Sr Unit 50A 50A 50A 25A 100A 100A 100A 100A 100A Tot Insta. A/T Capt.
No (5+1) (4+1) (3+1) (6+1) (3+1 (4+1) (5+1) (9+1 (11+2) al
) )
BF 2016-17 1 2 4 7
Received 2 3 5
2017-18
1 AGM GSM 2 2 2 2
2 AGM RUR 1 1 1 3 3 2
3 AGM RSM 1 1 1 1
4 AGM INT
5 AGM Ext. 3 3 3 3
Total 2 1 2 4 12 9 9 8
C) Shifting of Exchanges
Following exchanges would be shifted during financial year 2017-18
Action By:- AGM (Plg)/AGM (Rural)/AGM (RSMD)/AGM (Ext.I),after finalization of UG cable tender
End to End testing of fibre of all GPs of Mavli SDCA should be completed by 17.06.2017
Atleast 90% of GPs should be lit after installation of OLTE.
Traffic loading of MADM by next week (10.06.2017)
Prepare & submit the document of newly installed MADM by AGM (Tx)
Action By – AGM (Tx) / AGM (Sales & Mktg)
i) RSWAN,EB and FTTH Annx- D
(a) RSWAN HO 2Mbps
Total = 110, Upgraded = 106 ( MLLN – 63, Non MLLN – 43)
Pending = 4 (NF & Office Close)
(b) MPLS circuits Annx - D
Atal Seva Kendra Total = 16, Completed = 10, Pending = 6
(c) RMSP: Total school = 785, LL provided 65 , BB provided = 63+35
(d) EB stage IV Target – 750 Lakh Achievement – 12.30 Lakh
Action to be taken by AGM(Rural) / AGM(RSMD) / AGM (S&M) / AGM Tx
(C) CM :
Redep of 2G and 3G BTS Annx - D
3G BTS Work to be completed (One 3G site at Sarada)
1. Amet- II - Commissioned.
Tower ready site
Total - 26, Hand over to ZTE - 10 BSNL -2 Annx - D
ZTE Sites:
Commissioned: 1.Heera ka Badia, 2.Bhomtawada, 3.Kunwathal, 4.Kankarwa, 5.Was, 6.Gingla,
7.Kun, 8.Gajpur
Integrated: 1.Dhaneriya WIP:1.Dagar
BSNL Sites: 1)Karchha kalan, 2) Dhankawada ( Commissioned )
Action By – AGM (GSM) / AGM (Tx)/ AGM(Rural)/ AGM(RSMD)
Replacement of old 2202/2206 type BTS.
EMF submission of all GSm sites by 20.06.2017 – By AGM(GSM GNO)
(i) IPfication of 3G Nodes
IPfication planning
Additional requirement of DMW to circle office
Action By – AGM (GSM) / AGM (Tx) / AGM (Plg)
(i) Achievement
NAME OF Monthly
Monthly Target Yearly Target Yearly Target
SECTION Target
(Gross) (Gross) (Gross)
(Gross)
(vii) Inspection
-Inspection of Two Exch.& Two pillars by Addl.GM/DGM weekly and inspection report may be
released
-Action by Addl.GM/DGM
Miscellaneous
- Lease circuit fault should be clear within 3 days.
- Testing of line parameter in exchanges on regular basis
- Routine Testing schedule to be followed Daily/Weekly/Monthly/Qtrly & mainten register
- Activation of Alarm Pennel in city exchanges & SDCC – Report by next week
- Disply name & contect no of incharge in case of emergency
- Monitering of 20 high revenue exchange at all level
- All field Officer to Contact to disconnected BB subscriber for reconnection – progress to be submitted
in next meeting with register
- Report regarding LOW INSULATION cable fault along with action plan to be submitted by next
meeting
- IT section will prepare details of computers and Telephones provided in rooms of Admin building
- Tender document for wiring from Dharmsala
- Telecom services of Pipalkhoot and Dhariyawad to be maintained by area incharge and District level
meeting at Pratap garh will be attended by AGM concened
- Power plant setting should be done (Float Voltage = 54.2 V, Charging Voltage = 55.2 V, Current
Limit = 70% in City & 80% in Rural area.
- Calibration of voltage and current through shunt.
- Planning may initiate action for scrapping of all Obsolute & Unserviceable store by special drive
- Sell of scrapped material through MSTC and achieve target.
- Disposal of iron peaces, packing material and raddi as discussed in meeting
- ACE-9 for batteries and iron scap to be submitted
- Report on rented buildings to be submitted to planning by 01.03.2017
- Rjintranet letters to be downloaded by conern unit & followup action to initiated on daily basis - All
Officer
- Measurement of Voltage between Phase-Phase, Phase-Neutral & Neutral – Earth
Action by AGM(Plg.)/AGM(Rural)/AGM(RSMD)
(c) CM Maintenance –
(i) Availability Annx.- CM-
Target – 99.5 %
Availability 96.6% which is not upto mark.
Worst 20 BTS site is to be moniter by AGM(GSM)
(ii) 5 Para meters
SDCCH > 1% , TCH < 2 %, HOSR >95%, CSSR > 95% & DCR<3%
HOSR status as on 8/1/2017 Total 77 sectors are not as per norms
17 have shown improvent List of rest sectors to SDO concern for n/a
Top 10 high revenue sites to be checked and report to be submitted
List of BTS sectors not meeting the target
Action by – AGM(GSM)
(iii) Partially down sites
Action by – AGM(GSM)
(iv) Data usages nodewise- Top 25 BTS nodes and availability
Monitering by - AGM(GSM)/SDE (MSC)
(v) Drive Test – Weekly Target and Achievement
Schedule to be given at least 2 cluster in week
(vi) VSWR faults – Minimize and attend immediately
Alarm Extend from BTS to BSC. List of BTS provided by MSC.
Action by – AGM(GSM)
(3) Sales and Mktg
(i) Revenue Targets and Achievements –
Post Paid – Crore (Annual) , Monthly – Crore
Pre Paid - Crore (Annual), Monthly – Crore
Total - Crore (Annual), Monthly- Crore
Sales team visit & all out efforts for keeping Revenue positive
Action by – AGM (Sales & Mktg) / CAO (A/C)
(ii) Sim Sale – Achievement – Annx.- D IX
Target – One connection per BTS per Day
Achivement 17324 upto 31.05.2017
(iii) MNP Ratio
MNP ratio should be improved
Target – One MNP (IN) per retailer per week
CSC wise MNP Target
1. BSNL Shoppe – 50
2. CSC PGMTD – 20
3. CSC KKRL -25
4. CSC Amet – 5
5. CSC Bhim – 5
6. CSC Nathdwara -5
7. CSC Charbhujja – 5
8. CSC Deogarh - 5
9. CSC Gogunda -5
10. CSC Jhadol -5
11. CSC Dhariyawad – 5
12. CSC Chawand – 5
13. CSC Fatehnagar -5
14. CSC Vallabhnagar – 5
15. CSC Kherwara – 5
16. CSC Salumber – 5
(a) Electrical
(i) Replacement of lift at Main TE Building Tender Status
(ii)Repair of all faulty DG sets/AC
(iii)Requision of UPS wiring fault at PGMTD office by Planning Section.
(iv)Energy Audit – Udaipur City and SDCC HQ by 30.06.2017
(v)Review the capacity of E/A
(vi)Fire Drill by 05.06.2017