Professional Documents
Culture Documents
• “Consider” means it is necessary to think about but can be excluded, whereas “take into
account” means it is necessary to think but cannot be excluded.
• “Appropriate” means suitable (for, to) and implies some degree of freedom
• “Applicable” meansrelevant or possible to apply and implies that if it can be done, it shall be done
• “Ensure” means the responsibility can be delegated, but not the accountability to make sure that it
is performed.
Sumber dari: Pn. Hafidzah Abd. Rahim - SIRIM
Level of Documents
• Level 1 – Manual
• Level 2 – Operation and Management
• Level 3 – Procedure
• Level 4 - Forms
OBJEKTIF BENGKEL
1. Para peserta dapat mengenali struktur dokumentasi
ISO 45001:2018.
2. Memberi pemahaman ringkas bagi setiap klausa-
klausa yang berkaitan dalam ISO.
3. Meningkatkan pemahaman peserta berkenaan ISO
45001:2018
KESEDARAN ISO
• ISO adalah satu sistem yang
SUSAH!
• Gangu waktu kerja.
• Kalau tak ada pun, kerja tetap jalan.
KESEDARAN ISO
• ISO adalah satu sistem yang SUSAH!
• Boleh dilaksanakan dengan bekerjasama kerana sistem
ISO hendaklah dilaksanakan secara berorganisasi (Klausa
4.0)
• Gangu waktu kerja.
• Sistem ISO dicipta untuk meningkatkan kualiti kerja kita,
dan diserapkan dalam norma kerja kita.
• Kalau tak ada pun, kerja tetap jalan.
• ISO dapat meningkatkan kualiti kerja, kualiti dokumentasi
dan meningkatkan imej jabatan.
UNDERSTANDING OF
ISO 45001:2018
4.0 Context of the 5.0 Leadership and worker 7.0 Support (12 clause) 9.0 Performance evaluation
organization (4 clause) participation (4 clause) (5 clause)
• Resources
• Understanding the • Leadership and • Competence • Monitoring, measurement,
organization and its commitment • Awareness analysis and performance
context • OH&S policy • Communication (3 sc) evaluation (2 sc)
• Understanding the needs • Organizational roles, • Documented Information • Internal audit (2 sc)
and expectations of responsibilities and (3 sc) • Management review
workers and other authorities
interested parties • Consultation and 8.0 Operation (5 clause) 10.0 Improvement
• Determining the scope of participation of workers (3 clause)
the OH&S management • Operational planning and
system control (4 sc) • General
• OH&S management • Emergency preparedness • Incident, nonconformity
6.0 Planning (6 clause) and response
system and corrective action
• Action to address risks and • Continual improvement
opportunities (4 sc)
• OH&S objectives and
planning to achieve them (
2 sc)
Scope of the OH&S Management System [4.3/4.4]
PLAN
External & Planning [6]
Internal Issues Needs & Expectations
[4.1] of Workers and Others
Interested Parties
Issues [4.2]
Leadership
ACTION DO
and worker
Support [7]
Improvement
[10] participation Operation [8]
[5]
CHECK
Performance
Evaluation [9]
PLAN
External & Planning [6]
Internal Issues Needs & Expectations
[4.1] of Workers and Others
Interested Parties
Issues [4.2]
Leadership
and worker
participation
[5]
Measurable
Objectives Be monitored
Be communicated
Be updated as appropriate.
WHAT will be WHAT resources
done? will be required?
6.2.2
Planning to
WHO will be WHEN it will be
achieve responsible? completed?
OH&S
objectives HOW the results
HOW the actions to
will be evaluated,
achieve OH&S
including indicators
Objectives
for monitoring?
UNDERSTANDING OF
ISO 45001:2018
4.0 Context of the 5.0 Leadership and worker 7.0 Support (12 clause) 9.0 Performance evaluation
organization (4 clause) participation (4 clause) (5 clause)
• Resources
• Understanding the • Leadership and • Competence • Monitoring, measurement,
organization and its commitment • Awareness analysis and performance
context • OH&S policy • Communication (3 sc) evaluation (2 sc)
• Understanding the needs • Organizational roles, • Documented Information • Internal audit (2 sc)
and expectations of responsibilities and (3 sc) • Management review
workers and other authorities
interested parties • Consultation and 8.0 Operation (5 clause) 10.0 Improvement
• Determining the scope of participation of workers (3 clause)
the OH&S management • Operational planning and
system control (4 sc) • General
• OH&S management • Emergency preparedness • Incident, nonconformity
6.0 Planning (6 clause) and response
system and corrective action
• Action to address risks and • Continual improvement
opportunities (4 sc)
• OH&S objectives and
planning to achieve them
(2 sc)
PLAN
Planning [6]
Leadership
DO
and worker
Support [7]
participation Operation [8]
[5]
Leadership DO
and worker Support [7]
participation Operation
[8]
[5]
6.1 Planning
6.2 Action to address risks & opportunities
Substitution
Engineering Control
Administration control
Leadership
DO
and worker
Support [7]
participation Operation [8]
[5]
CHECK
Performance
Evaluation [9]
Leadership
ACTION DO
and worker
Support [7]
Improvement
[10] participation Operation [8]
[5]
CHECK
Performance
Evaluation [9]
• 10.1 – General
Organization shall determine
opportunities for improvements (see
clause 9) and implement necessary
actions to achieve intended
outcomes of its OH&S MS.
10.2 Incident, nonconformity and
corrective action
Assess Risk that
Review
Incident/NCR relate to new
effectiveness
hazard
React-control,
correct, mitigate, Make changes if Make change if
deal with necessary necessary
consequences
Investigating the
Review existing
incident or Communicate
assessment
review NCR
Determine
Determine RC similar incidents
occuring
• The organization shall continually improve the
suitability, adequacy and effectiveness of the
OH&S management system, by:
• enhancing OH&S performance;
• promoting a culture that supports an OH&S
10.3 management system;
1. ISO 45001:2018
2. Slide presentation SIRIM –
Pn. Hafidzah Binti Abd.
Rahim