2022
CORPORATION
Project: Replacement of BITZER
compressor to R407 for CO2
tank cooling
Unit Designation: ACCU NO.1 Equipment: Dong Hwa Win ACCU Equipment Location: C02 AREA
MOTOR DATA
Motor Hp (Kw)
Phase 3 PHASE
Hertz 60 HZ
MOTOR READINGS
Remarks: ____PASSED_______________________________________
Remarks: As per Electrical Engineering Portal (EEP), a general rule of thumb is 10 megaohm or more
(see attachment)
Unit Designation: ACCU NO.2 Equipment: Dong Hwa Win ACCU Equipment Location: C02 AREA
MOTOR DATA
Motor Hp (Kw)
Phase 3 PHASE
Hertz 60 HZ
MOTOR READINGS
Remarks: ____PASSED_______________________________________
Remarks: As per Electrical Engineering Portal (EEP), a general rule of thumb is 10 megaohm
or more(see attachment)