Technical Site Survey (TSS) Checklist for LTE
Region : Sourthern
Yes No Remarks
Rooftop ✘ ✘
Temporary BTS ✘ ✘
Tower ✘ ✘
4 legged ✘ ✘
Billboard ✘ ✘
Boom Bipod ✘ ✘
Boon Tripod ✘ ✘
Lamp pole ✘ ✘
Minaret ✘ ✘
Mini monopole ✘ ✘
Mini structure ✘ ✘
Minimast ✘ ✘
Monopole ✘ ✘
Monopole tree ✘ ✘
PBTS ✘ ✘ COW
Pylon ✘ ✘
RAMO ✘ ✘
Street Light ✘ ✘
Tower ✘ ✘
Unipole ✘ ✘
Water Tank ✘ ✘
Technical Site Survey (TSS) Checklist for LTE
Yes No Remarks
8 TM Fiber Availability ✘ ✘
EXISTING
*Propose fiber cable routing from existing rooftop equipment
to TM Fiber Pop equipment. (existing or new)
Private Landlord ✘ ✘
Other ✘ ✘
Prepared by/Contact No
……………………………..
TSS Team Lead
Name:
Date:
Summary of CME Material Required
Antenna Boom 115 Supply & Install HDG Antenna Pole: 76mm dia Pole (LTE) No.
Remark:
Survey Summary Page
Remark:
Site Access
Remark:
Site Access
Remark: <<Remark(Mark641204000)>>
Propose Site Layout
Propose Layout
PROPOSED 1 SECTOR PROPOSED 1 SECTOR
FDD850 + TDD 2.3 and 2.6 TO FDD850 + TDD 2.3 and 2.6 TO
FS5 BUILDING AGL 12m to FS4 BUILDING AGL 12m to
15m 15m
PROPOSED 1 SECTOR
FDD850 + TDD 2.3 and 2.6 TO
BETWEEN FS4 & FS5
BUILDING AGL 12m to 15m
<<Propose Layout-1(Mark642233000)>>
PROPOSED CABINET,IUC
ON COW LOCATION COME
WITH GENSET
Propose Layout
PROPOSED RRU 850 +
FILTER,2300 and 2600 x 3 NOS
Remark: <<Remark(Mark642239000)>>
Propose Electrical
NA
Location: Ground
Remark:
Propose Electrical
Remark:
Propose Electrical
Remark: <<Remark(Mark642248000)>>
Propose Grounding
Remark: <<Remark:(Mark642252000)>>
RF - Sector View Photo
PROPOSED COW
LOCATION
<<L
TE
Sec
tor
2
RF
Vie
w(M FS4 BUILDING
<<LTE Sector 1 RF View(Mark642368000)>>
ark
642
369
LTE Sector 2 RF View
000 Sector 2 260 Degree
)>>
SITE INFO LATITUDE LONGITUDE
Remark:
RF - Sector View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - Panoramic View Photo
Remark:
RF - GPS Photo
GPS Photo
<<GPS-1(Mark642391000)>>
<<GPS-2(Mark642392000)>>
Remark:
Technical Site Survey Report
(Proposed LTE Antenna Location)
LTE Sector 1
LTE Sector 2
Remark:
RF - Propose Antenna, TX Filter & GPS Location
LTE Sector 3
LTE Sector 4
Remark:
RF - Photo of Celcom Antenna
within 100m from P1 LTE antenna
Celcom Antenna 1
Celcom Antenna 2
Remark:
RF - Photo of Celcom Antenna
within 100m from P1 LTE antenna
Celcom Antenna 3
Sketch Example
U-Mobile
Webe
20m
Celcom
Maxis
<<Photo-Sketch Example(Mark642431000)>>
Celcom Site GPS LAT: 1.535382° LONG: 103.682953°
Remark: <<Remark(Mark642432000)>>
RF - Photo of Maxis Antenna
within 100m from P1 LTE antenna
Maxis Antenna 1
Maxis Antenna 2
Remark:
RF - Photo of Maxis Antenna
within 100m from P1 LTE antenna
Maxis Antenna 3
Sketch Example
U-Mobile
Webe
20m
Celcom
Maxis
<<Photo-Sketch Example(Mark642405000)>>
Maxis Site GPS LAT: 1.535382° LONG: 103.682953°
Remark: <<Remark(Mark642406000)>>
RF - Propose RRU Location
LTE Sector 1
LTE Sector 2
Remark:
RF - Propose RRU Location
LTE Sector 3
LTE Sector 4
Remark: <<Remark(Mark642442000)>>
RF - Photo of YTL Antenna
within 100m from webe LTE antenna
YTL Antenna 1
Distance to YTL Antenna 1 : 155 m Azimuth: 20 °
YTL Antenna 2
Distance to YTL Antenna 2 : 155 m Azimuth: 20 °
Remark:
RF - Photo of YTL Antenna
within 100m from webe LTE antenna
YTL Antenna 3
Distance to YTL Antenna 3 : 155 m Azimuth: 20 °
Sketch Example:
YTL Site GPS LAT: 1.657671 LONG: 103.641979
YTL
Webe
155m
Celcom
Digi
<<Photo-Sketch Example(Mark658869000)>>
<<Remark(Mark658870000)>>
RF - Obstacle Diagram
Remark: <<Remark(Mark642448000)>>
Propose Fiber FTB Location & Fiber Route
<<Photo-Propose FTB Self Stand Pole location (only for vacant land )(Mark645197000)>>
MDF ROOM
SERVER ROOM
<<Propose fiber route from P1 FTB to Huawei Cabinet 1(Mark647580000)>>
Remark:
Propose Fiber FTB Location & Fiber Route
Remark:
Summary of Material Required
Sector 1 5
RRU Grounding Cable
Sector 2 5
Length
Sector 3 5
Sector 1 30
CPRI Sector 2 30
Sector 3 30
Sector 1 30
Power cable single
length of per RRU/AAU Sector 2 30
(m)
Sector 3 30
TP48200A Power
Power Cable Length 2
Cable(PDU to Cabinet)