MICROWAVE SITE SURVEY REPORT

Customer HCPT
Project Name Mega 2 / Upgrade Capacity&Antenna
Contract No.
Quotation list No.
Region Batam
Site Name Hang Lekui - Batu Besar
Site ID 040008
Jl. Hang Lekui, Batu Besar,Nongsa,Batam City,Riau &
Site Address
Kepulauan Riau
Coordinate
104.1085031 1.16334119
Survey Date 21 September 2014

H3I Huawei
TEL: TEL:
Contact person: Contact person:
E-Mail: E-Mail:
Date: Date:
Signature Signature
Site Information
1 Floor Type : ✘ Cement Shelter Other :
2x2 2x3 3x4

2 Site Size
Other : 50X 200
✘ Green Field Other, Please Specify :
3 Site Location : Roof Top Building Height : m / Storey (Jumlah Lantai) :

Stair Lift

4 Access to Rooftop Site :


Other :
✘ Car ✘ Truck

5 Access Main Road :


Other, Please Specify :

24-hours Work time only :08,00-17,00


6 Access time to enter site : ✘

At night only Other :

BTS 3900A BTS 3900


7 Proposed BTS type :

8 Existing Baseframe : ✘ Available N/A


If N/A, Proposed New Baseframe
Dimension
: x x m
Height : 75 m
9 Tower SST 4 Leg Pole/
Type : ✘ SST 3 Leg
Monopole
Feeder Length Antenna Other :
Microwave : m
Feeder Brand : HANSEN ANDREW
Antenna Brand :
Length of Trunk Cable from
IDU to DDF Transmission : m

Length of E1 Cable from


DDF Transmission to DDF
Existing
Microwave
BTS : m
10 Informatio E1 QTY in DDF
n Transmission : E1
Length Power Cable from
Microwave to Rectifier : m
Microwave Antenna Directio : 159.9626º
Microwave Antenna Height : 30 m
Height Available Space in
Tower for Proposed New
Microwave Antenna : 30 m
11 Distance from Tower to Node B : m
12 Optic cable from BBU to RRU : -m
Feeder Length and Qty : m
New RF 7/8 5/4
Cable/
Other, please specify :
11 Feeder Feeder Type :
Informatio
n
New RF
Cable/
11 Feeder
Informatio
n
Feeder Brand : HANSEN ANDREW
Jumper
12 Jumper Length : m
Informatio
Available Not Available

Alarm Box Spaces are
available for installation
:
16 Alarm Box
Alarm cable length(from
Alarm box to BTS)
: m
✘ Available
Existing DDF : ✘ Cabinet

Slim rack
Existing rack type : ✘ LSA+
Existing module type : K52
DDF impedance : ✘ 120 ohm 75 ohm
E1 jumper cable brand
:
13 DDF
E1 jumper cable type : 1E1/pcs ✘ 4E1/pcs
Length PCM Cable
from New BTS to Existing : m
DDF
Length PCM Cable
from New BTS to New : m
DDF
New DDF PGND Cable m
:
Length
Below information will provided by RNP:
New Antenna Azimuth Sector 1: o Sector 2: o
Sector 3: o

New Antenna Height (m) Sector 1: M Sector 2: M Sector 3: M MARL/MAGL


New Type&Brand: Katherin Single Polar /Katherin Single Polar Katherin x Polar
Mechanical Tilt:
Electrical Tilt:
Configuration:
Power Source, Cables, ACPDB and Grounding Information
✘ PLN Genset
1 Power source :
PLN with genset backup
Power source capacity
PLN : kVA
2
Genset : kVA
Load Current : R=1,5 S=1,4 T= 1,3
Available MCB in ACPDB ? : Yes No

3 AC Power New MCB QTY (pcs) × MCB:c


New MCB brand : Merlin Gerin
Available N/A
Existing Rectifier :

D Existing Recitifer Brand : DELTA


C
Existing Rectifier Capacity : 120 A
P Existing Module Type :
4 o Total QTY Module in Existing: 1 pcs
w
e Existing Module QTY already: 1 pcs
r Existing Module Capacity : 30 A /MODULE
Existing Current Load : 20 A
Length of AC power cable
from BTS/Rectifier to AC
source : m
Length of PGND cable
from BTS/Rectifier to
grounding bar : m
Length of -48V power cable
from BTS cabinet to DC
source : m
Length of GND power cable
C from BTS cabinet to DC
A source : m
B
5 L Length AC cable from new
I ACPDB box to main AC : m
N
G Length of Power cable
from RRU to APM30
Cabinet (m) : m
Section of Power cable
from RRU to APM30
cabinet (mm^2) : mm^2
Length of PGND cable
from RRU to grounding
bar (m) : m
Section of PGND cable
from RRU to grounding
bar (mm^2) : mm^2

Length DC Cable from BTS


to Battery Cabinet (if not in Yes 0,09 No
same baseframe) : m
6 The indoor ground resistance <1Ω :
Auxiliary Permit
✘ HCPT Owner, contact : Toni -XL 0818
1 Site entry permit
: Other, Please specify :
No Site
Estimated time to get entry permit the
2 : days
work
Civil Information
Needed New Pole □Needed □No Needed N/A, Need :
2 Pole If Need New Pole
New Pole height : m
✘ Available
Space of Outdoor Tray
:
1 Cable Tray Vertical Tray Length : m
Horizontal Tray Length : m
Width : 200 mm ✘ 300 mm 400 mm
Existing grounding bar : Available N/A, Need :
Existing grounding bar holes: pcs
2 Grounding
Available Existing Outdoor
2 Grounding
Grounding Bar Hole : ✘ Available pcs N/A, Need :
Existing Grounding Kit
New Grounding Kit Cable : m
3 Tower Tower strengthen : Need √ ✘ No Need

Remark (specify additional requirements beside all above) √

1
2
3
Jl. Hang Lekui, Batu Besar,Nongsa,Batam 40008
Address City,Riau & Kepulauan Riau
Site ID
Coordinate
Shelter Other :
2x3 3x4

Other, Please Specify :

h Lantai) :

Lift Crane ✘ N/A

✘ Truck

Work time only :08,00-17,00


Other :

BTS 3900

N/A

Pole/
Monopole

ANDREW intercondOther :

pcs
5/4 1 3/8

Other
ANDREW ✘ Commsc
ope
pcs
Not Available

Ot
✘ Cabinet he
r:
Ot
✘ LSA+ her
:

75 ohm

✘ 4E1/pcs 8E1/pcs

m
3: o

M MARL/MAGL

Genset

Phase: 3

kVA
No

N/A

A /MODULE
Owner, contact : Toni -XL 081809230184

…..…-……….hour

N/A, Need :

Other :600 MM
500 mm
N/A, Need : pcs
N/A, Need :
pcs

✘ No Need

From RNP enginner:
Antenna Size Antenna Tower Leg
No Type (m) Height (m) Number Azimuth Brand of Antenna
1 MW 1.2 32 A 159.9626º Huawei
Taiwan Industrial Park,
Kavling No. A 041, Kabil
Address Centre,Batam,Riau & Site ID 040007
0 Antenna Information
CoordinateKepulauan Riau Site Name Taiwan International Park
tenna Information
(4) ODU and Antenna Proposed
BTS Porthhole
NodeB on Feeder Doc. about DDF port
Antenna 1 .assignment
Far End Site : 040008 Antenna Height : ______30M________ Antenna Diameter :_.____1.2____
Antenna Model : A0S12HAC ODU frequency band : Tx; - Rx; -

Antenna-1 Total View Antenna-1 Factory label Antenna 1 Installation Label Waveguide interface to antenna-1(If have)

Antenna Direction Label

ODU-1 frame Label (1+0 or 1+1)-if have ODU 1 Factory Label ODU-1 Installation Label Other

ODU Freq and Direction Label


Antenna 2
Far End Site : Antenna Height : ____________ Antenna Diameter :______________
Antenna Model : ODU frequency band: TX : / TR:

Antenna-2 Total View Antenna-2 Factory label Antenna-2 Installation Label Waveguide interface to antenna-2(If have)

ODU-2 frame Label (1+0 or 1+1)-if have ODU-2 Factory Label ODU-2 Installation Label Other
1. SITE DATA REQUIRED BY MICROWAVE
1 General
Site Name&ID
Site Name: Hang Lekui - Batu Besar Tower Owner : Protelindo
Site ID: 040008

Site Type Roof


✘ Top / Greenfield / GF
MW Installation Site Type
RT
Indo Outdo

or or
Cable TrayExisting cable

✘ tray is
New cable
tray required
availablePlate
Existing
Porthole/Penetration Existing
Prothole Space Prothole
New Porthole Outdoor,
Available ✘ Position
IDU/ODU
Required no need

Far end site ODU Link Frequency ODU Frame Support


Item IDU Type Capacity Config
Site ID Site Name Type Suband Hi,lo Tx Rx Frame type P/N
1 40007 Taiwan International Park RTN950 28M 1+1 XMC J high 7624 7463
2
3
4
5
6
7
8
9
10
11

(2) Tower
Tower Existing
New Tower is
✘ Tower is
Required
Available
Self-
Type of Tower
Ot Roof
Suppo
✘ he Mount
rt
rs 45m
Tower Height Building Height :

Existing Microwave Antenna Load Information (All Existing Antennas)

Far end site Antenna Antenna Antenna configur


Item Tower leg Antenna Size Antenna Type Azimuth Operator Remark
Height Freq. Brand ation
Site ID Site Name
1 C 40706 ISAT-UNRI 0.9 43M 7 GHz Huawei A07S09HAC 263.05° H3I 1+1
2
3
4
5
6

Proposed New Antenna Informtion for HCPT

Far end New Antenna


Item Far end site name Antenna Size Antenna Height Tower leg Azimuth Remark
site ID Space available

1 40706 ISAT-UNRI 0.6 44M C 263.05° OK


2
3

(3) Cable Length Information

Item Length (meters / pc) Remark

Distance from available space/APM30 to ACPDB

Distance from available space to Tower Leg

Distance from available space to NSN cabinet

IDU Grounding Cable to Grounding Point

Optical Patch Cords from IDU to ODF

Distance from ODU Grounding Cable to Grounding Point

Remark: The cable length must be measured from Proposed New installation position(Cabinet/19" subrack ,IDU,rectifier,DCPDB etc.)
(4) MW mounting pole Information

Far end site


Item Mounting Pole dia. Mounting Pole Height Mounting Pole Leg
Site ID Site Name
1
2
3
4
5
6
7
8
9
10
Proposed
BTS Porthhole
NodeB on Feeder Doc. about DDF port
2. Photo Required .assignment

(5) Photo of MW antenna

Propose MW
HCPT
Dir to 040007
Existing MW Dia Ø1.2m
HCPT Elv +30m.
Dir to 040007
Dia Ø1.2m
Elv +30m.
3. Photo Required

(5) Photo of MW antenna


(6) Photo of Busbar on Tower
Outdoor Busbar on Tower(From down to top)
Amount of busbar on tower Set
Height of busbar 1 Meter
Height of busbar 2 Meter
Height of busbar 3 Meter

(7) Photo of Busbar 1 Photo of Busbar 2 Photo of Busbar 3

Photo of Busbar 1 Photo of Busbar 2 Photo of Busbar 3

(8) Photo of Tower Identity

NA
2. Photo Required

(1) IDU
Remark:If required ,pls provide the photo of proposed position of New Outdoor cabinet.Must provide overview photo of cabinet.
IDU Rack (Indoor or Outdoor) Propose indoor 19 inch rack(If need)

#NA

IDU-1 Installation Label IDU-1 Factory Label

IDU-1 Installation Label IDU-1 Factory Label


IDU-2 Installation Label IDU-2 Factory Label

IDU-2 Installation Label


#NA
IDU-2 Factory Label

IDU-3 Installation Label IDU-3 Factory Label

IDU-2 Installation Label IDU-2 Factory Label


IDU-4 Installation Label IDU-4 Factory Label

IDU-2 Installation Label IDU-2 Factory Label

if no IDU Label
IDU-5 Installation Label IDU-5 Factory Label

IDU-2 Installation Label IDU-2 Factory Label


(2) Photo of Existing DDF for Interconnection
BTS NodeB
DDF NO. 4 4
Port NO. 1 2

Remark:1)Indoor unit shall propose the position of new DDF. 2) Shall confirm the 2G and 3G jumper port on DDF.

(3) Photo of Cable Tray, Busbar and Porthole

Photo Busbar Photo Porthole Photo of Cable tray

#NA
(2) Photo of Existing PANORAMA

BTS NodeB
DDF NO.
Port NO.

0
90

180
270
30 60
120 150

210 240
300 330