You are on page 1of 3

GNQ INDUSTRIAL & CONTRACTING Date Prepared: JAN 10.

2022
CORPORATION
Project: Replacement of BITZER
compressor to R407 for CO2
tank cooling

Client Name: MOTOR INSULATION RESISTANCE


SAN MIGUEL BREWERY INC. Page ____ of ____ page/s
TEST REPORT

Unit Designation: ACCU NO.1 Equipment: Dong Hwa Win ACCU Equipment Location: C02 AREA

MOTOR DATA

Motor Manufacturer/Brand BITZER

Model No. CDAS-L1-075

Serial No. 1600507803

Motor Hp (Kw)

Speed (rpm) 1750 RPM

Volts / FLA 230 V

Phase 3 PHASE

Hertz 60 HZ

MOTOR READINGS

Insulation Resistance (Mega-Ohms at G-L1 = ___550___MΩ


500V,550MΩ)
G-L2 = ___550___MΩ
*MEGGER DIGITAL INSULATION TESTER –
FLUKE DIGITAL INSULATION TESTER* G-L3 = ___550___ MΩ

Unit Rotation Clockwise Counter Clockwise

Remarks: ____PASSED_______________________________________

Remarks: As per Electrical Engineering Portal (EEP), a general rule of thumb is 10 megaohm or more

(see attachment)

Prepared by: Accepted for Client:

GNQ Representative Owner / Representative


(Signature of Over Printed Name)

Motor Insulation Test Record


GNQ INDUSTRIAL & CONTRACTING Date Prepared: JAN 10.2022
CORPORATION
Project: Replacement of BITZER
compressor to R407 for CO2
tank cooling

Client Name: MOTOR INSULATION RESISTANCE


SAN MIGUEL BREWERY INC. Page ____ of ____ page/s
TEST REPORT

(Signature of Over Printed Name)

Unit Designation: ACCU NO.2 Equipment: Dong Hwa Win ACCU Equipment Location: C02 AREA

MOTOR DATA

Motor Manufacturer/Brand BITZER

Model No. CDAS-L1-075

Serial No. 1600507801

Motor Hp (Kw)

Speed (rpm) 1750 RPM

Volts / FLA 230 V

Phase 3 PHASE

Hertz 60 HZ

MOTOR READINGS

Insulation Resistance (Mega-Ohms at G-L1 = ___550___MΩ


500V,550MΩ)
G-L2 = ___550___MΩ
*MEGGER DIGITAL INSULATION TESTER –
FLUKE DIGITAL INSULATION TESTER G-L3 = ___550___ MΩ

Unit Rotation Clockwise Counter Clockwise

Remarks: ____PASSED_______________________________________

Remarks: As per Electrical Engineering Portal (EEP), a general rule of thumb is 10 megaohm
or more(see attachment)

Prepared by: Accepted for Client:

Motor Insulation Test Record


GNQ INDUSTRIAL & CONTRACTING Date Prepared: JAN 10.2022
CORPORATION
Project: Replacement of BITZER
compressor to R407 for CO2
tank cooling

Client Name: MOTOR INSULATION RESISTANCE


SAN MIGUEL BREWERY INC. Page ____ of ____ page/s
TEST REPORT

GNQ Representative Owner / Representative


(Signature of Over Printed Name) (Signature of Over Printed Name)

Motor Insulation Test Record

You might also like