GENSET 1 GENSET 2

FRONT SIDE ELEVATION

19 18 17 16 51 41 31 21 11 01 9 8 7 6 5 4 3 2 1

REAR SIDE ELEVATION

SCHEDULE OF DOORS

F D C B A A B C D E F

1DR 2DR

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION

LOCATION QUANTITY LOCATION QUANTITY

STORAGE AREA 1 SET COOL PAD AREA 1 SET

CAGE AREA 2 SETS CAGE AREA 1 SET

HARVEST ROOM 1 SET CONTROL ROOM 2 SETS

HARVEST ROOM 1 SET

PU WALL PANEL ON STEEL FRAME


TYPE TYPE PU WALL PANEL ON STEEL FRAME
DOUBLE SWING TYPE DOOR SWING TYPE DOOR

DEVELOPER PROJECT CONSULTANT: OWNER : PROJECT TITLE: SHEET CONTENTS: DESIGNED BY:
R.A. 9266 SEC. 33 CADD BY: SDCH & JRF

PROPOSED 18X106M CAGE FRONT SIDE ELEVATION


DATE:
THIS DOCUMENT IS AN KING B FARM CHECKED BY:
INTELLECTUAL PROPERTY OF SYSTEM BROILER BLDG. REAR SIDE ELEVATION
AND DATE:
LB BOADO CONSTRUCTION AND HAULING THE ENGINEER. NO PART OF IT ARCHITECT / CIVIL ENGINEER
(MULTI TIER TUNNEL VENT) RIGHT SIDE ELEVATION REVISIONS:
MAY BE DUPLICATED OR
INTERNATIONAL HASDAQ PHILIPPINES
No. 23 AGUINALDO ST., POBLACION, BINALONAN, PANGASINAN REPRODUCED WITHOUT PROPER
PERMISSION AND WRITTEN AGRO-INDUSTRIAL CORPORATION
LOCATION LEFT SIDE ELEVATION
SCHEDULE OF DOORS
SHEET NO.
4
CONSENT FROM THE ENGINEER. PRC. REG. No.
PTR. No.
PTR DATE ISSUED:
PTR PLACE ISSUED: BRGY. ALULA. TALUGTUG, NUEVA ECIJA A 4