ENVIRONMENTAL ENGINEERING DIVISION
PROJECT ENGINEER/PROJECT MANAGER CHECKLIST
Project Title: ________________________________
Client: HTP / TITP / DCT / LAG / CS / Other
(Circle one)
CIP No.: _____________
W.O. No.: _____________
Start Date: _____________
Project Manager: ______________________________________ Date: ___________
Project Engineer: ______________________________________ Date: ___________
This checklist to be filled out by the Project Engineer CIP No.: ______________
A. Project Setup B. Preliminary Phase (Cont’d)
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Create Project Notebook Obtain project information from
Project Request form or the CIP
Request from PCE:
Conduct an early Project Definition
CIP # Meeting with Client
Create UPRS File
Prepare for and conduct a "Blue Sky"
Have Clerical create Electronic files Meeting internally
Have Records Management create Conduct workshop with client
master file
If project is not approved: write memo
to file canceling project
If project is approved:
Develop Detailed Scope:
B. Preliminary Phase Prepare:
PM/PE
Activities
Date
Comments Process Flow Diagram
Check Performed
Process Description
Develop Preliminary Scope &
Preliminary P&ID
Schedule
General Layout
Check Budget in CIP
Report Outline
Request & Receive Scope/Schedule/
Resources Input from Design Groups Develop Budget:
Construction, Design and CM costs
Develop Schedule
Obtain Approval from EED
Management
Reviewed by PM: Date:
2 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
B. Preliminary Phase (Cont’d) C. Pre-Design Phase
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Identify Construction Vehicle Update UPRS files
For B & A - Section E Proceed to Pre-Design (10% to
25% Design)
For CiSCo - Section F
Arrange Pre-Design "Kick-Off"
For Emergency Contract Meeting
- Section G
Identify design criteria
Initiate Project Approvals:
Identify design constraints
Prepare:
Obtain Preliminary Soil Values
PA Form
Produce recommendations (cosult
PRC Presentation with Design Group)
CAF
Conduct economic analysis
Present project to SPT & obtain
Publish draft report
signatures on PA form
Conduct an internal review
Present to AMP & obtain
signatures on PA form Conduct external review and
workshop with client
Place on PRC Agenda, call
Incorporate comments from review
FMD by due date & submit all
documents Review & Update Project Schedule
Present to PRC and obtain
Prepare class C estimate
signatures on PA and CAF
forms
Produce final Pre-Design Report
Request W.O. from FMD
Obtain client approval and signature
3 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
C. Pre-Design Phase (Cont’d) D. Design Phase
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Proceed to PRC with request for Request Survey & Geotechnical
more money (if needed) Report (If necessary)
Set up Inter-discipline and Design
Close W.O. (if not approved) Team (If necessary)
Close work order (if not Arrange/Schedule Design Kickoff
approved by PRC) meeting
Initiate the following Permit
Initiate Technical Specifications
processes as applicable: Distribute TOC
Follow up on all Permits (as listed
Environmental Permits from earlier)
the Harbor Department
Building & Safety (Identify the Start R/W process (If necessary)
Case Manager) Submit project to Cultural Affairs (If
necessary)
Obtain Haul Route Permit
Obtain most recent utility drawings
SCAQMD from and coordinate with Q & S (if
necessary)
Fire Dept
Obtain Preliminary Geotechnical
Environmental Clearance from Report
the Environmental Group
Request Plans from Street Lighting,
Proceed with Design Phase LADOT, etc.(if necessary)
Develop 50% plans and specs.
Including GR's/GR's
Prepare 50% QA/QC checklist
Review Correct sheet layouts
Prepare Class "B" Estimate
Go back to PRC (if necessary)
Review & Update Schedule
Reviewed by PM: Date: Review 50% QA/QC checklist by
PM/COP
4 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
D. Design Phase (Cont’d) D. Design Phase (Cont’d)
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Distribute 50% Plans & Distribute 90% Plans &
Specifications for Internal & Specifications for Internal and
External Review External Review
Obtain Comments & Incorporate
50% design comments Submit 90% plans to B & S
Hold 50% workshop with client (If Civil
necessary) Architectural
Complete 50% Design Structural
Check Calculations: Plumbing
Engineering Calculation HVAC
Hydraulic Calculations Electrical
(Hydraulic Profile, Pumping
Systems, etc.) Instrumentation & Control
Conduct Constructibility Review (by
Conduct Constructibility review (If
CM Group):
necessary)
Obtain and Review Final
Verify construction duration
Geotechnical Report (Earthwork
and Foundation design) Prepare Class A estimate
Conduct Technical Reviews (if Review & Update Construc-
tion QA/QC Checklist
necessary):
Review & Update All QA/QC
TAC Checklists (100%)
Value Engineering Hold Workshop w/Client & Obtain
Review: Comments
Major Equipment Specs
Inter-discipline Check by
Payment Schedule in GR Discipline Managers:
Complete 90% Plans & Specs. Red/Yellow Line
Complete 90% QA/QC checklist
Checking/Cross-Checking
of Drawings & Specs.
5 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
D. Design Phase (Cont’d) D. Design Phase (Cont’d)
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Schedule and Conduct QA/QC Complete 100% Design Package
Squad Check Complete 100% Checklists
Incorporate comments into 90%
design
Complete QA/QC Checklist
Complete Specifications -
Complete Back Check of reviews Sign-Off Approval Form
This activity may start
Draft Volume I (Instructions to Bidders)
sooner Produce Mylars
Prepare: In House Signature
Volume I Checklist Sign & Stamp Specs
Bid Items Schedule Sign & Stamp Drawings
Construction Duration (Always Send drawings to BOE Plan
Processing
calendar days)
Schedule of Work & Prices Plan Processing:
(Verify fixed cash allowance Indexing
items w/ GR) Obtain Signatures
Ready to Advertise Checklist - Deputy City Engineer (Specs
must accompany plans)
Draft Vol I & Ready to
Advertise Checklist to Q&S - City Engineer
Microfilming
Contact Bid & Award section in Return the signed Plans & Specs
to EED
Q & S group
Produce CDs & Hard
Insurance Requirements
Copies(Check with Q&S on
MBE/WBE/OBE & Sub- the required quantity)
Contractor outreach
requirements
Produce 3 full-size plans &
specs for the Con A
Contact City's Risk Management
Prepare 10 half-size plans &
for Insurance Requirements
specs for in-house use
Refer to distribution matrix for addi-
tional copies
Reviewed by PM: Date: 6 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
E. Bid & Award E. Bid & Award (Cont’d)
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Prepare Bid Documents: Deliver 2 Includes Bid Proposal
complete sets to Board office (Q&S)
Obtain Board authorization if an
addendum change is ± $100K
Notify Utility Companies of the
project - 2nd Notice (If necessary)
Prepare Motion
Prepare & Schedule Motion to Obtain signatures
Advertise (Q&S) Schedule & Brief Board
Schedule & Brief Board (Q&S) Board Approves Addendum
Last day to issue shall be
Issue Addendum to Bidders (Q&S)
Board Authorizes Advertisement min. 2 weeks prior to bid
opening
If I&C Subcontractor Pre-
Qualification Required Open Bids Always on Wednesday
Receive I&C Subcontractors' Post Bids
Pre-Qualification Submittals Evaluate bid
Evaluate I&C Subcontractors' Bid summary MSM & MBE/
Pre-Qualification Submittals WBE/OBE participation (Q&S)
Project under $100K Sub-Contractor Outreach
Good Faith Effort (OCC)
Advertise Project with no MBE/
WBE/DBE requirements (Q&S) Prepare Board Report to Award
Project overr $100K Contract (Q&S)
Advertise Project with no Schedule & Brief BPW (Q&S)
MBE/WBE/DBE applies (Q&S) Award Contract (BPW)
Hold Pre-bid meeting Contractor Submits Bonds &
Insurance to the BPW office
Receive questions from
Contractors/Subcontractors BPW Issues Notice to Proceed (NTP)
Prepare addendum Repeat as necessary Start Construction
Complete Addendum Checklist
7 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
F. CiSCO Contracts F. CiSCO Contracts (Cont’d)
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Verify PRC approval for projects For Subcontractor Quotes
over $100,000
This activity should start as Forward CiSCo GC & GR to
Prepare Board Report if project is
over $100,000 early as PRC approves use the subcontractor
of CiSCO Use Contractor's Schedule "A"
Schedule & Brief BPW
list to obtain quotations from subs.
Receive BPW approval Select MBE/WBE when possible
Prepare Project as design phase follow- Fill Out "Vendors/Subcon-
ing design phase procedure: tractors Selection Justification"
Prepare Plans & Specs sheet (be specific)
Review Plans & Specs
Receive Quote from CiSCo
Conduct workshop with the client Contractor
Incorporate comments Evaluate
For Vendor Quote: Negotiate
Obtain Three (3) quotes from
equipment Vendors & Installers Issue Final TWO
Fill out Design/Build Vendor
Quotation Checklist (Form
Directory)
Use "Checklist for Complete
Vendors Proposals"
Fill Out "Vendors/Subcon-
tractors Selection Justification"
sheet (be specific)
8 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________
G. Emergency Construction Contracts (WTPEC) G. Emergency Construction Contracts (WTPEC) Cont’d
CONSTRUCTION COST LESS THAN $200,000 CONSTRUCTION COST EQUAL OR GREATER THAN $200,000
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Refer to EED BPW flow Refer to EED BPW flowchart
Prepare Board Report declaring
chart Prepare board report declaring
"URGENT NECESSITY" Board "URGENT NECESSITY". Board
report must indicate top listed or top report must indicate top listed or top
three listed pre-qualified contractors three listed pre-qualified contractors
Schedule & Brief BPW Schedule & Brief BPW
Prepare addendum #1 to meet the
project specifics Prepare addendum #1 to meet the
project specifics
Attach Addendum #1 drawings /
specifications / supplemental infor- Attach Addendum #1 drawings /
specifications / supplemental
mation
information
Prepare Class "A" estimate
Prepare Class "A" estimate
Construction Services Manager
(CSM) to contact listed contractors CSM to contact Top listed or
Top Three listed contractors
Conduct Pre-Bid meeting
Contractor to provide lump sum
Contractor to provide lump sum
proposal
proposal
Issue "Notice To Proceed" to the
Evaluate the bids (same as CiSCo) Same as CiSCo lowest bidder
Expedite OCC/GFE review Same as CiSCo
Negotiate with Contractor If applicable
CSM to issue "Construction Order" (Notice of Award)
Contractor submits
Insurance
Bond
CSM to issue "Notice to Proceed"
Construction to Start