You are on page 1of 7

Implementation Checklist-U900 Phase-2- 2021

Site Name: LARPAZEE Date: 19TH JAN 2022

Tower Height: 30M Inspection Type: In-/Process


Final
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

GRD DIMGBA PROGRESS GRD 881573797


IMPLEMENTATION IMPLEMENTATION
Name Tel:
Contractor/Vendor Site ID:
Name:
GRD LAR31
Site Configuration GSM YES UMTS Site Code:
WIMAX

RBS-6102
SECTOR: 1 UMTS-900 (U900 SERVICE) DATE OF HAND OVER________________________
Description Y N Remarks

Network Technology
1 Antenna reference: KATHRIEN
2 Antenna numbers: KATHRIEN
3 Antenna numbers: KATHRIEN
4 Azimuth: OK
5 Mechanical Tilt: 2 OK
6 Existence of a mechanical tilting kit on Antenna? OK
7 Optical Fibre cables labelling Done? OK
8 Jumper connections Sealed with Waterproof? OK
9 Fibre optic cables routed through Feeder clamps to OK
prevent damage?
10 RRUS grounding installed and connected to site Main OK
Earth Terminal (MET)/Tower Leg?
11 RRUS properly aligned and Solar Shield facing Sun? OK
12 Antenna cables tightened and sealed? OK
13 Jumper connections sealed and Labelled as a required sector? OK
14 Optical cables properly connected, labelled, and OK
strapped to RRU*2219 and DUW?
15 Antenna system installed as specified by the N/A
Optimization sectional Data given?
16 Antenna brackets compatible with the mast or pole (no N/A
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly? OK
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 1/7


Implementation Checklist-U900 Phase-2- 2021

SECTOR: 2 UMTS-900 (U900 SERVICE)


Description Y N Remarks
1 Antenna reference: COMMSCOPE KATHRIEN
2 Antenna numbers: COMMSCOPE KATHRIEN
3 Antenna numbers: KATHRIEN
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

4 Azimuth: OK
5 Mechanical Tilt: 2
6 Existence of a mechanical tilting kit on Antenna? OK
7 Optical Fibre cables labelling Done? OK
8 Jumper connections Sealed with Waterproof? OK
9 Fibre optic cables routed through Feeder clamps to OK
prevent damage?
10 RRUS grounding installed and connected to site Main OK
Earth Terminal (MET)/Tower Leg?
11 RRUS properly aligned and Solar Shield facing Sun? OK
12 Antenna cables tightened and sealed? OK
13 Jumper connections sealed and Labelled as a required sector? OK
14 Optical cables properly connected, labelled, and OK
strapped to RRU*2219 and DUW?
15 Antenna system installed as specified by the N/A
Optimization sectional Data given?
16 Antenna brackets compatible with the mast or pole (no N/A

Network Technology
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly? OK
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 2/7


Implementation Checklist-U900 Phase-2- 2021

SECTOR: 3 UMTS-900 (U900 SERVICE)


Description Y N Remarks
1 Antenna reference: COMMSCOPE KATHRIEN
2 Antenna numbers: KATHRIENE
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

3 Antenna numbers: KATHRIEN


4 Azimuth: OK
5 Mechanical Tilt: 2 OK
6 Existence of a mechanical tilting kit on Antenna? OK
7 Optical Fibre cables labelling Done? OK
8 Jumper connections Sealed with Waterproof? OK
9 Fibre optic cables routed through Feeder clamps to OK
prevent damage?
10 RRUS grounding installed and connected to site Main OK
Earth Terminal (MET)/Tower Leg?
11 RRUS properly aligned and Solar Shield facing Sun? OK
12 Antenna cables tightened and sealed? OK
13 Jumper connections sealed and Labelled as a required sector? OK
14 Optical cables properly connected, labelled, and OK
strapped to RRU*2219 and DUW?
15 Antenna system installed as specified by the N/A
Optimization sectional Data given?

Network Technology
16 Antenna brackets compatible with the mast or pole (no N/A
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly?
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A

RBS-SECTION:
Description
1 RBS Type: 6102
2 RBS configuration BB6630(UL2100 + U900 + L1800)+DUG(G900+G1800)
3 RBS Serial Number
4 DUW TYPE: N/A

RBS commissioned: Y: YES / N: NO


Description Y N Remarks
1 RBS configuration per site specification? ADD L1800
2 RBS internal alarm tested with NOC? N/A
3 RBS external Alarm tested with NOC? N/A
4 ALL ALARM SEEN BY NOC? N/A
5 DATE OF:U900 COMMISSIONED

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 3/7


Implementation Checklist-U900 Phase-2- 2021

Alarm list and check list/INDOOR DEFINED Local NOC Remarks


RBS test TEST
Description Y N Y N Y N N/A
1 Door Opened (Intrusion) Shelter N/A
2 High Temperature N/A
3 Generator 1 alarm N/A
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

4 Generator 2 alarm N/A


5 Generator 1 alive N/A
6 Generator 2 alive N/A
7 Mains Failure N/A
8 Rectifier Mains failure N/A
9 Site on Hybrid N/A
10 TX rectifier Mains Failure (optional) N/A

Inspection Details: Power Installations:


Generator Specs presentation
Description Remarks

Network Technology
A Generator 1 N/A
1 Model: PERKINS 13.5KVA N/A
2 Serial number: N/A
3 Rating Power N/A
4 Hour meter: N/A
B Generator 2 N/A
1 Model: N/A
2 Serial number: N/A
3 Rating Power: N/A
4 Hour meter: N/A

GENERATOR installation + Connection Y: YES / N: NO


Description Y N Remarks
1 Generator (s) installed in Position as per site drawings N/A
2 Fuel tank (s) positioned as per site drawings N/A
3 Fuel connection made in the pipes duct N/A
4 Fuel water separator installed N/A
5 No fuel leak at pipes connection N/A
6 ATS installed as per site drawings N/A
7 Electrical Cables connected properly N/A
8 Control cables connected properly N/A
9 Generator connected to ground N/A
10 Neutral connected to ground N/A
11 Battery installed and ready N/A
12 Oil level checked and correct N/A
13 Coolant level checked and correct N/A
14 Generator ready for use N/A
15 Generator meter and dial working and correct N/A
16 Electrical-Hybrid lights installed on Tower? N/A
17 Electrical-Lights from Generator installed on Tower? N/A
18 Site Aviation light(s) Installed and Operational? N/A
19 ODU Shelter Lights installed and Operational? N/A

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 4/7


Implementation Checklist-U900 Phase-2- 2021

20 Power cables/Earth cables/Alarms control cables in PVC

GENERATOR Protection + Alarm Y: YES / N: NO


All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

Description Y N Remarks
1 Generator Hi temperature tested N/A
2 Generator low lube oil pressure tested N/A
3 Generator over speed tested N/A
4 Generator auto start tested (3 start) N/A

ATS Y: YES / N: NO
Description Y N Remarks
1 ATS install at correct position N/A
2 ATS cable connection done and proper. N/A
3 ATS tested correct N/A
4 ATS connected to ground N/A

DC POWER SUPPLY
Description

Network Technology
1 MAKER HAUWEI
2 MODEL IDU-300A MAX.
3 TYPE POWER CUBE 1000
4 # MODULES DU-48DCV
5 Battery type DCB-500B
6 MAKER AGISSON
7 MODEL R4850N
8 CAPACITY 500Ah-48VDC
9 QTY OF BATT. 48PCS.

DC POWER SUPPLY (Rectifier Huawei-Hybrid Y Y: YES / N: NO


Description E Y N Remarks
1 Cabinet installed and fixed to slab S N/A
2 Cabinet body connected to ground N/A
3 Electrical cables connected and torqued N/A
4 Cables colour coded /identification available N/A
5 U900 Breakers Installed and Labelled? OKAY

Battery Rack (VRLA) (Deep cycle) Y: YES / N: NO


Description Y N Remarks
1 Cabinet installed and fixed to slab N/A
2 Cabinet body connected to ground N/A
3 Batteries installed and connected N/A
4 Batteries numbered N/A

DC POWER SUPPLY Y: YES / N: NO


Description Y N Remarks
1 Rectifier commissioned? N/A
2 Rectifier charging? N/A
2 Rectifier alarm installed? N/A
3 Rectifier alarm tested on site? N/A
4 Mains failure alarm tested? (Optional)? N/A

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 5/7


Implementation Checklist-U900 Phase-2- 2021
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

List of Remarks: U900

Item Problem description OK? Solved Date


1
2
3
4
5
6
7
8
9

Network Technology
NAME: MTN-REPRESENTATIVES: GRD -INTEGRATOR

Mr. Sidney D. Teah Name: DIMGBA PROGRESS

Date: Jan. 20,2022 Date: 19TH JAN 2022

Signature: Signature:

Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: LARPAZEE page 6/7


All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.

Ref: U900- Hand-Over Checklist:……/.............2021


Site Name: LARPAZEE
Implementation Checklist-U900 Phase-2- 2021

page
7/7
Network Technology