Providing and applying plaster / wall punning with plaster of paris (

with plaster of paris material of Ambuja / Mor Chap or equivalent


make ) in 10 to 13 millimeter thickness to previously plastered surface
Item / or on newly brick surface ( Excluding rough cast plaster ) in all position
No. 21 including preparing and Finishing the surface scaffolding etc.complete.

R/E - 01 No L B D Qty
Administration 2 9.82 3.48 = 68.35
2 3.25 3.48 = 22.62
Technical Branch 2 9.82 3.48 = 68.35
2 3.25 3.48 = 22.62
Dy Engineer Cabin 2 6.47 3.48 = 45.03
2 5.20 3.48 = 36.19
Store 2 1.75 3.48 = 12.18
2 2.65 3.48 = 18.44
Technical/ store / Recod 2 5.69 3.48 = 39.60
2 5.20 3.48 = 36.19
Waiting Area 0 3.30 3.48 = 0.00
2 5.43 3.48 = 37.79
Water Cooler Passage 2 5.43 3.48 = 37.79
Corridor 2 26.57 3.48 = 184.93
2 2.00 3.48 = 13.92
Entrance foyer 2 4.47 3.48 = 31.11
Staff Toilet corridor 2 4.80 3.48 = 33.41
2 1.85 3.48 = 12.88
Staff Toilet 2 2.25 3.48 = 15.66
2 3.12 3.48 = 21.72
2 2.32 3.48 = 16.15
2 3.12 3.48 = 21.72
WC 1 1.00 3.48 = 3.48
1 1.20 3.48 = 4.18
1 1.10 3.48 = 3.83
1 1.20 3.48 = 4.18
Bath 1 1.00 3.48 = 3.48
1 2.07 3.48 = 7.20
Dy Engineer Toilet 2 1.48 3.48 = 10.30
2 3.76 3.48 = 26.17
2 1.50 3.48 = 10.44
Beam Offset 2 5.20 0.40 = 4.16
2 5.20 0.40 = 4.16
4 3.25 0.40 = 5.20
Deduction
MD 1 2.40 1.00 2.40 = -5.76
D 2 1.50 1.00 1.50 = -4.50
D1 4 1.50 1.00 1.50 = -9.00
HD 1 1.20 0.50 1.50 = -0.90
D2 1 1.00 0.50 2.10 = -1.05
D2 3 1.00 1.00 1.20 = -3.60
D3 0 0.80 0.50 2.10 = 0.00
W 10 1.80 1.00 1.50 = -27.00
W1 12 1.50 1.00 1.50 = -27.00
V 0 0.60 1.00 0.90 = 0.00
Corridor 1 26.57 1.00 0.90 = -23.91
2 10.05 1.00 0.90 = -18.09
Water Cooler Corridor 2 5.43 1.00 0.90 = -9.77
Waiting Area 2 5.43 1.00 0.90 = -9.77
WC 2 1.20 1.00 2.40 = -5.76
2 1.00 1.00 2.40 = -4.80
2 1.20 1.00 2.40 = -5.76
2 1.10 1.00 2.40 = -5.28
Bath 2 2.07 1.00 2.40 = -9.94
2 1.00 1.00 2.40 = -4.80
Dy Engineer Toilet 2 1.48 1.00 2.40 = -7.10
2 3.76 1.00 2.40 = -18.05
Total Qty = 681.59 Sqm