You are on page 1of 16

Hazrat Shahjalal International Airport Expansion Project.

- Bills of Quantities Section 30000G Summary-Architectural Works


AD7-II-55

Item Amount
Description Unit Qty
No Yen BDT

30000G: Generator House


Section
Summary

30200G Earthworks (Site Clearance is Civil Works, Tree cutting and


disposal)

30201G: Basement excavation sum 1

Sub-total to Division Summary

30300G Foundations (Prestressed High Strength pile, Screwed Steel


Pile, Excavations & Shoring)
30301G: Prestressed High Strength pile- PHC sum 1
30304G: Cutting off tops of piles sum 1
30305G: Pile Tests sum 1
30306G: Static Working Load Test sum 1
30307G: Dynamic Load Test sum 1
30308G: Integrity Test sum 1
30309G: Others sum 1
Sub-total to Division Summary

30400G Concrete Structure (Cement Material, Aggregate, Steel


Reinforcement, Formwork, Placement, Curing & Quality Control)

30401G: Reinforced in-situ concrete sum 1

30402G: Formwork to in-situ concrete framed structures sum 1

30403G: Reinforcement for RC structure sum 1

30404G: Waterproofing sum 1

30405G: Sundries sum 1

Sub-total to Division Summary

30500G Steel Structure (Material & Fabrication, Transportation,


Erection, Quality Control & Testing) N/A

30600G Masonry Works

30601G: Brick wall sum 1

Sub-total to Division Summary

30800G Roofing works

30809G: Asphalt Built Up Roofing sum 1

Sub-total to Division Summary

30900G External glazing/Internal glazing/Partition N/A

31000G Doors / Windows / Grilles / Shutter

31002G: Metal doors/Windows /Grilles sum 1

31003G: Stile Doors (inc. fire doors) sum 1

Page No.30000G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Section 30000G Summary-Architectural Works
AD7-II-55

Item Amount
Description Unit Qty
No Yen BDT

30000G: Generator House


31006G: Roller shutter/fire rated shutter sum 1

31010G: Special Operating Door /Window sum 1

Sub-total to Division Summary

31100G Metalworks

31101G: Steel catladders sum 1

31103G: Balustrades and Handrailiings (Stainless) sum 1

31104G: Mild Steel Works sum 1

31106G: Stainless Steel Works sum 1

31107G: Fixed Louvers (ALV) sum 1

Sub-total to Division Summary

31200G Finishing Works

31201G: Wall finishes sum 1


31202G: Ceiling finishes sum 1
31203G: Floor finishes sum 1
31204G: Waterproofing sum 1
31206G: Suspended Ceiling sum 1
31207G: Painting / Clear Finishing sum 1
31208G: Tile works sum 1
31209G: Others sum 1

Sub-total to Division Summary

31300G Interior fittings

31301G: Toilet accessories sum 1

31302G: Signages sum 1

31305G: Fixtures & fittings/ Hoist crane(inc. steel str.) sum 1

Sub-total to Division Summary

31400G Ancillary Works

31401G: Guard House sum 1

31402G: Security fence with Gate for IPP, IPR and Generator House sum 1

31403G: Sodding for IPP, IPR and Generator House sum 1

Totaol to Section 30000G Summary

For Section 30000G : Generator House

Page No.30000G- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30200G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30200G Earthworks (Site Clearance is Civil


Works, Tree cutting and disposal)

Division Summary

30201G: Basement excavation sum 1

Total to Division Summary

30201G: Basement excavation

Basement excavation- Site Clearance is Civil Works, Tree


cutting and disposal

1 Survey / Layout sum 1

2 Marking works

a) Land layout sum 1

b) PHS piles layout sum 1

c) Floors layout sum 1


Filling and Leveling works (Open cut for Fuel Tank sand
3
backfill) m3 10,438

4 Excavation m3 12,347

5 Soil moving m3 12,347

Sand filling and compaction (Open cut method for Fuel storage
6 m3 3,956
tank)

Sub-total to Division Summary

Page No.30200G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30300G-Architectural Works
AD11-II-6

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30300G Foundations (Prestressed High Strength pile,


Screwed Steel Pile, Excavations & Shoring)

Division Summary

30301G: Prestressed High Strength pile- PHC sum 1

30304G: Cutting off tops of piles sum 1

30305G: Pile Tests sum 1

30306G: Static Working Load Test sum 1

30307G: Dynamic Load Test sum 1

30308G: Integrity Test sum 1

30309G: Others sum 1

Total to Division Summary

30301G: Prestressed High Strength pile- PHC


Pile capacity- 532KN for 15 meters pile embedment length above
values are for net length. Pile capacity- 549KN for 12 meters pile
embedment length above values are for net length. Net embedment
length- pile length- pile cut-off length. Test piles shall be driven at the
location specified by the embedment to determine the recurred length
of piles. Test pile shall driven with the same hammer that is used for
driving foundation piles; all in accordance with Drawings and
Specifications

1 500 mm dia. PHC piles m 3,029

Sub-total to Division Summary

30304G: Cutting off tops of piles

1 500 mm dia. PHC piles m 218

Sub-total to Division Summary

30305G: Pile Tests

Preliminary load test

1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30306G: Static Working Load Test

1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30307G: Dynamic Load Test

1 500 mm dia. PHC piles no. 2

Sub-total to Division Summary

30308G: Integrity Test


1 500 mm dia. PHC piles no. 1

Sub-total to Division Summary

Page No.30300G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30300G-Architectural Works
AD11-II-6

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30300G Foundations (Prestressed High Strength pile,


Screwed Steel Pile, Excavations & Shoring)

30309G: Others
1 Rebar for Pile cap connections kg 4,142

2 Concrete for Pile cap connections m3 17

3 Steel plate for Pile cap connections kg 276

Sub-total to Division Summary

Page No.30300G- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400G Concrete Structure (Cement Material,


Aggregate, Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)

Division Summary

30401G: Reinforced in-situ concrete sum 1

30402G: Formwork to in-situ concrete framed structures sum 1

30403G: Reinforcement for RC structure sum 1

30404G: Waterproofing sum 1

30405G: Sundries sum 1

#REF!

30401G: Reinforced in-situ concrete

Plain Concrete C25,30.

1 Lean concrete 100mm thick - Pile cap m3 70

2 Lean concrete 100mm thick - Ground beam m3 54


3
3 Lean concrete 100mm thick - Ground Slab m 214
3
6 Lean concrete 100mm thick - service line trench & pits N/A m 21

7 Lean concrete 100mm thick - service pits m3 148

Reinforced Concrete C35


Grade 35 for reinforced concrete as shown in the Drawings
and Specifications._

8 Pile cap m3 436

9 Ground beam m3 289

11 Ground floor slab m3 266

10 Suspended slabs m3 299


11 Columns m3 218
3
12 Beams m 378

13 Staircases m3 7
3
14 Walls m 61
3
15 M&E Foundation m 88
3
16 Service line trench & pits m 24
3
17 Service pits - base m 1,389
3
18 Service pits - wall m 917
3
19 Service pits - slab m 277

20 Damp Proof Membrane. Gauge 1000 polythene m2 3,004

#REF!

30402G: Formwork to in-situ concrete framed structures


Formwork as shown in the Drawing and Specification._

1 Sides of Pile cap m2 568


2
2 Sides of Ground slab m 31
2
3 Sides of Ground beams m 1,245

4 Side of M&E Foundation m2 57


2
5 Side of service line trench & pit m 320

Page No.30400G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400G Concrete Structure (Cement Material,


Aggregate, Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)

6 Service pits - base m2 652


2
7 Service pits - wall m 2,292
2
8 Service pits - slab m 1,085
2
9 Sides and soffit of beams m 2,097

10 Sides of columns m2 1,453

11 Staircases m2 38
2
12 Side of wall m 681

13 Side of suspended slab m2 4,042

#REF!

30403G: Reinforcement for RC structure

Deformed bar reinforcement Grade 460, dia. 10mm to 32mm


Pile cap
1 25mm dia. kg 13,687

2 20mm dia. kg 7,122

3 16mm dia. kg 7,132


4 12mm dia. kg 8,209

Columns

5 25mm dia. kg 59,801

6 20mm dia. kg 769

7 10mm dia. kg 11,563

Staircase
8 12mm dia. kg 676

Beams
9 32mm dia. kg 27,692

10 25mm dia. kg 58,418


11 16mm dia. kg 56,055

Ground floor slab

12 12mm dia. kg 32,430

Slabs

13 10mm dia. kg 29,741

Walls
14 10mm dia. kg 3,632

M&E Foundation

15 12mm dia. kg 5,459

Service line trench and pits


16 10mm dia. kg 1,646

Service pits - Fuel storage tank

17 20mm dia. kg 94,437

18 16mm dia. kg 119,262

Page No.30400G- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30400G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30400G Concrete Structure (Cement Material,


Aggregate, Steel Reinforcement, Formwork,
Placement, Curing & Quality Control)

19 12mm dia. kg 31,276

20 10mm dia. kg 94,437

#REF!

30404G: Waterproofing

1 Waterproofing/polyethylene sheet to toilet floor m2 339

#REF!

30405G: Sundries

1 Rebar for lintel and soffit kg 412

2 Concrete for lintel and soffit m3 7

3 Formwork for lintel and soffit m2 46

#REF!

Page No.30400G- 3
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30600G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30600G Masonry Works


Division Summary

30601G: Brick wall sum 1

Total to Division Summary

30601G: Brick wall


Brick wall
2
1 115 mm thick Reinforced brick wall m 116
2
2 240 mm thick Reinforced brick wall m 2,249

#REF!

Page No.30600G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 30800G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

30800G Roofing works


Division Summary
30809G: Asphalt Built Up Roofing sum 1

Total to Division Summary

30809G: Asphalt Built Up Roofing

1 Asphalt Built Up Roofing (ROY, WP-1 SYS. included) m2 2,369

Elastomeric - PLASTOMERIC POLY MER-BITUMEN


2 m2 108
MEMBRANE WP 5

#REF!

Page No.30800G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31000G-Architectural Works
AD7-II-55

Rate Amount
Item No Description Unit Qty
Yen BDT Yen BDT
31000G Doors / Windows / Grilles / Shutter
Final finish paint/coating shall not be paid separately. All related
cost but exempt tariff (Hardwear/parts, stainless sill, fillings,
embedments, etc.,) to be included to unit rate.

Division Summary

31002G: Metal doors/Windows /Grilles sum 1

31003G: Stile Doors (inc. fire doors) sum 1

31006G: Roller shutter/fire rated shutter sum 1

31010G: Special Operating Door /Window sum 1

Total to Division Summary

31002G: Metal doors/Windows /Grilles

Steel Doors(SD)

1 SD-1 900*2100 no. 5

2 SD-1B(AT) 900*2100 no. 3

3 SD-6Bi 1800*2100 no. 3

4 SD-7B 2500*2500 no. 1


5 LSD-1L 900*2100 no. 7
6 LSD-11L 800*2100 no. 2
Aluminum Window
7 AW-1 1800*1200 no. 2
8 AW-2 900*1200 no. 3
9 AW-3 3700*1200 no. 1
10 AW-4 3700*1200 no. 3
11 GS -1 937*1200 no. 1

Sub-total to Division Summary

31003G: Stile Doors (inc. fire doors)

1 FSD-1(SAT) 900*2100 no. 1


2 FSD-1B(SAT) 900*2100 no. 1
3 FSD-6 1800*2100 no. 1

4 FSD-7 2500*2500 no. 2

Sub-total to Division Summary

31006G: Roller shutter/fire rated shutter

Fire Resistant Roller Shutter Doors (FSH )


Roller Shutter Doors (SH )

1 SH - 2 6000*4800 no. 1

Sub-total to Division Summary

31010G: Special Operating Door /Window


Fire Resistant Sliding Window

1 FSW-1 5900*2100 no. 2

Sub-total to Division Summary

Page No.31000G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31100G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31100G Metalworks
Division Summary
31101G: Steel catladders sum 1
31103G: Balustrades and Handrailiings (Stainless) sum 1

31104G: Mild Steel Works sum 1

31106G: Stainless Steel Works sum 1

31107G: Fixed Louvers (ALV) sum 1

Total to Division Summary

31101G: Steel catladders

1 LDS1 m 17
2 LDS2 sum 1

Sub-total to Division Summary


31103G: Balustrades and Handrailiings (Stainless)
1 Balustrades and Handrailiings (MD 11A, MD 12) sum 1

Sub-total to Division Summary

31104G: Mild Steel Works

1 Trench cover MD 22 & Manhole MD 25 sum 1

Sub-total to Division Summary

31106G: Stainless Steel Works

1 RD104 roof outlets sum 1

Sub-total to Division Summary

31107G: Fixed Louvers (ALV)


inc. SUS bird-net
1 AL-1 5600*4200 no. 12

2 AL-2 2550*4200 no. 2

3 AL-3 5500*3800 no. 12

4 AL-4 5700*3700 no. 4

Sub-total to Division Summary

Page No.31100G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31200G-Architectural Works
AD10-II-9

Item Rate Amount


Description Unit Qty
No
Yen BDT Yen BDT

31200G Finishing Works

Division Summary

31201G: Wall finishes sum 1


31202G: Ceiling finishes sum 1
31203G: Floor finishes sum 1
31204G: Waterproofing sum 1
31206G: Suspended Ceiling sum 1
31207G: Painting / Clear Finishing sum 1
31208G: Tile works sum 1
31209G: Others sum 1
Total to Division Summary

31201G: Wall finishes


(Cement render to lintel & stiffener included)
2
1 Cement render to walls (external) m 1,212
2
2 Cement render to walls (internal) m 3,519

3 Cement render to walls (parapet ) m2 687

Sub-total to Division Summary

31202G: Ceiling finishes

1 Cement render to ceiling m2 4,081

2 Cement render to ceiling (beam) m2 2,097


2
3 Cement render to ceiling (stair+column) m 1,470

Sub-total to Division Summary

31203G: Floor finishes

INTERNAL WORK_
1 Cement render to internal ground flooring m2 427

2 Cement render to external ground flooring m2 316

3 Cement render to internal second FL. flooring m2 370

4 Cement render to roof flooring m2 2,052

5 Cement render to treads and risers (staircase) m2 21

6 Cement render to toilet floors m2 70

7 Cement render to skirting, H=150mm m 514

EXTERNAL WORK_
8 Formed face concrete with trowel finish m2 316

Sub-total to Division Summary

31204G: Waterproofing

1 Toilet flooring m2 91

Sub-total to Division Summary

31206G: Suspended Ceiling

Page No.31200G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31200G-Architectural Works
AD10-II-9

Item Rate Amount


Description Unit Qty
No
Yen BDT Yen BDT

31200G Finishing Works

Ground floor
2
1 C 31 m 43

First floor
2
2 First floor C 31 m 280

3 First floor C 33 m2 116

4 First floor C 34 m2 1,549

Sub-total to Division Summary

31207G: Painting / Clear Finishing

Synthetic Resin Emulsion Paint (P 1)


2
1 To wall m 4,501
2
2 To concrete m 7,966

Epoxy Resin Floor Paint (P 6)

3 To cement render flooring m2 466


2
4 To concrete flooring m 1,881

5 To skirting(h:150mm) m 306

Acrylic Resin Emulsion Paint ( P 7)

External Work_

6 To soffit and eaves m2 20

7 To beam/column/wall parapet in formed face concrest m2 1,760

Sub-total to Division Summary

31208G: Tile works

INTERNAL WORK_
1 Non-slip Tiles to treads and risers m2 21

2 Non-slip Nosing m 46

3 Ceramic Tiles to Flooring (Toilet) m2 70

4 Ceramic Tiles to Walls (Toilet ) m2 230

5 Ceramic Tiles to Floors (office) m2 330

6 Ceramic Tiles to skirting, H=150 mm m 207

Sub-total to Division Summary

31209G: Others

1 Anti-static tile m2 117

Sub-total to Division Summary

Page No.31200G- 2
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31300G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31300G Interior fittings


Division Summary

31301G: Toilet accessories sum 1

31302G: Signages sum 1

31305G: Fixtures & fittings/ Hoist crane(inc. steel str.) sum 1

Total to Division Summary

31301G: Toilet accessories

1 Partition board for toilet m2 30

2 Mirrors for toilet sum 1


Sub-total to Division Summary
31302G: Signages
1 Signages SGD2 nos 12

Sub-total to Division Summary

31305G: Fixtures & fittings/ Hoist crane(inc. steel str.)

1 Hoist crane lot 2

2 Steel Structures lot 2

3 Toilet lining counter, wash bowl counter sum 1

Sub-total to Division Summary

Page No.31300G- 1
Hazrat Shahjalal International Airport Expansion Project. - Bills of Quantities Division 31400G-Architectural Works
AD7-II-55

Item Rate Amount


Description Unit Qty
No Yen BDT Yen BDT

31400G Ancillary Works


Division Summary

1 31401G: Guard House sum 1

31402G: Security fence with Gate for IPP, IPR and


2 sum 1
Generator House

3 31403G: Sodding for IPP, IPR and Generator House sum 1

Total to Division Summary

Page No.31400G- 1