CW8000B_COW1_Pinewood TM Award

Revision: A Survey Date: 30-Mar-17

Site Name : COW1_Pinewood TM Award LTE Site ID : CW8000B


P1 LTE Candidate ID : CW8000B WiMAX Site ID : N/A
LTE Candidate : 1
Cluster : Region : Sourthern
Owner : EDOTCO State : Johor
1,79250,PERSIARAN LAYAR PERAK,79100 NUSAJAYA,JOHOR MALAYSIA
Site Address :
Technology Type : FDD850 & TDD2300 Site Type : COW

Categories:

New Site

N/A

<<Photo in cover page(Mark642126000)>>


Latitude: 1.409110
Longitude: 103.637362

Prepared By : HUSEN Surveyed By : HUSEN


Join CME Surveyor : N/A
Surveyor Contact No : 167259224

Access Hour: WORKING HOURS From 8AM to 5PM


Access Contact Details:

Mobilization / Unloading Information

Yes/No Size
Is crane required? No N/A
Is skylift required? No N/A
Other Constraints No N/A

Checked & Approved by (Huawei):


Signature: mukun ridzuan ridzuan
Department: RF CME TX (Fiber) SA/Premise Owner
Name: Mukunthan Ridzuan Ridzuan
Date: 28/Mar/17 28/Mar/17 28/Mar/17

Checked & Approved by (Packet One):


Signature:
Department: RF CME TX SA/Premise Owner
Name:
Date:

Page 1
Technical Site Survey (TSS) Checklist for LTE

LTE SITE ID : CW8000B Site Name: COW1_Pinewood TM Award

Region : Sourthern

Latitude : 1.409110 Longitude: 103.637362

Site Address: 1,79250,PERSIARAN LAYAR PERAK,79100 NUSAJAYA,JOHOR MALAYSIA

Surveyor Name: HUSEN Surveyor Company Nam HUAWEI

Yes No Remarks

1 Building structure ( AGL, m ) ✘ ✘

2 Type of structure - boom, unipole, minimast, tower ✘ ✘ 15M COW

MCMC structure category


Dual-function ✘ ✘

Rooftop ✘ ✘

Temporary BTS ✘ ✘

Tower ✘ ✘

MCMC structure type


3 legged ✘ ✘

4 legged ✘ ✘

Aesthetic lamp / lamp pole ✘ ✘

Billboard ✘ ✘

Boom wall mounted ✘ ✘

Boom without bracing ✘ ✘

Boom Bipod ✘ ✘

Boon Tripod ✘ ✘

Lamp pole ✘ ✘

Minaret ✘ ✘

Mini monopole ✘ ✘

Mini structure ✘ ✘

Minimast ✘ ✘

Monopole ✘ ✘

Monopole tree ✘ ✘

PBTS ✘ ✘ COW
Pylon ✘ ✘

RAMO ✘ ✘

Street Light ✘ ✘

Tower ✘ ✘

Unipole ✘ ✘

Water Tank ✘ ✘
Technical Site Survey (TSS) Checklist for LTE

Yes No Remarks

3 Maxis/Celcom/DiGi site Co-located/Next Row/VL within 100 m? MAXIS,CELCOM


✘ ✘
If Yes, please provide the photo with sketch and measure distance between the
Maxis /Celcom/DiGi antenna with azimuth and webe LTE proposed antenna.
Fill in the information in the template

4 Space for New LTE Antenna(3.0 m Height), RRU & TX Filter ✘ ✘


Proposed New
( Min Antenna Space Separation : Vertical 3M, Horizontal 10M (Only with Maxis))
If Yes, please provide the photo, same height with existing Antenna Height
If No, please propose the available space for new boom / new building /other
nearby OLO tower as alternative candidate. Minimum new boom height is 5m

5 Is space available for new cabinet plinth size as below? ✘ ✘

Please provide the photo to clearly show the location/space


a) i-Beam ✘ ✘
b) Concrete Plinth ✘ ✘

6 TNB Power / Power Tapping / Sub Meter ✘ ✘

Please provide TNB Power meter photo

7 PDU / DB board (please provide photo) ✘ ✘


GENSET
Power cable diameter 10mm (propose to change to 16mm) ✘ ✘

Power cable diameter 16mm ✘ ✘

8 TM Fiber Availability ✘ ✘
EXISTING
*Propose fiber cable routing from existing rooftop equipment
to TM Fiber Pop equipment. (existing or new)

9 LOS with 360' panaromic view picture at LTE Antenna Height ✘ ✘

10 Is site being Vandalised ✘ ✘

Is site being flood prone ✘ ✘

Access Key : Building management ✘ ✘

Private Landlord ✘ ✘

Other ✘ ✘

11 FTB proposed location ✘ ✘

Please provide photo

12 Grounding bus bar availability ✘ ✘

Please provide Grounding bar photo

13 Structure require camouflage ? ✘ ✘

Prepared by/Contact No

……………………………..
TSS Team Lead
Name:
Date:
Summary of CME Material Required

Common CME Work

CME Item S/N Specification Unit Quantity Remark

5m Boom - 113.3mm O.D. x 4.5mm thk. CHS complete with Bipod


49 No.
Wall Mounting Boom with Bracings & adhesive bolts on RC wall
Steps and Bipod bracing 6m Boom - 113.3mm O.D. x 4.5mm thk. CHS complete with Bipod
51 No.
Bracings & thru-bolts clamp on brickwall
5m Boom - 113.3mm O.D. x 4.5mm thk. CHS complete with floor
63 No.
Floor Mounting Boom with mounted capsule adhesive bolts
Steps and Bipod bracing 6m Boom - 113.3mm O.D. x 4.5mm thk. CHS complete with floor
65 No.
mounted capsule adhesive bolts
105 Supply & Install 0.50m height Antenna Bracket (W/out Boom) No.
Antenna Bracket 106 Supply & Install 1.00m height Antenna Bracket (W/out Boom) No.
114 Supply & Install Antenna H-Bracket (W/out Boom) No.

Antenna Boom 115 Supply & Install HDG Antenna Pole: 76mm dia Pole (LTE) No.

RRU Pole with Floor Mount


109 Supply & install 1.50m height RRU Pole with floor mount bracket No.
Bracket
98 Busbar Clamp Bracket No.
Clamp Bracket
99 Feeder Clamp Bracket No.
For Unipole
100 RRU Clamp Bracket No.
160 200mm wide cable ladder No.
Cable Ladder 161 No.
400mm wide cable ladder
(Floor mounted)
164 250mm height concrete block No.
Cable Ladder 167 200mm wide cable ladder (option 3) (Vertical) No.
(Wall mounted) 168 200mm wide cable ladder (option 4) (Horizontal) No.
I-Beam for Outdoor Cabinet
230 152mm x 102mm x 13.39 kg/m UB m
Anchorage
232 1000mm x 1000mm x 150mm (Single Cabinet) No.
Reinforced Concrete Plinth
237 2000mm x 1100mm x 250mm (Single Cabinet with Security Lockbar) No.
175 Walking Platform with Handrail No.
Walking Platform 176 Supply and install hot dip galvanized Walking platform with all No.
necessary support framing including fixings and fittings.
177 Walkway panel size: 600mm x Constructed length at site m
AC Power Cable 336 2 x 1C x 16mm sq + E (single phase) (For PDU upgrade) m
Trunking For Power Cable 345 HDG Steel Trunking 50mm x 50 mm (Outdoor) m
(From PDU to TP48200A) 350 Metal Trunking (Orange Color) 50mm x 50 mm (Indoor) m
HDG Type 1 Grounding busbar c/w insulated holder, stainless steel
394 No.
bolts & nuts and U-bolts / brackets (LTE)
405 Tin Coated Cu C-clamp 25 pcs. (C16-C50) Box
Earthing And Grounding 412 Cable shoe 50 mm2 / M12 pcs
System 422 GI Lightning Spike 450mm x 15mm dia No.
431 50mm sq aluminium cable for Grounding m
432 Stainless steel cable tie 4.6mm x 8" (1m each on Cable Ladder) pcs
433 Stainless steel cable tie 4.6mm x 20" (1m each on Pole) pcs
63A Single Phase PDU ( Drg : P1/LTEV1/M&E/G/1ØW.PDU/205 &
313 No.
P1/LTEV1/M&E/G/1ØF.PDU/206)
Upgrade to New 63A PDU Supply and install 63A Single Phase PDU and all necessary fitting
(From Small PDU) 314 including fixings in accordance to manufacturer's instructions as No.
illustrated in Drg.
316 Weatherproof Wall Mounted No.
To dismantle existing 40A (main), supply & upgrade to ABB RCCB 2
441 No.
Pole 63A 300mA (F202 ACS 63/0.3)
To dismantle existing MCB 32A (Outgoing to Huawei cabinet), supply
442 No.
& upgrade to ABB MCB 1 Pole 40A 10kA (S201MC40)
PDU Upgrade Works To dismantle existing 40A (main), supply & upgrade to ABB MCB 2
443 No.
Pole 63A 10kA (S202MC63)
To dismantle existing 40A (For Main & incoming portable genset),
444 supply & upgrade to 63A Changeover Modular switch (2 Pole) (ABB or No.
Hager)
New TM FTB 501 Install Fiber Termination Box (FTB) c/w pigtail and adapter (P1) No.
Fiber Cable 502 Indoor 4 cores fiber cable from FTB (TM) to FTB (P1) m
505 Metal Trunking (Green Color) 50mm x 50 mm (Indoor) m
Trunking for Fiber
506 HDG Steel Trunking 50mm x 50 mm (Outdoor) m
507 To hack and making good riser floor/slab opening for trunking No.
Hacking
508 To hack and making good wall opening for trunking No.
Security Lock Bar Install Security Lock Bar Type-3 c/w cement mortar No.

Remark:
Survey Summary Page

Item Propose Equipment Type Propose Quantity Remark


LTE BBU3910 1
BBU UBBP UBBPd4
L850 RRU3952 3
L2300/L2600 RRU3256 3
RRU
L2300/L2600 RRU3276
L2300/L2600 RRU3279
Outdoor TP48200A 1
DCDU DCDU
Battery 150Ah Battery(x4) 1
Rectifier Power Module PSU
L850 ADU4516R7
L850+L2300/L2600 AQU4518R24 3
AFS
L2300/L2600 ADU4516R6
L2300/L2600 ATD4516R5
60dB 3
Filter L850
75dB
Combiner L2300/L2600 Combiner

Remark:
Site Access

<<Site assess photo-1(Mark641192000)>>

<<Site assess photo-2(Mark641193000)>>

Remark:
Site Access

<<Site assess photo-3(Mark641194000)>>

<<Site assess photo-4(Mark641195000)>>

Remark: <<Remark(Mark641204000)>>
Propose Site Layout

Propose Layout
PROPOSED 1 SECTOR PROPOSED 1 SECTOR
FDD850 + TDD 2.3 and 2.6 TO FDD850 + TDD 2.3 and 2.6 TO
FS5 BUILDING AGL 12m to FS4 BUILDING AGL 12m to
15m 15m
PROPOSED 1 SECTOR
FDD850 + TDD 2.3 and 2.6 TO
BETWEEN FS4 & FS5
BUILDING AGL 12m to 15m

<<Propose Layout-1(Mark642233000)>>

PROPOSED CABINET,IUC
ON COW LOCATION COME
WITH GENSET

Propose Layout
PROPOSED RRU 850 +
FILTER,2300 and 2600 x 3 NOS

PROPOSED RRU TDD 2.3 and


2.6 COMBINE USING
COMBINER

Remark: <<Remark(Mark642239000)>>
Propose Electrical

Propose Tap to Existing ACDB

NA

Location: Ground

Propose Power cable Route from ACDB to PDU

<<Photo-Propose Power cable Route from TNB Meter to PDU(Mark642242000)>>

Remark:
Propose Electrical

Propose Power cable Route from TNB Meter to PDU

<<Photo1-Propose Power cable Route from TNB Meter to PDU(Mark642243000)>>

Propose Power cable Route from TNB Meter to PDU

<<Photo2-Propose Power cable Route from TNB Meter to PDU(Mark642244000)>>

Remark:
Propose Electrical

Propose New PDU Location

Location: Ground Level

Propose Power Cable route from P1 PDU to Huawei Cabinet

Remark: <<Remark(Mark642248000)>>
Propose Grounding

Propose New EGB Location

<<Photo-Propose New MGB Location(Mark642249000)>>na


Location: Ground Level

Propose grounding cable Route from EGB to MGB

<<Propose grounding cable Route from MGB to Earthing Chamber(Mark642251000)>>

Remark: <<Remark:(Mark642252000)>>
RF - Sector View Photo

LTE Sector 1 RF View Sector 1 200 Degree


MDF & SERVER ROOM FS5 BUILDING

PROPOSED COW
LOCATION

<<L
TE
Sec
tor
2
RF
Vie
w(M FS4 BUILDING
<<LTE Sector 1 RF View(Mark642368000)>>
ark
642
369
LTE Sector 2 RF View
000 Sector 2 260 Degree
)>>
SITE INFO LATITUDE LONGITUDE

MDF & SERVER ROOM : 1.4085650,103.6376630


FS4 BUILDING : 1.4073230,103.6402900
FS5 BUILDING : 1.408364,103.640256
COW LOCATION : 1.408413,103.640853

Remark:
RF - Sector View Photo

LTE Sector 3 RF View Sector 3 320 Degree

<<LTE Sector 3 RF View(Mark642370000)>>

LTE Sector 4 RF View Sector 4 Degree

<<LTE Sector 4 RF View(Mark642371000)>>

Remark:
RF - Panoramic View Photo

Panoramic View 0 Degree

<<Panoramic View-0 degree(Mark642372000)>>

Panoramic View 30 Degree

<<Panoramic View-30 degree(Mark642373000)>>

Remark:
RF - Panoramic View Photo

Panoramic View 60 Degree

<<Panoramic View-60 degree(Mark642381000)>>

Panoramic View 90 Degree

<<Panoramic View-90 degree(Mark642382000)>>

Remark:
RF - Panoramic View Photo

Panoramic View 120 Degree

Panoramic View 150 Degree

Remark:
RF - Panoramic View Photo

Panoramic View 180 Degree

Panoramic View 210 Degree

<<Panoramic View-210 degree(Mark642386000)>>

Remark:
RF - Panoramic View Photo

Panoramic View 240 Degree

<<Panoramic View-240 degree(Mark642387000)>>

Panoramic View 270 Degree

<<Panoramic View-270 degree(Mark642388000)>>

Remark:
RF - Panoramic View Photo

Panoramic View 300 Degree

<<Panoramic View-300 degree(Mark642389000)>>

Panoramic View 330 Degree

<<Panoramic View-330 degree(Mark642390000)>>

Remark:
RF - GPS Photo

GPS Photo

<<GPS-1(Mark642391000)>>

<<GPS-2(Mark642392000)>>

Remark:
Technical Site Survey Report
(Proposed LTE Antenna Location)

Site Name: COW1_Pinewood TM Award Survey Date: 30-Mar-17


Site ID : CW8000B Building Height(m): N/A
Structure Height(m): 15m
Co-locate Operator: MAXIS,CELCOM State: Johor
LTE Candidate: 1
Lat (6-Decimal): 1.40911
Long (6-Decimal): 103.637362

Base Station room Type: Outdoor Base Station Type: DBS3900


Base Station Configuration: 3 Sector

Transmission Type on site: Fiber

Address: 1,79250,PERSIARAN LAYAR PERAK,79100 NUSAJAYA,JOHOR MALAYSIA

Cell Site RF Configuration


FDD850 TDD2600 TDD2300
Sector 1 Sector 2 Sector 3 Sector 1 Sector 2 Sector 3 Sector 1 Sector 2 Sector 3
Cell ID CW8000B-1 CW8000B-2 CW8000B-3 CW8000B-4 CW8000B-5 CW8000B-6 CW8000B-7 CW8000B-8 CW8000B-9
Model ADU4516R7 ADU4516R7 ADU4516R7
Antenna Type
Beam width (deg) 65 65 65
LTE Antenna Height (m)
15 15 15 15 15 15
(Mid. of Antenna)
Current Wimax Antenna
N/A N/A N/A N/A N/A N/A
Direction (˚)
Current Wimax Antenna Tilt
N/A N/A N/A N/A N/A N/A
, E/M (˚)
Proposed LTE Antenna
200 260 320 200 260 320
Direction (˚)
Proposed LTE Antenna
2 2 2 0 0 0
Elec. Tilt (˚)
Proposed LTE Antenna
2 2 2 2 2 2
Mech. Tilt (˚)
Jumper Cable (1/2') length
2m x 2pcs 2m x 2pcs 2m x 2pcs NA NA NA
(Antenna to Filter) (m x pcs)
Jumper Cable (1/2') length
2m x 2pcs 2m x 2pcs 2m x 2pcs NA NA NA
(Filter to RRU) (m x pcs)
Jumper Cable (1/2') length
2m x 2pcs 2m x 2pcs 2m x 2pcs 15m x 4pcs 15m x 4pcs 15m x 4pcs
(Antenna to RRU) (m x pcs)
Jumper Cable(1/2') length
N/A N/A N/A N/A N/A N/A
(Antenna to Combiner)
Jumper Cable(1/2') length
N/A N/A N/A N/A N/A N/A
(Combiner to RRU)
Feeder Length (m) N/A N/A N/A N/A N/A N/A
Feeder (7/8', 1 5/8') Size
N/A N/A N/A N/A N/A N/A
(Inch)
CPRI Length (m x pcs) 30 30 30 20 20 20
RRU Power Cable (m) 30 30 30 20 20 20
Alumminium Grounding
5 5 5 5 5 5
Cable 35mm (RRU) (m)
GPS Cable 6mm (GPS) (m) 5m Mount on COW
Type Existing Sub Boom
Existing Sub Boom
Existing Sub Boom Existing Sub Boom
Existing Sub Boom
Existing Sub Boom
Proposed Structure Height (m) 2 2 2 2 2 2
No. of Pole/ Sharing Stand alone Stand alone Stand alone Stand alone Stand alone Stand alone
TX Filter Yes Yes Yes Yes Yes Yes
RET Yes(Build In) Yes(Build In) Yes(Build In) Yes(Build In) Yes(Build In) Yes(Build In)
Comment / Remark:
Covering main road & housing area
Sector 1 :
Covering Resident & Houses
Sector 2 :
Covering main road & housing area
Sector 3 :
N/A
Sector 4 :
Others: N/A

Technical Site Surveyor :


Company : Signature:
Contact No:
RF Planner
Company : Signature:
Contact No:
Packet ONE Reviewer :
RF - Propose Antenna, TX Filter & GPS Location

LTE Sector 1

SEC 1 @ 80 (20m AGL)


PROPOSED NEW LTE ANTENNA, RRU & TX
FILTER MOUNT AT EXISTING 2m SUB
BOOM AT 30m LAMPOLE

<<LTE Sector 1(Mark642433000)>>

LTE Sector 2

SEC 1 @ 180 (20m AGL)


PROPOSED NEW LTE ANTENNA, RRU & TX
FILTER MOUNT AT EXISTING 2m SUB
<<LTE Sector 2(Mark642434000)>>
BOOM AT 30m LAMPOLE

Remark:
RF - Propose Antenna, TX Filter & GPS Location

LTE Sector 3

<<LTE Sector 3(Mark642435000)>>

LTE Sector 4

<<LTE Sector 4(Mark642436000)>>

Remark:
RF - Photo of Celcom Antenna
within 100m from P1 LTE antenna

Celcom Antenna 1

<<Photo-Celcom Antenna 1(Mark642422000)>>


Distance to Celcom Antenna 1: 20m Azimuth: 20

Celcom Antenna 2

<<Photo-Celcom Antenna 2(Mark642425000)>>


Distance to Celcom Antenna 2: 20m Azimuth: 20

Remark:
RF - Photo of Celcom Antenna
within 100m from P1 LTE antenna

Celcom Antenna 3

<<Photo-Celcom Antenna 3(Mark642428000)>>


Distance to Celcom Antenna 3: 20m Azimuth: 20

Sketch Example

U-Mobile
Webe
20m
Celcom

Maxis

<<Photo-Sketch Example(Mark642431000)>>
Celcom Site GPS LAT: 1.535382° LONG: 103.682953°

Remark: <<Remark(Mark642432000)>>
RF - Photo of Maxis Antenna
within 100m from P1 LTE antenna

Maxis Antenna 1

Distance to Maxis Antenna 1: 20m Azimuth: 20

Maxis Antenna 2

<<Photo-Maxis Antenna 2(Mark642399000)>>


Distance to Maxis Antenna 2: 20m Azimuth: 20

Remark:
RF - Photo of Maxis Antenna
within 100m from P1 LTE antenna

Maxis Antenna 3

<<Photo-Maxis Antenna 3(Mark642402000)>>


Distance to Maxis Antenna 3: 20m Azimuth: 20

Sketch Example

U-Mobile
Webe
20m
Celcom

Maxis

<<Photo-Sketch Example(Mark642405000)>>
Maxis Site GPS LAT: 1.535382° LONG: 103.682953°

Remark: <<Remark(Mark642406000)>>
RF - Propose RRU Location

LTE Sector 1

<<LTE Sector 1(Mark642438000)>>

LTE Sector 2

<<LTE Sector 2(Mark642439000)>>

Remark:
RF - Propose RRU Location

LTE Sector 3

<<LTE Sector 3(Mark642440000)>>

LTE Sector 4

<<LTE Sector 4(Mark642441000)>>

Remark: <<Remark(Mark642442000)>>
RF - Photo of YTL Antenna
within 100m from webe LTE antenna

YTL Antenna 1
Distance to YTL Antenna 1 : 155 m Azimuth: 20 °

<<Photo-YTL Antenna 1(Mark658801000)>>

YTL Antenna 2
Distance to YTL Antenna 2 : 155 m Azimuth: 20 °

<<Photo-YTL Antenna 2(Mark658804000)>>

Remark:
RF - Photo of YTL Antenna
within 100m from webe LTE antenna

YTL Antenna 3
Distance to YTL Antenna 3 : 155 m Azimuth: 20 °

Sketch Example:
YTL Site GPS LAT: 1.657671 LONG: 103.641979

YTL
Webe
155m
Celcom

Digi

<<Photo-Sketch Example(Mark658869000)>>

<<Remark(Mark658870000)>>
RF - Obstacle Diagram

Obstacle Diagram (Google Earth)

<<Obstacle Diagram (Google Earth)(Mark642443000)>>

Type of Obstacle Description Azimuth (˚) Height (m) Distance (m)


NO OBSTCLE

Remark: <<Remark(Mark642448000)>>
Propose Fiber FTB Location & Fiber Route

Propose webe FTB Location


Propose FTB Self Stand Pole location (only for vacant land )
Location: Cabinet Location (Ground Floor)

<<Photo-Propose FTB Self Stand Pole location (only for vacant land )(Mark645197000)>>

Propose fiber route from webe FTB to Huawei Cabinet


PROPOSED FIBRE SC
LC 2m FROM
INCOMING TM TO
FIBRE SWITCH

<<Propose fiber route from P1 FTB to Huawei Cabinet(Mark645199000)>>

MDF ROOM

Indoor Metal Trunking Outdoor HDG


Fiber Provider Fiber Length (m) Remark
Length (m) Trunking Length (m)

TM 5 N/A 5 TM FTB to Cabinet

Remark: <<Total Remark(Mark645205000)>>


Propose Fiber FTB Location & Fiber Route

Propose fiber route from webe FTB to Huawei Cabinet

PROPOSED PATCHCORD 10m


FROM FIBER SWITCH
CABINET TO CABINET FS5
AT SERVER ROOM

SERVER ROOM
<<Propose fiber route from P1 FTB to Huawei Cabinet 1(Mark647580000)>>

Propose fiber route from webe FTB to Huawei Cabinet

PROPOSED PATCHCORD 150m


FROM FIBER SWITCH CABINET
FS5 AT LEVEL 1 TO CABINET
COW (CELL ON WHEEL)
<<Propose fiber route from P1 FTB to Huawei Cabinet 2(Mark647579000)>>

Remark:
Propose Fiber FTB Location & Fiber Route

Propose fiber route from webe FTB to Huawei Cabinet

<<Propose fiber route from P1 FTB to Huawei Cabinet 3(Mark647700000)>>

Propose fiber route from webe FTB to Huawei Cabinet

PATCHCORD ROUTE WITH TEMPORARY


USING HANGER CABLE LADDER FROM PATCHCORD ROUTE WITH TEMPORARY USING
BUILDING MANAGEMENT HANGER CABLE LADDER FROM BUILDING
<<Propose fiber route from P1 FTBMANAGEMENT
to Huawei Cabinet 4(Mark647701000)>>

Remark:
Summary of Material Required

CME Item Specification Qty

Filter Type Type 60

Sector1-1 Jumper Length (From Antenna to Filter) 2

Sector1-1 Jumper Quantity (From Antenna to Filter) 2

Sector1-2 Jumper Length (From Filter to RRU) 2

Sector1-2 Jumper Quantity (From Filter to RRU) 2

Sector1-3 Jumper Length (From Antenna to RRU) 2

Sector1-3 Jumper Quantity (From Antenna to RRU) 2

Sector2-1 Jumper Length (From Antenna to Filter) 2

Sector2-1 Jumper Quantity (From Antenna to Filter) 2

Sector2-2 Jumper Length (From Filter to RRU) 2


Jumper
Sector2-2 Jumper Quantity (From Filter to RRU) 2

Sector2-3 Jumper Length (From Antenna to RRU) 2

Sector2-3 Jumper Quantity (From Antenna to RRU) 2

Sector3-1 Jumper Length (From Antenna to Filter) 2

Sector3-1 Jumper Quantity (From Antenna to Filter) 2

Sector3-2 Jumper Length (From Filter to RRU) 2

Sector3-2 Jumper Quantity (From Filter to RRU) 2

Sector3-3 Jumper Length (From Antenna to RRU) 2

Sector3-3 Jumper Quantity (From Antenna to RRU) 2

Sector 1 5
RRU Grounding Cable
Sector 2 5
Length
Sector 3 5

Sector 1 30

CPRI Sector 2 30

Sector 3 30

Sector 1 30
Power cable single
length of per RRU/AAU  Sector 2 30
(m)
Sector 3 30

TP48200A Power
Power Cable Length 2
Cable(PDU to Cabinet)

GPS GPS feeder length 5