ANALYSIS TEMPLATE REPORT

Primary Element Secondary Element Weight Unit Element Rate Value

12 . Dewatering
12-310-10 Bail out of water with all leads and lifts: by manual labour
20 . Materials : Misc.
20-530 Rope : Jute ... ... ... ... ... ... ... 0.0100 kg @ Tk. . . .per kg Tk. . . . . . .
20-655 Kerosine tin : empty ... ... ... ... ... 0.0010 No. @ Tk. . . .per No. Tk. . . . . . .
Sub Total Tk. . . . . . .
80 . Labour
80-375 Labour, Unskilled ... ... ... ... ... 0.0400 day @ Tk. . . .per day Tk. . . . . . .
80-375 (Labour, Unskilled ... ... ... ... ...) 0.0020 day @ Tk. . . .per day Tk. . . . . . . (Misc. Sundry)
Sub Total Tk. . . . . . .
Sum of Sub Total Tk. . . . . . .
Overhead & 2.5 Tk. . . . . . .
Estt.
Item Total % Tk. . . . . . .
Contractor's 10 % Tk. . . . . . .
Profit
Total Tk. . . . . . .
VAT 6.0 % Tk. . . . . . .
Item Grand Total Tk. . . . . . .