 6,577.65 32,888.26
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.28 27,290.98 7,127.73 35,638.66
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 488.17 25,319.77 6,689.16 33,445.79
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 488.17 26,749.77 7,046.66 35,233.29
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 271 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 488.17 43,519.89 11,239.19 56,195.94
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 488.17 46,379.89 11,954.19 59,770.94
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.53 40,905.80 10,382.85 51,914.25
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.32 36,258.10 9,207.47 46,037.34
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.85 34,609.14 8,812.52 44,062.58
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.27 35,753.13 9,112.76 45,563.78
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.53 36,905.80 9,382.85 46,914.25
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.32 32,258.10 8,207.47 41,037.34
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.85 30,609.14 7,812.52 39,062.58
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.27 31,753.13 8,112.76 40,563.78
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 272 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.75 225.20 1,126.00
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.06 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.46


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.63 220.74 130.09 650.46
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 365.34 687.23 321.48 1,607.38
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 135.22 36.33 181.65
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 165.77 43.97 219.83
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.63 327.81 156.86 784.30
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.86 945.95 372.04 1,860.18
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.82 366.31 129.03 645.15
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.60 998.11 294.43 1,472.14
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.82 476.11 156.48 782.40
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.83 1,373.87 381.75 1,908.76
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 502.04 144.08 720.39
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.78 78.28 391.40
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 273 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MIANWALI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 602.04 169.08 845.39
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.78 84.53 422.65
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.54 1,498.55 501.17 2,505.84
DRAWING

610c KILOMETER POST Each 346.14 572.30 3,212.80 1,032.81 5,164.06

610d TEN KILOMETER POST Each 692.29 1,144.61 8,485.77 2,580.67 12,903.34

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.46 2,286.58 709.87 3,549.35
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,152.10 22.00 396.03 1,980.14
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.70 28.47 16.40 81.99

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.70 94.31 32.86 164.28

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.97 10.00 49.98

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.96 3.00 4.18 20.90
PER ADDITIONAL MONTH

Page 274 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

MULTAN

Page 275 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.80 19.67 - 5.37 26.84

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 46.17 562.30 31.47 159.98 799.91

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 85.28 865.70 141.60 273.14 1,365.71

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 409.33 1,747.08 755.18 727.90 3,639.48

103 STRIPPING Cu.m 9.67 273.40 - 70.77 353.84

104 COMPACTION OF NATURAL GROUND Sq.m 1.67 18.45 1.76 5.47 27.34

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.86 303.49 - 79.59 397.93

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 52.58 781.92 38.65 218.29 1,091.45

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 39.44 608.95 - 162.10 810.48

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 30.55 433.03 - 115.90 579.48

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.86 303.49 - 79.59 397.93

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 52.58 781.92 38.65 218.29 1,091.45

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 39.44 608.95 - 162.10 810.48

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 30.55 433.03 - 115.90 579.48

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 29.20 277.82 - 76.76 383.78

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 202.00 681.88 211.74 273.91 1,369.53
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 52.58 772.45 38.65 215.92 1,079.61
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 39.50 599.35 - 159.71 798.56
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 30.55 423.51 - 113.52 567.58
MATERIAL

107d GRANULAR BACKFILL Cu.m 118.00 291.89 1,392.36 450.56 2,252.81

107e COMMON BACK FILL Cu.m 92.00 125.89 11.70 57.40 286.99

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 27.47 309.99 11.70 87.29 436.44
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 62.92 967.71 38.65 267.32 1,336.60
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 48.03 780.57 11.70 210.08 1,050.38
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 42.05 595.89 11.70 162.41 812.05
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 27.00 296.29 60.14 95.86 479.29
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 26.65 165.18 11.70 50.88 254.41
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 46.56 205.77 11.70 66.01 330.04
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.01 79.74 3.51 22.07 110.33

Page 276 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.29 70.41 3.12 19.21 96.03
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 24.33 325.88 518.22 217.11 1,085.54

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.96 22.08 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.22 22.49 11.17 9.47 47.35

201 GRANULAR SUBBASE Cu.m 38.24 264.28 1,880.31 545.71 2,728.54

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 58.18 516.96 1,972.13 636.82 3,184.09

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 58.18 406.26 1,972.13 609.14 3,045.71

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 198.59 1,843.12 14,500.77 4,135.62 20,678.10

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 198.59 1,843.12 14,894.16 4,233.97 21,169.84

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 198.59 1,842.56 14,500.77 4,135.48 20,677.40
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 198.59 1,842.56 14,773.42 4,203.64 21,018.21
"B")

204b CEMENT STABILIZED BASE Cu.m 97.23 565.43 3,215.28 969.49 4,847.43

204c CEMENT CONTENT Ton 400.00 - 14,522.97 3,730.74 18,653.71

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 823.33 2,286.88 107,403.24 27,628.36 138,141.81

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 823.33 2,286.88 102,150.24 26,315.11 131,575.56
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 335.28 143.75 1,952.66 607.92 3,039.60
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 185.19 2,427.25 13,896.36 4,127.20 20,636.00
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 368.80 107.29 2,092.30 642.10 3,210.49
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.73 39.17 114.71 39.91 199.53

207b DEEP PATCHING (15-30 cm) Sq.m 5.73 39.17 114.71 39.91 199.53

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.43 106.36 0.98 28.44 142.21

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 15.57 464.41 6.50 121.62 608.10
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.11 60.62 0.97 16.18 80.89

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.02 1.08 110.29 28.10 140.50

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.25 104.22 26.62 133.08
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.41 0.74 44.94 11.52 57.61

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.41 0.74 41.68 10.71 53.54
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.13 34.42 203.95 60.13 300.63

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.13 33.69 133.65 42.37 211.83

304bi DOUBLE SURFACE TREATMENT Sq.m 3.49 41.90 421.75 116.78 583.91

Page 277 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.49 40.98 351.45 98.98 494.90

304ci TRIPLE SURFACE TREATMENT Sq.m 6.35 46.56 498.06 137.74 688.71

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.35 45.60 427.62 119.89 599.46

304d SEAL COAT Sq.m 2.63 10.01 58.25 17.72 88.61

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 174.40 1,934.57 15,477.04 4,396.50 21,982.50
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 174.40 1,934.57 15,775.86 4,471.21 22,356.04
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 683.00 869.31 13,823.29 3,843.90 19,219.50

307b OPEN GRADED HOT BIT-MAC Cu.m 683.00 869.31 13,670.12 3,805.61 19,028.05

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 102.28 1,465.76 3,343.25 1,227.82 6,139.11
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 266.67 1,322.62 99,984.00 25,393.32 126,966.61

309a COLD MILLING, 0 - 30 mm Sq.m 2.09 32.32 60.27 23.67 118.35

309b COLD MILLING, 0 - 50 mm Sq.m 4.14 53.28 99.91 39.33 196.66

309c COLD MILLING, 0 - 70 mm Sq.m 7.83 71.51 139.41 54.69 273.44

309d COLD MILLING, 0 - 100 mm Sq.m 9.03 97.10 200.18 76.58 382.89

309e COLD MILLING, 0 - 130 mm Sq.m 11.74 126.23 260.24 99.55 497.75

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 344.00 3,651.78 13,070.73 4,266.63 21,333.13
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,141.67 2,584.57 8,077.86 2,951.02 14,755.11

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,141.67 2,584.97 9,353.21 3,269.96 16,349.81

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,141.67 2,584.57 9,779.33 3,376.39 16,881.95

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,141.67 2,585.03 8,613.07 3,084.94 15,424.70

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,141.67 2,691.44 9,888.42 3,430.38 17,151.91

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,190.00 2,584.97 10,314.54 3,522.38 17,611.89

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,141.67 2,584.57 8,957.41 3,170.91 15,854.56

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,141.67 2,691.44 10,232.76 3,516.47 17,582.34

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,190.00 2,585.03 10,658.88 3,608.48 18,042.39

401b CONCRETE CLASS "B" Cu.m 1,461.11 1,283.40 6,530.67 2,318.80 11,593.98

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,097.78 2,700.15 7,574.99 2,843.23 14,216.15

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,130.00 2,698.31 8,860.24 3,172.14 15,860.69

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,130.00 2,699.23 9,276.46 3,276.42 16,382.11

401di CONCRETE CLASS "D1" Cu.m 1,780.00 2,852.54 12,379.72 4,253.07 21,265.33

401dii CONCRETE CLASS "D2" Cu.m 1,780.00 2,853.00 13,231.00 4,466.00 22,330.00

Page 278 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,780.00 2,853.00 13,922.57 4,638.89 23,194.46

401e CONCRETE CLASS "Y" Cu.m 1,141.67 1,690.55 10,113.77 3,236.50 16,182.49

401f LEAN CONCRETE Cu.m 956.00 1,009.86 5,119.05 1,771.23 8,856.14

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,710.00 1,480.50 9,082.60 3,318.27 16,591.36

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,710.00 1,480.50 10,121.86 3,578.09 17,890.45

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,710.00 1,771.91 7,523.47 3,001.35 15,006.73

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,931.39 2,853.00 12,439.15 4,305.89 21,529.43

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,931.39 2,853.00 13,290.43 4,518.71 22,593.53

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,931.39 2,853.00 13,982.00 4,691.60 23,457.99

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,290.00 1,262.81 4,985.84 1,884.66 9,423.31
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,232.00 816.11 183,833.30 47,470.36 237,351.78

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,232.00 816.11 187,953.33 48,500.36 242,501.80

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,892.80 1,852.90 214,467.32 54,803.26 274,016.28
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,480.00 7,779.25 358,124.73 93,096.00 465,479.98
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 200.00 1,003.20 - 300.80 1,504.00

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 368.89 - 1,577.14 486.51 2,432.54
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 248.89 - 4,072.21 1,080.28 5,401.38
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 25.97 4.18 249.84 70.00 349.99
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 900.00 - 48,648.88 12,387.22 61,936.10
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 900.00 - 44,148.88 11,262.22 56,311.10
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 900.00 - 140,249.17 35,287.29 176,436.46


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 900.00 - 115,249.95 29,037.49 145,187.44


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 900.00 - 43,507.88 11,101.97 55,509.85


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 900.00 - 38,431.52 9,832.88 49,164.40


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 279 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 900.00 - 34,024.15 8,731.04 43,655.19
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 900.00 - 26,339.72 6,809.93 34,049.65


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 900.00 - 31,944.66 8,211.17 41,055.83
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 900.00 - 105,684.15 26,646.04 133,230.19
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 840.00 - 69,109.93 17,487.48 87,437.41
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 220.00 - 978.34 299.59 1,497.93

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 220.00 - 1,259.74 369.94 1,849.68

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 87.00 - 475.62 140.66 703.28

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 466.96 3,860.71 258.14 1,146.45 5,732.25
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,110.97 5,149.65 365.52 1,656.54 8,282.68
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 511.33 4,445.34 298.40 1,313.77 6,568.84
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,282.44 6,072.78 466.17 1,955.35 9,776.74
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 653.46 9,484.95 853.94 2,748.09 13,740.44
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,791.91 13,431.48 853.97 4,269.34 21,346.70
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 967.82 13,559.14 1,351.59 3,969.64 19,848.19
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,001.91 19,572.30 1,351.59 6,231.45 31,157.25
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 456.00 1,591.96 3,671.16 1,429.78 7,148.90
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 912.00 3,147.59 2,781.14 1,710.18 8,550.91
SIZE) INCLUDING TESTING AND REPORTING

Page 280 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,824.00 6,231.47 925.64 2,245.28 11,226.39
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 21,600.00 98,801.44 925,470.30 261,467.94 1,307,339.68

407t PILE LOAD TEST UPTO 800 TON Each 26,400.00 108,827.04 1,346,155.02 370,345.52 1,851,727.58

407u PILE LOAD TEST UPTO 1000 TON Each 26,400.00 108,827.04 1,682,738.88 454,491.48 2,272,457.40

407v PILE LOAD TEST UPTO 1200 TON Each 26,400.00 108,827.04 1,971,262.60 526,622.41 2,633,112.05

407w PILE LOAD TEST UPTO 1500 TON Each 26,400.00 108,827.04 2,389,048.18 631,068.81 3,155,344.03

407x PILE LOAD TEST UPTO 2000 TON Each 26,400.00 108,827.04 2,794,048.18 732,318.81 3,661,594.03

407y PILE LOAD TEST UPTO 2500 TON Each 26,400.00 135,060.96 3,199,048.18 840,127.29 4,200,636.43

407l PERMANENT PILE CASING FOR PILES Ton 1,645.00 8,321.18 229,105.12 59,767.83 298,839.13

410 BRICK WORK Cu.m 979.20 447.65 8,467.72 2,473.64 12,368.21

411a STONE MASONRY RANDOM DRY Cu.m 782.00 250.20 2,154.26 796.62 3,983.08

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 832.00 353.21 4,199.09 1,346.08 6,730.38

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,232.00 250.20 2,382.42 966.16 4,830.78

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,452.00 353.21 4,291.79 1,524.25 7,621.25
MORTAR

411g ROLL POINTING Sq.m 164.40 23.82 175.11 90.83 454.15

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,882.00 531.92 4,291.79 1,676.43 8,382.14
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 323.00 1,233.16 1,091.63 661.95 3,309.74
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 334.00 1,247.11 1,375.43 739.14 3,695.68
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 542.00 1,263.84 2,267.37 1,018.30 5,091.51
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 605.45 1,275.38 3,358.19 1,309.76 6,548.78
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 672.73 1,246.54 5,721.86 1,910.28 9,551.41
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 777.27 1,304.42 8,748.53 2,707.56 13,537.78
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 901.18 1,471.77 9,622.34 2,998.82 14,994.11
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,094.29 1,667.60 11,502.31 3,566.05 17,830.24
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,410.00 1,959.50 23,055.43 6,606.23 33,031.16
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 323.00 1,233.16 1,608.23 791.10 3,955.49
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 334.00 1,247.11 1,949.43 882.64 4,413.18
DIA 380 mm

Page 281 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 542.00 1,263.84 2,595.37 1,100.30 5,501.51
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 605.45 1,275.38 4,014.19 1,473.76 7,368.78
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 672.73 1,246.54 7,361.86 2,320.28 11,601.41
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 777.27 1,304.42 11,618.53 3,425.06 17,125.28
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 901.18 1,471.77 13,722.34 4,023.82 20,119.11
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,094.29 1,667.60 16,031.50 4,698.35 23,491.73
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,410.00 1,959.50 28,918.41 8,071.98 40,359.89
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 325.33 221.00 1,396.69 485.76 2,428.79
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,647.78 1,000.91 6,530.67 2,294.84 11,474.20
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.83 - 239.27 64.03 320.14

507b ROCK FILL IN GABIONS Cu.m 320.00 - 1,473.28 448.32 2,241.60

508a BRICK PAVING (SINGLE COURSE) Sq.m 340.40 12.37 587.57 235.09 1,175.43

508b BRICK PAVING (DOUBLE COURSE) Sq.m 600.40 23.08 1,175.08 449.64 2,248.20

509a RIP RAP CLASS "A" Cu.m 994.40 102.00 1,587.78 671.05 3,355.23

509b RIP RAP CLASS "B" Cu.m 1,058.32 64.32 1,609.55 683.05 3,415.24

509c RIP RAP CLASS "C" Cu.m 1,110.00 51.19 1,644.73 701.48 3,507.40

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 683.33 527.02 1,711.39 730.44 3,652.19

509d GROUTED RIP RAP CLASS "A" Cu.m 1,202.40 172.02 3,776.23 1,287.67 6,438.33

509e GROUTED RIP RAP CLASS "B" Cu.m 1,498.28 134.34 3,642.93 1,318.89 6,594.44

509f GROUTED RIP RAP CLASS "C" Cu.m 1,721.33 109.54 3,540.63 1,342.88 6,714.39

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,721.33 710.03 3,565.47 1,499.21 7,496.05

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,592.22 790.47 7,814.72 2,549.35 12,746.76
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 169.09 279.13 1,402.56 462.70 2,313.48

510 DISMANTLING OF STRUCTURE AND Cu.m 574.00 857.47 - 357.87 1,789.34


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 268.00 71.49 280.10 154.90 774.49

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 306.29 81.70 360.18 187.04 935.20

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 256.00 48.69 1,169.31 368.50 1,842.50
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 292.57 55.65 1,463.79 453.00 2,265.01
BITUMEN JOINTS

Page 282 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 235.00 84.44 824.58 286.01 1,430.03
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 268.57 96.50 1,025.18 347.56 1,737.81
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 408.00 713.50 39,896.63 10,254.53 51,272.66
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 408.00 713.50 45,978.52 11,775.01 58,875.03
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 318.68 1,015.70 6,420.46 1,938.71 9,693.55
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 318.68 1,133.79 7,085.96 2,134.61 10,673.05
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 132.06 1,103.24 4,697.30 1,483.15 7,415.75
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 132.06 1,119.62 5,179.58 1,607.82 8,039.08
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 85.60 114.38 1,026.52 306.63 1,533.13
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 221.60 496.62 8,771.67 2,372.47 11,862.36
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 221.60 480.01 9,593.60 2,573.80 12,869.00
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 29.00 - 117.12 36.53 182.65

604a METAL GUARD RAIL M 90.53 37.62 4,299.62 1,106.94 5,534.71

604b METAL GUARD RAIL END PIECES Each 300.00 142.97 3,779.40 1,055.59 5,277.96

604d STEEL POST FOR METAL GUARD RAIL Each 172.00 131.20 5,246.31 1,387.38 6,936.89

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,052.00 491.41 30,631.54 8,793.74 43,968.69
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,052.00 491.41 30,536.19 8,769.90 43,849.50
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 893.33 377.28 16,114.58 4,346.30 21,731.49
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 893.33 377.28 18,178.87 4,862.37 24,311.85
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 283 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 893.33 377.28 20,284.87 5,388.87 26,944.35
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 893.33 377.28 16,712.71 4,495.83 22,479.15
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 893.33 377.28 18,982.27 5,063.22 25,316.10
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 893.33 377.28 21,298.87 5,642.37 28,211.85
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 986.67 270.36 20,287.09 5,386.03 26,930.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 986.67 270.36 23,914.09 6,292.78 31,463.90
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 986.67 270.36 27,450.09 7,176.78 35,883.90
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 986.67 270.36 21,299.79 5,639.21 28,196.03
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 986.67 270.36 25,289.49 6,636.63 33,183.15
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 986.67 270.36 27,450.09 7,176.78 35,883.90
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 986.67 486.52 25,658.92 6,783.03 33,915.15
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 986.67 486.52 27,088.92 7,140.53 35,702.65
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 284 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 986.67 486.52 43,868.04 11,335.31 56,676.55
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 986.67 486.52 46,728.04 12,050.31 60,251.55
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 347.45 290.31 41,119.97 10,439.43 52,197.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 424.80 162.87 36,558.77 9,286.61 46,433.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 492.00 167.14 34,900.47 8,889.91 44,449.53
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 546.67 171.52 36,044.09 9,190.57 45,952.85
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 347.45 290.31 37,119.97 9,439.43 47,197.16
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 424.80 162.87 32,558.77 8,286.61 41,433.05
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 492.00 167.14 30,900.47 7,889.91 39,449.53
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 546.67 171.52 32,044.09 8,190.57 40,952.85
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 452.00 - 4,680.00 1,283.00 6,415.00
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 452.00 - 3,960.00 1,103.00 5,515.00
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 285 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 452.00 - 7,020.00 1,868.00 9,340.00
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 452.00 - 5,940.00 1,598.00 7,990.00
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.93 14.76 869.91 225.40 1,127.00
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.84 3.57 30.03 9.36 46.79


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.84 5.04 93.50 25.60 127.98


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.84 3.57 36.03 10.86 54.30


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.84 4.37 114.69 30.73 153.63


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 145.60 159.50 220.74 131.46 657.30
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 242.67 364.08 687.23 323.49 1,617.46
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.80 3.99 39.03 11.95 59.76
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.80 5.46 135.22 36.37 181.85
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.80 3.99 46.83 13.91 69.53
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.80 5.46 165.77 44.01 220.04
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 145.60 159.50 327.81 158.23 791.14
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 242.67 307.90 945.95 374.13 1,870.64
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 72.80 79.75 366.31 129.71 648.56
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 72.80 109.22 998.11 295.04 1,475.18
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 72.80 79.75 476.11 157.16 785.81
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 106.40 50.57 1,373.87 382.71 1,913.55
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 36.80 38.87 502.50 144.54 722.71
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 23.80 10.45 279.91 78.54 392.70
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 286 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MULTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 36.80 38.87 602.50 169.54 847.71
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 23.80 10.45 304.91 84.79 423.95
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 279.33 235.72 1,578.64 523.42 2,617.11
DRAWING

610c KILOMETER POST Each 360.00 571.89 3,388.28 1,080.04 5,400.21

610d TEN KILOMETER POST Each 720.00 1,143.78 8,909.87 2,693.41 13,467.05

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 456.00 114.38 2,404.30 743.67 3,718.35
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 426.43 1,148.32 20.00 398.69 1,993.44
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.99 22.63 28.44 16.52 82.58

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.99 22.63 94.28 32.97 164.86

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.43 4.62 33.94 10.00 49.99

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.95 8.93 3.00 4.22 21.10
PER ADDITIONAL MONTH

Page 287 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

MUZAFFARGARH

Page 288 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.66 - 5.35 26.75

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.81 31.45 159.42 797.08

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 864.81 141.51 272.08 1,360.40

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,741.18 754.75 722.38 3,611.88

103 STRIPPING Cu.m 9.29 273.38 - 70.67 353.35

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.45 1.76 5.45 27.26

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.45 - 79.44 397.18

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 781.85 38.65 217.77 1,088.83

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 608.87 - 161.70 808.49

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.98 - 115.59 577.94

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.45 - 79.44 397.18

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 781.85 38.65 217.77 1,088.83

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 608.87 - 161.70 808.49

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.98 - 115.59 577.94

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.78 - 76.46 382.31

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 681.79 211.84 271.97 1,359.83
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.38 38.65 215.40 1,076.99
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 599.28 - 159.32 796.58
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.46 - 113.21 566.04
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.87 1,188.92 398.56 1,992.81

107e COMMON BACK FILL Cu.m 88.46 125.88 11.70 56.51 282.54

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.95 11.70 87.02 435.08
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 967.62 38.65 266.69 1,333.46
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 780.48 11.70 209.59 1,047.96
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 595.69 11.70 161.96 809.78
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.25 60.14 95.59 477.94
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.17 11.70 50.62 253.11
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.75 11.70 65.56 327.78
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.73 3.51 22.02 110.08

Page 289 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.40 3.12 19.17 95.86
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.81 460.88 202.52 1,012.61

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.08 1.76 6.67 33.35

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.49 11.16 9.43 47.14

201 GRANULAR SUBBASE Cu.m 36.77 264.25 1,654.43 488.86 2,444.31

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 516.54 1,746.25 579.68 2,898.41

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.22 1,746.25 552.10 2,760.51

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,842.85 14,287.00 4,080.20 20,401.00

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,842.85 14,680.65 4,178.61 20,893.06

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,842.29 14,287.00 4,080.06 20,400.30
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,842.29 14,559.83 4,148.27 20,741.33
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 565.27 2,992.57 912.83 4,564.16

204c CEMENT CONTENT Ton 384.60 - 14,396.97 3,695.39 18,476.96

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,286.61 107,359.54 27,609.45 138,047.23

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,286.61 102,106.54 26,296.20 131,480.98
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.72 1,725.82 547.98 2,739.89
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,426.93 13,700.16 4,076.29 20,381.44
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.28 1,865.73 581.90 2,909.51
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.17 101.68 36.59 182.96

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.17 101.68 36.59 182.96

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.35 0.98 28.38 141.89

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.36 6.50 121.46 607.29
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.61 0.97 16.15 80.73

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 110.25 28.08 140.39

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 104.18 26.59 132.96
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.92 11.52 57.58

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.66 10.70 53.49
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.42 202.72 59.80 298.98

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.68 132.45 42.04 210.21

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.90 418.22 115.87 579.34

Page 290 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.98 347.95 98.07 490.36

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.56 493.91 136.64 683.21

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.59 423.50 118.80 593.99

304d SEAL COAT Sq.m 2.53 10.01 57.85 17.60 87.99

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,934.30 15,264.51 4,341.62 21,708.11
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,934.30 15,564.14 4,416.53 22,082.65
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.19 13,613.18 3,784.77 18,923.85

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.19 13,457.62 3,745.88 18,729.40

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,465.64 3,343.09 1,226.77 6,133.85
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,322.53 99,964.58 25,385.88 126,929.39

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.32 60.26 23.65 118.24

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.28 99.91 39.29 196.45

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.50 139.40 54.61 273.04

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.08 200.17 76.48 382.41

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.20 260.22 99.43 497.14

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,651.40 12,937.42 4,229.90 21,149.48
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,583.93 7,963.87 2,911.38 14,556.91

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,584.34 9,240.01 3,230.52 16,152.59

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,583.93 9,666.19 3,336.96 16,684.81

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,584.39 8,492.69 3,043.70 15,218.51

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,690.80 9,768.83 3,389.34 16,946.69

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,584.34 10,195.01 3,480.89 17,404.44

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,583.93 8,834.04 3,128.92 15,644.61

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,690.80 10,110.17 3,474.68 17,373.38

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,584.39 10,536.36 3,566.24 17,831.19

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,283.10 6,439.03 2,281.75 11,408.76

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,699.49 7,463.62 2,804.66 14,023.29

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,697.65 8,749.69 3,133.46 15,667.31

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,698.57 9,165.94 3,237.76 16,188.78

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,851.87 12,246.01 4,202.35 21,011.73

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,852.33 13,091.69 4,413.88 22,069.39

Page 291 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,852.33 13,777.26 4,585.27 22,926.35

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,690.11 9,995.27 3,195.78 15,978.89

401f LEAN CONCRETE Cu.m 919.20 1,009.48 5,035.46 1,741.04 8,705.18

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,480.09 8,969.33 3,263.78 16,318.90

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,480.09 9,999.59 3,521.35 17,606.74

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,771.36 7,441.85 2,954.73 14,773.66

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,852.33 12,305.64 4,253.76 21,268.79

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,852.33 13,151.31 4,465.18 22,325.89

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,852.33 13,836.88 4,636.57 23,182.85

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,262.57 4,862.97 1,841.47 9,207.36
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.09 183,846.36 47,423.28 237,116.41

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.09 188,046.36 48,473.28 242,366.41

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.85 214,600.45 54,808.70 274,043.48
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,778.83 358,462.95 93,118.07 465,590.36
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,002.57 - 298.72 1,493.59

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,578.66 483.34 2,416.69
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,076.40 1,078.93 5,394.64
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 250.19 69.84 349.18
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,675.71 12,385.27 61,926.33
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,175.71 11,260.27 56,301.33
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,315.90 35,295.31 176,476.56


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,316.57 29,045.48 145,227.40


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,522.97 11,097.08 55,485.40


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,446.41 9,827.94 49,139.70


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 292 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,054.40 8,729.94 43,649.69
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,357.35 6,805.68 34,028.38


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,993.18 8,214.63 41,073.16
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,777.54 26,660.72 133,303.61
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,115.55 17,480.80 87,404.01
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 979.78 297.83 1,489.14

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,261.18 368.18 1,840.89

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 477.13 140.20 700.98

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,858.10 275.80 1,145.72 5,728.60
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,147.64 384.38 1,650.06 8,250.29
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,442.30 316.51 1,312.62 6,563.08
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,070.35 486.14 1,947.40 9,736.98
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,483.11 877.84 2,747.31 13,736.56
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,425.78 877.86 4,247.02 21,235.10
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,556.51 1,380.93 3,967.00 19,835.01
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,563.88 1,380.93 6,198.17 30,990.84
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,591.54 3,697.07 1,431.76 7,158.81
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,146.77 2,807.05 1,707.68 8,538.39
SIZE) INCLUDING TESTING AND REPORTING

Page 293 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,229.85 951.55 2,233.79 11,168.96
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,787.28 912,951.75 258,126.86 1,290,634.29

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,811.04 1,327,945.95 365,535.15 1,827,675.74

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,811.04 1,659,976.80 448,542.86 2,242,714.30

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,811.04 1,943,948.50 519,535.79 2,597,678.93

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,811.04 2,354,906.05 622,275.17 3,111,375.86

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,811.04 2,759,906.05 723,525.17 3,617,625.86

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,040.88 3,164,906.05 831,332.63 4,156,663.16

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,320.21 229,115.69 59,754.39 298,771.96

410 BRICK WORK Cu.m 941.51 447.57 8,412.36 2,450.36 12,251.80

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.19 1,937.23 734.83 3,674.15

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.17 4,002.97 1,289.03 6,445.14

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.19 2,148.02 895.70 4,478.49

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.17 4,095.67 1,461.24 7,306.19
MORTAR

411g ROLL POINTING Sq.m 158.07 23.81 175.48 89.34 446.71

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.87 4,095.67 1,609.28 8,046.38
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,233.02 1,120.82 666.10 3,330.50
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,246.96 1,416.37 746.12 3,730.59
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,263.69 2,324.26 1,027.27 5,136.35
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,274.68 3,460.62 1,329.36 6,646.81
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,245.85 5,835.83 1,932.13 9,660.63
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,303.72 8,894.92 2,736.50 13,682.49
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,471.59 9,768.62 3,026.67 15,133.36
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,667.39 11,708.01 3,606.89 18,034.45
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,959.26 23,397.16 6,678.04 33,390.18
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,233.02 1,637.42 795.25 3,976.25
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,246.96 1,990.37 889.62 4,448.09
DIA 380 mm

Page 294 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,263.69 2,652.26 1,109.27 5,546.35
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,274.68 4,116.62 1,493.36 7,466.81
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,245.85 7,475.83 2,342.13 11,710.63
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,303.72 11,764.92 3,454.00 17,269.99
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,471.59 13,868.62 4,051.67 20,258.36
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,667.39 16,237.04 4,739.15 23,695.74
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,959.26 29,260.13 8,143.78 40,718.89
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.98 1,197.79 432.90 2,164.48
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,000.70 6,439.03 2,256.02 11,280.11
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 239.61 63.95 319.75

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,270.57 394.56 1,972.81

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.37 583.22 230.72 1,153.60

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.08 1,166.39 441.69 2,208.45

509a RIP RAP CLASS "A" Cu.m 956.12 101.99 1,372.33 607.61 3,038.06

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.32 1,394.12 619.01 3,095.03

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.19 1,427.54 636.50 3,182.50

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.99 1,491.31 668.83 3,344.16

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.00 3,679.52 1,251.91 6,259.54

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.32 3,545.17 1,280.02 6,400.11

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.53 3,437.73 1,300.59 6,502.93

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 709.98 3,462.57 1,456.91 7,284.54

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 790.29 7,705.54 2,506.69 12,533.46
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.11 1,203.12 411.20 2,056.01

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.45 - 352.34 1,761.69


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.48 242.10 142.82 714.08

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.69 311.30 171.87 859.36

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.69 1,153.69 362.13 1,810.65
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.64 1,442.54 444.87 2,224.36
BITUMEN JOINTS

Page 295 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.43 792.24 275.66 1,378.28
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.49 983.22 334.49 1,672.44
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,913.83 10,254.91 51,274.53
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,998.43 11,776.06 58,880.29
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,015.29 6,378.75 1,925.12 9,625.58
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,133.33 7,039.98 2,119.93 10,599.66
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,103.11 4,651.26 1,470.34 7,351.69
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,119.48 5,128.67 1,593.78 7,968.91
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.37 1,009.58 301.56 1,507.81
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.57 8,688.87 2,349.63 11,748.14
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.95 9,501.91 2,548.74 12,743.68
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.62 4,306.14 1,107.70 5,538.50

604b METAL GUARD RAIL END PIECES Each 288.45 142.96 3,783.48 1,053.72 5,268.61

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.17 5,254.43 1,387.75 6,938.73

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 491.24 30,528.96 8,729.06 43,645.28
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 491.24 30,433.29 8,705.14 43,525.68
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 377.18 16,115.98 4,338.03 21,690.13
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 377.18 18,193.67 4,857.45 24,287.24
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 296 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 377.18 20,299.67 5,383.95 26,919.74
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 377.18 16,714.11 4,487.56 22,437.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 377.18 18,997.07 5,058.30 25,291.49
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 377.18 21,313.67 5,637.45 28,187.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.30 20,301.75 5,380.18 26,900.91
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.30 23,928.75 6,286.93 31,434.66
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.30 27,464.75 7,170.93 35,854.66
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.30 21,314.45 5,633.36 28,166.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.30 25,304.15 6,630.78 33,153.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.30 27,464.75 7,170.93 35,854.66
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.40 25,658.01 6,773.27 33,866.36
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.40 27,088.01 7,130.77 35,653.86
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 297 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.40 43,870.17 11,326.31 56,631.56
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.40 46,730.17 12,041.31 60,206.56
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.23 41,114.96 10,434.82 52,174.09
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.83 36,534.70 9,276.50 46,382.48
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.11 34,869.28 8,877.36 44,386.81
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.48 36,011.45 9,177.14 45,885.70
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.23 37,114.96 9,434.82 47,174.09
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.83 32,534.70 8,276.50 41,382.48
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.11 30,869.28 7,877.36 39,386.81
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.48 32,011.45 8,177.14 40,885.70
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 298 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 870.17 225.30 1,126.51
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.04 93.50 25.56 127.79


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.44


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.49 220.74 130.06 650.29
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 363.99 687.23 321.14 1,605.68
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 135.22 36.33 181.63
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.46 165.77 43.96 219.80
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.49 327.81 156.83 784.13
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.82 945.95 371.78 1,858.88
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.74 366.31 129.01 645.06
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.20 998.11 294.33 1,471.64
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.74 476.11 156.46 782.31
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.55 1,373.87 381.68 1,908.40
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.65 144.23 721.14
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.96 78.33 391.63
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 299 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: MUZAFFARGARH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.65 169.23 846.14
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.96 84.58 422.88
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 235.68 1,569.04 518.33 2,591.63
DRAWING

610c KILOMETER POST Each 346.14 571.86 3,355.64 1,068.41 5,342.05

610d TEN KILOMETER POST Each 692.29 1,143.71 8,818.23 2,663.56 13,317.79

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.37 2,402.19 738.75 3,693.75
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,148.03 19.00 394.26 1,971.30
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.62 28.45 16.37 81.85

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.62 94.28 32.83 164.14

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.92 9.98 49.89

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.93 3.00 4.17 20.85
PER ADDITIONAL MONTH

Page 300 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

NANKANA SAHIB

Page 301 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.94 19.70 - 5.41 27.05

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 49.73 561.71 31.55 160.75 803.75

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 91.86 864.02 141.97 274.46 1,372.31

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 440.94 1,742.06 757.16 735.04 3,675.20

103 STRIPPING Cu.m 10.41 273.71 - 71.03 355.15

104 COMPACTION OF NATURAL GROUND Sq.m 1.80 18.51 1.76 5.52 27.59

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 16.01 304.32 - 80.08 400.40

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 56.64 784.07 38.52 219.81 1,099.04

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 42.48 610.89 - 163.34 816.71

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 32.91 434.48 - 116.85 584.24

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 16.01 304.32 - 80.08 400.40

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 56.64 784.07 38.52 219.81 1,099.04

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 42.48 610.89 - 163.34 816.71

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 32.91 434.48 - 116.85 584.24

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 31.45 278.90 - 77.59 387.94

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 217.60 685.21 210.55 278.34 1,391.70
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 56.64 774.58 38.52 217.44 1,087.19
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 42.55 601.28 - 160.96 804.79
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 32.91 424.94 - 114.46 572.31
MATERIAL

107d GRANULAR BACKFILL Cu.m 127.11 292.52 1,494.55 478.55 2,392.73

107e COMMON BACK FILL Cu.m 99.10 126.37 11.70 59.29 296.46

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 29.59 310.60 11.70 87.97 439.86
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 67.78 970.00 38.52 269.08 1,345.38
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 51.74 782.94 11.70 211.60 1,057.98
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 45.30 597.96 11.70 163.74 818.70
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 29.08 296.99 60.13 96.55 482.76
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 28.71 165.89 11.70 51.58 257.88
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 50.16 206.25 11.70 67.03 335.14
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.40 79.92 3.51 22.21 111.04

Page 302 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.55 70.55 3.12 19.31 96.53
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 26.21 327.01 462.32 203.89 1,019.43

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.18 22.18 1.76 6.78 33.90

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.55 22.58 11.19 9.58 47.91

201 GRANULAR SUBBASE Cu.m 41.19 265.01 1,660.11 491.58 2,457.90

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 62.67 518.02 1,889.66 617.59 3,087.94

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 62.67 407.78 1,889.66 590.03 2,950.14

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 213.92 1,848.18 13,765.38 3,956.87 19,784.35

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 213.92 1,848.18 14,165.63 4,056.93 20,284.66

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.62 13,765.38 3,956.73 19,783.64
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,847.62 14,042.56 4,026.03 20,130.13
"B")

204b CEMENT STABILIZED BASE Cu.m 104.74 567.21 2,325.18 749.28 3,746.41

204c CEMENT CONTENT Ton 430.88 - 14,753.76 3,796.16 18,980.80

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 886.91 2,291.10 108,520.59 27,924.65 139,623.24

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 886.91 2,291.10 103,713.61 26,722.90 133,614.51
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 361.16 144.15 1,731.52 559.21 2,796.05
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 199.48 2,435.44 13,222.26 3,964.30 19,821.48
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 397.27 107.53 1,998.55 625.84 3,129.19
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 6.18 39.28 109.96 38.85 194.26

207b DEEP PATCHING (15-30 cm) Sq.m 6.18 39.28 109.96 38.85 194.26

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.92 106.73 0.98 28.66 143.29

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 16.78 465.72 6.50 122.25 611.24
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.36 60.75 0.97 16.27 81.35

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.10 1.09 111.85 28.51 142.55

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.06 1.26 105.79 27.03 135.14
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.44 0.75 45.57 11.69 58.44

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.44 0.75 42.30 10.87 54.36
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.29 34.51 202.07 59.72 298.58

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.29 33.76 130.78 41.71 208.54

304bi DOUBLE SURFACE TREATMENT Sq.m 3.75 42.00 413.74 114.88 574.38

Page 303 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.75 41.08 342.45 96.82 484.11

304ci TRIPLE SURFACE TREATMENT Sq.m 6.84 46.67 488.65 135.54 677.70

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.84 45.69 417.22 117.44 587.19

304d SEAL COAT Sq.m 2.84 10.07 57.51 17.61 88.03

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.82 14,759.91 4,221.90 21,109.49
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,939.82 15,065.58 4,298.32 21,491.58
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 735.73 871.29 13,083.15 3,672.54 18,362.70

307b OPEN GRADED HOT BIT-MAC Cu.m 735.73 871.29 12,925.79 3,633.20 18,166.00

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 110.18 1,467.87 3,345.81 1,230.97 6,154.83
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 287.25 1,330.30 101,547.38 25,791.23 128,956.16

309a COLD MILLING, 0 - 30 mm Sq.m 2.25 32.43 60.34 23.76 118.78

309b COLD MILLING, 0 - 50 mm Sq.m 4.46 53.41 100.04 39.48 197.39

309c COLD MILLING, 0 - 70 mm Sq.m 8.43 71.92 139.59 54.99 274.93

309d COLD MILLING, 0 - 100 mm Sq.m 9.73 97.64 200.44 76.95 384.76

309e COLD MILLING, 0 - 130 mm Sq.m 12.65 126.93 260.57 100.04 500.19

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 370.56 3,660.41 12,741.80 4,193.19 20,965.96
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,229.81 2,601.40 7,723.64 2,888.71 14,443.56

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,229.81 2,601.80 8,990.32 3,205.48 16,027.41

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,229.81 2,601.40 9,413.65 3,311.22 16,556.08

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,229.81 2,601.86 8,272.79 3,026.12 15,130.58

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,229.81 2,708.38 9,539.47 3,369.42 16,847.08

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,281.88 2,601.80 9,962.80 3,461.62 17,308.10

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,229.81 2,601.40 8,622.63 3,113.46 15,567.29

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,229.81 2,708.38 9,889.30 3,456.88 17,284.38

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,281.88 2,601.86 10,312.64 3,549.09 17,745.46

401b CONCRETE CLASS "B" Cu.m 1,573.91 1,295.13 6,222.30 2,272.84 11,364.18

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,182.52 2,715.98 7,218.23 2,779.18 13,895.91

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,217.23 2,714.14 8,494.57 3,106.49 15,532.43

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,217.23 2,715.06 8,908.24 3,210.13 16,050.66

401di CONCRETE CLASS "D1" Cu.m 1,917.42 2,872.98 12,050.76 4,210.29 21,051.45

401dii CONCRETE CLASS "D2" Cu.m 1,917.42 2,873.44 12,910.08 4,425.24 22,126.18

Page 304 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,917.42 2,873.44 13,612.64 4,600.88 23,004.38

401e CONCRETE CLASS "Y" Cu.m 1,229.81 1,700.35 9,761.02 3,172.80 15,863.98

401f LEAN CONCRETE Cu.m 1,029.80 1,021.69 4,801.30 1,713.20 8,565.99

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,919.21 1,494.97 8,718.27 3,283.11 16,415.56

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,919.21 1,494.97 9,774.03 3,547.05 17,735.25

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,919.21 1,785.61 7,255.05 2,989.97 14,949.84

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,080.50 2,873.44 12,108.75 4,265.67 21,328.36

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,080.50 2,873.44 12,968.08 4,480.51 22,402.53

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,080.50 2,873.44 13,670.64 4,656.15 23,280.73

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,389.59 1,271.88 4,710.59 1,843.02 9,215.08
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,635.90 816.38 183,392.81 47,461.27 237,306.36

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,635.90 816.38 187,251.64 48,425.98 242,129.89

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,116.12 1,853.62 213,789.30 54,689.76 273,448.79
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,980.44 7,785.85 355,609.19 92,593.87 462,969.35
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 215.45 1,014.10 - 307.39 1,536.94

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 397.36 - 1,566.90 491.07 2,455.34
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 268.10 - 4,042.55 1,077.66 5,388.31
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 27.97 4.18 247.22 69.85 349.23
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 48,367.27 12,334.19 61,670.95
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 43,867.27 11,209.19 56,045.95
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 139,562.67 35,133.04 175,665.20


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 114,569.48 28,884.74 144,423.71


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 43,335.06 11,076.14 55,380.69


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 38,269.57 9,809.77 49,048.83


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 305 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 969.49 - 33,731.18 8,675.17 43,375.84
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 969.49 - 26,171.33 6,785.21 33,926.03


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 969.49 - 31,518.87 8,122.09 40,610.45
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 969.49 - 104,822.61 26,448.03 132,240.13
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 904.85 - 68,897.94 17,450.70 87,253.49
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 236.98 - 967.88 301.22 1,506.08

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 236.98 - 1,249.28 371.57 1,857.83

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 1.67 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 3.03 0.78 3.88
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 5.53 1.40 7.00
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 93.72 - 465.42 139.79 698.93

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 503.01 3,902.79 293.27 1,174.77 5,873.84
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,196.75 5,182.14 391.75 1,692.66 8,463.29
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 550.81 4,494.36 330.19 1,343.84 6,719.20
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,381.45 6,111.95 484.06 1,994.37 9,971.83
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 703.92 9,514.53 842.44 2,765.22 13,826.11
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,007.51 13,523.30 842.46 4,343.32 21,716.59
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,042.56 13,601.49 1,299.43 3,985.87 19,929.35
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,310.96 19,708.03 1,299.43 6,329.61 31,648.03
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 491.21 1,598.85 3,711.90 1,450.49 7,252.46
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 982.42 3,161.24 2,821.89 1,741.39 8,706.93
SIZE) INCLUDING TESTING AND REPORTING

Page 306 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,964.84 6,258.51 966.39 2,297.43 11,487.17
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 23,267.68 99,028.08 917,377.50 259,918.32 1,299,591.58

407t PILE LOAD TEST UPTO 800 TON Each 28,438.24 109,085.12 1,334,383.50 367,976.72 1,839,883.58

407u PILE LOAD TEST UPTO 1000 TON Each 28,438.24 109,085.12 1,668,024.00 451,386.84 2,256,934.20

407v PILE LOAD TEST UPTO 1200 TON Each 28,438.24 109,085.12 1,953,605.00 522,782.09 2,613,910.45

407w PILE LOAD TEST UPTO 1500 TON Each 28,438.24 109,085.12 2,366,976.50 626,124.97 3,130,624.83

407x PILE LOAD TEST UPTO 2000 TON Each 28,438.24 109,085.12 2,771,976.50 727,374.97 3,636,874.83

407y PILE LOAD TEST UPTO 2500 TON Each 28,438.24 135,384.56 3,176,976.50 835,199.83 4,175,999.13

407l PERMANENT PILE CASING FOR PILES Ton 1,772.01 8,336.60 228,677.46 59,696.52 298,482.59

410 BRICK WORK Cu.m 1,054.80 448.93 8,574.95 2,519.67 12,598.35

411a STONE MASONRY RANDOM DRY Cu.m 842.37 250.42 1,938.62 757.86 3,789.28

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 896.23 353.84 4,034.46 1,321.13 6,605.66

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,327.11 250.42 2,149.85 931.85 4,659.23

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,564.10 353.84 4,127.16 1,511.27 7,556.36
MORTAR

411g ROLL POINTING Sq.m 177.09 23.91 175.37 94.10 470.48

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,027.29 532.71 4,127.16 1,671.79 8,358.95
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 347.94 1,238.96 1,192.41 694.83 3,474.14
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 359.79 1,250.14 1,516.40 781.58 3,907.90
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 583.85 1,266.89 2,462.83 1,078.39 5,391.96
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 652.20 1,277.86 3,709.84 1,409.97 7,049.86
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 724.66 1,249.06 6,112.48 2,021.55 10,107.76
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 837.28 1,307.03 9,251.70 2,849.00 14,245.01
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 970.75 1,475.43 10,126.68 3,143.22 15,716.08
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,178.77 1,670.94 12,205.52 3,763.81 18,819.04
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,518.86 1,963.39 24,228.56 6,927.70 34,638.50
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 347.94 1,238.96 1,709.01 823.98 4,119.89
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 359.79 1,250.14 2,090.40 925.08 4,625.40
DIA 380 mm

Page 307 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 583.85 1,266.89 2,790.83 1,160.39 5,801.96
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 652.20 1,277.86 4,365.84 1,573.97 7,869.86
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 724.66 1,249.06 7,752.48 2,431.55 12,157.76
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 837.28 1,307.03 12,121.70 3,566.50 17,832.51
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 970.75 1,475.43 14,226.68 4,168.22 20,841.08
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,178.77 1,670.94 16,735.02 4,896.18 24,480.91
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,518.86 1,963.39 30,091.53 8,393.45 41,967.23
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 350.45 221.30 1,463.24 508.75 2,543.74
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,774.99 1,007.00 6,222.30 2,251.07 11,255.36
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 18.13 - 236.74 63.72 318.59

507b ROCK FILL IN GABIONS Cu.m 344.70 - 1,275.67 405.09 2,025.46

508a BRICK PAVING (SINGLE COURSE) Sq.m 366.68 12.42 596.51 243.90 1,219.50

508b BRICK PAVING (DOUBLE COURSE) Sq.m 646.75 23.17 1,192.93 465.71 2,328.56

509a RIP RAP CLASS "A" Cu.m 1,071.17 102.70 1,377.75 637.91 3,189.53

509b RIP RAP CLASS "B" Cu.m 1,140.02 64.98 1,399.54 651.13 3,255.66

509c RIP RAP CLASS "C" Cu.m 1,195.69 51.25 1,433.00 669.99 3,349.94

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 736.09 527.57 1,496.85 690.13 3,450.63

509d GROUTED RIP RAP CLASS "A" Cu.m 1,295.23 173.95 3,719.29 1,297.12 6,485.59

509e GROUTED RIP RAP CLASS "B" Cu.m 1,613.95 136.23 3,583.09 1,333.32 6,666.59

509f GROUTED RIP RAP CLASS "C" Cu.m 1,854.22 110.63 3,473.92 1,359.69 6,798.46

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,854.22 711.74 3,498.76 1,516.18 7,580.90

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,715.14 793.43 7,519.20 2,506.94 12,534.71
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 182.15 279.48 1,463.36 481.25 2,406.24

510 DISMANTLING OF STRUCTURE AND Cu.m 618.32 857.77 - 369.02 1,845.11


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 288.69 71.55 243.05 150.82 754.11

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 329.93 81.77 312.53 181.06 905.30

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 275.76 48.78 1,173.15 374.42 1,872.11
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 315.16 55.74 1,466.75 459.41 2,297.06
BITUMEN JOINTS

Page 308 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 253.14 84.55 801.35 284.76 1,423.80
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 289.31 96.63 994.41 345.09 1,725.43
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 39,764.30 10,229.33 51,146.64
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 45,826.49 11,744.87 58,724.36
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,022.25 6,271.54 1,909.27 9,546.34
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,141.23 6,921.76 2,101.57 10,507.84
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,106.62 4,562.80 1,452.92 7,264.60
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,121.86 5,031.13 1,573.81 7,869.05
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 92.21 114.48 1,013.15 304.96 1,524.80
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 497.52 8,713.71 2,362.49 11,812.43
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 480.88 9,529.57 2,562.29 12,811.45
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 31.24 - 117.12 37.09 185.45

604a METAL GUARD RAIL M 97.52 37.66 4,252.14 1,096.83 5,484.14

604b METAL GUARD RAIL END PIECES Each 323.17 143.10 3,749.63 1,053.97 5,269.86

604d STEEL POST FOR METAL GUARD RAIL Each 185.28 131.65 5,187.28 1,376.05 6,880.26

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,364.81 495.87 30,188.91 8,762.40 43,812.00
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,364.81 495.87 30,095.86 8,739.14 43,695.68
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 962.30 384.38 15,891.10 4,309.45 21,547.23
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 962.30 384.38 17,927.31 4,818.50 24,092.49
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 309 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 962.30 384.38 20,033.31 5,345.00 26,724.99
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 962.30 384.38 16,494.30 4,460.25 22,301.23
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 962.30 384.38 18,730.71 5,019.35 25,096.74
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 962.30 384.38 21,047.31 5,598.50 27,992.49
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,062.84 271.46 20,035.77 5,342.52 26,712.59
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,062.84 271.46 23,662.77 6,249.27 31,246.34
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,062.84 271.46 27,198.77 7,133.27 35,666.34
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,062.84 271.46 21,048.47 5,595.69 27,978.46
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,062.84 271.46 25,038.17 6,593.12 32,965.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,062.84 271.46 27,198.77 7,133.27 35,666.34
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,062.84 488.51 25,346.94 6,724.57 33,622.86
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,062.84 488.51 26,776.94 7,082.07 35,410.36
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 310 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,062.84 488.51 43,533.91 11,271.32 56,356.58
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,062.84 488.51 46,393.91 11,986.32 59,931.58
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 374.27 291.73 40,943.04 10,402.26 52,011.31
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.42 36,387.51 9,252.13 46,260.65
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.95 34,770.07 8,867.00 44,334.99
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.37 35,920.59 9,170.46 45,852.28
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 374.27 291.73 36,943.04 9,402.26 47,011.31
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.42 32,387.51 8,252.13 41,260.65
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 167.95 30,770.07 7,867.00 39,334.99
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.37 31,920.59 8,170.46 40,852.28
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 486.90 - 4,680.00 1,291.73 6,458.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 486.90 - 3,960.00 1,111.73 5,558.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 311 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 486.90 - 7,020.00 1,876.73 9,383.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 486.90 - 5,940.00 1,606.73 8,033.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 18.24 14.76 867.94 225.24 1,126.18
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 30.03 9.43 47.16


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 5.07 93.50 25.68 128.38


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 36.03 10.94 54.68


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 4.39 114.69 30.81 154.03


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 156.84 159.66 220.74 134.31 671.55
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 261.40 365.60 687.23 328.56 1,642.79
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 39.03 12.05 60.24
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 135.22 36.47 182.35
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 46.83 14.00 69.99
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.48 165.77 44.11 220.53
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 156.84 159.66 327.81 161.08 805.39
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 261.40 309.06 945.95 379.10 1,895.51
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 78.42 79.83 366.31 131.14 655.70
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 78.42 109.68 998.11 296.55 1,482.76
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 78.42 79.83 476.11 158.59 792.95
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 114.61 50.89 1,373.87 384.84 1,924.21
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 501.34 144.97 724.83
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 279.56 78.91 394.56
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 312 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NANKANA SAHIB

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 601.34 169.97 849.83
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 304.56 85.16 425.81
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 300.90 237.98 1,549.87 522.19 2,610.94
DRAWING

610c KILOMETER POST Each 387.79 572.39 3,354.17 1,078.59 5,392.94

610d TEN KILOMETER POST Each 775.58 1,144.78 8,866.69 2,696.77 13,483.83

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 491.21 114.48 2,334.93 735.16 3,675.78
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 459.35 1,152.88 23.00 408.81 2,044.05
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.72 28.45 16.83 84.15

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.72 94.29 33.29 166.44

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.54 4.63 34.03 10.05 50.25

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.33 8.97 3.00 4.32 21.61
PER ADDITIONAL MONTH

Page 313 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

NAROWAL

Page 314 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.71 - 5.36 26.80

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.42 31.53 159.59 797.93

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 865.68 141.88 272.39 1,361.95

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,746.15 756.70 724.11 3,620.54

103 STRIPPING Cu.m 9.29 273.83 - 70.78 353.91

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.54 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 304.54 - 79.71 398.53

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 785.89 38.48 218.73 1,093.66

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 612.14 - 162.52 812.58

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 435.48 - 116.22 581.08

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 304.54 - 79.71 398.53

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 785.89 38.48 218.73 1,093.66

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 612.14 - 162.52 812.58

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 435.48 - 116.22 581.08

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 279.14 - 76.81 384.03

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 686.68 210.42 272.83 1,364.15
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 776.40 38.48 216.36 1,081.80
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 602.52 - 160.13 800.63
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 425.95 - 113.83 569.15
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.67 1,550.69 489.21 2,446.03

107e COMMON BACK FILL Cu.m 88.46 126.46 11.70 56.66 283.28

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.89 11.70 87.25 436.25
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 971.84 38.48 267.70 1,338.51
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 784.06 11.70 210.49 1,052.43
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 598.60 11.70 162.68 813.41
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 297.31 60.13 95.85 479.26
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 166.00 11.70 50.83 254.16
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.38 11.70 65.71 328.56
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.97 3.51 22.08 110.38

Page 315 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.63 3.12 19.23 96.14
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 327.46 563.73 228.65 1,143.23

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.19 1.76 6.70 33.49

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.60 11.19 9.46 47.31

201 GRANULAR SUBBASE Cu.m 36.77 265.23 2,059.60 590.40 2,952.00

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 518.34 2,151.41 681.43 3,407.13

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 408.08 2,151.41 653.86 3,269.29

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,850.65 14,201.47 4,060.77 20,303.83

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,850.65 14,599.82 4,160.35 20,801.76

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.08 14,201.47 4,060.63 20,303.13
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,850.08 14,476.23 4,129.31 20,646.56
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 567.79 2,712.78 843.52 4,217.58

204c CEMENT CONTENT Ton 384.60 - 14,883.12 3,816.93 19,084.65

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,292.79 108,537.32 27,905.44 139,527.19

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,292.79 104,335.08 26,854.88 134,274.38
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.31 2,129.14 648.96 3,244.79
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,437.57 13,594.99 4,052.66 20,263.28
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.62 2,262.73 681.24 3,406.19
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.30 125.06 42.47 212.34

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.30 125.06 42.47 212.34

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.92 0.98 28.52 142.60

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 466.62 6.50 122.02 610.11
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.80 0.97 16.19 80.96

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.10 112.48 28.64 143.19

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.27 106.41 27.16 135.78
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.75 45.81 11.74 58.69

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.75 42.55 10.92 54.61
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.56 205.19 60.45 302.24

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.81 133.50 42.34 211.70

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 42.06 421.92 116.84 584.18

Page 316 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.14 350.23 98.68 493.41

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.74 498.20 137.76 688.81

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.77 426.37 119.56 597.81

304d SEAL COAT Sq.m 2.53 10.08 58.47 17.77 88.86

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.37 15,198.38 4,327.11 21,635.54
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,942.37 15,507.49 4,404.39 22,021.93
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 872.62 13,517.52 3,761.71 18,808.56

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 872.62 13,355.00 3,721.08 18,605.41

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,468.64 3,346.83 1,228.46 6,142.28
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,330.91 102,168.84 25,939.04 129,695.19

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.46 60.37 23.71 118.55

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.50 100.09 39.39 196.96

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 72.24 139.66 54.86 274.29

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.71 200.54 76.74 383.68

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 127.03 260.70 99.76 498.78

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,662.84 12,959.92 4,238.38 21,191.90
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,611.68 7,919.11 2,907.13 14,535.64

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,612.08 9,184.92 3,223.68 16,118.40

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,611.68 9,607.40 3,329.20 16,646.00

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,612.14 8,473.89 3,045.94 15,229.70

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,719.34 9,739.70 3,389.19 16,945.96

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,612.08 10,162.18 3,479.62 17,398.09

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,611.68 8,826.96 3,134.09 15,670.45

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,719.34 10,092.76 3,477.46 17,387.29

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,612.14 10,515.25 3,567.90 17,839.48

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,298.36 6,382.77 2,271.50 11,357.52

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,722.87 7,410.17 2,797.14 13,985.70

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,721.95 8,685.65 3,123.53 15,617.63

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,721.95 9,098.46 3,226.73 16,133.64

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,880.87 12,266.51 4,214.72 21,073.60

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,881.33 13,132.18 4,431.25 22,156.26

Page 317 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,881.33 13,840.90 4,608.43 23,042.16

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,704.54 9,960.41 3,190.67 15,953.35

401f LEAN CONCRETE Cu.m 919.20 1,025.34 4,952.08 1,724.16 8,620.79

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,499.93 8,921.06 3,256.68 16,283.38

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,499.93 9,985.86 3,522.88 17,614.38

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,789.94 7,402.97 2,949.66 14,748.28

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,881.33 12,324.58 4,265.74 21,328.71

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,881.33 13,190.25 4,482.16 22,410.80

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,881.33 13,898.97 4,659.34 23,296.70

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,274.42 4,925.20 1,860.00 9,299.98
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.47 183,257.49 47,276.16 236,380.81

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.47 187,272.14 48,279.82 241,399.11

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.90 213,808.60 54,611.00 273,054.99
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,788.48 356,087.47 92,526.62 462,633.08
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,018.89 - 302.80 1,513.99

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,567.51 480.55 2,402.74
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,044.15 1,070.87 5,354.33
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.35 69.13 345.63
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,428.72 12,323.52 61,617.59
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,928.72 11,198.52 55,992.59
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,721.64 35,146.75 175,733.74


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,730.30 28,898.91 144,494.56


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,363.38 11,057.18 55,285.91


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,301.21 9,791.64 48,958.20


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 318 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,798.82 8,666.04 43,330.21
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,208.91 6,768.57 33,842.83


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,593.33 8,114.67 40,573.35
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 104,998.33 26,465.92 132,329.60
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,911.07 17,429.68 87,148.41
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 968.42 294.99 1,474.94

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,249.82 365.34 1,826.69

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 466.02 137.42 687.09

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,919.51 302.41 1,167.73 5,838.64
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,195.04 401.33 1,666.15 8,330.74
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,513.84 339.50 1,336.25 6,681.24
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,127.51 494.04 1,963.66 9,818.30
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,526.28 853.87 2,752.11 13,760.56
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,559.77 853.89 4,274.53 21,372.63
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,618.32 1,312.85 3,965.43 19,827.16
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,761.94 1,312.85 6,230.66 31,153.31
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,601.58 3,742.85 1,445.72 7,228.60
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,166.64 2,852.83 1,724.09 8,620.45
SIZE) INCLUDING TESTING AND REPORTING

Page 319 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,269.22 997.33 2,255.08 11,275.41
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 99,118.24 911,307.90 257,798.64 1,288,993.18

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 109,187.76 1,325,554.86 365,031.56 1,825,157.78

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 109,187.76 1,656,987.84 447,889.80 2,239,449.00

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 109,187.76 1,940,361.80 518,733.29 2,593,666.45

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 109,187.76 2,350,422.74 621,248.53 3,106,242.63

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 109,187.76 2,755,422.74 722,498.53 3,612,492.63

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,513.36 3,160,422.74 830,329.93 4,151,649.63

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,342.77 228,541.78 59,616.56 298,082.78

410 BRICK WORK Cu.m 941.51 449.43 8,532.81 2,480.94 12,404.69

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.51 2,322.04 831.11 4,155.56

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 354.09 4,394.52 1,387.15 6,935.73

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.51 2,564.09 999.79 4,998.96

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 354.09 4,487.28 1,559.37 7,796.85
MORTAR

411g ROLL POINTING Sq.m 158.07 23.95 174.76 89.20 445.98

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 533.02 4,487.28 1,707.47 8,537.33
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,239.92 1,198.74 687.31 3,436.54
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,251.10 1,525.19 774.36 3,871.80
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,267.87 2,474.97 1,066.00 5,329.98
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,278.84 3,731.72 1,398.18 6,990.89
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,250.06 6,136.64 2,008.38 10,041.91
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,308.07 9,282.88 2,834.57 14,172.86
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,476.60 10,158.03 3,125.28 15,626.40
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,672.27 12,248.72 3,743.29 18,716.44
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,964.93 24,301.63 6,905.57 34,527.85
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,239.92 1,715.34 816.46 4,082.29
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,251.10 2,099.19 917.86 4,589.30
DIA 380 mm

Page 320 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,267.87 2,802.97 1,148.00 5,739.98
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,278.84 4,387.72 1,562.18 7,810.89
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,250.06 7,776.64 2,418.38 12,091.91
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,308.07 12,152.88 3,552.07 17,760.36
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,476.60 14,258.03 4,150.28 20,751.40
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,672.27 16,778.39 4,875.71 24,378.53
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,964.93 30,164.60 8,371.31 41,856.56
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.42 1,551.84 521.52 2,607.59
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,011.26 6,382.77 2,244.60 11,223.00
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 236.86 63.26 316.31

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,634.43 485.53 2,427.64

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.43 590.88 232.65 1,163.26

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.20 1,181.70 445.55 2,227.74

509a RIP RAP CLASS "A" Cu.m 956.12 102.74 1,759.08 704.49 3,522.43

509b RIP RAP CLASS "B" Cu.m 1,017.58 65.01 1,780.84 715.86 3,579.29

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.76 1,817.43 734.11 3,670.56

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 529.79 1,886.42 768.31 3,841.56

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 174.59 3,838.06 1,292.19 6,460.96

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 136.85 3,706.36 1,320.96 6,604.78

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 111.63 3,608.90 1,343.90 6,719.51

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 714.50 3,633.76 1,500.84 7,504.18

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 794.61 7,699.63 2,506.30 12,531.49
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.62 1,558.19 500.10 2,500.50

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.87 - 352.44 1,762.21


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.57 310.32 159.90 799.48

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.80 399.03 193.83 969.16

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.81 1,203.54 374.63 1,873.13
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.78 1,507.75 461.21 2,306.05
BITUMEN JOINTS

Page 321 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.60 862.29 293.21 1,466.05
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.68 1,073.18 357.03 1,785.13
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,776.35 10,220.54 51,102.69
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,839.55 11,736.34 58,681.69
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,024.86 6,345.99 1,919.32 9,596.59
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,144.19 7,003.84 2,113.61 10,568.05
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,107.50 4,644.92 1,469.85 7,349.24
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,123.69 5,121.88 1,593.14 7,965.68
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.52 1,006.88 300.93 1,504.63
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.87 8,662.95 2,343.48 11,717.38
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 481.22 9,473.70 2,542.00 12,710.00
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.67 4,254.57 1,094.82 5,474.10

604b METAL GUARD RAIL END PIECES Each 288.45 143.15 3,751.15 1,045.69 5,228.44

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.83 5,190.31 1,371.88 6,859.39

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 496.99 30,385.75 8,694.69 43,473.45
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 496.99 30,292.58 8,671.40 43,356.98
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 386.70 15,924.71 4,292.59 21,462.94
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 386.70 17,961.80 4,801.86 24,009.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 322 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 386.70 20,067.80 5,328.36 26,641.80
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 386.70 16,527.91 4,443.39 22,216.94
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 386.70 18,765.20 5,002.71 25,013.55
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 386.70 21,081.80 5,581.86 27,909.30
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.90 20,070.39 5,322.74 26,613.71
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.90 23,697.39 6,229.49 31,147.46
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.90 27,233.39 7,113.49 35,567.46
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.90 21,083.09 5,575.92 27,879.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.90 25,072.79 6,573.34 32,866.71
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.90 27,233.39 7,113.49 35,567.46
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 490.10 25,410.67 6,712.36 33,561.81
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 490.10 26,840.67 7,069.86 35,349.31
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 323 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 490.10 43,598.79 11,259.39 56,296.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 490.10 46,458.79 11,974.39 59,871.96
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 292.44 40,984.10 10,402.66 52,013.28
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.63 36,448.21 9,255.07 46,275.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.17 34,830.29 8,867.88 44,339.41
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.60 35,981.01 9,169.81 45,849.05
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 292.44 36,984.10 9,402.66 47,013.28
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.63 32,448.21 8,255.07 41,275.36
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 168.17 30,830.29 7,867.88 39,339.41
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.60 31,981.01 8,169.81 40,849.05
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 324 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.04 224.77 1,123.85
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.07 93.50 25.57 127.84


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.83 54.13


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.39 114.69 30.70 153.48


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.72 220.74 130.12 650.58
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 366.21 687.23 321.69 1,608.45
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 135.22 36.33 181.66
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.49 165.77 43.97 219.84
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.72 327.81 156.88 784.41
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 309.53 945.95 372.20 1,861.00
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.86 366.31 129.04 645.20
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.86 998.11 294.49 1,472.46
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.86 476.11 156.49 782.45
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 51.01 1,373.87 381.80 1,908.99
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.40 143.92 719.59
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.58 78.23 391.15
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 325 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: NAROWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.40 168.92 844.59
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.58 84.48 422.40
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 238.58 1,565.40 518.14 2,590.70
DRAWING

610c KILOMETER POST Each 346.14 572.59 3,342.65 1,065.35 5,326.74

610d TEN KILOMETER POST Each 692.29 1,145.18 8,797.86 2,658.83 13,294.16

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.52 2,339.39 723.09 3,615.44
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,154.69 22.00 396.68 1,983.38
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.75 28.46 16.41 82.03

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.75 94.29 32.86 164.31

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 34.01 10.01 50.03

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.98 3.00 4.19 20.93
PER ADDITIONAL MONTH

Page 326 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

OKARA

Page 327 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.69 - 5.36 26.78

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 563.20 31.49 159.77 798.85

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 867.28 141.69 272.74 1,363.70

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,752.10 755.68 725.34 3,626.70

103 STRIPPING Cu.m 9.29 273.60 - 70.72 353.61

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.50 1.76 5.47 27.33

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.95 - 79.56 397.79

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.66 38.58 218.20 1,090.99

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.48 - 162.10 810.49

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.18 - 115.89 579.45

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.95 - 79.56 397.79

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.66 38.58 218.20 1,090.99

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.48 - 162.10 810.49

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.18 - 115.89 579.45

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.68 - 76.69 383.44

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.75 210.89 272.47 1,362.34
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.18 38.58 215.83 1,079.15
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.87 - 159.71 798.56
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.65 - 113.51 567.54
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.38 1,634.42 510.06 2,550.31

107e COMMON BACK FILL Cu.m 88.46 126.04 11.70 56.55 282.75

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.41 11.70 87.13 435.65
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.49 38.58 267.14 1,335.71
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.45 11.70 210.08 1,050.41
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 597.46 11.70 162.40 812.00
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.77 60.13 95.72 478.58
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.64 11.70 50.74 253.71
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.14 11.70 65.65 328.26
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.84 3.51 22.04 110.21

Page 328 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.51 3.12 19.20 96.00
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.61 505.36 213.84 1,069.20

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.69 33.43

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.55 11.17 9.45 47.23

201 GRANULAR SUBBASE Cu.m 36.77 264.82 1,829.69 532.82 2,664.09

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.72 2,059.23 658.22 3,291.11

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.75 2,059.23 630.48 3,152.40

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,846.64 13,918.69 3,989.07 19,945.35

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,846.64 14,316.66 4,088.56 20,442.81

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.08 13,918.69 3,988.93 19,944.64
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,846.08 14,194.37 4,057.85 20,289.24
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.50 2,530.88 797.72 3,988.59

204c CEMENT CONTENT Ton 384.60 - 14,829.15 3,803.44 19,017.19

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,289.60 108,408.26 27,872.37 139,361.86

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,289.60 103,155.26 26,559.12 132,795.61
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 144.01 1,901.82 592.05 2,960.25
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,433.61 13,364.82 3,994.12 19,970.61
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.44 2,168.65 657.67 3,288.36
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.21 119.74 41.12 205.58

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.21 119.74 41.12 205.58

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.67 0.98 28.46 142.28

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.41 6.50 121.72 608.60
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.71 0.97 16.17 80.85

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.30 28.34 141.71

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.23 26.86 134.29
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.34 11.62 58.10

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 42.08 10.80 54.01
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 202.15 59.66 298.31

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.73 131.21 41.75 208.74

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.97 414.87 115.05 575.24

Page 329 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.06 343.93 97.09 485.43

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.63 489.97 135.68 678.38

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.65 418.89 117.66 588.31

304d SEAL COAT Sq.m 2.53 10.07 57.58 17.55 87.73

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,938.25 14,907.15 4,253.27 21,266.35
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,938.25 15,210.55 4,329.12 21,645.60
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.58 13,238.06 3,691.34 18,456.70

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.58 13,082.05 3,652.34 18,261.69

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,467.01 3,344.89 1,227.56 6,137.81
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.95 100,989.03 25,643.10 128,215.48

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.38 60.32 23.68 118.38

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.38 100.00 39.34 196.69

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.87 139.53 54.73 273.66

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.29 200.35 76.58 382.90

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.48 260.45 99.56 497.78

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,658.23 13,054.58 4,260.89 21,304.46
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,595.08 8,021.41 2,928.56 14,642.78

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,595.49 9,290.50 3,245.93 16,229.64

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,595.08 9,715.03 3,351.96 16,759.80

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,595.54 8,573.64 3,066.73 15,333.64

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,702.03 9,842.73 3,410.62 17,053.10

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,595.49 10,267.26 3,501.74 17,508.69

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,595.08 8,925.28 3,154.52 15,772.60

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,702.03 10,194.36 3,498.53 17,492.65

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,595.54 10,618.90 3,589.66 17,948.30

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,290.71 6,500.63 2,299.06 11,495.28

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,712.19 7,513.70 2,820.35 14,101.76

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,710.34 8,792.49 3,147.34 15,736.68

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,711.27 9,207.32 3,251.27 16,256.36

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,863.41 12,364.55 4,234.87 21,174.33

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,863.87 13,227.97 4,450.84 22,254.18

Page 330 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,863.87 13,934.12 4,627.37 23,136.86

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,696.47 10,064.57 3,214.69 16,073.46

401f LEAN CONCRETE Cu.m 919.20 1,018.30 5,073.03 1,752.63 8,763.16

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,490.30 9,019.66 3,278.92 16,394.59

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,490.30 10,080.80 3,544.20 17,721.01

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,780.15 7,503.60 2,972.37 14,861.83

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,863.87 12,422.78 4,285.93 21,429.64

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,863.87 13,286.20 4,501.78 22,508.91

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,863.87 13,992.35 4,678.32 23,391.60

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,268.47 4,955.62 1,866.11 9,330.55
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.27 183,602.38 47,362.33 236,811.66

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.27 187,344.70 48,297.91 241,489.56

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.34 213,878.57 54,628.35 273,141.75
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,783.50 356,138.63 92,538.16 462,690.81
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,010.47 - 300.69 1,503.46

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,568.62 480.83 2,404.13
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,047.36 1,071.67 5,358.34
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 247.64 69.20 345.99
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,448.24 12,328.40 61,641.99
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,948.24 11,203.40 56,016.99
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,757.51 35,155.72 175,778.58


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,761.71 28,906.77 144,533.83


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,387.36 11,063.18 55,315.89


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,317.16 9,795.63 48,978.14


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 331 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,809.68 8,668.76 43,343.79
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,215.66 6,770.25 33,851.26


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,618.59 8,120.99 40,604.93
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,039.48 26,476.21 132,381.04
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,939.99 17,436.91 87,184.56
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 969.55 295.27 1,476.36

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,250.95 365.62 1,828.11

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 467.12 137.69 688.46

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,887.76 316.72 1,163.37 5,816.84
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,170.54 416.61 1,663.84 8,319.21
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,476.85 354.17 1,330.67 6,653.34
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,097.96 510.24 1,960.32 9,801.61
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,503.96 873.28 2,751.39 13,756.93
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,490.51 873.30 4,262.06 21,310.31
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,586.36 1,336.72 3,963.41 19,817.06
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,659.56 1,336.72 6,211.04 31,055.18
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,596.39 3,738.61 1,443.36 7,216.81
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,156.37 2,848.59 1,720.46 8,602.31
SIZE) INCLUDING TESTING AND REPORTING

Page 332 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,248.87 993.09 2,248.93 11,244.66
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,946.96 916,365.90 259,020.32 1,295,101.58

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,992.80 1,332,912.06 366,822.12 1,834,110.58

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,992.80 1,666,184.64 450,140.26 2,250,701.30

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,992.80 1,951,397.80 521,443.55 2,607,217.75

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,992.80 2,364,217.54 624,648.49 3,123,242.43

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,992.80 2,769,217.54 725,898.49 3,629,492.43

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,268.72 3,174,217.54 833,717.47 4,168,587.33

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,331.10 228,884.90 59,699.42 298,497.09

410 BRICK WORK Cu.m 941.51 448.47 8,610.65 2,500.16 12,500.79

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.34 2,103.19 776.36 3,881.80

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.61 4,345.42 1,374.75 6,873.76

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.34 2,327.46 940.60 4,702.98

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.61 4,438.12 1,546.96 7,734.80
MORTAR

411g ROLL POINTING Sq.m 158.07 23.88 178.68 90.16 450.79

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.43 4,438.12 1,695.03 8,475.14
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,238.10 1,219.19 691.97 3,459.83
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,249.27 1,553.69 781.03 3,905.13
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,266.01 2,514.36 1,075.38 5,376.89
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.97 3,802.37 1,415.37 7,076.86
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,248.16 6,215.63 2,027.66 10,138.28
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,306.10 9,384.79 2,859.56 14,297.79
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.67 10,260.69 3,150.21 15,751.06
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.75 12,391.06 3,778.24 18,891.21
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,962.00 24,536.22 6,963.49 34,817.43
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,238.10 1,735.79 821.12 4,105.58
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,249.27 2,127.69 924.53 4,622.63
DIA 380 mm

Page 333 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,266.01 2,842.36 1,157.38 5,786.89
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.97 4,458.37 1,579.37 7,896.86
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,248.16 7,855.63 2,437.66 12,188.28
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,306.10 12,254.79 3,577.06 17,885.29
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.67 14,360.69 4,175.21 20,876.06
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.75 16,920.66 4,910.64 24,553.21
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,962.00 30,399.20 8,429.23 42,146.14
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.19 1,601.41 533.85 2,669.26
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.79 6,500.63 2,272.70 11,363.49
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.14 63.33 316.66

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,427.85 433.88 2,169.41

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.40 599.21 234.73 1,173.64

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.14 1,198.33 449.69 2,248.44

509a RIP RAP CLASS "A" Cu.m 956.12 102.07 1,539.50 649.42 3,247.11

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.37 1,561.27 660.81 3,304.03

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.23 1,596.05 678.64 3,393.19

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.38 1,662.07 711.62 3,558.10

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.75 3,889.06 1,304.48 6,522.41

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 135.04 3,748.83 1,331.12 6,655.61

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.13 3,638.68 1,350.97 6,754.86

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 711.02 3,663.53 1,507.41 7,537.03

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 792.38 7,808.10 2,532.86 12,664.28
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.36 1,602.16 511.03 2,555.13

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.65 - 352.39 1,761.95


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.53 271.58 150.20 750.99

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.74 349.22 181.37 906.83

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.75 1,225.96 380.22 1,901.08
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.71 1,532.77 467.45 2,337.24
BITUMEN JOINTS

Page 334 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.51 869.53 295.00 1,474.99
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.58 1,079.52 358.59 1,792.93
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,788.61 10,223.60 51,118.01
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,853.94 11,739.94 58,699.68
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,019.91 6,387.32 1,928.41 9,642.06
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,138.57 7,049.40 2,123.60 10,617.99
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.89 4,679.30 1,477.79 7,388.96
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,121.06 5,159.86 1,601.97 8,009.86
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.44 1,016.03 303.20 1,515.98
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.20 8,697.31 2,351.90 11,759.48
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.57 9,511.73 2,551.34 12,756.71
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.65 4,259.72 1,096.10 5,480.51

604b METAL GUARD RAIL END PIECES Each 288.45 143.05 3,754.39 1,046.47 5,232.36

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.49 5,196.71 1,373.40 6,866.98

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.87 30,499.60 8,722.62 43,613.11
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.87 30,406.17 8,699.27 43,496.33
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 382.58 15,957.89 4,299.86 21,499.28
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 382.58 17,996.84 4,809.59 24,047.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 335 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 382.58 20,102.84 5,336.09 26,680.46
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 382.58 16,561.09 4,450.66 22,253.28
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 382.58 18,800.24 5,010.44 25,052.21
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 382.58 21,116.84 5,589.59 27,947.96
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 271.07 20,105.38 5,331.28 26,656.41
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 271.07 23,732.38 6,238.03 31,190.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 271.07 27,268.38 7,122.03 35,610.16
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 271.07 21,118.08 5,584.46 27,922.29
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 271.07 25,107.78 6,581.88 32,909.41
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 271.07 27,268.38 7,122.03 35,610.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.80 25,461.77 6,724.56 33,622.81
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.80 26,891.77 7,082.06 35,410.31
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 336 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.80 43,652.29 11,272.19 56,360.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.80 46,512.29 11,987.19 59,935.96
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.31 41,014.73 10,410.03 52,050.14
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.22 36,485.45 9,264.28 46,321.40
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.75 34,863.81 8,876.16 44,380.78
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.16 36,013.89 9,177.92 45,889.60
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.31 37,014.73 9,410.03 47,050.14
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.22 32,485.45 8,264.28 41,321.40
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.75 30,863.81 7,876.16 39,380.78
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.16 32,013.89 8,177.92 40,889.60
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 337 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.25 224.82 1,124.11
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.06 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.46


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.60 220.74 130.09 650.43
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 365.06 687.23 321.40 1,607.01
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.30
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.48 165.77 43.97 219.83
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.60 327.81 156.85 784.26
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.65 945.95 371.98 1,859.90
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.80 366.31 129.03 645.13
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.52 998.11 294.41 1,472.04
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.80 476.11 156.48 782.38
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.77 1,373.87 381.74 1,908.69
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.53 143.95 719.74
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 279.61 78.24 391.19
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 338 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: OKARA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.53 168.95 844.74
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.46 304.61 84.49 422.44
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.29 1,575.38 520.32 2,601.58
DRAWING

610c KILOMETER POST Each 346.14 572.21 3,365.22 1,070.90 5,354.48

610d TEN KILOMETER POST Each 692.29 1,144.42 8,845.77 2,670.62 13,353.10

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.44 2,364.96 729.46 3,647.31
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,151.25 23.00 396.07 1,980.33
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.68 28.45 16.39 81.93

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.68 94.28 32.85 164.23

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.96 9.99 49.95

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.89
PER ADDITIONAL MONTH

Page 339 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

PAKPATTAN

Page 340 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.68 - 5.36 26.78

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.87 31.48 159.44 797.18

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 864.83 141.65 272.12 1,360.59

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,743.42 755.49 723.12 3,615.60

103 STRIPPING Cu.m 9.29 273.56 - 70.71 353.56

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.49 1.76 5.46 27.31

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.76 - 79.51 397.56

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.50 38.61 218.17 1,090.84

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.31 - 162.06 810.29

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.06 - 115.86 579.30

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.76 - 79.51 397.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.50 38.61 218.17 1,090.84

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.31 - 162.06 810.29

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.06 - 115.86 579.30

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.59 - 76.67 383.34

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.56 211.21 272.50 1,362.49
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.02 38.61 215.80 1,078.99
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.71 - 159.67 798.36
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.54 - 113.48 567.39
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.32 1,543.07 487.21 2,436.06

107e COMMON BACK FILL Cu.m 88.46 126.01 11.70 56.54 282.71

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.33 11.70 87.11 435.55
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.29 38.61 267.10 1,335.50
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.15 11.70 210.01 1,050.04
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.58 11.70 162.18 810.89
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.61 60.13 95.68 478.38
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.50 11.70 50.71 253.54
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.09 11.70 65.64 328.20
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.82 3.51 22.04 110.19

Page 341 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.49 3.12 19.20 95.98
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.45 569.40 229.81 1,149.06

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.68 33.41

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.54 11.17 9.44 47.21

201 GRANULAR SUBBASE Cu.m 36.77 264.74 2,081.96 595.87 2,979.35

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.61 2,311.51 721.27 3,606.33

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.64 2,311.51 693.52 3,467.61

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,846.04 14,198.44 4,058.86 20,294.29

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,846.04 14,595.18 4,158.04 20,790.21

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.48 14,198.44 4,058.72 20,293.59
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.48 14,473.31 4,127.43 20,637.16
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.33 2,836.90 874.18 4,370.89

204c CEMENT CONTENT Ton 384.60 - 14,931.00 3,828.90 19,144.50

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,289.00 108,189.78 27,817.60 139,088.01

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,289.00 102,936.78 26,504.35 132,521.76
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.95 2,155.17 655.38 3,276.88
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,432.81 13,617.98 4,057.21 20,286.05
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.41 2,421.70 720.93 3,604.65
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.20 134.29 44.75 223.76

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.20 134.29 44.75 223.76

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.60 0.98 28.44 142.20

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.29 6.50 121.69 608.45
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.70 0.97 16.17 80.84

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.08 28.29 141.44

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.01 26.80 134.01
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.25 11.60 57.99

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.99 10.78 53.91
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 203.37 59.97 299.84

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.73 132.57 42.09 210.43

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.96 418.79 116.03 580.13

Page 342 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.04 347.99 98.10 490.48

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.62 494.59 136.83 684.14

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.64 423.65 118.85 594.24

304d SEAL COAT Sq.m 2.53 10.06 57.99 17.65 88.23

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.59 15,183.62 4,322.22 21,611.11
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.59 15,485.78 4,397.76 21,988.81
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.31 13,518.64 3,761.42 18,807.08

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.31 13,363.45 3,722.62 18,613.09

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.74 3,344.54 1,227.41 6,137.03
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.74 100,770.54 25,588.42 127,942.10

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.37 60.31 23.67 118.35

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.36 99.98 39.33 196.65

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.85 139.50 54.72 273.60

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.19 200.31 76.55 382.73

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.34 260.40 99.51 497.55

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,656.95 13,291.45 4,319.79 21,598.94
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,592.33 8,237.70 2,981.94 14,909.70

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,592.74 9,509.14 3,299.90 16,499.50

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,592.33 9,934.43 3,406.12 17,030.61

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,592.79 8,794.00 3,121.13 15,605.64

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,699.26 10,065.43 3,465.61 17,328.03

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,592.74 10,490.73 3,556.92 17,784.58

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,592.33 9,148.05 3,209.53 16,047.64

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,699.26 10,419.49 3,554.12 17,770.60

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,592.79 10,844.78 3,645.45 18,227.23

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,290.03 6,688.67 2,345.90 11,729.48

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,708.08 7,726.78 2,872.60 14,362.98

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,706.24 9,007.97 3,200.18 16,000.90

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,707.16 9,423.51 3,304.29 16,521.46

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,860.58 12,601.37 4,293.36 21,466.81

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,861.05 13,470.43 4,510.75 22,553.73

Page 343 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,861.05 14,181.43 4,688.50 23,442.48

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,695.46 10,286.75 3,269.98 16,349.91

401f LEAN CONCRETE Cu.m 919.20 1,017.44 5,251.88 1,797.13 8,985.65

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,489.38 9,238.79 3,333.47 16,667.35

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,489.38 10,307.20 3,600.58 18,002.88

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,778.93 7,673.16 3,014.45 15,072.25

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,861.05 12,659.99 4,344.52 21,722.61

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,861.05 13,529.05 4,561.79 22,808.95

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,861.05 14,240.05 4,739.54 23,697.70

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,267.92 5,153.79 1,915.52 9,577.58
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.25 183,710.68 47,389.40 236,947.01

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.25 187,519.70 48,341.66 241,708.28

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.23 214,047.14 54,670.46 273,352.31
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,782.55 356,820.58 92,708.41 463,542.06
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,009.06 - 300.34 1,501.70

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,571.50 481.55 2,407.74
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,055.56 1,073.72 5,368.59
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.35 69.38 346.88
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,526.65 12,348.00 61,740.00
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,026.65 11,223.00 56,115.00
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,948.72 35,203.52 176,017.59


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,951.27 28,954.16 144,770.78


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,435.39 11,075.19 55,375.93


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,362.22 9,806.89 49,034.46


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 344 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,891.18 8,689.13 43,445.66
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,262.46 6,781.95 33,909.76


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,736.37 8,150.43 40,752.15
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,278.49 26,535.96 132,679.80
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,018.19 17,456.46 87,282.31
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 972.41 295.99 1,479.93

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,253.81 366.34 1,831.68

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 469.98 138.41 692.05

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,881.88 368.31 1,174.80 5,873.98
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,166.00 470.63 1,676.21 8,381.06
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,470.00 406.67 1,342.08 6,710.41
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,092.49 566.53 1,973.03 9,865.14
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,499.83 937.59 2,766.43 13,832.15
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,477.69 937.61 4,274.93 21,374.66
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,580.44 1,412.10 3,980.78 19,903.89
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,640.60 1,412.10 6,225.14 31,125.71
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,595.43 3,778.28 1,453.04 7,265.19
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,154.46 2,888.26 1,729.90 8,649.51
SIZE) INCLUDING TESTING AND REPORTING

Page 345 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,245.09 1,032.76 2,257.90 11,289.52
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,915.36 928,884.45 262,142.05 1,310,710.26

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,956.80 1,351,121.13 371,365.38 1,856,826.91

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,956.80 1,688,946.72 455,821.78 2,279,108.90

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,956.80 1,978,711.90 528,263.08 2,641,315.38

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,956.80 2,398,359.67 633,175.02 3,165,875.09

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,956.80 2,803,359.67 734,425.02 3,672,125.09

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,223.60 3,208,359.67 842,241.72 4,211,208.59

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,328.92 228,990.11 59,725.18 298,625.88

410 BRICK WORK Cu.m 941.51 448.29 8,533.75 2,480.89 12,404.44

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.31 2,346.85 837.27 4,186.33

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.53 4,618.34 1,442.96 7,214.80

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.31 2,590.52 1,006.35 5,031.76

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.53 4,711.04 1,615.17 8,075.85
MORTAR

411g ROLL POINTING Sq.m 158.07 23.86 179.56 90.38 451.88

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.32 4,711.04 1,763.23 8,816.15
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,237.76 1,268.32 704.16 3,520.81
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.93 1,622.27 798.09 3,990.43
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.67 2,609.54 1,099.09 5,495.43
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.63 3,973.51 1,458.07 7,290.35
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.81 6,405.85 2,075.12 10,375.61
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.73 9,629.27 2,920.59 14,602.95
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.26 10,505.65 3,211.35 16,056.75
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.28 12,732.75 3,863.55 19,317.74
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,961.46 25,106.92 7,106.03 35,530.13
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,237.76 1,784.92 833.31 4,166.56
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.93 2,196.27 941.59 4,707.93
DIA 380 mm

Page 346 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.67 2,937.54 1,181.09 5,905.43
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.63 4,629.51 1,622.07 8,110.35
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.81 8,045.85 2,485.12 12,425.61
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.73 12,499.27 3,638.09 18,190.45
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.26 14,605.65 4,236.35 21,181.75
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.28 17,262.48 4,995.98 24,979.90
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,961.46 30,969.90 8,571.77 42,858.85
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.15 1,547.47 520.36 2,601.79
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.32 6,688.67 2,319.59 11,597.94
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.83 63.51 317.53

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,654.25 490.48 2,452.41

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.39 590.10 232.45 1,162.24

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.13 1,180.13 445.14 2,225.68

509a RIP RAP CLASS "A" Cu.m 956.12 102.06 1,780.13 709.58 3,547.89

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.36 1,801.89 720.96 3,604.78

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.22 1,838.63 739.28 3,696.40

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.30 1,907.88 773.05 3,865.26

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.70 4,061.86 1,347.67 6,738.34

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.99 3,919.58 1,373.80 6,868.99

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.09 3,811.93 1,394.28 6,971.38

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.89 3,836.78 1,550.69 7,753.43

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.96 8,010.77 2,583.42 12,917.10
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.31 1,554.36 499.06 2,495.31

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.62 - 352.38 1,761.90


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.52 314.04 160.81 804.05

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.73 403.81 195.01 975.05

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.74 1,252.93 386.95 1,934.76
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.70 1,568.01 476.25 2,381.26
BITUMEN JOINTS

Page 347 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.49 919.91 307.59 1,537.94
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.56 1,143.79 374.65 1,873.24
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,824.91 10,232.68 51,163.38
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,895.63 11,750.36 58,751.78
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,018.99 6,473.28 1,949.68 9,748.38
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,137.53 7,144.17 2,147.03 10,735.15
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.58 4,765.87 1,499.36 7,496.79
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.75 5,255.48 1,625.80 8,129.00
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.43 1,033.63 307.59 1,537.95
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.07 8,781.53 2,372.92 11,864.60
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.45 9,604.94 2,574.61 12,873.06
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.64 4,272.69 1,099.34 5,496.71

604b METAL GUARD RAIL END PIECES Each 288.45 143.04 3,762.52 1,048.50 5,242.50

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.42 5,212.84 1,377.41 6,887.05

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.48 30,738.12 8,782.16 43,910.79
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.48 30,644.07 8,758.65 43,793.23
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 381.92 16,036.43 4,319.32 21,596.61
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 381.92 18,080.09 4,830.24 24,151.19
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 348 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 381.92 20,186.09 5,356.74 26,783.69
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 381.92 16,639.63 4,470.12 22,350.61
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 381.92 18,883.49 5,031.09 25,155.44
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 381.92 21,200.09 5,610.24 28,051.19
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.92 20,188.73 5,352.08 26,760.41
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.92 23,815.73 6,258.83 31,294.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.92 27,351.73 7,142.83 35,714.16
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.92 21,201.43 5,605.26 28,026.29
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.92 25,191.13 6,602.68 33,013.41
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.92 27,351.73 7,142.83 35,714.16
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.53 25,579.07 6,753.82 33,769.10
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.53 27,009.07 7,111.32 35,556.60
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 349 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.53 43,775.63 11,302.96 56,514.80
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.53 46,635.63 12,017.96 60,089.80
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.14 41,084.60 10,427.46 52,137.28
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.14 36,567.25 9,284.71 46,423.55
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.67 34,935.51 8,894.06 44,470.30
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.08 36,084.09 9,195.45 45,977.25
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.14 37,084.60 9,427.46 47,137.28
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.14 32,567.25 8,284.71 41,423.55
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.67 30,935.51 7,894.06 39,470.30
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.08 32,084.09 8,195.45 40,977.25
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 350 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.79 224.96 1,124.79
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.58 220.74 130.08 650.40
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.85 687.23 321.35 1,606.75
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.58 327.81 156.85 784.24
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.48 945.95 371.94 1,859.70
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.79 366.31 129.02 645.11
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.45 998.11 294.39 1,471.95
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.79 476.11 156.47 782.36
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.73 1,373.87 381.73 1,908.64
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.84 144.03 720.13
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.71 78.26 391.31
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 351 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: PAKPATTAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.84 169.03 845.13
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.71 84.51 422.56
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.19 1,593.45 524.81 2,624.03
DRAWING

610c KILOMETER POST Each 346.14 572.14 3,402.89 1,080.29 5,401.46

610d TEN KILOMETER POST Each 692.29 1,144.28 8,933.74 2,692.58 13,462.89

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.43 2,390.19 735.77 3,678.83
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,150.61 19.00 394.91 1,974.54
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 28.45 16.38 81.91

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 94.28 32.84 164.21

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.95 9.99 49.94

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 352 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

RAHIM YAR KHAN

Page 353 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.64 - 5.34 26.71

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.56 31.41 159.34 796.70

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 863.98 141.34 271.83 1,359.15

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,739.56 753.81 721.74 3,608.69

103 STRIPPING Cu.m 9.29 273.17 - 70.62 353.08

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.41 1.76 5.44 27.21

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.07 - 79.34 396.70

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 779.93 38.86 217.34 1,086.69

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 607.62 - 161.39 806.93

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.19 - 115.39 576.96

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.07 - 79.34 396.70

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 779.93 38.86 217.34 1,086.69

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 607.62 - 161.39 806.93

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.19 - 115.39 576.96

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.07 - 76.29 381.44

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 680.85 213.03 272.03 1,360.14
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 770.47 38.86 214.97 1,074.85
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 598.03 - 159.00 795.01
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 422.68 - 113.01 565.06
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.60 1,477.22 470.57 2,352.85

107e COMMON BACK FILL Cu.m 88.46 125.47 11.70 56.41 282.04

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.24 11.70 86.84 434.19
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 965.09 38.86 266.11 1,330.55
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 778.09 11.70 208.99 1,044.96
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 594.18 11.70 161.58 807.89
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 295.64 60.15 95.44 477.19
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 164.98 11.70 50.58 252.88
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.30 11.70 65.44 327.21
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.54 3.51 21.97 109.84

Page 354 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.32 3.12 19.15 95.75
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.12 447.88 199.10 995.50

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.06 1.76 6.66 33.31

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.46 11.15 9.42 47.09

201 GRANULAR SUBBASE Cu.m 36.77 263.87 1,603.21 475.96 2,379.81

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 515.72 1,740.94 578.15 2,890.75

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 405.69 1,740.94 550.64 2,753.21

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,838.38 13,370.61 3,849.98 19,249.91

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,838.38 13,757.94 3,946.82 19,734.09

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,837.82 13,370.61 3,849.84 19,249.21
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,837.82 13,638.05 3,916.70 19,583.51
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 563.75 2,152.39 702.41 3,512.04

204c CEMENT CONTENT Ton 384.60 - 14,824.32 3,802.23 19,011.15

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,283.65 106,213.71 27,322.25 136,611.24

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,283.65 100,960.71 26,009.00 130,044.99
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 142.90 1,665.19 532.62 2,663.08
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,423.27 12,878.30 3,869.91 19,349.54
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.12 1,846.00 576.93 2,884.65
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.09 101.38 36.50 182.48

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.09 101.38 36.50 182.48

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.10 0.98 28.32 141.58

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 463.20 6.50 121.17 605.84
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.41 0.97 16.10 80.48

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 109.10 27.79 138.95

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.24 103.03 26.31 131.53
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.46 11.40 57.00

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.20 10.58 52.91
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.33 196.14 58.13 290.64

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.60 126.60 40.56 202.80

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.81 400.90 111.52 557.58

Page 355 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.90 331.36 93.91 469.53

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.46 473.39 131.49 657.44

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.49 403.71 113.83 569.14

304d SEAL COAT Sq.m 2.53 9.99 55.87 17.10 85.49

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,930.13 14,338.18 4,109.00 20,544.99
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,930.13 14,636.26 4,183.52 20,917.59
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 867.81 12,694.73 3,554.81 17,774.06

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 867.81 12,538.11 3,515.66 17,578.29

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,463.98 3,341.29 1,225.91 6,129.53
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,318.66 98,794.48 25,092.39 125,461.93

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.28 60.21 23.62 118.11

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.21 99.82 39.25 196.25

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.40 139.28 54.55 272.76

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 96.59 199.99 76.32 381.59

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 125.57 259.98 99.21 496.05

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,647.13 12,821.41 4,199.83 20,999.13
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,568.41 7,767.22 2,858.34 14,291.69

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,568.81 9,051.95 3,179.62 15,898.10

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,568.41 9,482.45 3,287.15 16,435.73

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,568.86 8,313.95 2,995.14 14,975.68

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,675.83 9,598.68 3,343.06 16,715.30

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,568.81 10,029.18 3,435.55 17,177.74

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,568.41 8,665.61 3,082.94 15,414.68

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,675.83 9,950.35 3,430.98 17,154.88

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,568.86 10,380.84 3,523.48 17,617.38

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,277.07 6,260.13 2,235.52 11,177.60

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,685.20 7,254.42 2,748.79 13,743.94

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,682.45 8,549.26 3,079.56 15,397.78

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,684.29 8,969.65 3,185.11 15,925.55

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,838.56 12,132.53 4,170.65 20,853.24

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,839.02 13,000.65 4,387.79 21,938.96

Page 356 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,839.02 13,706.57 4,564.27 22,821.36

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,681.90 9,825.81 3,151.36 15,756.80

401f LEAN CONCRETE Cu.m 919.20 1,003.35 4,820.97 1,685.88 8,429.40

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,473.23 8,783.76 3,215.68 16,078.38

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,473.23 9,844.36 3,480.83 17,404.13

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,762.97 7,321.73 2,922.60 14,613.01

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,839.02 12,193.19 4,222.32 21,111.59

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,839.02 13,061.31 4,439.35 22,196.74

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,839.02 13,767.23 4,615.83 23,079.14

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,257.86 4,771.34 1,817.39 9,086.93
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 815.91 184,694.88 47,635.37 238,176.85

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 815.91 187,616.47 48,365.77 241,828.83

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.30 215,266.11 54,974.97 274,874.86
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,774.25 360,634.98 93,659.94 468,299.69
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 994.72 - 296.76 1,483.78

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,585.68 485.09 2,425.46
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,097.47 1,084.20 5,420.98
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 252.08 70.31 351.54
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,929.63 12,448.75 62,243.73
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,429.63 11,323.75 56,618.73
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,923.95 35,447.33 177,236.63


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,915.39 29,195.19 145,975.93


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,690.04 11,138.85 55,694.24


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,596.86 9,865.55 49,327.76


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 357 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,303.87 8,792.31 43,961.53
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,499.80 6,841.29 34,206.44


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 32,338.58 8,300.98 41,504.91
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 106,494.48 26,839.96 134,199.79
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,249.26 17,514.23 87,571.15
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 987.34 299.72 1,498.59

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,268.74 370.07 1,850.34

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.04 0.78 3.88
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.54 1.40 7.00
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 484.15 141.95 709.75

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,828.69 403.83 1,170.38 5,851.89
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,124.93 518.84 1,678.00 8,389.99
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,408.05 446.95 1,336.66 6,683.31
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,042.97 626.65 1,975.68 9,878.38
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,462.44 1,039.60 2,782.59 13,912.93
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,361.61 1,039.62 4,271.42 21,357.08
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,526.92 1,572.10 4,007.40 20,036.98
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,469.02 1,572.10 6,222.25 31,111.23
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,586.73 3,875.96 1,475.28 7,376.42
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,137.26 2,985.94 1,750.02 8,750.11
SIZE) INCLUDING TESTING AND REPORTING

Page 358 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,211.00 1,130.44 2,273.80 11,369.02
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,628.88 901,950.60 255,336.97 1,276,684.85

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,630.64 1,311,944.04 361,489.57 1,807,447.85

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,630.64 1,639,973.76 443,497.00 2,217,485.00

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,630.64 1,919,945.20 513,489.86 2,567,449.30

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,630.64 2,324,902.36 614,729.15 3,073,645.75

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,630.64 2,729,902.36 715,979.15 3,579,895.75

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 134,814.64 3,134,902.36 823,775.15 4,118,875.75

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,309.39 229,568.68 59,864.94 299,324.68

410 BRICK WORK Cu.m 941.51 446.68 8,595.72 2,495.98 12,479.88

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.04 2,125.63 781.89 3,909.46

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 352.73 4,298.59 1,362.83 6,814.13

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.04 2,401.21 958.96 4,794.78

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 352.73 4,437.73 1,546.65 7,733.23
MORTAR

411g ROLL POINTING Sq.m 158.07 23.75 179.10 90.23 451.15

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.33 4,437.73 1,694.66 8,473.28
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,231.33 1,328.38 717.57 3,587.85
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,245.26 1,706.43 818.21 4,091.04
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,261.96 2,726.89 1,127.50 5,637.49
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,272.95 4,184.38 1,509.87 7,549.35
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,244.09 6,639.93 2,132.71 10,663.55
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,301.12 9,929.80 2,994.57 14,972.84
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,469.53 10,805.81 3,285.46 16,427.28
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,665.05 13,153.77 3,967.75 19,838.73
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,956.55 25,811.30 7,280.89 36,404.46
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,231.33 1,844.98 846.72 4,233.60
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,245.26 2,280.43 961.71 4,808.54
DIA 380 mm

Page 359 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,261.96 3,054.89 1,209.50 6,047.49
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,272.95 4,840.38 1,673.87 8,369.35
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,244.09 8,279.93 2,542.71 12,713.55
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,301.12 12,799.80 3,712.07 18,560.34
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,469.53 14,905.81 4,310.46 21,552.28
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,665.05 17,683.36 5,100.14 25,500.71
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,956.55 31,674.27 8,746.64 43,733.18
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.77 1,442.53 494.03 2,470.14
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 997.03 6,260.13 2,210.38 11,051.90
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 241.44 64.41 322.04

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,430.98 434.67 2,173.33

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.34 596.90 234.14 1,170.68

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 22.95 1,193.71 448.49 2,242.45

509a RIP RAP CLASS "A" Cu.m 956.12 101.33 1,553.78 652.81 3,264.05

509b RIP RAP CLASS "B" Cu.m 1,017.58 63.69 1,586.52 666.95 3,334.73

509c RIP RAP CLASS "C" Cu.m 1,067.27 50.67 1,632.58 687.63 3,438.14

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.13 1,721.48 726.16 3,630.79

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 170.19 3,956.67 1,320.75 6,603.73

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 132.54 3,819.45 1,348.15 6,740.75

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 108.05 3,713.01 1,369.04 6,845.18

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 706.55 3,750.28 1,527.98 7,639.90

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 788.22 7,552.69 2,467.96 12,339.81
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 278.86 1,441.92 470.84 2,354.20

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.25 - 352.29 1,761.44


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.44 274.10 150.81 754.04

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.64 352.47 182.15 910.75

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.63 1,197.72 373.12 1,865.61
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.58 1,497.97 458.72 2,293.58
BITUMEN JOINTS

Page 360 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.35 853.29 290.90 1,454.49
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.40 1,059.85 353.62 1,768.11
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 40,013.19 10,279.75 51,398.74
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,112.01 11,804.45 59,022.26
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,010.71 6,300.56 1,904.42 9,522.11
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,128.13 6,953.78 2,097.08 10,485.40
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,100.31 4,586.33 1,453.40 7,267.01
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,116.75 5,056.77 1,575.12 7,875.61
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.30 993.32 297.48 1,487.41
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 495.94 8,609.11 2,329.53 11,647.66
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.34 9,413.82 2,526.56 12,632.79
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.60 4,340.43 1,116.27 5,581.34

604b METAL GUARD RAIL END PIECES Each 288.45 142.88 3,804.98 1,059.08 5,295.38

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 130.86 5,297.06 1,398.33 6,991.63

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 489.30 30,291.49 8,669.20 43,346.01
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 489.30 30,194.16 8,644.87 43,224.35
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 373.57 16,232.60 4,366.28 21,831.39
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 373.57 18,320.30 4,888.20 24,441.01
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 361 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 373.57 20,426.30 5,414.70 27,073.51
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 373.57 16,830.73 4,515.81 22,579.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 373.57 19,123.70 5,089.05 25,445.26
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 373.57 21,440.30 5,668.20 28,341.01
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 269.53 20,428.83 5,411.76 27,058.80
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 269.53 24,055.83 6,318.51 31,592.55
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 269.53 27,591.83 7,202.51 36,012.55
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 269.53 21,441.53 5,664.94 28,324.68
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 269.53 25,431.23 6,662.36 33,311.80
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 269.53 27,591.83 7,202.51 36,012.55
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 484.22 25,760.49 6,798.35 33,991.75
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 484.22 27,190.49 7,155.85 35,779.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 362 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 484.22 43,988.63 11,355.39 56,776.93
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 484.22 46,848.63 12,070.39 60,351.93
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 288.94 41,161.29 10,446.08 52,230.39
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.21 36,526.23 9,274.22 46,371.11
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 166.72 34,826.52 8,866.58 44,332.88
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.08 35,962.68 9,164.85 45,824.23
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 288.94 37,161.29 9,446.08 47,230.39
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.21 32,526.23 8,274.22 41,371.11
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 166.72 30,826.52 7,866.58 39,332.88
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.08 31,962.68 8,164.85 40,824.23
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 363 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 871.59 225.66 1,128.29
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.60


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.03 93.50 25.56 127.78


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.36 114.69 30.69 153.43


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.38 220.74 130.03 650.15
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 362.92 687.23 320.87 1,604.34
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.98 39.03 11.91 59.53
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.44 135.22 36.32 181.60
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.98 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.44 165.77 43.96 219.78
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.38 327.81 156.80 783.99
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.01 945.95 371.57 1,857.85
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.69 366.31 129.00 644.99
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 108.88 998.11 294.25 1,471.24
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.69 476.11 156.45 782.24
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.32 1,373.87 381.63 1,908.13
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.86 503.49 144.43 722.16
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 280.21 78.39 391.93
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 364 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAHIM YAR KHAN

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.86 603.49 169.43 847.16
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 305.21 84.64 423.18
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 234.64 1,556.77 515.00 2,574.99
DRAWING

610c KILOMETER POST Each 346.14 571.51 3,324.79 1,060.61 5,303.05

610d TEN KILOMETER POST Each 692.29 1,143.02 8,762.61 2,649.48 13,247.40

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.30 2,466.52 754.82 3,774.09
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,144.85 25.00 394.97 1,974.83
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.56 28.44 16.35 81.76

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.56 94.28 32.81 164.06

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.87 9.97 49.84

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.90 3.00 4.17 20.83
PER ADDITIONAL MONTH

Page 365 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

RAJANPUR

Page 366 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.65 - 5.35 26.73

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.42 31.43 159.31 796.55

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 863.70 141.40 271.78 1,358.88

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,739.29 754.12 721.75 3,608.74

103 STRIPPING Cu.m 9.29 273.24 - 70.64 353.18

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.42 1.76 5.45 27.23

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.20 - 79.37 396.86

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 780.54 38.79 217.47 1,087.36

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 607.90 - 161.46 807.28

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 432.60 - 115.49 577.46

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.20 - 79.37 396.86

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 780.54 38.79 217.47 1,087.36

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 607.90 - 161.46 807.28

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 432.60 - 115.49 577.46

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.50 - 76.39 381.96

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 681.18 212.76 272.04 1,360.20
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 771.08 38.79 215.11 1,075.54
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 598.30 - 159.07 795.35
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 423.08 - 113.11 565.56
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 291.69 1,658.52 515.92 2,579.59

107e COMMON BACK FILL Cu.m 88.46 125.53 11.70 56.42 282.11

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 309.44 11.70 86.89 434.44
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 966.66 38.79 266.49 1,332.44
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 778.78 11.70 209.17 1,045.83
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 594.64 11.70 161.69 808.46
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 295.79 60.15 95.48 477.38
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.04 11.70 50.59 252.95
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 205.37 11.70 65.46 327.30
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.60 3.51 21.98 109.91

Page 367 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.34 3.12 19.16 95.79
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 325.29 478.15 206.71 1,033.55

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.06 1.76 6.67 33.33

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.47 11.15 9.42 47.10

201 GRANULAR SUBBASE Cu.m 36.77 264.00 1,722.46 505.81 2,529.04

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 515.92 1,860.18 608.01 3,040.05

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 405.87 1,860.18 580.50 2,902.49

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,839.40 13,543.11 3,893.36 19,466.81

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,839.40 13,931.54 3,990.47 19,952.36

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,838.84 13,543.11 3,893.22 19,466.11
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,838.84 13,811.28 3,960.27 19,801.33
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 564.31 2,297.04 738.71 3,693.55

204c CEMENT CONTENT Ton 384.60 - 14,608.02 3,748.16 18,740.78

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,284.64 106,582.71 27,414.75 137,073.74

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,284.64 101,329.71 26,101.50 130,507.49
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 142.99 1,784.94 562.58 2,812.89
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,424.48 13,029.96 3,908.13 19,540.63
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.17 1,965.62 606.85 3,034.24
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.11 108.26 38.22 191.10

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.11 108.26 38.22 191.10

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.15 0.98 28.33 141.63

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 463.95 6.50 121.36 606.79
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.44 0.97 16.10 80.51

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.08 109.47 27.88 139.41

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 103.40 26.40 131.99
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 44.61 11.44 57.18

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.35 10.62 53.10
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.35 197.57 58.49 292.45

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.62 127.80 40.87 204.33

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.83 404.50 112.42 562.10

Page 368 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 40.92 334.73 94.75 473.75

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.51 477.64 132.56 662.81

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.53 407.73 114.84 574.20

304d SEAL COAT Sq.m 2.53 10.00 56.30 17.21 86.03

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,931.22 14,513.60 4,153.13 20,765.63
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,931.22 14,812.78 4,227.92 21,139.60
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 868.27 12,866.41 3,597.85 17,989.25

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 868.27 12,709.24 3,558.56 17,792.79

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,464.44 3,341.90 1,226.17 6,130.86
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,319.02 99,168.33 25,185.94 125,929.68

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.29 60.23 23.63 118.16

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.23 99.85 39.27 196.33

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.44 139.32 54.57 272.86

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 96.63 200.05 76.34 381.70

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 125.62 260.06 99.24 496.21

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,648.57 12,802.84 4,195.54 20,977.71
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,572.72 7,787.67 2,864.53 14,322.65

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,573.12 9,070.33 3,185.30 15,926.48

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,572.72 9,499.34 3,292.45 16,462.24

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,573.18 8,324.71 2,998.91 14,994.53

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,679.54 9,607.37 3,346.16 16,730.79

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,573.12 10,036.38 3,438.43 17,192.13

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,572.72 8,671.22 3,085.42 15,427.09

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,679.54 9,953.88 3,432.79 17,163.93

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,573.18 10,382.89 3,525.07 17,625.34

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,278.20 6,288.06 2,242.79 11,213.93

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,692.03 7,280.63 2,757.05 13,785.24

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,689.27 8,573.34 3,087.28 15,436.41

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,691.11 8,992.30 3,192.48 15,962.40

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,843.01 12,114.08 4,167.15 20,835.74

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,843.47 12,971.30 4,381.57 21,907.84

Page 369 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,843.47 13,666.92 4,555.47 22,777.36

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,685.51 9,835.32 3,154.64 15,773.19

401f LEAN CONCRETE Cu.m 919.20 1,005.46 4,865.81 1,697.62 8,488.09

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,474.77 8,800.78 3,220.32 16,101.58

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,474.77 9,845.93 3,481.60 17,408.01

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,765.02 7,333.44 2,926.05 14,630.23

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,843.47 12,174.45 4,218.75 21,093.73

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,843.47 13,031.67 4,433.05 22,165.25

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,843.47 13,727.29 4,606.96 23,034.78

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,258.77 4,821.72 1,830.21 9,151.04
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 815.98 184,374.73 47,555.35 237,776.74

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 815.98 187,894.86 48,435.38 242,176.89

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,852.46 215,049.99 54,920.98 274,604.91
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,775.80 359,900.71 93,476.76 467,383.79
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 997.12 - 297.36 1,486.78

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,583.68 484.59 2,422.96
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,091.40 1,082.68 5,413.39
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 251.54 70.17 350.85
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,837.62 12,425.74 62,128.71
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,337.62 11,300.74 56,503.71
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,702.85 35,392.05 176,960.25


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,697.36 29,140.68 145,703.39


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,630.30 11,123.91 55,619.56


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,542.66 9,852.00 49,260.01


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 370 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 34,214.20 8,769.89 43,849.44
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,448.96 6,828.58 34,142.89


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 32,221.08 8,271.61 41,358.04
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 106,243.23 26,777.15 133,885.73
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,204.52 17,503.05 87,515.23
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 985.14 299.17 1,495.85

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,266.54 369.52 1,847.60

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.68 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 482.16 141.45 707.26

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,838.62 406.27 1,173.47 5,867.34
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,132.60 519.44 1,680.06 8,400.31
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,419.62 448.70 1,339.99 6,699.95
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,052.22 625.51 1,977.70 9,888.51
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,469.42 1,032.39 2,782.53 13,912.64
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,383.28 1,032.42 4,275.03 21,375.16
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,536.90 1,556.47 4,005.99 20,029.93
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,501.05 1,556.47 6,226.35 31,131.73
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,588.35 3,839.23 1,466.51 7,332.53
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,140.45 2,949.22 1,741.64 8,708.19
SIZE) INCLUDING TESTING AND REPORTING

Page 371 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,217.32 1,093.72 2,266.20 11,331.01
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,682.48 902,962.20 255,603.27 1,278,016.35

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,691.68 1,313,415.48 361,872.69 1,809,363.45

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,691.68 1,641,813.12 443,972.10 2,219,860.50

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,691.68 1,922,152.40 514,056.92 2,570,284.60

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,691.68 2,327,661.32 615,434.15 3,077,170.75

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,691.68 2,732,661.32 716,684.15 3,583,420.75

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 134,891.28 3,137,661.32 824,484.05 4,122,420.25

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,313.04 229,637.79 59,883.12 299,415.61

410 BRICK WORK Cu.m 941.51 446.98 8,654.77 2,510.82 12,554.08

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.09 2,238.50 810.12 4,050.60

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 352.88 4,409.42 1,390.57 6,952.85

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.09 2,523.24 989.48 4,947.39

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 352.88 4,548.56 1,574.39 7,871.94
MORTAR

411g ROLL POINTING Sq.m 158.07 23.77 178.54 90.10 450.48

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 531.51 4,548.56 1,722.41 8,612.04
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,231.90 1,286.84 707.33 3,536.64
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,245.83 1,648.48 803.86 4,019.31
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,262.55 2,646.44 1,107.53 5,537.65
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,273.54 4,039.75 1,473.86 7,369.29
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,244.68 6,479.47 2,092.75 10,463.73
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,301.74 9,723.28 2,943.09 14,715.46
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,470.22 10,598.89 3,233.90 16,169.50
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,665.84 12,865.17 3,895.79 19,478.96
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,957.46 25,329.24 7,160.61 35,803.03
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,231.90 1,803.44 836.48 4,182.39
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,245.83 2,222.48 947.36 4,736.81
DIA 380 mm

Page 372 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,262.55 2,974.44 1,189.53 5,947.65
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,273.54 4,695.75 1,637.86 8,189.29
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,244.68 8,119.47 2,502.75 12,513.73
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,301.74 12,593.28 3,660.59 18,302.96
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,470.22 14,698.89 4,258.90 21,294.50
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,665.84 17,394.48 5,028.12 25,140.60
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,957.46 31,192.21 8,626.35 43,131.75
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 220.84 1,611.58 536.31 2,681.54
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 997.82 6,288.06 2,217.56 11,087.81
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 240.92 64.28 321.38

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,537.99 461.42 2,307.09

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.35 602.44 235.52 1,177.61

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.04 1,204.77 451.28 2,256.38

509a RIP RAP CLASS "A" Cu.m 956.12 101.94 1,667.53 681.40 3,406.99

509b RIP RAP CLASS "B" Cu.m 1,017.58 63.71 1,700.25 695.38 3,476.91

509c RIP RAP CLASS "C" Cu.m 1,067.27 50.68 1,747.24 716.30 3,581.49

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 526.25 1,837.67 755.24 3,776.19

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 170.86 3,998.02 1,331.25 6,656.25

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 132.63 3,861.85 1,358.77 6,793.86

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 108.12 3,758.61 1,380.45 6,902.26

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 708.28 3,795.89 1,539.81 7,699.06

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 788.92 7,561.82 2,470.42 12,352.10
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 278.94 1,609.98 512.88 2,564.38

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.32 - 352.31 1,761.53


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.45 294.17 155.83 779.14

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.66 378.27 188.61 943.03

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.65 1,211.72 376.63 1,883.15
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.60 1,516.33 463.31 2,316.55
BITUMEN JOINTS

Page 373 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.38 872.80 295.78 1,478.91
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.43 1,084.98 359.91 1,799.55
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,982.64 10,272.11 51,360.55
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 46,077.33 11,795.78 58,978.91
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,012.25 6,311.80 1,907.62 9,538.09
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,129.88 6,966.17 2,100.62 10,503.10
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,101.77 4,589.50 1,454.56 7,272.80
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,117.28 5,060.31 1,576.14 7,880.70
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.32 995.81 298.11 1,490.55
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.15 8,621.52 2,332.69 11,663.44
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 479.55 9,427.38 2,530.00 12,650.00
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.61 4,330.50 1,113.79 5,568.94

604b METAL GUARD RAIL END PIECES Each 288.45 142.91 3,798.75 1,057.53 5,287.63

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 130.96 5,284.70 1,395.26 6,976.30

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 489.96 30,341.76 8,681.94 43,409.68
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 489.96 30,244.91 8,657.72 43,288.61
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 374.80 16,191.52 4,356.32 21,781.59
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 374.80 18,279.12 4,878.22 24,391.09
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 374 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 374.80 20,385.12 5,404.72 27,023.59
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 374.80 16,789.65 4,505.85 22,529.25
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 374.80 19,082.52 5,079.07 25,395.34
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 374.80 21,399.12 5,658.22 28,291.09
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 269.79 20,387.42 5,401.47 27,007.36
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 269.79 24,014.42 6,308.22 31,541.11
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 269.79 27,550.42 7,192.22 35,961.11
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 269.79 21,400.12 5,654.65 28,273.24
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 269.79 25,389.82 6,652.07 33,260.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 269.79 27,550.42 7,192.22 35,961.11
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 485.48 25,720.99 6,788.79 33,943.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 485.48 27,150.99 7,146.29 35,731.45
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 375 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 485.48 43,944.50 11,344.67 56,723.34
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 485.48 46,804.50 12,059.67 60,298.34
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 289.45 41,141.24 10,441.19 52,205.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.34 36,517.96 9,272.19 46,360.94
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 166.85 34,827.92 8,866.96 44,334.79
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.22 35,965.67 9,165.63 45,828.14
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 289.45 37,141.24 9,441.19 47,205.95
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 162.34 32,517.96 8,272.19 41,360.94
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 166.85 30,827.92 7,866.96 39,334.79
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.22 31,965.67 8,165.63 40,828.14
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 376 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 871.18 225.55 1,127.76
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.60


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.03 93.50 25.56 127.78


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.36 114.69 30.69 153.43


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.42 220.74 130.04 650.20
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 363.28 687.23 320.96 1,604.80
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.45 135.22 36.32 181.61
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.45 165.77 43.96 219.79
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.42 327.81 156.81 784.03
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 307.29 945.95 371.64 1,858.20
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.71 366.31 129.00 645.01
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 108.98 998.11 294.28 1,471.38
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.71 476.11 156.45 782.26
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.40 1,373.87 381.65 1,908.23
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.86 503.25 144.37 721.86
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 280.14 78.37 391.85
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 377 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAJANPUR

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.86 603.25 169.37 846.86
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 305.14 84.62 423.10
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 234.92 1,556.93 515.11 2,575.55
DRAWING

610c KILOMETER POST Each 346.14 571.62 3,328.36 1,061.53 5,307.66

610d TEN KILOMETER POST Each 692.29 1,143.25 8,764.38 2,649.98 13,249.89

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.32 2,447.04 749.95 3,749.76
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,145.93 19.00 393.74 1,968.68
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.58 28.46 16.37 81.83

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.58 94.31 32.83 164.13

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.62 33.89 9.97 49.85

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.91 3.00 4.17 20.84
PER ADDITIONAL MONTH

Page 378 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

RAWALPINDI

Page 379 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 2.25 19.72 - 5.49 27.46

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 57.71 565.39 31.65 163.69 818.43

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 106.60 871.14 142.39 280.03 1,400.16

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 511.67 1,765.63 759.43 759.18 3,795.90

103 STRIPPING Cu.m 12.08 273.88 - 71.49 357.46

104 COMPACTION OF NATURAL GROUND Sq.m 2.09 18.54 1.76 5.60 27.99

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 18.57 304.63 - 80.80 404.01

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 65.73 786.09 38.05 222.47 1,112.34

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 49.30 612.34 - 165.41 827.05

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 38.19 435.63 - 118.46 592.28

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 18.57 304.63 - 80.80 404.01

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 65.73 786.09 38.05 222.47 1,112.34

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 49.30 612.34 - 165.41 827.05

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 38.19 435.63 - 118.46 592.28

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 36.50 279.25 - 78.94 394.69

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 252.50 687.99 208.49 287.25 1,436.24
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 65.73 776.60 38.05 220.10 1,100.49
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 49.38 602.72 - 163.03 815.13
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 38.19 426.09 - 116.07 580.35
MATERIAL

107d GRANULAR BACKFILL Cu.m 147.50 292.73 1,324.96 441.30 2,206.50

107e COMMON BACK FILL Cu.m 115.00 126.50 11.70 63.30 316.50

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 34.33 311.14 11.70 89.30 446.48
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 78.65 972.39 38.05 272.27 1,361.36
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.04 784.82 11.70 214.14 1,070.70
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 52.56 598.78 11.70 165.76 828.81
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 33.75 297.53 60.13 97.85 489.25
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 33.31 166.05 11.70 52.77 263.83
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 58.20 206.44 11.70 69.09 345.43
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 6.27 80.06 3.51 22.46 112.30

Page 380 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 4.12 70.69 3.12 19.48 97.40
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 30.41 327.66 387.26 186.33 931.66

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.69 22.20 1.76 6.91 34.56

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 5.28 22.61 11.22 9.78 48.89

201 GRANULAR SUBBASE Cu.m 47.80 265.44 1,364.44 419.42 2,097.10

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 72.73 518.49 1,594.00 546.30 2,731.51

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 72.73 408.21 1,594.00 518.74 2,593.68

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 248.24 1,851.65 13,438.29 3,884.54 19,422.71

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 248.24 1,851.65 13,850.19 3,987.52 19,937.59

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,851.08 13,438.29 3,884.40 19,422.01
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,851.08 13,726.13 3,956.36 19,781.81
"B")

204b CEMENT STABILIZED BASE Cu.m 121.54 568.10 1,947.55 659.30 3,296.49

204c CEMENT CONTENT Ton 500.00 - 13,965.00 3,616.25 18,081.25

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 1,029.17 2,293.51 109,450.79 28,193.37 140,966.84

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 1,029.17 2,293.51 104,869.15 27,047.96 135,239.79
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 419.10 144.38 1,227.04 447.63 2,238.15
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 231.48 2,440.07 12,956.43 3,907.00 19,534.98
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 461.00 107.66 1,710.42 569.77 2,848.85
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 7.17 39.31 92.90 34.85 174.23

207b DEEP PATCHING (15-30 cm) Sq.m 7.17 39.31 92.90 34.85 174.23

208 REINSTATEMENT OF ROAD SURFACE Sq.m 8.03 106.96 0.98 28.99 144.96

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 19.47 466.77 6.50 123.19 615.93
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.89 60.82 0.97 16.42 82.11

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.27 1.10 113.01 28.85 144.23

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.23 1.27 106.94 27.36 136.80
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.51 0.75 46.03 11.82 59.11

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.51 0.75 42.76 11.01 55.03
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.66 34.57 201.70 59.73 298.66

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.66 33.83 129.67 41.54 207.70

304bi DOUBLE SURFACE TREATMENT Sq.m 4.36 42.07 410.85 114.32 571.60

Page 381 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 4.36 41.15 338.82 96.08 480.41

304ci TRIPLE SURFACE TREATMENT Sq.m 7.94 46.77 485.43 135.03 675.16

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 7.94 45.78 413.26 116.75 583.73

304d SEAL COAT Sq.m 3.29 10.09 57.42 17.70 88.50

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,943.43 14,445.22 4,151.66 20,758.31
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,943.43 14,749.20 4,227.66 21,138.28
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 853.75 872.96 12,755.27 3,620.50 18,102.48

307b OPEN GRADED HOT BIT-MAC Cu.m 853.75 872.96 12,607.21 3,583.48 17,917.41

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 127.85 1,468.98 3,347.28 1,236.03 6,180.14
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 333.33 1,331.16 102,208.08 25,968.14 129,840.71

309a COLD MILLING, 0 - 30 mm Sq.m 2.61 32.47 60.39 23.87 119.33

309b COLD MILLING, 0 - 50 mm Sq.m 5.18 53.52 100.11 39.70 198.51

309c COLD MILLING, 0 - 70 mm Sq.m 9.78 72.27 139.69 55.44 277.19

309d COLD MILLING, 0 - 100 mm Sq.m 11.29 97.74 200.58 77.40 387.01

309e COLD MILLING, 0 - 130 mm Sq.m 14.68 127.06 260.76 100.63 503.13

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 430.00 3,663.91 12,094.33 4,047.06 20,235.30
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,427.08 2,615.45 7,203.60 2,811.53 14,057.66

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,427.08 2,615.86 8,455.44 3,124.60 15,622.98

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,427.08 2,615.45 8,868.72 3,227.81 16,139.06

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,427.08 2,615.91 7,717.61 2,940.15 14,700.75

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,427.08 2,722.50 8,969.45 3,279.76 16,398.79

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,487.50 2,615.86 9,382.73 3,371.52 16,857.60

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,427.08 2,615.45 8,048.30 3,022.71 15,113.55

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,427.08 2,722.50 9,300.15 3,362.43 16,812.16

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,487.50 2,615.91 9,713.42 3,454.21 17,271.05

401b CONCRETE CLASS "B" Cu.m 1,826.39 1,300.59 5,787.72 2,228.68 11,143.38

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,372.22 2,727.40 6,719.21 2,704.71 13,523.54

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,412.50 2,726.47 7,980.53 3,029.88 15,149.38

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,412.50 2,726.47 8,384.33 3,130.83 15,654.13

401di CONCRETE CLASS "D1" Cu.m 2,225.00 2,884.74 11,380.90 4,122.66 20,613.30

401dii CONCRETE CLASS "D2" Cu.m 2,225.00 2,885.20 12,201.08 4,327.82 21,639.10

Page 382 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 2,225.00 2,885.20 12,866.08 4,494.07 22,470.35

401e CONCRETE CLASS "Y" Cu.m 1,427.08 1,705.80 9,186.14 3,079.76 15,398.78

401f LEAN CONCRETE Cu.m 1,195.00 1,027.09 4,427.13 1,662.31 8,311.53

401gi PRECAST CONCRETE CLASS "A1" Cu.m 3,387.50 1,501.07 8,198.05 3,271.66 16,358.29

401gii PRECAST CONCRETE CLASS "A3" Cu.m 3,387.50 1,501.07 9,197.94 3,521.63 17,608.15

401giii PRECAST CONCRETE CLASS "B" Cu.m 3,387.50 1,791.46 6,838.89 3,004.47 15,022.33

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,414.24 2,885.20 11,437.80 4,184.31 20,921.55

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,414.24 2,885.20 12,257.98 4,389.36 21,946.78

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,414.24 2,885.20 12,922.98 4,555.61 22,778.03

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,612.50 1,275.10 4,276.99 1,791.15 8,955.74
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 6,540.00 816.52 182,570.00 47,481.63 237,408.15

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 6,540.00 816.52 186,770.00 48,531.63 242,658.15

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,616.00 1,854.06 213,594.58 54,766.16 273,830.80
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 8,100.00 7,789.60 358,150.33 93,509.98 467,549.91
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 250.00 1,020.97 - 317.74 1,588.71

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 461.11 - 1,577.75 509.72 2,548.58
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 311.11 - 4,070.09 1,095.30 5,476.51
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 32.46 4.19 245.21 70.47 352.33
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 48,596.52 12,430.38 62,151.90
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 44,096.52 11,305.38 56,526.90
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 140,197.81 35,330.70 176,653.51


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 115,226.01 29,087.75 145,438.76


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 43,397.64 11,130.66 55,653.30


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 38,370.64 9,873.91 49,369.55


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 383 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 1,125.00 - 33,995.28 8,780.07 43,900.35
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 1,125.00 - 26,311.02 6,859.01 34,295.03


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 1,125.00 - 31,681.09 8,201.52 41,007.61
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 1,125.00 - 105,383.81 26,627.20 133,136.01
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 1,050.00 - 68,704.30 17,438.58 87,192.88
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 275.00 - 976.87 312.97 1,564.84

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 275.00 - 1,258.27 383.32 1,916.59

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 1.67 0.44 2.18
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 3.01 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 5.51 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 108.75 - 457.68 141.61 708.04

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 583.70 3,926.84 256.16 1,191.67 5,958.36
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,388.71 5,200.70 362.10 1,737.88 8,689.39
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 639.16 4,522.37 295.88 1,364.35 6,821.75
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,603.04 6,134.33 461.39 2,049.69 10,248.45
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 816.82 9,531.43 843.72 2,798.00 13,989.98
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,489.88 13,575.76 843.75 4,477.35 22,386.74
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,209.77 13,625.70 1,334.62 4,042.52 20,212.61
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 5,002.39 19,785.57 1,334.62 6,530.65 32,653.23
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 570.00 1,602.78 3,668.61 1,460.35 7,301.74
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 1,140.00 3,169.01 2,778.59 1,771.90 8,859.50
SIZE) INCLUDING TESTING AND REPORTING

Page 384 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 2,280.00 6,273.92 923.09 2,369.25 11,846.26
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 27,000.00 99,157.52 914,722.05 260,219.89 1,301,099.46

407t PILE LOAD TEST UPTO 800 TON Each 33,000.00 109,232.56 1,330,520.97 368,188.38 1,840,941.91

407u PILE LOAD TEST UPTO 1000 TON Each 33,000.00 109,232.56 1,663,195.68 451,357.06 2,256,785.30

407v PILE LOAD TEST UPTO 1200 TON Each 33,000.00 109,232.56 1,947,811.10 522,510.92 2,612,554.58

407w PILE LOAD TEST UPTO 1500 TON Each 33,000.00 109,232.56 2,359,734.23 625,491.70 3,127,458.49

407x PILE LOAD TEST UPTO 2000 TON Each 33,000.00 109,232.56 2,764,734.23 726,741.70 3,633,708.49

407y PILE LOAD TEST UPTO 2500 TON Each 33,000.00 135,569.44 3,169,734.23 834,575.92 4,172,879.59

407l PERMANENT PILE CASING FOR PILES Ton 2,056.25 8,345.46 227,825.37 59,556.77 297,783.85

410 BRICK WORK Cu.m 1,224.00 449.65 8,465.98 2,534.91 12,674.54

411a STONE MASONRY RANDOM DRY Cu.m 977.50 250.55 1,467.75 673.95 3,369.75

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 1,040.00 354.20 3,435.95 1,207.54 6,037.68

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,540.00 250.55 1,652.30 860.71 4,303.56

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,815.00 354.20 3,537.92 1,426.78 7,133.90
MORTAR

411g ROLL POINTING Sq.m 205.50 23.97 169.63 99.77 498.86

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,352.50 533.16 3,537.92 1,605.90 8,029.48
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 403.75 1,240.34 1,090.22 683.58 3,417.90
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 417.50 1,251.53 1,374.01 760.76 3,803.79
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 677.50 1,268.30 2,265.93 1,052.93 5,264.66
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 756.82 1,279.27 3,355.59 1,347.92 6,739.60
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 840.91 1,250.50 5,719.21 1,952.66 9,763.28
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 971.59 1,311.06 8,744.58 2,756.81 13,784.04
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,126.47 1,477.11 9,617.26 3,055.21 15,276.06
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,367.86 1,672.85 11,498.07 3,634.70 18,173.48
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,762.50 1,965.60 23,048.27 6,694.09 33,470.46
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 403.75 1,240.34 1,606.82 812.73 4,063.65
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 417.50 1,251.53 1,948.01 904.26 4,521.29
DIA 380 mm

Page 385 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 677.50 1,268.30 2,593.93 1,134.93 5,674.66
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 756.82 1,279.27 4,011.59 1,511.92 7,559.60
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 840.91 1,250.50 7,359.21 2,362.66 11,813.28
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 971.59 1,311.06 11,614.58 3,474.31 17,371.54
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,126.47 1,477.11 13,717.26 4,080.21 20,401.06
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,367.86 1,672.85 16,026.52 4,766.81 23,834.04
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,762.50 1,965.60 28,911.24 8,159.84 40,799.19
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 406.67 221.47 1,286.69 478.71 2,393.54
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 2,059.72 1,011.85 5,787.72 2,214.83 11,074.13
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 21.04 - 238.91 64.99 324.94

507b ROCK FILL IN GABIONS Cu.m 400.00 - 845.53 311.38 1,556.91

508a BRICK PAVING (SINGLE COURSE) Sq.m 425.50 12.44 595.06 258.25 1,291.24

508b BRICK PAVING (DOUBLE COURSE) Sq.m 750.50 23.21 1,190.03 490.94 2,454.68

509a RIP RAP CLASS "A" Cu.m 1,243.00 102.76 922.76 567.13 2,835.65

509b RIP RAP CLASS "B" Cu.m 1,322.89 65.02 946.78 583.67 2,918.36

509c RIP RAP CLASS "C" Cu.m 1,387.50 51.77 978.76 604.51 3,022.54

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 854.17 529.89 1,041.02 606.27 3,031.35

509d GROUTED RIP RAP CLASS "A" Cu.m 1,503.00 175.14 3,322.80 1,250.24 6,251.18

509e GROUTED RIP RAP CLASS "B" Cu.m 1,872.85 137.39 3,195.17 1,301.35 6,506.76

509f GROUTED RIP RAP CLASS "C" Cu.m 2,151.67 112.08 3,086.04 1,337.45 6,687.23

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 2,151.67 715.06 3,113.36 1,495.02 7,475.11

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,990.28 795.12 6,998.55 2,445.99 12,229.94
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 211.36 279.69 1,284.42 443.87 2,219.34

510 DISMANTLING OF STRUCTURE AND Cu.m 717.50 857.92 - 393.86 1,969.28


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 335.00 71.58 162.79 142.34 711.71

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 382.86 81.81 209.32 168.50 842.49

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 320.00 48.82 1,093.44 365.57 1,827.83
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 365.71 55.80 1,364.74 446.56 2,232.81
BITUMEN JOINTS

Page 386 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 293.75 84.62 686.51 266.22 1,331.09
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 335.71 96.70 848.97 320.35 1,601.74
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 39,715.64 10,234.79 51,173.93
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 45,758.75 11,745.57 58,727.83
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,026.00 6,060.43 1,871.20 9,355.98
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,145.48 6,689.02 2,058.22 10,291.08
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,107.88 4,349.71 1,405.67 7,028.33
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,124.40 4,795.58 1,521.27 7,606.33
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 107.00 114.54 1,005.11 306.66 1,533.30
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 498.03 8,705.17 2,370.05 11,850.25
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 482.50 9,519.83 2,569.83 12,849.15
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 36.25 - 117.12 38.34 191.71

604a METAL GUARD RAIL M 113.16 37.68 4,251.41 1,100.56 5,502.80

604b METAL GUARD RAIL END PIECES Each 375.00 143.17 3,770.80 1,072.24 5,361.21

604d STEEL POST FOR METAL GUARD RAIL Each 215.00 131.90 5,178.35 1,381.31 6,906.56

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 5,065.00 497.47 29,593.41 8,788.97 43,944.85
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 5,065.00 497.47 29,502.11 8,766.15 43,830.73
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 1,116.67 387.42 15,630.50 4,283.65 21,418.23
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 1,116.67 387.42 17,691.20 4,798.82 23,994.10
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 387 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 1,116.67 387.42 19,810.20 5,328.57 26,642.85
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 1,116.67 387.42 16,228.63 4,433.18 22,165.89
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 1,116.67 387.42 18,493.30 4,999.35 24,996.73
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 1,116.67 387.42 20,824.20 5,582.07 27,910.35
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,233.33 272.09 19,818.33 5,330.94 26,654.69
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,233.33 272.09 23,438.83 6,236.06 31,180.31
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,233.33 272.09 26,974.83 7,120.06 35,600.31
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,233.33 272.09 20,831.68 5,584.28 27,921.38
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,233.33 272.09 24,814.23 6,579.91 32,899.56
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,233.33 272.09 27,142.84 7,162.07 35,810.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,233.33 490.45 25,041.72 6,691.38 33,456.88
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,233.33 490.45 26,471.72 7,048.88 35,244.38
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 388 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,233.33 490.45 43,211.72 11,233.88 56,169.38
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,233.33 490.45 46,071.72 11,948.88 59,744.38
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 434.31 292.65 40,762.53 10,372.37 51,861.86
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.73 36,183.22 9,219.49 46,097.44
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 168.27 34,595.28 8,844.64 44,223.19
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.70 35,750.05 9,151.52 45,757.60
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 434.31 292.65 36,762.53 9,372.37 46,861.86
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.73 32,183.22 8,219.49 41,097.44
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 168.27 30,595.28 7,844.64 39,223.19
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.70 31,750.05 8,151.52 40,757.60
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 565.00 - 4,680.00 1,311.25 6,556.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 565.00 - 3,960.00 1,131.25 5,656.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 389 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 565.00 - 7,020.00 1,896.25 9,481.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 565.00 - 5,940.00 1,626.25 8,131.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 21.17 14.77 869.18 226.28 1,131.40
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.58 30.03 9.60 48.00


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 5.08 93.50 25.85 129.23


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.58 36.03 11.10 55.51


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 4.40 114.69 30.97 154.86


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 182.00 159.75 220.74 140.62 703.11
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 303.33 366.47 687.23 339.26 1,696.29
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 39.03 12.26 61.28
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.50 135.22 36.68 183.40
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 46.83 14.21 71.03
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.50 165.77 44.32 221.58
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 182.00 159.75 327.81 167.39 836.95
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 303.33 309.73 945.95 389.75 1,948.76
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 91.00 79.87 366.31 134.30 671.48
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 91.00 109.94 998.11 299.76 1,498.81
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 91.00 79.87 476.11 161.75 808.73
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 133.00 51.07 1,373.87 389.49 1,947.43
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.89 500.53 146.36 731.78
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 279.37 79.90 399.48
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 390 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: RAWALPINDI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.89 600.53 171.36 856.78
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 304.37 86.15 430.73
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 349.17 238.83 1,502.72 522.68 2,613.39
DRAWING

610c KILOMETER POST Each 450.00 572.68 3,330.07 1,088.19 5,440.94

610d TEN KILOMETER POST Each 900.00 1,145.35 8,863.05 2,727.10 13,635.50

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 570.00 114.54 2,205.23 722.44 3,612.21
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 533.04 1,155.48 19.00 426.88 2,134.40
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.77 28.44 17.49 87.44

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.77 94.28 33.95 169.73

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.79 4.64 34.13 10.14 50.70

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 6.18 8.99 3.00 4.54 22.71
PER ADDITIONAL MONTH

Page 391 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

SAHIWAL

Page 392 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.68 - 5.36 26.78

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 562.60 31.48 159.62 798.09

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 866.18 141.66 272.46 1,362.29

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,748.27 755.53 724.34 3,621.71

103 STRIPPING Cu.m 9.29 273.56 - 70.72 353.58

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.49 1.76 5.46 27.31

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.77 - 79.52 397.58

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.52 38.57 218.16 1,090.81

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.34 - 162.07 810.33

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.08 - 115.87 579.33

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.77 - 79.52 397.58

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.52 38.57 218.16 1,090.81

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.34 - 162.07 810.33

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.08 - 115.87 579.33

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.61 - 76.67 383.35

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.58 211.01 272.45 1,362.26
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.04 38.57 215.80 1,078.98
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.73 - 159.68 798.39
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.56 - 113.48 567.41
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.33 1,542.86 487.16 2,435.80

107e COMMON BACK FILL Cu.m 88.46 126.02 11.70 56.54 282.71

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.34 11.70 87.11 435.56
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.32 38.57 267.10 1,335.49
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 782.18 11.70 210.02 1,050.08
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.60 11.70 162.18 810.91
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.62 60.13 95.68 478.40
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.51 11.70 50.71 253.54
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.10 11.70 65.64 328.21
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.83 3.51 22.04 110.20

Page 393 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.49 3.12 19.20 95.98
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.48 505.36 213.81 1,069.04

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.68 33.41

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.54 11.17 9.45 47.23

201 GRANULAR SUBBASE Cu.m 36.77 264.76 1,829.69 532.80 2,664.01

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.63 2,059.23 658.20 3,291.00

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.66 2,059.23 630.46 3,152.29

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,846.14 13,903.12 3,985.05 19,925.25

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,846.14 14,300.44 4,084.38 20,421.90

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.57 13,903.12 3,984.91 19,924.54
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.57 14,178.37 4,053.72 20,268.60
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.35 2,530.88 797.68 3,988.40

204c CEMENT CONTENT Ton 384.60 - 14,760.48 3,786.27 18,931.35

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,289.08 108,223.77 27,826.12 139,130.60

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,289.08 102,970.77 26,512.87 132,564.35
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.96 1,901.82 592.04 2,960.19
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,432.92 13,352.45 3,990.86 19,954.29
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.42 2,168.65 657.67 3,288.34
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.20 119.74 41.12 205.58

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.20 119.74 41.12 205.58

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.61 0.98 28.44 142.21

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.31 6.50 121.70 608.48
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.70 0.97 16.17 80.84

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.11 28.30 141.48

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 105.04 26.81 134.06
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.27 11.60 58.00

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 42.00 10.79 53.93
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 201.81 59.58 297.89

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.73 131.00 41.69 208.45

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.96 414.19 114.88 574.38

Page 394 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.04 343.37 96.94 484.71

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.62 489.17 135.47 677.36

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.64 418.21 117.49 587.45

304d SEAL COAT Sq.m 2.53 10.06 57.49 17.52 87.60

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.68 14,889.85 4,248.81 21,244.03
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.68 15,192.60 4,324.49 21,622.45
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.35 13,222.96 3,687.51 18,437.53

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.35 13,067.31 3,648.59 18,242.96

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.78 3,344.59 1,227.43 6,137.15
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.77 100,804.53 25,596.93 127,984.63

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.37 60.31 23.67 118.36

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.36 99.98 39.33 196.65

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.85 139.51 54.72 273.60

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.19 200.32 76.55 382.74

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.35 260.41 99.51 497.56

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,657.51 13,069.00 4,264.32 21,321.59
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,592.56 8,045.38 2,933.92 14,669.58

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,592.96 9,315.39 3,251.52 16,257.59

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,592.56 9,739.78 3,357.52 16,787.58

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,593.02 8,593.94 3,071.17 15,355.86

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,699.49 9,863.95 3,415.29 17,076.46

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,592.96 10,288.34 3,506.38 17,531.88

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,592.56 8,943.94 3,158.56 15,792.78

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,699.49 10,213.95 3,502.79 17,513.95

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,593.02 10,638.34 3,593.89 17,969.45

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,290.14 6,528.71 2,305.93 11,529.66

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,708.31 7,538.90 2,825.69 14,128.43

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,706.47 8,818.66 3,152.91 15,764.55

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,707.39 9,233.30 3,256.80 16,284.00

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,860.82 12,378.49 4,237.70 21,188.51

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,861.28 13,239.04 4,452.96 22,264.78

Page 395 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,861.28 13,941.92 4,628.68 23,143.38

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,695.62 10,086.05 3,219.85 16,099.25

401f LEAN CONCRETE Cu.m 919.20 1,017.57 5,104.95 1,760.43 8,802.15

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,489.53 9,043.88 3,284.78 16,423.89

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,489.53 10,100.11 3,548.84 17,744.19

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,779.12 7,526.87 2,977.93 14,889.63

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,861.28 12,437.03 4,288.84 21,444.21

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,861.28 13,297.58 4,503.98 22,519.90

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,861.28 14,000.46 4,679.70 23,398.50

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,268.01 4,975.49 1,870.96 9,354.81
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.25 183,583.51 47,357.61 236,788.05

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.25 187,488.94 48,333.97 241,669.84

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.30 214,017.71 54,663.12 273,315.60
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,782.73 356,422.00 92,608.81 463,044.05
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,009.28 - 300.40 1,501.98

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,570.89 481.40 2,406.98
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,053.83 1,073.29 5,366.43
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.20 69.34 346.69
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,450.06 12,328.85 61,644.26
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,950.06 11,203.85 56,019.26
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,762.93 35,157.07 175,785.35


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,767.44 28,908.20 144,540.99


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,387.45 11,063.20 55,316.00


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,317.80 9,795.79 48,978.94


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 396 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,818.15 8,670.88 43,354.38
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,221.89 6,771.81 33,859.05


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,655.81 8,130.29 40,651.45
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,088.60 26,488.49 132,442.44
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 68,983.09 17,447.69 87,238.44
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 971.82 295.84 1,479.20

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,253.22 366.19 1,830.95

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 469.38 138.26 691.29

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,882.80 318.94 1,162.68 5,813.40
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,166.71 420.75 1,663.92 8,319.59
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,471.07 357.11 1,329.96 6,649.79
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,093.35 516.17 1,960.65 9,803.25
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,500.47 885.55 2,753.58 13,767.91
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,479.68 885.58 4,262.42 21,312.11
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,581.37 1,357.75 3,967.42 19,837.11
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,643.56 1,357.75 6,212.29 31,061.46
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,595.59 3,742.82 1,444.21 7,221.06
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,154.78 2,852.80 1,721.12 8,605.59
SIZE) INCLUDING TESTING AND REPORTING

Page 397 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,245.72 997.30 2,249.20 11,245.99
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,920.32 917,756.85 259,361.39 1,296,806.96

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,962.48 1,334,935.29 367,320.34 1,836,601.71

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,962.48 1,668,713.76 450,764.96 2,253,824.80

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,962.48 1,954,432.70 522,194.70 2,610,973.48

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,962.48 2,368,011.11 625,589.30 3,127,946.49

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,962.48 2,773,011.11 726,839.30 3,634,196.49

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,230.72 3,178,011.11 834,656.36 4,173,281.79

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,329.28 228,863.42 59,693.59 298,467.96

410 BRICK WORK Cu.m 941.51 448.32 8,564.36 2,488.55 12,442.74

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.32 2,103.16 776.35 3,881.73

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.54 4,376.55 1,382.52 6,912.59

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.32 2,327.43 940.58 4,702.91

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.54 4,469.25 1,554.73 7,773.63
MORTAR

411g ROLL POINTING Sq.m 158.07 23.87 179.26 90.30 451.50

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.34 4,469.25 1,702.79 8,513.94
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,237.82 1,258.20 701.65 3,508.23
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.98 1,608.30 794.61 3,973.03
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.73 2,590.20 1,094.27 5,471.33
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.68 3,938.80 1,449.41 7,247.04
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.87 6,367.41 2,065.53 10,327.64
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.79 9,579.83 2,908.24 14,541.21
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.32 10,455.92 3,198.93 15,994.66
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.35 12,663.91 3,846.36 19,231.78
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,961.54 24,991.38 7,077.16 35,385.80
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,237.82 1,774.80 830.80 4,153.98
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.98 2,182.30 938.11 4,690.53
DIA 380 mm

Page 398 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.73 2,918.20 1,176.27 5,881.33
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.68 4,594.80 1,613.41 8,067.04
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.87 8,007.41 2,475.53 12,377.64
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.79 12,449.83 3,625.74 18,128.71
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.32 14,555.92 4,223.93 21,119.66
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.35 17,193.42 4,978.73 24,893.66
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,961.54 30,854.36 8,542.91 42,714.53
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.16 1,522.06 514.01 2,570.04
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.39 6,528.71 2,279.62 11,398.08
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 237.69 63.47 317.34

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,427.85 433.88 2,169.41

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.40 595.19 233.72 1,168.61

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.13 1,190.31 447.68 2,238.40

509a RIP RAP CLASS "A" Cu.m 956.12 102.06 1,539.50 649.42 3,247.10

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.36 1,561.27 660.80 3,304.01

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.22 1,596.05 678.64 3,393.18

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.31 1,662.07 711.60 3,558.01

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.71 3,904.56 1,308.35 6,541.74

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 135.00 3,763.57 1,334.80 6,673.98

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.09 3,652.65 1,354.46 6,772.29

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.91 3,677.49 1,510.87 7,554.35

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 792.02 7,828.55 2,537.88 12,689.39
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.32 1,524.40 491.57 2,457.86

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.62 - 352.38 1,761.91


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.52 271.58 150.20 750.99

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.74 349.22 181.37 906.83

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.74 1,232.51 381.85 1,909.24
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.70 1,540.70 469.43 2,347.14
BITUMEN JOINTS

Page 399 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.50 877.97 297.11 1,485.53
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.57 1,089.83 361.16 1,805.79
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,811.76 10,229.39 51,146.95
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,881.36 11,746.79 58,733.94
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,019.14 6,399.00 1,931.14 9,655.69
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,137.69 7,062.28 2,126.60 10,632.99
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.63 4,687.25 1,479.72 7,398.58
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.79 5,168.61 1,604.10 8,020.48
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.43 1,018.08 303.71 1,518.53
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.09 8,708.85 2,354.76 11,773.78
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.46 9,524.42 2,554.49 12,772.45
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.64 4,269.99 1,098.67 5,493.34

604b METAL GUARD RAIL END PIECES Each 288.45 143.04 3,760.82 1,048.08 5,240.39

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.43 5,209.49 1,376.58 6,882.88

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.54 30,541.34 8,732.98 43,664.89
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.54 30,447.42 8,709.50 43,547.48
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 381.95 16,002.19 4,310.77 21,553.85
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 381.95 18,044.87 4,821.44 24,107.20
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 400 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 381.95 20,150.87 5,347.94 26,739.70
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 381.95 16,605.39 4,461.57 22,307.85
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 381.95 18,848.27 5,022.29 25,111.45
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 381.95 21,164.87 5,601.44 28,007.20
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.94 20,153.33 5,343.24 26,716.19
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.94 23,780.33 6,249.99 31,249.94
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.94 27,316.33 7,133.99 35,669.94
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.94 21,166.03 5,596.41 27,982.06
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.94 25,155.73 6,593.84 32,969.19
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.94 27,316.33 7,133.99 35,669.94
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.57 25,515.08 6,737.83 33,689.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.57 26,945.08 7,095.33 35,476.66
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 401 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.57 43,710.39 11,286.66 56,433.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.57 46,570.39 12,001.66 60,008.30
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 291.16 41,043.51 10,417.19 52,085.94
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.15 36,507.09 9,269.68 46,348.38
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.68 34,876.13 8,879.22 44,396.09
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.09 36,024.55 9,180.57 45,902.84
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 291.16 37,043.51 9,417.19 47,085.94
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.15 32,507.09 8,269.68 41,348.38
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.68 30,876.13 7,879.22 39,396.09
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.09 32,024.55 8,180.57 40,902.84
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 402 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 868.68 224.93 1,124.65
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.06 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.58 220.74 130.08 650.40
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.88 687.23 321.36 1,606.79
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.58 327.81 156.85 784.24
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.51 945.95 371.95 1,859.73
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.79 366.31 129.03 645.13
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.46 998.11 294.39 1,471.96
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.79 476.11 156.48 782.38
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.73 1,373.87 381.73 1,908.64
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 501.78 144.01 720.05
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.69 78.26 391.29
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 403 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SAHIWAL

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.88 601.78 169.01 845.05
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.69 84.51 422.54
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.21 1,577.05 520.71 2,603.55
DRAWING

610c KILOMETER POST Each 346.14 572.15 3,370.31 1,072.15 5,360.76

610d TEN KILOMETER POST Each 692.29 1,144.30 8,855.91 2,673.13 13,365.63

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.43 2,369.75 730.66 3,653.29
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,150.71 21.00 395.43 1,977.15
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 28.44 16.38 81.91

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 94.28 32.84 164.20

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.95 9.99 49.95

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 404 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

SARGODHA

Page 405 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.76 19.69 - 5.37 26.83

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 45.18 563.18 31.51 159.97 799.85

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 83.46 866.75 141.78 273.00 1,365.00

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 400.62 1,749.97 756.15 726.69 3,633.43

103 STRIPPING Cu.m 9.46 273.67 - 70.78 353.91

104 COMPACTION OF NATURAL GROUND Sq.m 1.63 18.51 1.76 5.48 27.38

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.54 304.25 - 79.70 398.50

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 51.46 783.93 38.42 218.46 1,092.28

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 38.60 610.76 - 162.34 811.69

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.90 434.38 - 116.07 580.35

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.54 304.25 - 79.70 398.50

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 51.46 783.93 38.42 218.46 1,092.28

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 38.60 610.76 - 162.34 811.69

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.90 434.38 - 116.07 580.35

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.58 278.83 - 76.85 384.26

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 197.70 685.06 210.48 273.31 1,366.56
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 51.46 774.45 38.42 216.09 1,080.43
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 38.66 601.15 - 159.95 799.76
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.90 424.85 - 113.69 568.44
MATERIAL

107d GRANULAR BACKFILL Cu.m 115.49 292.47 1,021.62 357.40 1,786.98

107e COMMON BACK FILL Cu.m 90.04 126.10 11.70 56.96 284.80

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.88 310.54 11.70 87.28 436.40
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 61.58 969.84 38.42 267.46 1,337.30
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 47.01 782.78 11.70 210.37 1,051.86
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 41.16 597.83 11.70 162.67 813.36
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 26.43 296.92 60.13 95.87 479.35
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 26.08 165.86 11.70 50.91 254.56
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 45.57 206.21 11.70 65.87 329.36
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.91 79.90 3.51 22.08 110.40

Page 406 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.22 70.54 3.12 19.22 96.10
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.81 326.88 291.70 160.60 803.00

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.89 22.17 1.76 6.71 33.53

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.13 22.58 11.18 9.47 47.36

201 GRANULAR SUBBASE Cu.m 37.43 264.95 987.99 322.59 1,612.96

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 56.94 517.92 1,364.44 484.83 2,424.14

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 56.94 407.31 1,364.44 457.17 2,285.86

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 194.36 1,847.69 13,372.16 3,853.55 19,267.76

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 194.36 1,847.69 13,772.74 3,953.70 19,768.48

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 194.36 1,847.12 13,372.16 3,853.41 19,267.06
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 194.36 1,847.12 13,649.55 3,922.76 19,613.80
"B")

204b CEMENT STABILIZED BASE Cu.m 95.16 566.89 1,940.15 650.55 3,252.75

204c CEMENT CONTENT Ton 391.48 - 14,124.60 3,629.02 18,145.10

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 805.81 2,290.61 108,884.07 27,995.12 139,975.61

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 805.81 2,290.61 103,631.07 26,681.87 133,409.36
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 328.14 144.11 1,224.04 424.07 2,120.36
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 181.24 2,434.85 12,879.77 3,873.97 19,369.83
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 360.95 107.50 1,499.86 492.08 2,460.38
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.61 39.27 79.66 31.13 155.66

207b DEEP PATCHING (15-30 cm) Sq.m 5.61 39.27 79.66 31.13 155.66

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.29 106.71 0.98 28.50 142.48

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 15.24 465.62 6.50 121.84 609.20
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.05 60.74 0.97 16.19 80.95

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.00 1.09 111.77 28.47 142.33

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.96 1.26 105.70 26.98 134.91
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.40 0.75 45.53 11.67 58.35

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.40 0.75 42.27 10.85 54.26
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.08 34.49 199.88 59.12 295.58

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.08 33.75 128.64 41.12 205.60

304bi DOUBLE SURFACE TREATMENT Sq.m 3.41 41.99 407.50 113.23 566.13

Page 407 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.41 41.08 336.26 95.19 475.93

304ci TRIPLE SURFACE TREATMENT Sq.m 6.21 46.66 481.29 133.54 667.70

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.21 45.68 409.91 115.45 577.26

304d SEAL COAT Sq.m 2.58 10.07 56.82 17.37 86.83

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 170.68 1,939.31 14,366.32 4,119.08 20,595.39
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 170.68 1,939.31 14,671.07 4,195.27 20,976.34
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 668.46 871.06 12,681.20 3,555.18 17,775.90

307b OPEN GRADED HOT BIT-MAC Cu.m 668.46 871.06 12,528.39 3,516.98 17,584.88

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 100.11 1,467.47 3,345.51 1,228.27 6,141.36
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 260.99 1,327.31 101,464.84 25,763.28 128,816.41

309a COLD MILLING, 0 - 30 mm Sq.m 2.04 32.39 60.33 23.69 118.46

309b COLD MILLING, 0 - 50 mm Sq.m 4.05 53.40 100.03 39.37 196.84

309c COLD MILLING, 0 - 70 mm Sq.m 7.66 71.90 139.57 54.78 273.91

309d COLD MILLING, 0 - 100 mm Sq.m 8.84 97.61 200.41 76.72 383.58

309e COLD MILLING, 0 - 130 mm Sq.m 11.49 126.90 260.53 99.73 498.65

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 336.68 3,659.71 12,285.81 4,070.55 20,352.74
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,117.36 2,598.89 7,368.61 2,771.22 13,856.08

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,117.36 2,599.30 8,635.02 3,087.92 15,439.60

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,117.36 2,598.89 9,056.27 3,193.13 15,965.65

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,117.36 2,599.35 7,887.19 2,900.98 14,504.89

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,117.36 2,705.86 9,153.61 3,244.21 16,221.05

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,164.67 2,599.30 9,574.85 3,334.71 16,673.53

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,117.36 2,598.89 8,222.05 2,984.58 14,922.89

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,117.36 2,705.86 9,488.46 3,327.92 16,639.61

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,164.67 2,599.35 9,909.71 3,418.43 17,092.16

401b CONCRETE CLASS "B" Cu.m 1,430.01 1,294.58 5,935.43 2,165.00 10,825.02

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,074.42 2,714.76 6,877.57 2,666.69 13,333.44

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,105.95 2,712.92 8,153.76 2,993.16 14,965.79

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,105.95 2,713.84 8,565.23 3,096.26 15,481.29

401di CONCRETE CLASS "D1" Cu.m 1,742.11 2,870.41 11,590.85 4,050.85 20,254.23

401dii CONCRETE CLASS "D2" Cu.m 1,742.11 2,870.87 12,420.82 4,258.45 21,292.25

Page 408 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,742.11 2,870.87 13,093.42 4,426.60 22,133.00

401e CONCRETE CLASS "Y" Cu.m 1,117.36 1,699.53 9,378.52 3,048.85 15,244.26

401f LEAN CONCRETE Cu.m 935.65 1,020.99 4,557.61 1,628.56 8,142.80

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,652.32 1,494.22 8,364.12 3,127.67 15,638.33

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,652.32 1,494.22 9,374.93 3,380.37 16,901.84

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,652.32 1,784.60 6,986.31 2,855.81 14,279.04

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,890.28 2,870.87 11,649.51 4,102.67 20,513.33

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,890.28 2,870.87 12,479.47 4,310.16 21,550.78

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,890.28 2,870.87 13,152.07 4,478.31 22,391.53

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,262.54 1,271.44 4,337.39 1,717.84 8,589.21
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,120.66 816.34 183,108.07 47,261.27 236,306.33

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,120.66 816.34 187,308.07 48,311.27 241,556.33

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,831.23 1,853.50 214,059.37 54,686.03 273,430.13
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,342.16 7,785.10 356,384.88 92,628.03 463,140.17
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 195.75 1,012.93 - 302.17 1,510.85

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 361.04 - 1,572.53 483.39 2,416.96
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 243.59 - 4,057.04 1,075.16 5,375.79
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 25.42 4.18 248.41 69.50 347.51
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 880.84 - 48,406.23 12,321.77 61,608.84
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 880.84 - 43,906.23 11,196.77 55,983.84
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 880.84 - 139,673.08 35,138.48 175,692.40


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 880.84 - 114,684.40 28,891.31 144,456.55


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 880.84 - 43,343.13 11,055.99 55,279.96


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 880.84 - 38,285.74 9,791.65 48,958.23


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 409 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 880.84 - 33,794.19 8,668.76 43,343.79
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 880.84 - 26,209.30 6,772.54 33,862.68


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 880.84 - 31,642.52 8,130.84 40,654.20
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 880.84 - 105,039.06 26,479.98 132,399.88
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 822.11 - 68,918.08 17,435.05 87,175.24
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 215.32 - 972.66 297.00 1,484.98

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 215.32 - 1,254.06 367.35 1,836.73

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.02 0.77 3.85
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.52 1.40 6.98
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 85.15 - 470.93 139.02 695.10

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 457.02 3,897.96 311.45 1,166.61 5,833.04
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,087.33 5,178.41 413.99 1,669.93 8,349.66
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 500.45 4,488.73 349.90 1,334.77 6,673.84
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,255.15 6,107.45 510.09 1,968.18 9,840.88
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 639.56 9,511.13 881.86 2,758.14 13,790.69
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,732.53 13,512.75 881.88 4,281.79 21,408.95
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 947.23 13,596.62 1,357.36 3,975.31 19,876.53
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,916.80 19,692.43 1,357.36 6,241.65 31,208.24
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 446.30 1,598.06 3,735.44 1,444.95 7,224.74
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 892.59 3,159.67 2,845.42 1,724.42 8,622.10
SIZE) INCLUDING TESTING AND REPORTING

Page 410 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,785.18 6,255.41 989.92 2,257.63 11,288.13
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 21,140.08 99,002.00 881,718.60 250,465.17 1,252,325.85

407t PILE LOAD TEST UPTO 800 TON Each 25,837.84 109,055.52 1,282,515.24 354,352.15 1,771,760.75

407u PILE LOAD TEST UPTO 1000 TON Each 25,837.84 109,055.52 1,603,186.56 434,519.98 2,172,599.90

407v PILE LOAD TEST UPTO 1200 TON Each 25,837.84 109,055.52 1,875,801.20 502,673.64 2,513,368.20

407w PILE LOAD TEST UPTO 1500 TON Each 25,837.84 109,055.52 2,269,723.16 601,154.13 3,005,770.65

407x PILE LOAD TEST UPTO 2000 TON Each 25,837.84 109,055.52 2,674,723.16 702,404.13 3,512,020.65

407y PILE LOAD TEST UPTO 2500 TON Each 25,837.84 135,347.52 3,079,723.16 810,227.13 4,051,135.65

407l PERMANENT PILE CASING FOR PILES Ton 1,609.98 8,334.83 228,386.92 59,582.93 297,914.66

410 BRICK WORK Cu.m 958.35 448.78 8,437.42 2,461.14 12,305.70

411a STONE MASONRY RANDOM DRY Cu.m 765.35 250.40 1,292.37 577.03 2,885.15

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 814.29 353.77 3,367.91 1,133.99 5,669.96

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,205.77 250.40 1,422.03 719.55 3,597.75

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,421.09 353.77 3,432.80 1,301.92 6,509.58
MORTAR

411g ROLL POINTING Sq.m 160.90 23.90 174.12 89.73 448.65

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,841.93 532.62 3,432.80 1,451.84 7,259.19
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 316.12 1,238.69 1,269.88 706.17 3,530.86
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 326.89 1,249.86 1,625.30 800.51 4,002.56
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 530.46 1,266.61 2,614.67 1,102.94 5,514.68
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 592.56 1,277.57 3,982.77 1,463.23 7,316.14
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 658.40 1,248.77 6,416.29 2,080.87 10,404.33
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 760.72 1,306.73 9,641.63 2,927.27 14,636.35
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 881.99 1,475.09 10,516.03 3,218.28 16,091.39
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,070.99 1,670.56 12,752.06 3,873.40 19,367.00
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,379.98 1,962.94 25,140.65 7,120.89 35,604.46
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 316.12 1,238.69 1,786.48 835.32 4,176.61
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 326.89 1,249.86 2,199.30 944.01 4,720.06
DIA 380 mm

Page 411 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 530.46 1,266.61 2,942.67 1,184.94 5,924.68
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 592.56 1,277.57 4,638.77 1,627.23 8,136.14
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 658.40 1,248.77 8,056.29 2,490.87 12,454.33
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 760.72 1,306.73 12,511.63 3,644.77 18,223.85
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 881.99 1,475.09 14,616.03 4,243.28 21,216.39
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,070.99 1,670.56 17,280.72 5,005.57 25,027.84
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,379.98 1,962.94 31,003.62 8,586.64 42,933.18
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 318.41 221.26 986.15 381.46 1,907.29
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,612.71 1,006.61 5,935.43 2,138.69 10,693.43
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.48 - 237.89 63.59 317.96

507b ROCK FILL IN GABIONS Cu.m 313.19 - 680.73 248.48 1,242.39

508a BRICK PAVING (SINGLE COURSE) Sq.m 333.15 12.41 589.37 233.73 1,168.66

508b BRICK PAVING (DOUBLE COURSE) Sq.m 587.62 23.16 1,178.68 447.36 2,236.81

509a RIP RAP CLASS "A" Cu.m 973.23 102.68 738.84 453.69 2,268.44

509b RIP RAP CLASS "B" Cu.m 1,035.78 64.39 754.11 463.57 2,317.85

509c RIP RAP CLASS "C" Cu.m 1,086.36 51.25 775.70 478.33 2,391.64

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 668.79 527.51 817.35 503.41 2,517.06

509d GROUTED RIP RAP CLASS "A" Cu.m 1,176.80 173.91 3,347.71 1,174.61 5,873.03

509e GROUTED RIP RAP CLASS "B" Cu.m 1,466.38 135.61 3,209.01 1,202.75 6,013.75

509f GROUTED RIP RAP CLASS "C" Cu.m 1,684.69 110.60 3,085.01 1,220.07 6,100.36

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,684.69 711.63 3,102.39 1,374.68 6,873.39

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,558.33 793.09 7,159.96 2,377.85 11,889.23
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 165.49 279.44 982.36 356.82 1,784.11

510 DISMANTLING OF STRUCTURE AND Cu.m 561.78 857.73 - 354.88 1,774.39


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 262.29 71.54 130.34 116.05 580.23

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 299.76 81.76 167.60 137.28 686.41

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 250.55 48.77 1,105.91 351.31 1,756.54
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 286.34 55.73 1,378.20 430.07 2,150.34
BITUMEN JOINTS

Page 412 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 230.00 84.54 683.14 249.42 1,247.09
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 262.85 96.61 842.76 300.56 1,502.79
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 399.31 713.50 39,817.65 10,232.62 51,163.09
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 399.31 713.50 45,888.82 11,750.41 58,752.05
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 311.90 1,021.50 6,137.02 1,867.61 9,338.03
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 311.90 1,140.37 6,773.48 2,056.44 10,282.20
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 129.25 1,105.42 4,411.81 1,411.62 7,058.10
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 129.25 1,121.60 4,864.15 1,528.75 7,643.75
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 83.78 114.47 964.95 290.80 1,453.99
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 216.88 497.41 8,474.52 2,297.21 11,486.03
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 216.88 480.78 9,264.81 2,490.62 12,453.10
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 28.38 - 117.12 36.38 181.88

604a METAL GUARD RAIL M 88.60 37.65 4,273.81 1,100.02 5,500.08

604b METAL GUARD RAIL END PIECES Each 293.62 143.08 3,763.22 1,049.98 5,249.90

604d STEEL POST FOR METAL GUARD RAIL Each 168.34 131.60 5,214.23 1,378.54 6,892.70

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,965.75 495.55 29,841.36 8,575.67 42,878.33
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,965.75 495.55 29,747.25 8,552.14 42,760.69
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 874.31 384.20 15,897.44 4,288.99 21,444.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 874.31 384.20 17,979.34 4,809.47 24,047.33
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 413 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 874.31 384.20 20,085.34 5,335.97 26,679.83
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 874.31 384.20 16,495.57 4,438.52 22,192.61
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 874.31 384.20 18,782.74 5,010.32 25,051.58
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 874.31 384.20 21,099.34 5,589.47 27,947.33
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 965.66 271.34 20,087.14 5,331.04 26,655.18
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 965.66 271.34 23,714.14 6,237.79 31,188.93
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 965.66 271.34 27,250.14 7,121.79 35,608.93
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 965.66 271.34 21,099.84 5,584.21 27,921.05
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 965.66 271.34 25,089.54 6,581.64 32,908.18
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 965.66 271.34 27,250.14 7,121.79 35,608.93
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 965.66 488.28 25,350.49 6,701.11 33,505.54
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 965.66 488.28 26,780.49 7,058.61 35,293.04
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 414 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 965.66 488.28 43,547.58 11,250.38 56,251.90
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 965.66 488.28 46,407.58 11,965.38 59,826.90
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 340.05 291.59 40,930.68 10,390.58 51,952.91
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 415.76 163.35 36,314.40 9,223.38 46,116.89
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 481.53 167.88 34,673.61 8,830.76 44,153.78
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 535.03 172.30 35,819.33 9,131.67 45,658.33
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 340.05 291.59 36,930.68 9,390.58 46,952.91
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 415.76 163.35 32,314.40 8,223.38 41,116.89
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 481.53 167.88 30,673.61 7,830.76 39,153.78
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 535.03 172.30 31,819.33 8,131.67 40,658.33
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 442.38 - 4,680.00 1,280.60 6,402.98
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 442.38 - 3,960.00 1,100.60 5,502.98
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 415 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 442.38 - 7,020.00 1,865.60 9,327.98
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 442.38 - 5,940.00 1,595.60 7,977.98
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.57 14.76 868.84 225.04 1,125.21
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.76 3.57 30.03 9.34 46.70


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.76 5.06 93.50 25.58 127.90


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.76 3.57 36.03 10.84 54.20


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.76 4.39 114.69 30.71 153.55


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 142.50 159.64 220.74 130.72 653.60
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 237.50 365.43 687.23 322.54 1,612.70
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.70 3.99 39.03 11.93 59.64
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.70 5.48 135.22 36.35 181.75
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.70 3.99 46.83 13.88 69.40
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.70 5.48 165.77 43.99 219.93
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 142.50 159.64 327.81 157.49 787.44
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 237.50 308.93 945.95 373.10 1,865.48
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 71.25 79.82 366.31 129.35 646.73
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 71.25 109.63 998.11 294.75 1,473.74
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 71.25 79.82 476.11 156.80 783.98
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 104.14 50.85 1,373.87 382.22 1,911.08
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 36.02 38.88 501.86 144.19 720.95
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 23.29 10.46 279.72 78.37 391.84
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 416 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SARGODHA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 36.02 38.88 601.86 169.19 845.95
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 23.29 10.46 304.72 84.62 423.09
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 273.39 237.78 1,518.13 507.33 2,536.63
DRAWING

610c KILOMETER POST Each 352.34 572.33 3,258.89 1,045.89 5,229.45

610d TEN KILOMETER POST Each 704.67 1,144.66 8,598.26 2,611.90 13,059.49

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 446.29 114.47 2,296.47 714.31 3,571.54
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 417.35 1,152.35 21.00 397.68 1,988.38
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.67 22.71 28.46 16.46 82.29

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.67 22.71 94.29 32.92 164.59

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.40 4.63 33.98 10.00 50.01

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.84 8.96 3.00 4.20 21.00
PER ADDITIONAL MONTH

Page 417 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

SHEIKHUPURA

Page 418 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.94 19.71 - 5.41 27.06

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 49.73 561.83 31.56 160.78 803.91

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 91.86 864.62 142.02 274.63 1,373.13

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 440.94 1,742.51 757.44 735.22 3,676.11

103 STRIPPING Cu.m 10.41 273.78 - 71.05 355.24

104 COMPACTION OF NATURAL GROUND Sq.m 1.80 18.52 1.76 5.52 27.59

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 16.01 304.45 - 80.11 400.56

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 56.64 784.92 38.50 220.02 1,100.08

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 42.48 611.95 - 163.61 818.04

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 32.91 434.67 - 116.90 584.48

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 16.01 304.45 - 80.11 400.56

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 56.64 784.92 38.50 220.02 1,100.08

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 42.48 611.95 - 163.61 818.04

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 32.91 434.67 - 116.90 584.48

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 31.45 279.04 - 77.62 388.11

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 217.60 685.54 210.11 278.31 1,391.56
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 56.64 775.44 38.50 217.65 1,088.23
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 42.55 602.33 - 161.22 806.10
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 32.91 425.14 - 114.51 572.55
MATERIAL

107d GRANULAR BACKFILL Cu.m 127.11 292.60 1,447.22 466.74 2,333.68

107e COMMON BACK FILL Cu.m 99.10 126.42 11.70 59.31 296.54

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 29.59 310.80 11.70 88.02 440.11
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 67.78 971.61 38.50 269.47 1,347.35
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 51.74 783.69 11.70 211.79 1,058.93
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 45.30 598.21 11.70 163.80 819.01
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 29.08 297.14 60.13 96.59 482.94
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 28.71 165.96 11.70 51.59 257.96
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 50.16 206.33 11.70 67.05 335.23
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 5.40 79.95 3.51 22.22 111.08

Page 419 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.55 70.61 3.12 19.32 96.59
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 26.21 327.28 482.34 208.96 1,044.78

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.18 22.19 1.76 6.78 33.91

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.55 22.59 11.20 9.59 47.93

201 GRANULAR SUBBASE Cu.m 41.19 265.14 1,739.01 511.34 2,556.68

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 62.67 518.21 1,974.62 638.88 3,194.39

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 62.67 407.96 1,974.62 611.32 3,056.58

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 213.92 1,849.18 13,887.12 3,987.56 19,937.78

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 213.92 1,849.18 14,288.10 4,087.80 20,439.01

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,848.62 13,887.12 3,987.42 19,937.08
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 213.92 1,848.62 14,164.79 4,056.83 20,284.16
"B")

204b CEMENT STABILIZED BASE Cu.m 104.74 567.59 2,428.25 775.15 3,875.73

204c CEMENT CONTENT Ton 430.88 - 14,712.81 3,785.92 18,929.61

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 886.91 2,292.09 108,392.25 27,892.81 139,464.05

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 886.91 2,292.09 103,961.23 26,785.06 133,925.28
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 361.16 144.25 1,816.85 580.57 2,902.83
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 199.48 2,436.63 13,329.39 3,991.38 19,956.88
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 397.27 107.58 2,083.78 647.16 3,235.80
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 6.18 39.29 114.86 40.08 200.41

207b DEEP PATCHING (15-30 cm) Sq.m 6.18 39.29 114.86 40.08 200.41

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.92 106.78 0.98 28.67 143.35

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 16.78 465.92 6.50 122.30 611.50
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.36 60.78 0.97 16.28 81.39

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.10 1.09 112.10 28.58 142.88

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.06 1.27 106.03 27.09 135.45
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.44 0.75 45.66 11.71 58.56

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.44 0.75 42.40 10.90 54.49
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.29 34.53 203.07 59.97 299.85

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.29 33.78 131.62 41.92 209.61

304bi DOUBLE SURFACE TREATMENT Sq.m 3.75 42.05 416.25 115.52 577.58

Page 420 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.75 41.13 344.80 97.42 487.11

304ci TRIPLE SURFACE TREATMENT Sq.m 6.84 46.71 491.61 136.29 681.46

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.84 45.74 420.02 118.15 590.75

304d SEAL COAT Sq.m 2.84 10.08 57.80 17.68 88.40

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,940.89 14,883.60 4,253.09 21,265.44
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 187.86 1,940.89 15,190.00 4,329.69 21,648.44
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 735.73 871.75 13,204.34 3,702.95 18,514.76

307b OPEN GRADED HOT BIT-MAC Cu.m 735.73 871.75 13,046.62 3,663.52 18,317.61

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 110.18 1,468.32 3,346.41 1,231.23 6,156.14
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 287.25 1,330.66 101,799.85 25,854.44 129,272.19

309a COLD MILLING, 0 - 30 mm Sq.m 2.25 32.45 60.36 23.77 118.83

309b COLD MILLING, 0 - 50 mm Sq.m 4.46 53.43 100.07 39.49 197.45

309c COLD MILLING, 0 - 70 mm Sq.m 8.43 71.95 139.63 55.01 275.03

309d COLD MILLING, 0 - 100 mm Sq.m 9.73 97.68 200.50 76.98 384.88

309e COLD MILLING, 0 - 130 mm Sq.m 12.65 126.98 260.65 100.07 500.34

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 370.56 3,661.84 12,693.08 4,181.37 20,906.85
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,229.81 2,605.13 7,687.72 2,880.67 14,403.33

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,229.81 2,605.54 8,951.12 3,196.62 15,983.09

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,229.81 2,605.13 9,373.97 3,302.23 16,511.14

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,229.81 2,605.59 8,236.36 3,017.94 15,089.71

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,229.81 2,712.78 9,499.76 3,360.59 16,802.94

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,281.88 2,605.54 9,922.61 3,452.51 17,262.54

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,229.81 2,605.13 8,585.23 3,105.04 15,525.21

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,229.81 2,712.78 9,848.63 3,447.80 17,239.01

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,281.88 2,605.59 10,271.48 3,539.74 17,698.68

401b CONCRETE CLASS "B" Cu.m 1,573.91 1,296.25 6,185.66 2,263.95 11,319.76

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,182.52 2,721.12 7,184.73 2,772.09 13,860.46

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,217.23 2,720.19 8,457.67 3,098.78 15,493.88

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,217.23 2,720.19 8,870.98 3,202.10 16,010.50

401di CONCRETE CLASS "D1" Cu.m 1,917.42 2,876.85 12,002.79 4,199.27 20,996.33

401dii CONCRETE CLASS "D2" Cu.m 1,917.42 2,877.31 12,858.72 4,413.36 22,066.81

Page 421 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,917.42 2,877.31 13,559.33 4,588.52 22,942.58

401e CONCRETE CLASS "Y" Cu.m 1,229.81 1,702.03 9,721.83 3,163.42 15,817.09

401f LEAN CONCRETE Cu.m 1,029.80 1,023.13 4,771.06 1,706.00 8,529.99

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,919.21 1,497.36 8,685.17 3,275.43 16,377.16

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,919.21 1,497.36 9,737.99 3,538.64 17,693.20

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,919.21 1,788.50 7,219.39 2,981.78 14,908.88

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,080.50 2,877.31 12,060.06 4,254.47 21,272.33

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,080.50 2,877.31 12,915.99 4,468.45 22,342.25

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,080.50 2,877.31 13,616.60 4,643.60 23,218.01

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,389.59 1,272.79 4,706.67 1,842.26 9,211.31
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,635.90 816.42 183,298.63 47,437.74 237,188.69

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,635.90 816.42 187,067.30 48,379.91 241,899.53

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,116.12 1,853.78 213,617.06 54,646.74 273,233.70
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,980.44 7,787.40 354,819.51 92,396.84 461,984.19
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 215.45 1,017.22 - 308.17 1,540.84

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 397.36 - 1,560.93 489.57 2,447.86
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 268.10 - 4,026.66 1,073.69 5,368.46
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 27.97 4.18 245.88 69.51 347.55
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 48,279.02 12,312.13 61,560.64
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 969.49 - 43,779.02 11,187.13 55,935.64
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 139,345.04 35,078.63 175,393.16


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 969.49 - 114,352.89 28,830.60 144,152.98


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 43,283.45 11,063.24 55,316.18


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 969.49 - 38,219.82 9,797.33 48,986.64


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 422 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 969.49 - 33,631.84 8,650.33 43,251.66
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 969.49 - 26,113.00 6,770.62 33,853.11


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 969.49 - 31,351.83 8,080.33 40,401.65
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 969.49 - 104,508.42 26,369.48 131,847.39
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 904.85 - 68,792.71 17,424.39 87,121.95
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 236.98 - 962.55 299.88 1,499.41

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 236.98 - 1,243.95 370.23 1,851.16

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 1.67 0.43 2.16
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 3.02 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 5.52 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 93.72 - 459.54 138.32 691.58

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 503.01 3,912.59 269.92 1,171.38 5,856.90
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,196.75 5,189.70 363.85 1,687.58 8,437.88
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 550.81 4,505.77 305.14 1,340.43 6,702.14
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,381.45 6,121.07 451.88 1,988.60 9,943.00
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 703.92 9,521.41 795.22 2,755.14 13,775.70
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,007.51 13,544.68 795.25 4,336.86 21,684.30
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,042.56 13,611.35 1,231.41 3,971.33 19,856.65
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 4,310.96 19,739.63 1,231.41 6,320.50 31,602.49
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 491.21 1,600.44 3,678.27 1,442.48 7,212.41
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 982.42 3,164.39 2,788.25 1,733.77 8,668.83
SIZE) INCLUDING TESTING AND REPORTING

Page 423 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,964.84 6,264.76 932.75 2,290.59 11,452.94
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 23,267.68 99,080.88 915,607.20 259,488.94 1,297,444.70

407t PILE LOAD TEST UPTO 800 TON Each 28,438.24 109,145.28 1,331,808.48 367,348.00 1,836,740.00

407u PILE LOAD TEST UPTO 1000 TON Each 28,438.24 109,145.28 1,664,805.12 450,597.16 2,252,985.80

407v PILE LOAD TEST UPTO 1200 TON Each 28,438.24 109,145.28 1,949,742.40 521,831.48 2,609,157.40

407w PILE LOAD TEST UPTO 1500 TON Each 28,438.24 109,145.28 2,362,148.32 624,932.96 3,124,664.80

407x PILE LOAD TEST UPTO 2000 TON Each 28,438.24 109,145.28 2,767,148.32 726,182.96 3,630,914.80

407y PILE LOAD TEST UPTO 2500 TON Each 28,438.24 135,460.08 3,172,148.32 834,011.66 4,170,058.30

407l PERMANENT PILE CASING FOR PILES Ton 1,772.01 8,340.22 228,590.38 59,675.65 298,378.26

410 BRICK WORK Cu.m 1,054.80 449.22 8,534.04 2,509.52 12,547.58

411a STONE MASONRY RANDOM DRY Cu.m 842.37 250.47 2,015.81 777.16 3,885.81

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 896.23 353.99 4,050.83 1,325.26 6,626.31

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,327.11 250.47 2,203.24 945.21 4,726.04

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,564.10 353.99 4,115.72 1,508.45 7,542.25
MORTAR

411g ROLL POINTING Sq.m 177.09 23.93 173.95 93.74 468.71

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,027.29 532.89 4,115.72 1,668.98 8,344.88
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 347.94 1,239.53 1,129.53 679.25 3,396.24
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 359.79 1,250.70 1,428.33 759.71 3,798.53
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 583.85 1,267.47 2,340.66 1,047.99 5,239.96
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 652.20 1,278.43 3,490.27 1,355.23 6,776.13
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 724.66 1,249.65 5,868.44 1,960.69 9,803.45
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 837.28 1,307.64 8,936.94 2,770.47 13,852.33
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 970.75 1,476.11 9,810.94 3,064.45 15,322.26
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,178.77 1,671.72 11,766.39 3,654.22 18,271.10
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,518.86 1,964.29 23,495.73 6,744.72 33,723.59
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 347.94 1,239.53 1,646.13 808.40 4,041.99
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 359.79 1,250.70 2,002.33 903.21 4,516.03
DIA 380 mm

Page 424 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 583.85 1,267.47 2,668.66 1,129.99 5,649.96
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 652.20 1,278.43 4,146.27 1,519.23 7,596.13
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 724.66 1,249.65 7,508.44 2,370.69 11,853.45
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 837.28 1,307.64 11,806.94 3,487.97 17,439.83
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 970.75 1,476.11 13,910.94 4,089.45 20,447.26
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,178.77 1,671.72 16,295.83 4,786.58 23,932.90
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,518.86 1,964.29 29,358.70 8,210.46 41,052.31
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 350.45 221.37 1,430.11 500.48 2,502.41
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,774.99 1,009.38 6,185.66 2,242.51 11,212.53
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 18.13 - 235.44 63.39 316.96

507b ROCK FILL IN GABIONS Cu.m 344.70 - 1,351.92 424.16 2,120.79

508a BRICK PAVING (SINGLE COURSE) Sq.m 366.68 12.43 592.83 242.99 1,214.93

508b BRICK PAVING (DOUBLE COURSE) Sq.m 646.75 23.19 1,185.59 463.88 2,319.41

509a RIP RAP CLASS "A" Cu.m 1,071.17 102.72 1,455.20 657.28 3,286.38

509b RIP RAP CLASS "B" Cu.m 1,140.02 65.00 1,470.41 668.86 3,344.29

509c RIP RAP CLASS "C" Cu.m 1,195.69 51.75 1,497.84 686.32 3,431.60

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 736.09 529.70 1,549.12 703.73 3,518.64

509d GROUTED RIP RAP CLASS "A" Cu.m 1,295.23 174.53 3,680.44 1,287.55 6,437.75

509e GROUTED RIP RAP CLASS "B" Cu.m 1,613.95 136.79 3,544.69 1,323.86 6,619.29

509f GROUTED RIP RAP CLASS "C" Cu.m 1,854.22 111.58 3,437.19 1,350.75 6,753.75

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,854.22 712.83 3,454.58 1,505.41 7,527.04

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,715.14 794.12 7,482.41 2,497.92 12,489.59
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 182.15 279.57 1,432.47 473.55 2,367.73

510 DISMANTLING OF STRUCTURE AND Cu.m 618.32 857.83 - 369.04 1,845.19


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 288.69 71.56 256.71 154.24 771.21

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 329.93 81.79 330.10 185.46 927.28

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 275.76 48.80 1,164.12 372.17 1,860.85
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 315.16 55.77 1,456.52 456.86 2,284.30
BITUMEN JOINTS

Page 425 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 253.14 84.58 798.54 284.07 1,420.33
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 289.31 96.66 991.86 344.46 1,722.29
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 39,701.85 10,213.71 51,068.56
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 439.50 713.50 45,753.99 11,726.75 58,633.75
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,023.78 6,253.80 1,905.22 9,526.09
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 343.29 1,142.96 6,902.20 2,097.11 10,485.56
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,107.13 4,549.58 1,449.74 7,248.71
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 142.26 1,123.32 5,016.61 1,570.55 7,852.74
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 92.21 114.50 1,010.17 304.22 1,521.10
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 497.73 8,698.68 2,358.78 11,793.89
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 238.71 481.08 9,513.03 2,558.21 12,791.03
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 31.24 - 117.12 37.09 185.45

604a METAL GUARD RAIL M 97.52 37.67 4,227.93 1,090.78 5,453.89

604b METAL GUARD RAIL END PIECES Each 323.17 143.13 3,734.45 1,050.19 5,250.94

604d STEEL POST FOR METAL GUARD RAIL Each 185.28 131.75 5,157.19 1,368.56 6,842.78

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 4,364.81 496.53 30,128.77 8,747.53 43,737.63
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 4,364.81 496.53 30,036.88 8,724.55 43,622.76
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 962.30 385.19 15,789.28 4,284.19 21,420.96
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 962.30 385.19 17,816.71 4,791.05 23,955.25
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 426 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 962.30 385.19 19,922.71 5,317.55 26,587.75
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 962.30 385.19 16,392.48 4,434.99 22,174.96
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 962.30 385.19 18,620.11 4,991.90 24,959.50
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 962.30 385.19 20,936.71 5,571.05 27,855.25
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,062.84 271.72 19,925.12 5,314.92 26,574.60
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,062.84 271.72 23,552.12 6,221.67 31,108.35
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,062.84 271.72 27,088.12 7,105.67 35,528.35
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,062.84 271.72 20,937.82 5,568.10 27,840.48
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,062.84 271.72 24,927.52 6,565.52 32,827.60
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,062.84 271.72 27,088.12 7,105.67 35,528.35
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,062.84 488.98 25,227.17 6,694.75 33,473.74
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,062.84 488.98 26,657.17 7,052.25 35,261.24
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 427 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,062.84 488.98 43,402.87 11,238.67 56,193.36
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,062.84 488.98 46,262.87 11,953.67 59,768.36
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 374.27 292.24 40,878.94 10,386.37 51,931.83
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.54 36,342.49 9,240.91 46,204.53
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 168.08 34,747.34 8,861.35 44,306.75
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.50 35,901.74 9,165.78 45,828.89
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 374.27 292.24 36,878.94 9,386.37 46,931.83
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 457.59 163.54 32,342.49 8,240.91 41,204.53
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 529.98 168.08 30,747.34 7,861.35 39,306.75
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 588.87 172.50 31,901.74 8,165.78 40,828.89
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 486.90 - 4,680.00 1,291.73 6,458.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 486.90 - 3,960.00 1,111.73 5,558.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 428 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 486.90 - 7,020.00 1,876.73 9,383.63
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 486.90 - 5,940.00 1,606.73 8,033.63
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 18.24 14.76 866.93 224.99 1,124.93
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 30.03 9.44 47.18


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 5.07 93.50 25.68 128.39


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.14 3.57 36.03 10.94 54.68


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.14 4.39 114.69 30.81 154.03


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 156.84 159.69 220.74 134.32 671.60
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 261.40 365.96 687.23 328.65 1,643.24
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 39.03 12.05 60.24
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.49 135.22 36.47 182.35
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 5.17 3.99 46.83 14.00 69.99
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 5.17 5.49 165.77 44.11 220.54
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 156.84 159.69 327.81 161.09 805.44
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 261.40 309.33 945.95 379.17 1,895.85
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 78.42 79.85 366.31 131.14 655.71
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 78.42 109.79 998.11 296.58 1,482.90
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 78.42 79.85 476.11 158.59 792.96
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 114.61 50.96 1,373.87 384.86 1,924.31
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 500.74 144.82 724.09
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 279.37 78.87 394.34
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 429 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SHEIKHUPURA

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 39.64 38.88 600.74 169.82 849.09
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 25.64 10.46 304.37 85.12 425.59
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 300.90 238.15 1,546.82 521.47 2,607.34
DRAWING

610c KILOMETER POST Each 387.79 572.51 3,347.52 1,076.96 5,384.78

610d TEN KILOMETER POST Each 775.58 1,145.02 8,850.34 2,692.74 13,463.68

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 491.21 114.50 2,320.68 731.60 3,657.99
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 459.35 1,153.94 21.00 408.58 2,042.88
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.74 28.45 16.83 84.16

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 16.15 22.74 94.28 33.29 166.46

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.54 4.63 34.04 10.06 50.28

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 5.33 8.98 3.00 4.33 21.63
PER ADDITIONAL MONTH

Page 430 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

SIALKOT

Page 431 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 2.25 19.71 - 5.49 27.46

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 57.71 562.99 31.64 163.09 815.43

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 106.60 866.74 142.36 278.92 1,394.61

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 511.67 1,749.92 759.23 755.21 3,776.03

103 STRIPPING Cu.m 12.08 273.84 - 71.48 357.41

104 COMPACTION OF NATURAL GROUND Sq.m 2.09 18.54 1.76 5.60 27.98

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 18.57 304.56 - 80.78 403.91

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 65.73 785.93 38.43 222.52 1,112.61

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 49.30 612.18 - 165.37 826.85

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 38.19 435.52 - 118.43 592.13

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 18.57 304.56 - 80.78 403.91

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 65.73 785.93 38.43 222.52 1,112.61

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 49.30 612.18 - 165.37 826.85

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 38.19 435.52 - 118.43 592.13

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 36.50 279.16 - 78.92 394.58

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 252.50 686.73 210.34 287.39 1,436.96
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 65.73 776.45 38.43 220.15 1,100.75
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 49.38 602.56 - 162.99 814.93
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 38.19 425.98 - 116.04 580.21
MATERIAL

107d GRANULAR BACKFILL Cu.m 147.50 292.68 1,191.93 408.03 2,040.14

107e COMMON BACK FILL Cu.m 115.00 126.47 11.70 63.29 316.46

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 34.33 310.91 11.70 89.24 446.18
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 78.65 971.89 38.43 272.24 1,361.20
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.04 784.11 11.70 213.96 1,069.81
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 52.56 598.64 11.70 165.73 828.63
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 33.75 297.44 60.13 97.83 489.15
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 33.31 166.01 11.70 52.76 263.79
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 58.20 206.39 11.70 69.07 345.36
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 6.27 80.05 3.51 22.46 112.28

Page 432 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 4.12 70.63 3.12 19.47 97.34
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 30.41 327.50 456.55 203.62 1,018.09

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 3.69 22.19 1.76 6.91 34.55

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 5.28 22.60 11.22 9.78 48.88

201 GRANULAR SUBBASE Cu.m 47.80 265.25 1,637.39 487.61 2,438.05

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 72.73 518.37 1,729.20 580.08 2,900.38

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 72.73 408.11 1,729.20 552.51 2,762.54

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 248.24 1,850.81 13,827.16 3,981.55 19,907.76

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 248.24 1,850.81 14,226.31 4,081.34 20,406.70

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,850.25 13,827.16 3,981.41 19,907.05
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 248.24 1,850.25 14,102.44 4,050.23 20,251.15
"B")

204b CEMENT STABILIZED BASE Cu.m 121.54 567.92 2,324.48 753.49 3,767.44

204c CEMENT CONTENT Ton 500.00 - 14,743.47 3,810.87 19,054.34

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 1,029.17 2,292.94 108,716.97 28,009.77 140,048.85

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 1,029.17 2,292.94 104,393.34 26,928.86 134,644.31
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 419.10 144.33 1,807.66 592.77 2,963.86
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 231.48 2,438.10 13,259.09 3,982.17 19,910.84
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 461.00 107.63 1,863.09 607.93 3,039.65
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 7.17 39.30 100.70 36.79 183.96

207b DEEP PATCHING (15-30 cm) Sq.m 7.17 39.30 100.70 36.79 183.96

208 REINSTATEMENT OF ROAD SURFACE Sq.m 8.03 106.93 0.98 28.99 144.93

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 19.47 466.65 6.50 123.16 615.78
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 3.89 60.80 0.97 16.42 82.09

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 1.27 1.10 112.53 28.73 143.63

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 1.23 1.27 106.47 27.24 136.20
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.51 0.75 45.84 11.77 58.86

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.51 0.75 42.57 10.96 54.79
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.66 34.56 203.24 60.12 300.58

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.66 33.81 131.52 42.00 209.99

304bi DOUBLE SURFACE TREATMENT Sq.m 4.36 42.07 416.14 115.64 578.21

Page 433 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 4.36 41.14 344.42 97.48 487.40

304ci TRIPLE SURFACE TREATMENT Sq.m 7.94 46.75 491.39 136.52 682.60

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 7.94 45.77 419.53 118.31 591.55

304d SEAL COAT Sq.m 3.29 10.08 57.85 17.81 89.03

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,942.59 14,826.11 4,246.67 21,233.36
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 217.99 1,942.59 15,135.91 4,324.12 21,620.61
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 853.75 872.69 13,142.06 3,717.13 18,585.63

307b OPEN GRADED HOT BIT-MAC Cu.m 853.75 872.69 12,979.30 3,676.44 18,382.19

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 127.85 1,468.72 3,346.92 1,235.87 6,179.36
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 333.33 1,330.96 102,227.10 25,972.85 129,864.25

309a COLD MILLING, 0 - 30 mm Sq.m 2.61 32.46 60.38 23.86 119.31

309b COLD MILLING, 0 - 50 mm Sq.m 5.18 53.51 100.10 39.70 198.48

309c COLD MILLING, 0 - 70 mm Sq.m 9.78 72.25 139.67 55.43 277.14

309d COLD MILLING, 0 - 100 mm Sq.m 11.29 97.72 200.55 77.39 386.95

309e COLD MILLING, 0 - 130 mm Sq.m 14.68 127.03 260.71 100.61 503.03

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 430.00 3,663.07 12,637.57 4,182.66 20,913.30
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,427.08 2,612.06 7,617.53 2,914.17 14,570.84

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,427.08 2,612.47 8,882.85 3,230.60 16,153.00

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,427.08 2,612.06 9,304.13 3,335.82 16,679.09

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,427.08 2,612.52 8,165.11 3,051.18 15,255.90

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,427.08 2,719.73 9,430.44 3,394.31 16,971.56

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,487.50 2,612.47 9,851.71 3,487.92 17,439.60

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,427.08 2,612.06 8,514.85 3,138.50 15,692.49

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,427.08 2,719.73 9,780.17 3,481.75 17,408.74

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,487.50 2,612.52 10,201.45 3,575.37 17,876.84

401b CONCRETE CLASS "B" Cu.m 1,826.39 1,298.54 6,114.68 2,309.90 11,549.51

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,372.22 2,723.27 7,111.36 2,801.71 14,008.56

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,412.50 2,722.34 8,386.40 3,130.31 15,651.55

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,412.50 2,722.34 8,797.96 3,233.20 16,166.00

401di CONCRETE CLASS "D1" Cu.m 2,225.00 2,881.27 11,941.51 4,261.95 21,309.73

401dii CONCRETE CLASS "D2" Cu.m 2,225.00 2,881.73 12,801.08 4,476.96 22,384.78

Page 434 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 2,225.00 2,881.73 13,503.15 4,652.47 23,262.36

401e CONCRETE CLASS "Y" Cu.m 1,427.08 1,704.81 9,651.04 3,195.73 15,978.66

401f LEAN CONCRETE Cu.m 1,195.00 1,025.57 4,692.63 1,728.30 8,641.50

401gi PRECAST CONCRETE CLASS "A1" Cu.m 3,387.50 1,500.17 8,617.54 3,376.30 16,881.51

401gii PRECAST CONCRETE CLASS "A3" Cu.m 3,387.50 1,500.17 9,672.36 3,640.01 18,200.04

401giii PRECAST CONCRETE CLASS "B" Cu.m 3,387.50 1,790.26 7,165.80 3,085.89 15,429.45

401giv PRECAST CONCRETE CLASS "D1" Cu.m 2,414.24 2,881.73 11,999.85 4,323.96 21,619.78

401gv PRECAST CONCRETE CLASS "D2" Cu.m 2,414.24 2,881.73 12,859.43 4,538.85 22,694.25

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 2,414.24 2,881.73 13,561.50 4,714.37 23,571.84

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,612.50 1,274.57 4,624.63 1,877.93 9,389.63
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 6,540.00 816.48 183,105.11 47,615.40 238,076.99

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 6,540.00 816.48 187,305.11 48,665.40 243,326.99

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 3,616.00 1,853.92 213,931.90 54,850.46 274,252.28
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 8,100.00 7,788.70 356,576.72 93,116.35 465,581.77
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 250.00 1,019.27 - 317.32 1,586.59

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 461.11 - 1,569.89 507.75 2,538.76
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 311.11 - 4,050.24 1,090.34 5,451.69
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 32.46 4.18 247.85 71.12 355.61
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 48,473.62 12,399.66 61,998.28
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 1,125.00 - 43,973.62 11,274.66 56,373.28
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 139,841.46 35,241.62 176,208.08


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 1,125.00 - 114,852.74 28,994.44 144,972.18


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 43,380.31 11,126.33 55,631.64


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 1,125.00 - 38,322.85 9,861.96 49,309.81


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 435 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 1,125.00 - 33,855.68 8,745.17 43,725.85
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 1,125.00 - 26,241.57 6,841.64 34,208.21


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 1,125.00 - 31,675.56 8,200.14 41,000.70
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 1,125.00 - 105,165.16 26,572.54 132,862.70
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 1,050.00 - 68,966.28 17,504.07 87,520.35
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 275.00 - 970.42 311.36 1,556.78

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 275.00 - 1,251.82 381.71 1,908.53

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.07 - 1.67 0.44 2.18
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 3.02 0.78 3.88
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.08 - 5.52 1.40 7.00
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 108.75 - 468.35 144.28 721.38

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 583.70 3,921.08 278.00 1,195.70 5,978.48
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,388.71 5,196.26 378.62 1,740.90 8,704.49
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 639.16 4,515.67 315.72 1,367.64 6,838.19
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,603.04 6,128.98 472.92 2,051.24 10,256.19
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 816.82 9,527.39 838.35 2,795.64 13,978.20
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 3,489.88 13,563.21 838.37 4,472.87 22,364.33
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 1,209.77 13,619.90 1,305.09 4,033.69 20,168.46
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 5,002.39 19,767.02 1,305.09 6,518.63 32,593.13
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 570.00 1,601.83 3,773.79 1,486.41 7,432.04
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 1,140.00 3,167.14 2,883.78 1,797.73 8,988.65
SIZE) INCLUDING TESTING AND REPORTING

Page 436 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 2,280.00 6,270.21 1,028.28 2,394.62 11,973.10
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 27,000.00 99,126.56 938,747.55 266,218.53 1,331,092.64

407t PILE LOAD TEST UPTO 800 TON Each 33,000.00 109,197.28 1,365,467.67 376,916.24 1,884,581.19

407u PILE LOAD TEST UPTO 1000 TON Each 33,000.00 109,197.28 1,706,880.48 462,269.44 2,311,347.20

407v PILE LOAD TEST UPTO 1200 TON Each 33,000.00 109,197.28 2,000,232.10 535,607.35 2,678,036.73

407w PILE LOAD TEST UPTO 1500 TON Each 33,000.00 109,197.28 2,425,259.53 641,864.20 3,209,321.01

407x PILE LOAD TEST UPTO 2000 TON Each 33,000.00 109,197.28 2,830,259.53 743,114.20 3,715,571.01

407y PILE LOAD TEST UPTO 2500 TON Each 33,000.00 135,525.28 3,235,259.53 850,946.20 4,254,731.01

407l PERMANENT PILE CASING FOR PILES Ton 2,056.25 8,343.31 228,386.51 59,696.52 298,482.59

410 BRICK WORK Cu.m 1,224.00 449.48 8,446.94 2,530.11 12,650.53

411a STONE MASONRY RANDOM DRY Cu.m 977.50 250.52 1,914.76 785.69 3,928.46

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 1,040.00 354.11 3,923.21 1,329.33 6,646.65

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,540.00 250.52 2,124.32 978.71 4,893.55

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,815.00 354.11 4,015.97 1,546.27 7,731.35
MORTAR

411g ROLL POINTING Sq.m 205.50 23.95 173.10 100.64 503.20

412a STONE MASONRY DRESSED COURSED WITH Cu.m 2,352.50 533.05 4,015.97 1,725.38 8,626.90
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 403.75 1,240.01 1,232.53 719.08 3,595.38
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 417.50 1,251.20 1,572.63 810.33 4,051.66
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 677.50 1,267.97 2,541.05 1,121.63 5,608.15
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 756.82 1,278.93 3,850.68 1,471.61 7,358.04
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 840.91 1,250.16 6,268.84 2,089.98 10,449.88
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 971.59 1,308.17 9,452.46 2,933.06 14,665.28
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,126.47 1,476.71 10,327.25 3,232.61 16,163.04
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,367.86 1,672.40 12,486.27 3,881.63 19,408.15
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,762.50 1,965.07 24,699.34 7,106.73 35,533.65
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 403.75 1,240.01 1,749.13 848.23 4,241.13
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 417.50 1,251.20 2,146.63 953.83 4,769.16
DIA 380 mm

Page 437 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 677.50 1,267.97 2,869.05 1,203.63 6,018.15
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 756.82 1,278.93 4,506.68 1,635.61 8,178.04
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 840.91 1,250.16 7,908.84 2,499.98 12,499.88
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 971.59 1,308.17 12,322.46 3,650.56 18,252.78
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,126.47 1,476.71 14,427.25 4,257.61 21,288.04
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,367.86 1,672.40 17,015.75 5,014.00 25,070.01
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,762.50 1,965.07 30,562.32 8,572.47 42,862.36
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 406.67 221.43 1,198.69 456.70 2,283.49
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 2,059.72 1,011.39 6,114.68 2,296.45 11,482.24
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 21.04 - 237.35 64.60 322.99

507b ROCK FILL IN GABIONS Cu.m 400.00 - 1,255.52 413.88 2,069.40

508a BRICK PAVING (SINGLE COURSE) Sq.m 425.50 12.43 583.69 255.41 1,277.04

508b BRICK PAVING (DOUBLE COURSE) Sq.m 750.50 23.20 1,167.34 485.26 2,426.30

509a RIP RAP CLASS "A" Cu.m 1,243.00 102.75 1,356.35 675.53 3,377.63

509b RIP RAP CLASS "B" Cu.m 1,322.89 65.01 1,378.15 691.51 3,457.56

509c RIP RAP CLASS "C" Cu.m 1,387.50 51.76 1,411.45 712.68 3,563.39

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 854.17 529.81 1,475.03 714.75 3,573.76

509d GROUTED RIP RAP CLASS "A" Cu.m 1,503.00 174.61 3,506.07 1,295.92 6,479.60

509e GROUTED RIP RAP CLASS "B" Cu.m 1,872.85 136.86 3,379.94 1,347.41 6,737.06

509f GROUTED RIP RAP CLASS "C" Cu.m 2,151.67 111.64 3,280.43 1,385.94 6,929.68

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 2,151.67 714.54 3,305.28 1,542.87 7,714.36

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,990.28 794.72 7,409.41 2,548.60 12,743.01
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 211.36 279.64 1,203.65 423.67 2,118.33

510 DISMANTLING OF STRUCTURE AND Cu.m 717.50 857.88 - 393.85 1,969.23


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 335.00 71.58 239.28 161.46 807.31

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 382.86 81.80 307.68 193.09 965.43

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 320.00 48.81 1,145.77 378.65 1,893.23
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 365.71 55.79 1,433.08 463.65 2,318.23
BITUMEN JOINTS

Page 438 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 293.75 84.60 773.90 288.07 1,440.33
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 335.71 96.69 960.65 348.26 1,741.31
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 39,801.73 10,256.31 51,281.54
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 510.00 713.50 45,868.68 11,773.05 58,865.24
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,025.10 6,231.41 1,913.72 9,568.58
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 398.35 1,144.46 6,877.52 2,105.09 10,525.43
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,107.58 4,526.21 1,449.72 7,248.59
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 165.08 1,123.77 4,990.64 1,569.87 7,849.36
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 107.00 114.52 1,037.61 314.78 1,573.91
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 497.90 8,870.69 2,411.40 12,057.00
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 277.00 481.26 9,702.89 2,615.29 13,076.44
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 36.25 - 117.12 38.34 191.71

604a METAL GUARD RAIL M 113.16 37.67 4,263.64 1,103.62 5,518.09

604b METAL GUARD RAIL END PIECES Each 375.00 143.15 3,756.84 1,068.75 5,343.74

604d STEEL POST FOR METAL GUARD RAIL Each 215.00 131.84 5,201.59 1,387.11 6,935.54

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 5,065.00 497.09 30,087.39 8,912.37 44,561.85
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 5,065.00 497.09 29,993.78 8,888.97 44,444.83
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 1,116.67 386.75 15,905.43 4,352.21 21,761.06
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 1,116.67 386.75 17,964.93 4,867.09 24,335.44
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 439 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 1,116.67 386.75 20,070.93 5,393.59 26,967.94
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 1,116.67 386.75 16,503.56 4,501.75 22,508.73
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 1,116.67 386.75 18,768.33 5,067.94 25,339.69
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 1,116.67 386.75 21,084.93 5,647.09 28,235.44
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 1,233.33 271.94 20,073.38 5,394.66 26,973.31
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 1,233.33 271.94 23,700.38 6,301.41 31,507.06
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 1,233.33 271.94 27,236.38 7,185.41 35,927.06
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 1,233.33 271.94 21,086.08 5,647.84 28,239.19
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 1,233.33 271.94 25,075.78 6,645.26 33,226.31
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 1,233.33 271.94 27,236.38 7,185.41 35,927.06
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 1,233.33 490.18 25,370.68 6,773.55 33,867.74
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 1,233.33 490.18 26,800.68 7,131.05 35,655.24
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 440 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 1,233.33 490.18 43,563.02 11,321.63 56,608.16
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 1,233.33 490.18 46,423.02 12,036.63 60,183.16
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 434.31 292.48 40,951.37 10,419.54 52,097.71
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.65 36,372.88 9,266.89 46,334.43
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 168.19 34,743.62 8,881.70 44,408.51
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.62 35,891.98 9,186.98 45,934.91
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 434.31 292.48 36,951.37 9,419.54 47,097.71
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 531.00 163.65 32,372.88 8,266.89 41,334.43
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 615.00 168.19 30,743.62 7,881.70 39,408.51
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 683.33 172.62 31,891.98 8,186.98 40,934.91
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 565.00 - 4,680.00 1,311.25 6,556.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 565.00 - 3,960.00 1,131.25 5,656.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 441 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 565.00 - 7,020.00 1,896.25 9,481.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 565.00 - 5,940.00 1,626.25 8,131.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 21.17 14.76 868.41 226.09 1,130.43
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 30.03 9.60 48.00


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 5.08 93.50 25.85 129.23


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 4.80 3.57 36.03 11.10 55.50


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 4.80 4.40 114.69 30.97 154.86


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 182.00 159.73 220.74 140.62 703.09
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 303.33 366.27 687.23 339.21 1,696.03
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 39.03 12.26 61.28
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.49 135.22 36.68 183.40
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 6.00 3.99 46.83 14.21 71.03
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 6.00 5.49 165.77 44.32 221.58
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 182.00 159.73 327.81 167.39 836.93
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 303.33 309.57 945.95 389.71 1,948.56
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 91.00 79.86 366.31 134.29 671.46
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 91.00 109.88 998.11 299.75 1,498.74
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 91.00 79.86 476.11 161.74 808.71
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 133.00 51.03 1,373.87 389.48 1,947.38
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.89 501.62 146.63 733.13
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 279.65 79.97 399.83
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 442 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: SIALKOT

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 46.00 38.89 601.62 171.63 858.13
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 29.75 10.46 304.65 86.22 431.08
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 349.17 238.61 1,539.53 531.83 2,659.14
DRAWING

610c KILOMETER POST Each 450.00 572.61 3,398.21 1,105.21 5,526.03

610d TEN KILOMETER POST Each 900.00 1,145.22 9,038.75 2,770.99 13,854.96

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 570.00 114.52 2,311.32 748.96 3,744.80
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 533.04 1,154.86 19.00 426.72 2,133.61
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.75 28.45 17.49 87.43

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 18.74 22.75 94.28 33.95 169.73

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.79 4.64 34.12 10.14 50.69

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 6.18 8.98 3.00 4.54 22.70
PER ADDITIONAL MONTH

Page 443 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

TOBA TEK SINGH

Page 444 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.68 - 5.35 26.76

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.78 31.48 159.42 797.08

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 864.68 141.65 272.08 1,360.41

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,742.91 755.49 722.99 3,614.96

103 STRIPPING Cu.m 9.29 273.55 - 70.71 353.55

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.48 1.76 5.46 27.31

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.75 - 79.51 397.55

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 783.47 38.54 218.15 1,090.73

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.29 - 162.05 810.26

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 434.05 - 115.86 579.28

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.75 - 79.51 397.55

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 783.47 38.54 218.15 1,090.73

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.29 - 162.05 810.26

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 434.05 - 115.86 579.28

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 278.58 - 76.67 383.33

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 684.53 211.08 272.46 1,362.29
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 774.00 38.54 215.78 1,078.88
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.68 - 159.67 798.33
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.52 - 113.47 567.36
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.32 1,606.25 503.01 2,515.03

107e COMMON BACK FILL Cu.m 88.46 126.01 11.70 56.54 282.70

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.32 11.70 87.11 435.54
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 969.26 38.54 267.08 1,335.38
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 781.60 11.70 209.87 1,049.35
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.56 11.70 162.17 810.86
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.60 60.14 95.68 478.38
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.50 11.70 50.71 253.53
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.08 11.70 65.64 328.20
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.82 3.51 22.04 110.19

Page 445 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.49 3.12 19.20 95.98
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.43 489.63 209.86 1,049.31

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.14 1.76 6.68 33.41

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.54 11.17 9.44 47.21

201 GRANULAR SUBBASE Cu.m 36.77 264.73 1,767.68 517.30 2,586.48

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.59 1,997.22 642.69 3,213.44

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.63 1,997.22 614.95 3,074.74

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,845.95 13,824.49 3,965.35 19,826.74

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,845.95 14,221.71 4,064.65 20,323.25

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.39 13,824.49 3,965.21 19,826.03
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,845.39 14,099.67 4,034.00 20,170.00
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 566.30 2,455.66 778.86 3,894.31

204c CEMENT CONTENT Ton 384.60 - 14,645.82 3,757.61 18,788.03

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,288.90 108,155.79 27,809.08 139,045.41

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,288.90 102,902.79 26,495.83 132,479.16
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.94 1,839.54 576.46 2,882.31
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,432.69 13,282.39 3,973.29 19,866.43
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.41 2,106.45 642.12 3,210.58
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.20 116.16 40.22 201.10

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.20 116.16 40.22 201.10

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.60 0.98 28.44 142.20

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 465.27 6.50 121.69 608.43
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.69 0.97 16.17 80.83

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 111.04 28.28 141.39

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.26 104.98 26.80 133.98
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.24 11.60 57.98

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.98 10.78 53.89
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.46 201.30 59.45 297.25

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.72 130.52 41.57 207.86

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.94 412.80 114.52 572.61

Page 446 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.03 342.02 96.60 483.00

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.62 487.52 135.06 675.31

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.64 416.61 117.09 585.44

304d SEAL COAT Sq.m 2.53 10.06 57.33 17.48 87.40

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.49 14,810.95 4,229.03 21,145.15
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,937.49 15,113.58 4,304.69 21,523.44
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 870.26 13,144.43 3,667.85 18,339.25

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 870.26 12,988.81 3,628.95 18,144.74

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.69 3,344.48 1,227.38 6,136.90
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.70 100,741.41 25,581.13 127,905.64

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.37 60.30 23.67 118.35

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.36 99.97 39.33 196.64

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.85 139.50 54.72 273.59

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.18 200.31 76.54 382.71

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.34 260.40 99.51 497.53

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,656.81 12,951.22 4,234.70 21,173.49
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,592.11 7,946.09 2,908.98 14,544.90

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,592.51 9,216.74 3,226.74 16,133.71

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,592.11 9,640.54 3,332.59 16,662.96

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,592.57 8,489.47 3,044.94 15,224.70

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,699.04 9,760.12 3,389.22 16,946.10

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,592.51 10,183.92 3,480.16 17,400.79

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,592.11 8,836.74 3,131.64 15,658.21

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,699.04 10,107.39 3,476.04 17,380.19

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,592.57 10,531.19 3,566.99 17,834.95

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,289.93 6,442.94 2,284.44 11,422.20

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,707.85 7,442.62 2,801.50 14,007.49

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,706.00 8,723.09 3,128.90 15,644.50

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,706.92 9,137.07 3,232.63 16,163.13

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,860.35 12,260.42 4,208.07 21,040.34

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,860.81 13,115.23 4,421.89 22,109.43

Page 447 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,860.81 13,812.65 4,596.24 22,981.20

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,695.31 9,982.39 3,193.86 15,969.28

401f LEAN CONCRETE Cu.m 919.20 1,017.30 5,027.61 1,741.03 8,705.14

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,489.24 8,946.57 3,260.38 16,301.91

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,489.24 9,994.62 3,522.39 17,611.96

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,778.74 7,450.01 2,958.62 14,793.08

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,860.81 12,319.36 4,259.31 21,296.54

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,860.81 13,174.17 4,473.01 22,365.05

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,860.81 13,871.59 4,647.37 23,236.83

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,267.84 4,897.53 1,851.43 9,257.15
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.23 183,487.58 47,333.62 236,668.11

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.23 187,658.64 48,376.39 241,881.94

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.20 214,180.81 54,703.87 273,519.36
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,782.45 356,634.34 92,661.83 463,309.14
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,008.84 - 300.29 1,501.43

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,574.02 482.18 2,410.89
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,062.41 1,075.43 5,377.15
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 248.93 69.52 347.60
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,423.13 12,322.12 61,610.60
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 43,923.13 11,197.12 55,985.60
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 139,699.42 35,141.19 175,705.96


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 114,705.23 28,892.65 144,463.23


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,368.75 11,058.53 55,292.63


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,301.46 9,791.70 48,958.51


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 448 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,802.20 8,666.89 43,334.44
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,215.14 6,770.12 33,850.61


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,677.02 8,135.59 40,677.96
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,084.86 26,487.55 132,437.76
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,025.19 17,458.21 87,291.06
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 974.75 296.57 1,482.86

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,256.15 366.92 1,834.61

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 472.47 139.03 695.15

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,880.97 313.58 1,160.89 5,804.43
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,165.29 417.89 1,662.85 8,314.25
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,468.94 352.69 1,328.32 6,641.60
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,091.64 515.66 1,960.10 9,800.49
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,499.19 893.29 2,755.20 13,775.98
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,475.69 893.32 4,263.36 21,316.80
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,579.53 1,376.90 3,971.75 19,858.73
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,637.65 1,376.90 6,215.60 31,078.01
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,595.29 3,739.39 1,443.28 7,216.41
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,154.19 2,849.38 1,720.11 8,600.57
SIZE) INCLUDING TESTING AND REPORTING

Page 449 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,244.55 993.88 2,248.05 11,240.25
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,910.40 912,193.05 257,967.96 1,289,839.81

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,951.20 1,326,842.37 365,294.29 1,826,471.46

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,951.20 1,658,597.28 448,233.02 2,241,165.10

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,951.20 1,942,293.10 519,156.98 2,595,784.88

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,951.20 2,352,836.83 621,792.91 3,108,964.54

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,951.20 2,757,836.83 723,042.91 3,615,214.54

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,216.56 3,162,836.83 830,859.25 4,154,296.24

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,328.61 228,764.23 59,668.63 298,343.13

410 BRICK WORK Cu.m 941.51 448.26 8,591.07 2,495.21 12,476.05

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.31 2,043.00 761.30 3,806.51

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.51 4,286.83 1,360.08 6,800.40

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.31 2,262.50 924.35 4,621.73

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.51 4,379.53 1,532.29 7,661.45
MORTAR

411g ROLL POINTING Sq.m 158.07 23.86 178.47 90.10 450.51

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.30 4,379.53 1,680.35 8,401.75
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,234.92 1,241.20 696.67 3,483.36
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.87 1,584.65 788.67 3,943.33
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.62 2,557.47 1,086.06 5,430.29
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,276.57 3,879.94 1,434.67 7,173.33
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.75 6,301.99 2,049.15 10,245.73
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.67 9,495.64 2,887.17 14,435.84
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,473.19 10,371.37 3,177.76 15,888.81
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,669.20 12,546.46 3,816.96 19,084.78
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,961.37 24,795.37 7,028.12 35,140.58
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,234.92 1,757.80 825.82 4,129.11
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.87 2,158.65 932.17 4,660.83
DIA 380 mm

Page 450 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.62 2,885.47 1,168.06 5,840.29
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,276.57 4,535.94 1,598.67 7,993.33
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.75 7,941.99 2,459.15 12,295.73
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.67 12,365.64 3,604.67 18,023.34
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,473.19 14,471.37 4,202.76 21,013.81
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,669.20 17,075.81 4,949.30 24,746.48
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,961.37 30,658.34 8,493.86 42,469.29
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.14 1,570.80 526.19 2,630.95
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,005.24 6,442.94 2,258.14 11,290.69
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.40 63.65 318.23

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,372.20 419.97 2,099.85

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.39 599.23 234.73 1,173.65

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.12 1,198.37 449.70 2,248.48

509a RIP RAP CLASS "A" Cu.m 956.12 102.06 1,480.35 634.63 3,173.16

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.36 1,502.13 646.02 3,230.08

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.22 1,536.43 663.73 3,318.65

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.29 1,601.65 696.49 3,482.46

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.69 3,912.51 1,310.33 6,551.64

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.99 3,769.49 1,336.27 6,681.36

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 110.08 3,655.44 1,355.15 6,775.75

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.87 3,680.28 1,511.56 7,557.79

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.89 7,730.52 2,513.34 12,566.70
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.30 1,570.92 503.20 2,516.00

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.61 - 352.38 1,761.89


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.52 261.15 147.59 737.94

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.73 335.81 178.01 890.05

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.73 1,219.74 378.66 1,893.28
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.70 1,524.53 465.38 2,326.91
BITUMEN JOINTS

Page 451 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.49 859.53 292.50 1,462.48
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.56 1,066.64 355.36 1,776.79
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,839.00 10,236.20 51,180.99
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,914.11 11,754.98 58,774.89
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,018.85 6,363.99 1,922.32 9,611.58
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,137.37 7,023.69 2,116.87 10,584.35
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,104.53 4,647.96 1,469.87 7,349.34
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.70 5,125.12 1,593.20 7,965.99
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.43 1,010.17 301.73 1,508.63
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 497.05 8,676.13 2,346.56 11,732.81
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.43 9,488.05 2,545.39 12,726.93
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.64 4,283.28 1,101.99 5,509.96

604b METAL GUARD RAIL END PIECES Each 288.45 143.03 3,769.15 1,050.16 5,250.79

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.42 5,226.01 1,380.70 6,903.50

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 494.42 30,464.18 8,713.65 43,568.26
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 494.42 30,369.61 8,690.01 43,450.06
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 381.89 16,027.11 4,316.99 21,584.93
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 381.89 18,091.13 4,832.99 24,164.95
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 452 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 381.89 20,197.13 5,359.49 26,797.45
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 381.89 16,625.24 4,466.52 22,332.59
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 381.89 18,894.53 5,033.84 25,169.20
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 381.89 21,211.13 5,612.99 28,064.95
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.89 20,199.47 5,354.76 26,773.81
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.89 23,826.47 6,261.51 31,307.56
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.89 27,362.47 7,145.51 35,727.56
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.89 21,212.17 5,607.94 28,039.69
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.89 25,201.87 6,605.36 33,026.81
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.89 27,362.47 7,145.51 35,727.56
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 487.48 25,548.88 6,746.26 33,731.30
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 487.48 26,978.88 7,103.76 35,518.80
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 453 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 487.48 43,750.38 11,296.64 56,483.18
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 487.48 46,610.38 12,011.64 60,058.18
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.88 41,057.27 10,420.56 52,102.79
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.13 36,496.97 9,267.14 46,335.69
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.65 34,852.66 8,873.34 44,366.71
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.06 35,998.59 9,174.07 45,870.35
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.88 37,057.27 9,420.56 47,102.79
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.13 32,496.97 8,267.14 41,335.69
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.65 30,852.66 7,873.34 39,366.71
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 172.06 31,998.59 8,174.07 40,870.35
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 454 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.23 225.07 1,125.34
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.81


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.38 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.58 220.74 130.08 650.40
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.81 687.23 321.34 1,606.71
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.64
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.58 327.81 156.85 784.23
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.46 945.95 371.93 1,859.66
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.79 366.31 129.02 645.11
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.44 998.11 294.39 1,471.94
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.79 476.11 156.47 782.36
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.72 1,373.87 381.73 1,908.63
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.10 144.09 720.45
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.79 78.28 391.41
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 455 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: TOBA TEK SINGH

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.10 169.09 845.45
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.79 84.53 422.66
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 237.17 1,568.31 518.52 2,592.59
DRAWING

610c KILOMETER POST Each 346.14 572.13 3,353.10 1,067.85 5,339.23

610d TEN KILOMETER POST Each 692.29 1,144.26 8,814.98 2,662.88 13,314.41

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.43 2,360.04 728.23 3,641.14
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,150.51 24.00 396.13 1,980.65
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 28.46 16.39 81.93

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.67 94.29 32.84 164.21

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.95 9.99 49.94

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.95 3.00 4.18 20.88
PER ADDITIONAL MONTH

Page 456 of 469


NATIONAL HIGHWAY AUTHORITY
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD

COMPOSITE SCHEDULE OF RATES-2022

VEHARI

Page 457 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

101 CLEARING AND GRUBBING Sq.m 1.73 19.67 - 5.35 26.76

102a REMOVAL OF TREES 150 - 300 mm GIRTH Each 44.39 561.34 31.47 159.30 796.50

102b REMOVAL OF TREES 301 - 600 mm GIRTH Each 81.99 863.89 141.59 271.87 1,359.35

102c REMOVAL OF TREES 601 mm OR OVER GIRTH Each 393.57 1,740.33 755.14 722.26 3,611.30

103 STRIPPING Cu.m 9.29 273.47 - 70.69 353.46

104 COMPACTION OF NATURAL GROUND Sq.m 1.61 18.46 1.76 5.46 27.28

106a EXCAVATE UNSUITABLE COMMON MATERIAL Cu.m 14.29 303.61 - 79.48 397.38

106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL Cu.m 50.56 782.41 38.66 217.91 1,089.54

106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL Cu.m 37.92 610.00 - 161.98 809.90

106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL Cu.m 29.37 433.70 - 115.77 578.84

106c EXCAVATE SURPLUS COMMON MATERIAL Cu.m 14.29 303.61 - 79.48 397.38

106di EXCAVATE SURPLUS HARD ROCK MATERIAL Cu.m 50.56 782.41 38.66 217.91 1,089.54

106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL Cu.m 37.92 610.00 - 161.98 809.90

106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL Cu.m 29.37 433.70 - 115.77 578.84

107a STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 28.08 277.96 - 76.51 382.55

107b STRUCTURAL EXCAVATION IN COMMON MATERIAL Cu.m 194.22 683.12 211.65 272.25 1,361.25
BELOW WATER LEVEL (WHERE DEWATERING IS
PERFORMED BY PUMP FOR STRUCTURES ONLY)

107ci STRUCTURAL EXCAVATION IN HARD ROCK Cu.m 50.56 772.94 38.66 215.54 1,077.69
MATERIAL

107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK Cu.m 37.98 600.40 - 159.60 797.98
MATERIAL

107ciii STRUCTURAL EXCAVATION IN SOFT ROCK Cu.m 29.37 424.17 - 113.39 566.94
MATERIAL

107d GRANULAR BACKFILL Cu.m 113.46 292.22 1,828.38 558.52 2,792.58

107e COMMON BACK FILL Cu.m 88.46 125.95 11.70 56.53 282.63

108a FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 26.41 310.12 11.70 87.06 435.29
EXCAVATION IN COMMON MATERIAL

108bi FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 60.49 968.73 38.66 266.97 1,334.86
EXCAVATION IN HARD ROCK MATERIAL

108bii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 46.18 781.26 11.70 209.79 1,048.93
EXCAVATION IN MEDIUM ROCK MATERIAL

108biii FORMATION OF EMBANKMENT FROM ROADWAY Cu.m 40.43 596.14 11.70 162.07 810.35
EXCAVATION IN SOFT ROCK MATERIAL

108c FORMATION OF EMBANKMENT FROM BORROW Cu.m 25.96 296.44 60.14 95.64 478.18
EXCAVATION IN COMMON MATERIAL

108d FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 25.62 165.43 11.70 50.69 253.44
EXCAVATION IN COMMON MATERIAL

108e FORMATION OF EMBANKMENT FROM STRUCTURAL Cu.m 44.77 206.01 11.70 65.62 328.10
EXCAVATION IN ANY TYPE OF ROCK MATERIAL

109a SUBGRADE PREPARATION IN EARTH CUT Sq.m 4.82 79.79 3.51 22.03 110.15

Page 458 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

109bi SUBGRADE PREPARATION IN EXISTING ROAD Sq.m 3.17 70.46 3.12 19.19 95.94
WITHOUT ANY FILL

110 IMPROVED SUB-GARDE (CBR>20%) Cu.m 23.39 326.15 644.36 248.48 1,242.39

114a DRESSING OF BERM WITHOUT EXTRA MATERIAL Sq.m 2.84 22.13 1.76 6.68 33.40

114b DRESSING OF BERM WITH EXTRA MATERIAL Sq.m 4.06 22.53 11.17 9.44 47.20

201 GRANULAR SUBBASE Cu.m 36.77 264.60 2,377.25 669.65 3,348.26

202i AGGREGATE BASE COURSE (WITH PAVER) Cu.m 55.94 517.16 2,469.07 760.54 3,802.71

202ii AGGREGATE BASE COURSE (WITH GRADER) Cu.m 55.94 406.44 2,469.07 732.86 3,664.31

203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") Cu.m 190.94 1,844.14 14,577.84 4,153.23 20,766.15

203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") Cu.m 190.94 1,844.14 14,972.46 4,251.89 21,259.43

203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.57 14,577.84 4,153.09 20,765.45
"A")

203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS Cu.m 190.94 1,843.57 14,851.31 4,221.46 21,107.29
"B")

204b CEMENT STABILIZED BASE Cu.m 93.49 565.91 3,262.41 980.45 4,902.26

204c CEMENT CONTENT Ton 384.60 - 14,755.44 3,785.01 18,925.05

204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 Ton 791.64 2,287.88 107,772.23 27,712.94 138,564.68

204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS- Ton 791.64 2,287.88 102,519.23 26,399.69 131,998.43
1

205a GRADED CRUSHED AGGREGATE CRACK-RELIEF Cu.m 322.37 143.84 2,451.72 729.48 3,647.41
LAYER

205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK- Cu.m 178.06 2,431.44 13,962.36 4,142.96 20,714.81
RELIEF LAYER

206b WATER BOUND MACADAM BASE WITH COARSE Cu.m 354.60 107.35 2,590.76 763.18 3,815.89
AGG: CLASS B

207a DEEP PATCHING (0-15 cm) Sq.m 5.51 39.19 143.38 47.02 235.10

207b DEEP PATCHING (15-30 cm) Sq.m 5.51 39.19 143.38 47.02 235.10

208 REINSTATEMENT OF ROAD SURFACE Sq.m 6.18 106.45 0.98 28.40 142.00

209a BREAKING OF EXISTING ROAD PAVEMENT Cu.m 14.97 464.62 6.50 121.52 607.61
STRUCTURE

209b SCARIFICATION OF EXISTING ROAD PAVEMENT Sq.m 2.99 60.64 0.97 16.15 80.76

302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME Sq.m 0.98 1.09 110.66 28.18 140.91

302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME Sq.m 0.95 1.25 104.59 26.70 133.49
COAT

303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT Sq.m 0.39 0.74 45.09 11.56 57.78

303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK Sq.m 0.39 0.74 41.82 10.74 53.70
COAT

304ai SINGLE SURFACE TREATMENT Sq.m 2.04 34.44 204.86 60.34 301.68

304aii SINGLE SURFACE TREATMENT W/O PRIME COAT Sq.m 2.04 33.70 134.33 42.52 212.60

304bi DOUBLE SURFACE TREATMENT Sq.m 3.35 41.93 423.83 117.28 586.39

Page 459 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

304bii DOUBLE SURFACE TREATMENT W/O PRIME COAT Sq.m 3.35 41.01 353.30 99.41 497.06

304ci TRIPLE SURFACE TREATMENT Sq.m 6.10 46.59 500.51 138.30 691.51

304cii TRIPLE SURFACE TREATMENT W/O PRIME COAT Sq.m 6.10 45.62 429.84 120.39 601.96

304d SEAL COAT Sq.m 2.53 10.04 58.51 17.77 88.85

305a ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.66 15,557.37 4,415.18 22,075.89
(CLASS "A")

305b ASPHALTIC CONCRETE FOR WEARING COURSE Cu.m 167.68 1,935.66 15,857.43 4,490.19 22,450.96
(CLASS "B")

307a DENSE GRADED HOT BIT-MAC Cu.m 656.71 869.78 13,899.47 3,856.49 19,282.45

307b OPEN GRADED HOT BIT-MAC Cu.m 656.71 869.78 13,745.64 3,818.03 19,090.16

308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm Cu.m 98.35 1,466.22 3,343.85 1,227.11 6,135.53
THICK)

308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) Ton 256.40 1,326.34 100,353.00 25,483.94 127,419.68

309a COLD MILLING, 0 - 30 mm Sq.m 2.01 32.36 60.28 23.66 118.31

309b COLD MILLING, 0 - 50 mm Sq.m 3.98 53.31 99.94 39.31 196.54

309c COLD MILLING, 0 - 70 mm Sq.m 7.53 71.82 139.46 54.70 273.50

309d COLD MILLING, 0 - 100 mm Sq.m 8.68 97.14 200.24 76.52 382.58

309e COLD MILLING, 0 - 130 mm Sq.m 11.29 126.28 260.32 99.47 497.35

310a JOINTED PLAIN CONCRETE PAVEMENT (JPCP) Cu.m 330.76 3,653.22 13,270.65 4,313.66 21,568.29
USING MINIMUM 5000 PSI CLASS CONCRETE LAID
THROUGH CONCRETE PAVER INCLUDING
TRANSVERSE AND LONGITUDINAL JOINTS
FORMATION, EXPANSION CAPS AND FILLING WITH
SEALANT COMPLETE IN ALL RESPECTS
EXCLUDING REINFORCEMENT (DOWEL/TIE BARS)

401a1i CONCRETE CLASS "A1" (UNDERGROUND) Cu.m 1,097.72 2,588.28 8,241.40 2,981.85 14,909.25

401a1ii CONCRETE CLASS "A1" (ON GROUND) Cu.m 1,097.72 2,588.69 9,516.05 3,300.62 16,503.08

401a1iii CONCRETE CLASS "A1" (ELEVATED) Cu.m 1,097.72 2,588.28 9,942.37 3,407.09 17,035.46

401a2i CONCRETE CLASS "A2" (UNDERGROUND) Cu.m 1,097.72 2,588.74 8,788.23 3,118.68 15,593.38

401a2 ii CONCRETE CLASS "A2" (ON GROUND) Cu.m 1,097.72 2,695.18 10,062.88 3,463.95 17,319.74

401a2iii CONCRETE CLASS "A2" (ELEVATED) Cu.m 1,144.20 2,588.69 10,489.20 3,555.52 17,777.61

401a3i CONCRETE CLASS "A3" (UNDERGROUND) Cu.m 1,097.72 2,588.28 9,138.11 3,206.03 16,030.15

401a3ii CONCRETE CLASS "A3" (ON GROUND) Cu.m 1,097.72 2,695.18 10,412.76 3,551.42 17,757.09

401a3iii CONCRETE CLASS "A3" (ELEVATED) Cu.m 1,144.20 2,588.74 10,839.08 3,643.01 18,215.03

401b CONCRETE CLASS "B" Cu.m 1,404.88 1,287.43 6,675.72 2,342.01 11,710.05

401ci CONCRETE CLASS "C" (UNDERGROUND) Cu.m 1,055.53 2,705.25 7,733.55 2,873.58 14,367.90

401cii CONCRETE CLASS "C" (ON GROUND) Cu.m 1,086.51 2,703.40 9,018.06 3,201.99 16,009.96

401ciii CONCRETE CLASS "C" (ELEVATED) Cu.m 1,086.51 2,704.33 9,434.52 3,306.34 16,531.69

401di CONCRETE CLASS "D1" Cu.m 1,711.50 2,856.38 12,580.69 4,287.14 21,435.71

401dii CONCRETE CLASS "D2" Cu.m 1,711.50 2,856.84 13,442.49 4,502.71 22,513.54

Page 460 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

401diii CONCRETE CLASS "D3" Cu.m 1,711.50 2,856.84 14,145.13 4,678.37 23,391.84

401e CONCRETE CLASS "Y" Cu.m 1,097.72 1,692.24 10,286.44 3,269.10 16,345.51

401f LEAN CONCRETE Cu.m 919.20 1,013.93 5,248.83 1,795.49 8,977.46

401gi PRECAST CONCRETE CLASS "A1" Cu.m 2,605.71 1,486.15 9,245.80 3,334.41 16,672.06

401gii PRECAST CONCRETE CLASS "A3" Cu.m 2,605.71 1,486.15 10,301.67 3,598.38 17,991.90

401giii PRECAST CONCRETE CLASS "B" Cu.m 2,605.71 1,776.59 7,657.07 3,009.84 15,049.21

401giv PRECAST CONCRETE CLASS "D1" Cu.m 1,857.06 2,856.84 12,639.85 4,338.44 21,692.19

401gv PRECAST CONCRETE CLASS "D2" Cu.m 1,857.06 2,856.84 13,501.64 4,553.89 22,769.44

401gvi PRECAST CONCRETE CLASS "D3" Cu.m 1,857.06 2,856.84 14,204.28 4,729.55 23,647.74

401h PLUM (CYCLOPEAN / RUBBLE) CONCRETE (2:1 Cu.m 1,240.35 1,265.90 5,213.98 1,930.06 9,650.29
CONCRETE, STONE RATIO)

404a REINFORCEMENT AS per AASHTO M-31 GRADE 40 Ton 5,030.68 816.18 183,864.07 47,427.73 237,138.66

404 b REINFORCEMENT AS per AASHTO M-31 GRADE 60 Ton 5,030.68 816.18 187,775.60 48,405.61 242,028.06

404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER Ton 2,781.48 1,853.06 214,294.07 54,732.15 273,660.75
ASTM-A-36

405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA Ton 6,230.52 7,780.85 357,688.67 92,925.01 464,625.05
COMPLETE IN ALL RESPECT

405b LAUNCHING OF GIRDER Ton 192.30 1,005.59 - 299.47 1,497.36

406a PREMOULDED JOINT FILLER 12 mm THICK WITH Sq.m 354.69 - 1,575.35 482.51 2,412.55
BITUMASTIC JOINT SEAL

406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK Sq.m 239.31 - 4,066.73 1,076.51 5,382.55
WITH BITUMASTIC JOINT SEAL

406ci STEEL EXPANSION JOINTS (LOCAL-MAKE), AS PER Kg 24.97 4.18 249.34 69.62 348.11
DESIGN

406cii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 48,618.10 12,370.86 61,854.31
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (EUROPEAN/AMERICAN MAKE)

406ciii 50 mm EXPANSION JOINT-NOSING TYPE WITH TWO M 865.35 - 44,118.10 11,245.86 56,229.31
ALUMINUM ALLOY SECTIONS AND ELASTOMERIC
PROFILE IMPORTED (ASIAN MAKE)

406civ 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 140,170.99 35,259.09 176,295.43


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (EUROPEAN/AMERICAN MAKE)

406cv 110 mm EXPANSION JOINT-CANTILEVER SAW M 865.35 - 115,171.35 29,009.18 145,045.88


TEETH WITH TWO ALUMINUM ALLOY SECTIONS
IMPORTED (ASIAN MAKE)

406cvi 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 43,492.20 11,089.39 55,446.94


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED
(EUROPEAN/AMERICAN)

406cvii 65 mm EXPANSION JOINT-NOSING-MOLDED M 865.35 - 38,415.08 9,820.11 49,100.54


VULCANIZED ELASTOMER SINGLE SECTION (ONE
PIECE, MONOBLOCK) IMPORTED (ASIAN MAKE)

Page 461 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

406cviii 50 mm EXPANSION JOINT- TWO PROFILE ALLOY M 865.35 - 33,987.11 8,713.12 43,565.58
ALUMINUM 6063 T 6 CONTINOUS CR PROFILE,
SOCKETS STUDS LOCAL (PAKISTAN MAKE),PSQCA
CERTIFIED

406cix 65 mm EXPANSION JOINT-W SECTION CR M 865.35 - 26,317.96 6,795.83 33,979.14


VULCANIZED MOLDED NOSING LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cx 50 mm EXPANSION JOINT- INDIGENOUS TYPE 15MM M 865.35 - 31,882.29 8,186.91 40,934.55
THICK TWO VERTICAL STEEL PLATES WELDED
10MM THICK ROUND STEEL BARS LOCAL
(PAKISTAN MAKE),PSQCA CERTIFIED

406cxi 110 mm EXPANSION JOINT SAW TEETH FOUR M 865.35 - 105,566.92 26,608.07 133,040.34
PROFILE ALUMINUM ALLOY 6063-T6 CONTINOUS
CR PROFILE NOISE FREE LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406cxii 80 mm EXPANSION JOINT STEEL GRADE EN10025 M 807.66 - 69,088.19 17,473.96 87,369.81
SOUND ISOLATED SILENT TYPE WITH SINUS
PLATES IMPORTED (ASIAN MAKE)

406di PVC WATER STOPS 6" SIZE (12 mm THICK) M 211.54 - 976.34 296.97 1,484.85

406dii PVC WATER STOPS 8" SIZE (12 mm THICK) M 211.54 - 1,257.74 367.32 1,836.60

406e ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.05 - 1.67 0.43 2.15
SIZE AND THICKNESS) LOCAL (PAKISTAN
MAKE),PSQCA CERTIFIED

406ei ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 3.03 0.77 3.86
SIZE AND THICKNESS) IMPORTED (ASIAN MAKE)

406eii ELASTOMERIC BEARING PADS (ACCORDING TO Cu.cm 0.06 - 5.53 1.40 6.99
SIZE AND THICKNESS) IMPORTED
(EUROPEAN/AMERICAN MAKE)

406f ASPHALT FELT (3 PLY) Sq.m 83.65 - 473.83 139.37 696.85

407di CAST IN PLACE PILES UP TO 0.8 m DIA IN NORMAL M 448.99 3,870.64 314.55 1,158.55 5,792.73
SOIL (BORING ONLY)

407dii CAST IN PLACE PILES UP TO 0.8 m DIA IN GRAVEL M 1,068.22 5,157.32 420.23 1,661.44 8,307.21
STRATA (BORING ONLY)

407diii CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 491.65 4,456.91 354.17 1,325.68 6,628.41
NORMAL SOIL (BORING ONLY)

407div CAST IN PLACE PILES > 0.8 m UPTO 1 m DIA IN M 1,233.09 6,082.03 519.28 1,958.60 9,793.00
GRAVEL STRATA (BORING ONLY)

407dv CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 628.30 9,491.93 901.43 2,755.42 13,777.08
NORMAL SOIL (BORING ONLY)

407dvi CAST IN PLACE PILES > 1 m UPTO 1.5 m DIA IN M 2,684.43 13,453.16 901.45 4,259.76 21,298.81
GRAVEL STRATA (BORING ONLY)

407dvii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 930.56 13,569.14 1,391.30 3,972.75 19,863.75
NORMAL SOIL (BORING ONLY)

407dviii CAST IN PLACE PILES > 1.5 m UPTO 2 m DIA IN M 3,847.86 19,604.35 1,391.30 6,210.88 31,054.40
GRAVEL STRATA (BORING ONLY)

407ki CONFIRMATORY BORING IN SOIL STRATA (NX M 438.44 1,593.60 3,741.80 1,443.46 7,217.31
SIZE) INCLUDING TESTING AND REPORTING

407kii CONFIRMATORY BORING IN GRAVEL STRATA (NX M 876.89 3,150.85 2,851.78 1,719.88 8,599.40
SIZE) INCLUDING TESTING AND REPORTING

Page 462 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

407kiii CONFIRMATORY BORING IN ROCK STRATA (NX M 1,753.78 6,237.94 996.28 2,247.00 11,234.99
SIZE) INCLUDING TESTING AND REPORTING

407s PILE LOAD TEST UPTO 550 TON Each 20,768.40 98,854.80 929,137.35 262,190.14 1,310,950.69

407t PILE LOAD TEST UPTO 800 TON Each 25,383.60 108,887.84 1,351,488.99 371,440.11 1,857,200.54

407u PILE LOAD TEST UPTO 1000 TON Each 25,383.60 108,887.84 1,689,406.56 455,919.50 2,279,597.50

407v PILE LOAD TEST UPTO 1200 TON Each 25,383.60 108,887.84 1,979,263.70 528,383.79 2,641,918.93

407w PILE LOAD TEST UPTO 1500 TON Each 25,383.60 108,887.84 2,399,049.41 633,330.21 3,166,651.06

407x PILE LOAD TEST UPTO 2000 TON Each 25,383.60 108,887.84 2,804,049.41 734,580.21 3,672,901.06

407y PILE LOAD TEST UPTO 2500 TON Each 25,383.60 135,137.12 3,209,049.41 842,392.53 4,211,962.66

407l PERMANENT PILE CASING FOR PILES Ton 1,581.67 8,324.84 229,137.86 59,761.09 298,805.45

410 BRICK WORK Cu.m 941.51 447.95 8,580.37 2,492.46 12,462.29

411a STONE MASONRY RANDOM DRY Cu.m 751.90 250.25 2,632.20 908.59 4,542.95

411b STONE MASONRY RANDOM WITH MORTAR Cu.m 799.98 353.36 4,753.48 1,476.71 7,383.53

411c STONE MASONRY DRESSED UNCOURSED DRY Cu.m 1,184.58 250.25 2,898.59 1,083.36 5,416.79

411d STONE MASONRY DRESSED UNCOURSED WITH Cu.m 1,396.11 353.36 4,846.18 1,648.91 8,244.56
MORTAR

411g ROLL POINTING Sq.m 158.07 23.84 176.79 89.68 448.38

412a STONE MASONRY DRESSED COURSED WITH Cu.m 1,809.56 532.11 4,846.18 1,796.96 8,984.81
MORTAR

501a R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 310.57 1,234.33 1,182.98 681.97 3,409.84
DIA 310 mm

501b R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 321.14 1,248.27 1,503.14 768.14 3,840.70
DIA 380 mm

501c R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 521.14 1,265.01 2,444.38 1,057.63 5,288.15
DIA 460 mm

501d R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 582.15 1,275.96 3,676.67 1,383.70 6,918.48
DIA 610 mm

501e R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 646.83 1,247.14 6,075.70 1,992.42 9,962.09
DIA 760 mm

501f R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 747.35 1,305.04 9,204.28 2,814.17 14,070.83
DIA 910 mm

501g R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 866.48 1,472.47 10,079.22 3,104.55 15,522.73
DIA 1070 mm

501h R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,052.16 1,668.38 12,139.49 3,715.01 18,575.04
DIA 1220 mm

501i R . C . C. PIPE CULVERT AASHTO-M 170 CLASS II M 1,355.72 1,960.42 24,117.51 6,858.41 34,292.06
DIA 1520 mm

501j R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 310.57 1,234.33 1,699.58 811.12 4,055.59
DIA 310 mm

501k R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 321.14 1,248.27 2,077.14 911.64 4,558.20
DIA 380 mm

Page 463 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

501l R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 521.14 1,265.01 2,772.38 1,139.63 5,698.15
DIA 460 mm

501m R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 582.15 1,275.96 4,332.67 1,547.70 7,738.48
DIA 610 mm

501n R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 646.83 1,247.14 7,715.70 2,402.42 12,012.09
DIA 760 mm

501o R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 747.35 1,305.04 12,074.28 3,531.67 17,658.33
DIA 910 mm

501p R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 866.48 1,472.47 14,179.22 4,129.55 20,647.73
DIA 1070 mm

501q R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,052.16 1,668.38 16,668.99 4,847.38 24,236.91
DIA 1220 mm

501r R . C . C. PIPE CULVERT AASHTO-M 170 CLASS IV M 1,355.72 1,960.42 29,980.49 8,324.16 41,620.79
DIA 1520 mm

502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE Cu.m 312.81 221.07 1,824.27 589.54 2,947.69
CULVERT

502b CONCRETE CLASS "B" IN BEDDING AND Cu.m 1,584.36 1,001.70 6,675.72 2,315.45 11,577.24
ENCASEMENT CONCRETE PIPE CULVERT

507a STEEL WIRE MESH (9 SWG) FOR GABIONS Kg 16.19 - 238.79 63.74 318.71

507b ROCK FILL IN GABIONS Cu.m 307.68 - 1,919.25 556.73 2,783.66

508a BRICK PAVING (SINGLE COURSE) Sq.m 327.30 12.38 596.63 234.08 1,170.39

508b BRICK PAVING (DOUBLE COURSE) Sq.m 577.29 23.10 1,193.18 448.39 2,241.96

509a RIP RAP CLASS "A" Cu.m 956.12 102.03 2,061.79 779.98 3,899.91

509b RIP RAP CLASS "B" Cu.m 1,017.58 64.34 2,083.52 791.36 3,956.80

509c RIP RAP CLASS "C" Cu.m 1,067.27 51.21 2,122.55 810.26 4,051.29

509ci RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 657.03 527.15 2,195.59 844.94 4,224.71

509d GROUTED RIP RAP CLASS "A" Cu.m 1,156.12 172.11 4,111.38 1,359.90 6,799.51

509e GROUTED RIP RAP CLASS "B" Cu.m 1,440.61 134.42 3,974.31 1,387.34 6,936.68

509f GROUTED RIP RAP CLASS "C" Cu.m 1,655.08 109.61 3,877.19 1,410.47 7,052.36

509fi GROUTED RIP RAP CLASS "D" (101 kg TO 150 kg) Cu.m 1,655.08 710.25 3,902.04 1,566.84 7,834.20

509g REINFORCED CONCRETE SLOPE PROTECTION 20 Cu.m 1,530.94 791.17 7,985.47 2,576.90 12,884.48
cm THICK EXCLUDING REINFORCEMENT

509h FILTER LAYER OF GRANULAR MATERIAL Cu.m 162.58 279.21 1,831.52 568.33 2,841.65

510 DISMANTLING OF STRUCTURE AND Cu.m 551.90 857.55 - 352.36 1,761.81


OBSTRUCTIONS

511a1 DRY STONE PITCHING (15-20 cm THICK) Sq.m 257.68 71.50 363.72 173.23 866.14

511a2 DRY STONE PITCHING (20-25 cm THICK) Sq.m 294.50 81.72 467.70 210.98 1,054.89

511b1 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 246.15 48.71 1,238.23 383.27 1,916.36
BITUMEN JOINTS

511b2 GROUTED STONE PITCHING (20-25 cm THICK) WITH Sq.m 281.31 55.67 1,552.81 472.45 2,362.25
BITUMEN JOINTS

Page 464 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

511b3 GROUTED STONE PITCHING (15-20 cm THICK) WITH Sq.m 225.95 84.46 928.91 309.83 1,549.16
PCC BANDS (PAID SEPERATLY)

511b4 GROUTED STONE PITCHING (20-25 cm THICK) Sq.m 258.23 96.53 1,157.99 378.19 1,890.95
WITHIN P.C.C. BANDS (PAID SEPERATELY)

513a FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 39,873.28 10,244.77 51,223.84
SIZE (600 mm X 600 mm) CLASS D 400 WITH FRAME
(IMPORTED)

513b FIBER GLASS REINFORCED POLYESTER GRATING Each 392.29 713.50 45,951.41 11,764.30 58,821.51
SIZE (876 mm X 603 mm) CLASS C 250 WITH FRAME
(IMPORTED)

601aii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,017.24 6,479.80 1,950.87 9,754.34
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiii R.C.C. NEW JERSEY BARRIER (IN-SITU) FOR M 306.42 1,135.54 7,151.37 2,148.34 10,741.68
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT) - AS PER AMENDED
DRAWING

601aiv R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,103.99 4,764.53 1,498.88 7,494.38
FORMED) FOR MEDIAN DOUBLE FACE 810 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601av R.C.C. NEW JERSEY BARRIER (IN-SITU SLIP M 126.98 1,120.15 5,253.93 1,625.27 8,126.33
FORMED) FOR MEDIAN DOUBLE FACE 1010 mm
ABOVE GROUND (INCL. REINFORCEMENT)-AS PER
AMENDED DRAWING

601di PRECAST CURB IN CONCRETE CLASS A-1 OF SIZE M 82.30 114.40 1,033.56 307.57 1,537.84
450 x 150 mm INCL. BEDDING & HAUNCHING

601dii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 496.83 8,788.02 2,374.48 11,872.40
MEDIAN DOUBLE FACE 810 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

601diii R.C.C. NEW JERSEY BARRIER (PRE-CAST) FOR M 213.07 480.21 9,611.96 2,576.31 12,881.55
MEDIAN DOUBLE FACE 1010 mm ABOVE GROUND
(INCL. REINFORCEMENT)-AS PER AMENDED
DRAWING

603 BRICK EDGING M 27.88 - 117.12 36.25 181.25

604a METAL GUARD RAIL M 87.04 37.63 4,290.56 1,103.81 5,519.04

604b METAL GUARD RAIL END PIECES Each 288.45 143.00 3,773.72 1,051.29 5,256.46

604d STEEL POST FOR METAL GUARD RAIL Each 165.38 131.31 5,235.05 1,382.93 6,914.66

605a CONCRETE BEAM GUARDRAIL (INCL. Cu.m 3,896.02 492.07 30,774.14 8,790.56 43,952.79
REINFORCEMENT)

605c CONCRETE POST FOR GUARDRAIL (INCL Cu.m 3,896.02 492.07 30,679.22 8,766.83 43,834.14
REINFORCEMENT)

607ai TRAFFIC SIGN CAT 1i - 90 cm SIGN BOARD IN HIGH Each 858.94 378.87 16,108.88 4,336.67 21,683.36
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607aii TRAFFIC SIGN CAT 1ii - 105 cm SIGN BOARD IN HIGH Each 858.94 378.87 18,159.02 4,849.21 24,246.04
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

Page 465 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607aiii TRAFFIC SIGN CAT 1iii - 120 cm SIGN BOARD IN Each 858.94 378.87 20,265.02 5,375.71 26,878.54
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607aiv TRAFFIC SIGN CAT 1i - 90 cm DIGITAL PRINTING Each 858.94 378.87 16,712.08 4,487.47 22,437.36
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607av TRAFFIC SIGN CAT 1ii - 105 CM DIGITAL PRINTING Each 858.94 378.87 18,962.42 5,050.06 25,250.29
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607avi TRAFFIC SIGN CAT 1iii - 120 cm DIGITAL PRINTING Each 858.94 378.87 21,279.02 5,629.21 28,146.04
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bi TRAFFIC SIGN CAT 2i - 90 cm SIGN BOARD IN HIGH Each 948.68 270.62 20,267.47 5,371.70 26,858.48
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607bii TRAFFIC SIGN CAT 2ii - 105 cm SIGN BOARD IN HIGH Each 948.68 270.62 23,894.47 6,278.45 31,392.23
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607biii TRAFFIC SIGN CAT 2iii - 120 cm SIGN BOARD IN Each 948.68 270.62 27,430.47 7,162.45 35,812.23
HIGH INTENSITY REFLECTIVE SHEET LAMINATED
ON 1.8 mm THICK G.I SHEET WITH G.I PIPE DIA 3''
AND THICKNESS 8 GUAGE

607biv TRAFFIC SIGN CAT 2i - 90 cm DIGITAL PRINTING Each 948.68 270.62 21,280.17 5,624.87 28,124.35
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bv TRAFFIC SIGN CAT 2ii - 105 cm DIGITAL PRINTING Each 948.68 270.62 25,269.87 6,622.30 33,111.48
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607bvi TRAFFIC SIGN CAT 2iii - 120 cm DIGITAL PRINTING Each 948.68 270.62 27,430.47 7,162.45 35,812.23
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 3'' AND THICKNESS 8 GUAGE

607ci TRAFFIC SIGN CAT 3A SIGN BOARD IN HIGH Each 948.68 486.99 25,661.61 6,774.32 33,871.60
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 3'' AND
THICKNESS 8 GUAGE

607cii TRAFFIC SIGN CAT 3A DIGITAL PRINTING SIGN Each 948.68 486.99 27,091.61 7,131.82 35,659.10
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 3'' AND THICKNESS 8 GUAGE

Page 466 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607di TRAFFIC SIGN CAT 3B SIGN BOARD IN HIGH Each 948.68 486.99 43,866.51 11,325.55 56,627.73
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 4'' AND
THICKNESS 8 GUAGE

607dii TRAFFIC SIGN CAT 3B DIGITAL PRINTING SIGN Each 948.68 486.99 46,726.51 12,040.55 60,202.73
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 mm THICK G.I SHEET WITH G.I
PIPE DIA 4'' AND THICKNESS 8 GUAGE

607ei TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 Sq.m) - Sq.m 334.08 290.59 41,127.88 10,438.14 52,190.68
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.00 36,593.77 9,291.31 46,456.53
SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 4'' AND THICKNESS 8 GUAGE

607eiii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.28 34,945.40 8,896.44 44,482.18
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 6'' THICKNESS AS PER
SCHEDULE 40

607eiv TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.66 36,091.03 9,197.08 45,985.40
Sq.m)-SIGN BOARD IN HIGH INTENSITY REFLECTIVE
SHEET LAMINATED ON 1.8 mm THICK G.I SHEET
WITH G.I PIPE DIA 8'' THICKNESS AS PER
SCHEDULE 40

607ev TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 3 sq.m) - Sq.m 334.08 290.59 37,127.88 9,438.14 47,190.68
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evi TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 5 Sq.m)- Sq.m 408.45 163.00 32,593.77 8,291.31 41,456.53
DIGITAL PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 mm THICK
G.I SHEET WITH G.I PIPE DIA 4'' AND THICKNESS 8
GUAGE

607evii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 10 Sq.m 473.06 167.28 30,945.40 7,896.44 39,482.18
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 6''
THICKNESS AS PER SCHEDULE 40

607eviii TRAFFIC ROAD SIGN CATEGORY 3C (UP TO 15 Sq.m 525.63 171.66 32,091.03 8,197.08 40,985.40
Sq.m)-DIGITAL PRINTING SIGN BOARD IN HIGH
INTENSITY REFLECTIVE SHEET LAMINATED ON 1.8
mm THICK G.I SHEET WITH G.I PIPE DIA 8''
THICKNESS AS PER SCHEDULE 40

607fi ADDITIONAL PANEL SIZE 60 cm X 30 cm SIGN Each 434.60 - 4,680.00 1,278.65 6,393.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607fii ADDITIONAL PANEL SIZE 60 cm X 30 cm DIGITAL Each 434.60 - 3,960.00 1,098.65 5,493.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

Page 467 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

607gi ADDITIONAL PANEL SIZE 90 cm X 30 cm SIGN Each 434.60 - 7,020.00 1,863.65 9,318.25
BOARD IN HIGH INTENSITY REFLECTIVE SHEET
LAMINATED ON 1.8 MM THICK G.I SHEET

607gii ADDITIONAL PANEL SIZE 90 cm X 30 cm DIGITAL Each 434.60 - 5,940.00 1,593.65 7,968.25
PRINTING SIGN BOARD IN HIGH INTENSITY
REFLECTIVE SHEET LAMINATED ON 1.8 MM THICK
G.I SHEET

607i PROVIDING AND FIXING ANTIGLARE SHIELD (200 Each 16.28 14.76 869.53 225.14 1,125.71
mm x 800 mm) MADE UP OF POLY-PROPYLENE
COPOLYMER MATERIAL GREEN COLOR UV
PROTECTED INCLUDING INSTALLATION WITH
ANCHOR BOLTS FIXED WITH EPOXY

608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 30.03 9.32 46.61


PAINT FOR LINES OF 15 cm WIDTH

608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 5.05 93.50 25.56 127.80


PAINT FOR LINES OF 15 cm WIDTH

608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR M 3.69 3.57 36.03 10.82 54.11


PAINT FOR LINES OF 20 cm WIDTH

608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP M 3.69 4.37 114.69 30.69 153.45


PAINT FOR LINES OF 20 cm WIDTH

608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR Each 140.00 159.54 220.74 130.07 650.35
PAINT FOR 4 m ARROWS

608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP Each 233.33 364.44 687.23 321.25 1,606.24
PAINT FOR 4 m ARROWS

608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 39.03 11.91 59.54
FOR LINES OF 15 cm WIDTH

608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 135.22 36.33 181.63
FOR LINES OF 15 cm WIDTH

608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT M 4.62 3.99 46.83 13.86 69.29
FOR LINES OF 20 CM WIDTH

608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT M 4.62 5.47 165.77 43.96 219.81
FOR LINES OF 20 cm WIDTH

608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 140.00 159.54 327.81 156.84 784.18
FOR 4 m ARROWS

608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 233.33 308.17 945.95 371.86 1,859.31
FOR 4 m ARROWS

608n1 PAVEMENT MARKING IN NON REFLECTIVE CR Each 70.00 79.77 366.31 129.02 645.09
PAINT FOR STOP

608n2 PAVEMENT MARKING IN NON REFLECTIVE TP Each 70.00 109.33 998.11 294.36 1,471.80
PAINT FOR STOP

608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT Each 70.00 79.77 476.11 156.47 782.34
FOR STOP

608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT Each 102.31 50.64 1,373.87 381.71 1,908.53
FOR STOP

609c REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 502.27 144.13 720.65
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

609ci REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 279.84 78.30 391.48
(RAISED PROFILE TYPE - SINGLE) 100 mm x100 mm

Page 468 of 469


CLIENT: CONSULTANTS:
NATIONAL HIGHWAY AUTHORITY
CSR - 2022 PRIME ENGINEERING TESTING CONSULTANTS
ISLAMABAD REPUBLIC ENGINEERING CORPORATION (JV)

Summary of Rate Analysis


Province: PUNJAB
District: VEHARI

Item No. Description Unit Manpower Equipment Material OH-Profit Rate (Rs)

609d REFLECTORISED ALUMINUM PAVEMENT STUD Each 35.38 38.87 602.27 169.13 845.65
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

609di REFLECTORISED PLASTIC PAVEMENT STUD Each 22.88 10.45 304.84 84.55 422.73
(RAISED PROFILE TYPE - DOUBLE) 100 mm x100 mm

610b RIGHT OF WAY MARKER AS PER AMENDED Each 268.58 236.68 1,593.05 524.58 2,622.90
DRAWING

610c KILOMETER POST Each 346.14 572.01 3,402.61 1,080.19 5,400.95

610d TEN KILOMETER POST Each 692.29 1,144.02 8,931.08 2,691.85 13,459.24

611a GALVANIZED WIRE MESH FENCE 1500 mm HIGH M 438.44 114.40 2,415.93 742.19 3,710.96
WITH PRECAST PRESTRESSED R.C.C. POSTS
COMPLETE IN ALL RESPECTS AS PER M2
STANDARD

612a FURNISHING AND PLANTING OF TREES (LOCAL Each 410.01 1,149.39 25.00 396.10 1,980.50
INHABITANT ) INCL MAINTENANCE FOR 2 YEARS

613a SPRIGGING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.65 28.46 16.38 81.90

613b SODDING (INCL 2 MONTHS MAINTENANCE) Sq.m 14.41 22.65 94.29 32.84 164.19

613c PLACING OF TOP SOIL USING SWEET EARTH Sq.m 1.38 4.63 33.93 9.99 49.93

613d MAINTENANCE OF SPRIGGING/SODDING PER SQM Sq.m/Month 4.75 8.94 3.00 4.17 20.86
PER ADDITIONAL MONTH

Page 469 of 469

You might also like