C&W activities at JP mainly involve maintenance of coaching stock. Following are major
work details-
(1) Primary maintenance –CCC/JP is a mega coaching depot on NWR carrying out
primary maintenance of 18 BG trains which includes world famous tourist train viz.
Palace On Wheels & Royal Rajasthan On Wheels.Depot is maintaining North Western
Railway’s first Double Decker AC train plying between Jaipur-Delhi Sarai Rohilla &
Jaipur-Agrafort Shatabdi Train.The details of the trains maintained is as under-

S. No. of
Train No. From-To LOAD
No. Rakes
1. 12985/86 JP-DLI-JP 15 One
2. 12035/36 JP-AF-JP 07 One
3. 12968/12970 JP-MAS/JP-CBE 23 Two
4. 12976/12975 JP-MYS 21
Two
5. 19713/14 JP-SC 20
6. 19711/12 JP-AII-BPL-JP 20 Two
7. 12974/12973 JP-IND 13 One
8. 12980/12979 JP-BDTS 24 One
9. 19707/19708 JP-BDTS 24 Three
10. 59721/59722 JP-HSR 10 One
11. 59706/59705 JP-SOG-BTI-SOG-JP 10 Four
59714/59715/09766/5
9717/59716/09765/59
12. JP-FL-RE-JP 12 Four
725/59726/59723/597
24/59718/59713
13. 12940/12939 JP-PA-JP-BCT-JP 17 One
14. 09722/09721 JP-UDZ-JP 11 One
15. 19709/10 JP-KMQ-JP 18 One
16. Palace On Wheels 22 One
17. Royal Rajasthan On Wheels 22
(2) Secondary Maintenance –Jaipur depot is maintaining 02 weekly trains viz.
Yashwantpur-Jaipur-Yashwantpur Garibrath & Bandra terminus-Jaipur-Bandra
Terminus Duronto S/F Express .
S.
No. Train No. From-To LOAD PM depot
1. 12239/12240 JP-BCT Duronto Exp. 14 Coaches BCT
2. 06512 (Garib Rath) JP-YPR-JP 18 Coaches YPR
(3) Primary Maintenance MG

S. No. of Coaches
Train No. From-To LOAD
No. Rakes (Nos.)
02081/02082/
52083/02084/
02093/02094/52081/5208
1. 2/52085/52086/ Jaipur-Sikar-Churu 12 coaches 3 36
02087/02086

02083/52084/02085/0208
8/52087/52088/02089/02
2 Jaipur-Sikar-Churu 12 coaches 4 48
099/19736/
19736

(4) BG Platform examination –Following trains are platform return trains & Internal
cleaning of coaches of these trains is carried out by outsourced agency.

Base
S.N. Train no. from to Load Arrival Dep. Halt Freq. depot
1 12181/82 JP JBP 18 11:50 17:35 05:45 Daily JBP
2 12955/56 JP BCT 22 12.50 14.10 01:20 Daily BCT
3 12467/68 JP BKN 08 12.35 15.00 02:25 Daily BKN
4 12986/85 JP DEE 15 22:05 06:00 07:55 2,3,5,6,7 JP
5 54807/08 JP AII 13 22:25 05:35 07:10 Daily JU
6 59721/22 JP HSR 10 22.55 05.15 06:20 1,2,3,5,6 JP
7 19573/74 JP OKHA 21 15:15 16:40 01:25 2 OKHA
8 59702/01 JP HSR 13 09.15 18.25 09:10 3,4,7 JP
9 12991/92 JP UDZ 17 13:30 14:00 00:30 Daily UDZ
10 19711/12 JP BPL 22 09:25 17:30 08:05 3,4,7 JP
11 59806/02 JP BXN 12 20:05 23:55 03:50 Daily KTT
12 09721/22 JP UDZ 11 21:15 06:45 09:30 1,2,4,5,7 JP
13 51974/73 JP MTJ 10 13:55 14:20 00:25 Daily MTJ
5.0 Sick line activities –
 On an average 25 BG coaches are IOHed per month at BG-Sick line / JP .
 During IOH unit exchange of bogies is done.Beside this heavy repair works viz.
wheel changing, V-belt changing, changing of Axle box spring etc. are
attended.

****