Project Engineer Checklist for Environmental Engineering

This document provides a checklist for project engineers and project managers to use over the course of an environmental engineering project. The checklist is divided into multiple phases: project setup, preliminary phase, pre-design phase, design phase, bidding phase, construction phase, and closeout phase. It includes key activities to be completed in each phase along with spaces to note the date each activity is performed and any relevant comments. The checklist aims to help project teams systematically track progress and ensure important steps are not missed over the lifetime of a project.

Uploaded by

Francisco Mena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
281 views9 pages

Project Engineer Checklist for Environmental Engineering

This document provides a checklist for project engineers and project managers to use over the course of an environmental engineering project. The checklist is divided into multiple phases: project setup, preliminary phase, pre-design phase, design phase, bidding phase, construction phase, and closeout phase. It includes key activities to be completed in each phase along with spaces to note the date each activity is performed and any relevant comments. The checklist aims to help project teams systematically track progress and ensure important steps are not missed over the lifetime of a project.

Uploaded by

Francisco Mena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Preliminary Phase: Details activities in the preliminary phase including scope development, site visit prep, and F&O Studies.
  • Project Setup: This section covers initial project setup activities such as creating a project notebook and requesting CIP numbers.
  • Pre-Design Phase: Outlines pre-design activities like updating utilities, property descriptions, and preliminary engineering coordination.
  • Design Phase: Covers extensive design phase activities such as survey requests, design reviews, and completing construction documents.
  • Bid & Award: This section describes the steps for bid and award processes including drafting Board authorizations and preparing motions.
  • CISCO Contracts: Lists responsibilities related to CISCO contracts, such as preparing board reports and obtaining pricing quotes.
  • Emergency Construction Contracts: Details emergency contract procedures for projects below and above $200,000 in construction costs.

ENVIRONMENTAL ENGINEERING DIVISION

PROJECT ENGINEER/PROJECT MANAGER CHECKLIST

Project Title: ________________________________

Client: HTP / TITP / DCT / LAG / CS / Other


(Circle one)

CIP No.: _____________

W.O. No.: _____________

Start Date: _____________

Project Manager: ______________________________________ Date: ___________

Project Engineer: ______________________________________ Date: ___________


This checklist to be filled out by the Project Engineer CIP No.: ______________

A. Project Setup B. Preliminary Phase (Cont’d)


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed

† Create Project Notebook † Obtain project information from


Project Request form or the CIP
Request from PCE:
† Conduct an early Project Definition
Œ CIP # † Meeting with Client
Œ Create UPRS File
† Prepare for and conduct a "Blue Sky"
† Have Clerical create Electronic files Meeting internally

† Have Records Management create † Conduct workshop with client


master file
† If project is not approved: write memo
to file canceling project
†
If project is approved:

Develop Detailed Scope:


†
B. Preliminary Phase Prepare:
PM/PE
Activities
Date
Comments † Œ Process Flow Diagram
Check Performed
† Œ Process Description
† Develop Preliminary Scope &
† Œ Preliminary P&ID
Schedule
† Œ General Layout
† Check Budget in CIP
Œ Report Outline
†
† Request & Receive Scope/Schedule/
Resources Input from Design Groups † Develop Budget:
Construction, Design and CM costs

† Develop Schedule

Obtain Approval from EED


† Management

Reviewed by PM: Date:

2 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

B. Preliminary Phase (Cont’d) C. Pre-Design Phase


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
† Identify Construction Vehicle † Update UPRS files
Œ For B & A - Section E Proceed to Pre-Design (10% to
† 25% Design)
Œ For CiSCo - Section F
Arrange Pre-Design "Kick-Off"
Œ For Emergency Contract † Meeting
- Section G
Identify design criteria
†
Initiate Project Approvals:
Identify design constraints
Prepare:
†
Obtain Preliminary Soil Values
† PA Form †
Produce recommendations (cosult
† PRC Presentation † with Design Group)
† CAF
† Conduct economic analysis
† Present project to SPT & obtain
† Publish draft report
signatures on PA form
Conduct an internal review
† Present to AMP & obtain †
signatures on PA form Conduct external review and
† workshop with client
Place on PRC Agenda, call
† Incorporate comments from review
FMD by due date & submit all †
documents Review & Update Project Schedule
†
† Present to PRC and obtain
Prepare class C estimate
signatures on PA and CAF †
forms
† Produce final Pre-Design Report

† Request W.O. from FMD


† Obtain client approval and signature
†
†

3 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

C. Pre-Design Phase (Cont’d) D. Design Phase


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed

† Proceed to PRC with request for † Request Survey & Geotechnical


more money (if needed) Report (If necessary)
Set up Inter-discipline and Design
† Close W.O. (if not approved) † Team (If necessary)
Œ Close work order (if not Arrange/Schedule Design Kickoff
approved by PRC) † meeting
Œ Initiate the following Permit
†
Initiate Technical Specifications
processes as applicable: Œ Distribute TOC
Œ Follow up on all Permits (as listed
† Environmental Permits from † earlier)
the Harbor Department

† Œ Building & Safety (Identify the † Start R/W process (If necessary)
Case Manager) Submit project to Cultural Affairs (If
† necessary)
† Œ Obtain Haul Route Permit
Obtain most recent utility drawings
† Œ SCAQMD † from and coordinate with Q & S (if
necessary)
Œ Fire Dept
Obtain Preliminary Geotechnical
Œ Environmental Clearance from † Report
the Environmental Group
† Request Plans from Street Lighting,
† Proceed with Design Phase LADOT, etc.(if necessary)
Develop 50% plans and specs.
† † Including GR's/GR's
† † Prepare 50% QA/QC checklist

† † Review Correct sheet layouts

† Prepare Class "B" Estimate


Œ Go back to PRC (if necessary)
† Review & Update Schedule

Reviewed by PM: Date: † Review 50% QA/QC checklist by


PM/COP

4 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

D. Design Phase (Cont’d) D. Design Phase (Cont’d)


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Distribute 50% Plans & Distribute 90% Plans &
† Specifications for Internal & † Specifications for Internal and
External Review External Review
† Obtain Comments & Incorporate
50% design comments † Submit 90% plans to B & S

Hold 50% workshop with client (If Œ Civil


† necessary) Œ Architectural

† Complete 50% Design Œ Structural

† Check Calculations: Œ Plumbing


Œ Engineering Calculation Œ HVAC
Œ Hydraulic Calculations Œ Electrical
(Hydraulic Profile, Pumping
Systems, etc.) Œ Instrumentation & Control
Conduct Constructibility Review (by
† Conduct Constructibility review (If
CM Group):
necessary)
† Obtain and Review Final
† Œ Verify construction duration
Geotechnical Report (Earthwork
and Foundation design) † Œ Prepare Class A estimate

† Conduct Technical Reviews (if † Œ Review & Update Construc-


tion QA/QC Checklist
necessary):
Review & Update All QA/QC
Œ TAC † Checklists (100%)
Œ Value Engineering Hold Workshop w/Client & Obtain
†
† Review: Comments
Œ Major Equipment Specs
† Inter-discipline Check by
Œ Payment Schedule in GR Discipline Managers:

† Complete 90% Plans & Specs. Œ Red/Yellow Line

† Complete 90% QA/QC checklist


Œ Checking/Cross-Checking
of Drawings & Specs.

5 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

D. Design Phase (Cont’d) D. Design Phase (Cont’d)


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed

† Schedule and Conduct QA/QC † Complete 100% Design Package


Squad Check Œ Complete 100% Checklists
Incorporate comments into 90% Œ
† design
Complete QA/QC Checklist
Œ Complete Specifications -
† Complete Back Check of reviews Sign-Off Approval Form
This activity may start
† Draft Volume I (Instructions to Bidders)
sooner † Produce Mylars
Prepare: † In House Signature

Œ Volume I Checklist Œ Sign & Stamp Specs

Œ Bid Items Schedule Œ Sign & Stamp Drawings

Œ Construction Duration (Always † Send drawings to BOE Plan


Processing
calendar days)
Œ Schedule of Work & Prices † Plan Processing:

(Verify fixed cash allowance Œ Indexing


items w/ GR) Œ Obtain Signatures
Œ Ready to Advertise Checklist - Deputy City Engineer (Specs
must accompany plans)
Œ Draft Vol I & Ready to
Advertise Checklist to Q&S - City Engineer
Œ Microfilming
† Contact Bid & Award section in † Return the signed Plans & Specs
to EED
Q & S group
Œ Œ Produce CDs & Hard
† Insurance Requirements
Copies(Check with Q&S on
† Œ MBE/WBE/OBE & Sub- the required quantity)
Contractor outreach
requirements
Œ Produce 3 full-size plans &
specs for the Con A
† Œ Contact City's Risk Management
Œ Prepare 10 half-size plans &
for Insurance Requirements
specs for in-house use
Refer to distribution matrix for addi-
tional copies

Reviewed by PM: Date: 6 of 9


This checklist to be filled out by the Project Engineer CIP No.: ______________

E. Bid & Award E. Bid & Award (Cont’d)


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Prepare Bid Documents: Deliver 2 Includes Bid Proposal
† complete sets to Board office (Q&S)
Obtain Board authorization if an
addendum change is ± $100K
Notify Utility Companies of the
† project - 2nd Notice (If necessary)
† Œ Prepare Motion

Prepare & Schedule Motion to † Œ Obtain signatures


† Advertise (Q&S) † Œ Schedule & Brief Board

† Schedule & Brief Board (Q&S) † Œ Board Approves Addendum


Last day to issue shall be
† Issue Addendum to Bidders (Q&S)
† Board Authorizes Advertisement min. 2 weeks prior to bid
opening
If I&C Subcontractor Pre-
Qualification Required † Open Bids Always on Wednesday

† Œ Receive I&C Subcontractors' † Post Bids


Pre-Qualification Submittals † Evaluate bid
† Œ Evaluate I&C Subcontractors' Œ Bid summary MSM & MBE/
Pre-Qualification Submittals WBE/OBE participation (Q&S)
Project under $100K Œ Sub-Contractor Outreach
Good Faith Effort (OCC)
† Œ Advertise Project with no MBE/
WBE/DBE requirements (Q&S) † Prepare Board Report to Award
Project overr $100K Contract (Q&S)

† Œ Advertise Project with no † Schedule & Brief BPW (Q&S)


MBE/WBE/DBE applies (Q&S) † Award Contract (BPW)

† Hold Pre-bid meeting † Contractor Submits Bonds &


Insurance to the BPW office
Receive questions from
† Contractors/Subcontractors † BPW Issues Notice to Proceed (NTP)
Prepare addendum Repeat as necessary † Start Construction
† Œ Complete Addendum Checklist †

7 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

F. CiSCO Contracts F. CiSCO Contracts (Cont’d)


PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed

† Verify PRC approval for projects † For Subcontractor Quotes


over $100,000
This activity should start as Œ Forward CiSCo GC & GR to
Prepare Board Report if project is
† over $100,000 early as PRC approves use the subcontractor
of CiSCO Œ Use Contractor's Schedule "A"
Œ Schedule & Brief BPW
list to obtain quotations from subs.
Œ Receive BPW approval Select MBE/WBE when possible

† Prepare Project as design phase follow- Œ Fill Out "Vendors/Subcon-


ing design phase procedure: tractors Selection Justification"
Œ Prepare Plans & Specs sheet (be specific)

Œ Review Plans & Specs


† Receive Quote from CiSCo
Œ Conduct workshop with the client Contractor

Œ Incorporate comments Œ Evaluate

For Vendor Quote: Œ Negotiate

† Œ Obtain Three (3) quotes from


equipment Vendors & Installers † Issue Final TWO
† Œ Fill out Design/Build Vendor
Quotation Checklist (Form †
Directory)

† Œ Use "Checklist for Complete †


Vendors Proposals"
†
† Œ Fill Out "Vendors/Subcon-
tractors Selection Justification"
sheet (be specific) †

8 of 9
This checklist to be filled out by the Project Engineer CIP No.: ______________

G. Emergency Construction Contracts (WTPEC) G. Emergency Construction Contracts (WTPEC) Cont’d


CONSTRUCTION COST LESS THAN $200,000 CONSTRUCTION COST EQUAL OR GREATER THAN $200,000
PM/PE Date PM/PE Date
Activities Comments Activities Comments
Check Performed Check Performed
Refer to EED BPW flow Refer to EED BPW flowchart
† Prepare Board Report declaring
chart † Prepare board report declaring
"URGENT NECESSITY" Board "URGENT NECESSITY". Board
report must indicate top listed or top report must indicate top listed or top
three listed pre-qualified contractors three listed pre-qualified contractors

† Schedule & Brief BPW † Schedule & Brief BPW


Prepare addendum #1 to meet the
† project specifics † Prepare addendum #1 to meet the
project specifics
† Attach Addendum #1 drawings /
specifications / supplemental infor- † Attach Addendum #1 drawings /
specifications / supplemental
mation
information
† Prepare Class "A" estimate
† Prepare Class "A" estimate
† Construction Services Manager
(CSM) to contact listed contractors † CSM to contact Top listed or
Top Three listed contractors
† Conduct Pre-Bid meeting
† Contractor to provide lump sum
† Contractor to provide lump sum
proposal
proposal
Issue "Notice To Proceed" to the
† Evaluate the bids (same as CiSCo) Same as CiSCo † lowest bidder
† Expedite OCC/GFE review Same as CiSCo

† Negotiate with Contractor If applicable

† CSM to issue "Construction Order" (Notice of Award)

† Contractor submits
Œ Insurance
Œ Bond
† CSM to issue "Notice to Proceed"

† Construction to Start