Questionnaire on Positive Isolation Standard
All Question Carry 1 Mark
T otal Marks : 30, Passing Marks :26
T ime Limit - 20 Minutes
1. What actions can leads to termination of employment for standard violation (Multiple
Answers)
*
Forgot t o remove personal lock before leaving from dut y
Tempering wit h lock put on isolat or and t rying t o remove it by mechanical means
Energizing t he isolat or t hat has been put off and locked out
Working in equipment wit hout Posit ive Isolat ion t hat is covered under ESI
Not Put t ing personal lock while working on isolat ed equipment
2. Employee Code *
913776
3. At what circumstances group isolation is done (Multiple Answers) *
Mult iple Agencies are working in same equipment
Equipment is having Mult iple Energy Sources
Equipment is int erlinked t o upst ream and downst ream equipment
Mult iple Agencies is working in Int erlinked upst ream and downst ream equipment
More t han one permit t aken by single Agency in one equipment having Single energy source
4. Which statements are correct for Interlinking of Group Isolation Box (Multiple Answers) *
More t han one group isolat ion box is used due t o work permit t aken in separat e t imes or
any ot her sit uat ion t hat demands it s use
Done by put t ing yellow lock by owner agency in first isolat ion box and key dropped t o
second isolat ion box
Done if de-solat ion of a pre-isolat ed energy by one working agency which is not covered in
ESI may pose secondary risk t o ot her working agency
Depends upon requirement by working agency
5. Separate Cutting Power to be filled up by all agencies working in the same equipment *
True
False
6. What criteria's are to be full filled before 'Try Out' under LOTO-TO (Multiple Answers) *
Owner agency should be present at Sit e
Lock out and Tag out is complet ed
Emergency st op under release condit ion
Belt Tripping Devices like Belt Sway Swit ch, Smart Conveyor Guard and Pull Cord is in
Heat hy (Released) Condit ion
7. What are the criteria needs to be Qualify for Control Stop Procedure (Multiple Answers) *
Act ivit y should be of frequent and rout ine t ype
Act ivit y could be complet ed in less t han 30 minut es
Consequence should be low in event of isolat ion failure
Act ivit y should not be relat ed t o product ion process
8. ESI document is referred as *
Elect rical Source Ident ificat ion
Energy Source Ident ificat ion
Elect rical Source Isolat ion
Energy Source Isolat ion
9. Which action does not falls under consequence management for lock handling and use
(Multiple Answers)
*
Not carrying Lock while on dut y
Misuse of Lock by using it for personal use
Using Ot her Person Personal lock
Not following t he color coding st andard of locks
Not Put t ing personal lock while working on isolat ed equipment
10. Company Name *
TSM
11. What is the theme of Positive Isolation *
Save My Life
Save My Team Life
My Life is My Life
Safe Work Saves Life
12. Which sequence is correct for Permit Work Flow under Positive Isolation *
Permit t o Work Approval - Cut t ing Power Approval - Isolat ion and Lock Out - Get t ing
Power Approval - De-isolat ion - Permit t o Work Closure
Cut t ing Power Approval - Isolat ion and Lock Out - Permit t o Work Approval - Permit t o
Work Closure - Get t ing Power Approval - De-isolat ion
Cut t ing Power Approval - Permit t o Work Approval - Isolat ion and Lock Out - Permit t o
Work Closure - Get t ing Power Approval - De-isolat ion
Cut t ing Power Approval - Permit t o Work Approval - Isolat ion and Lock Out - Get t ing
Power Approval - De-isolat ion - Permit t o Work Closure
13. Among below points what is not mandatory to be mentioned in Tag under LOTO-TO
(Multiple Answers)
*
Equipment Name
Isolat ing Person Name and cont act no.
Permit Request er Name and cont act no.
Dat e and Time of Isolat ion
Job Descript ion
14. What LOTO-TO stands for *
Lock Out , Tag Out and Try Out
Lock Out , Try Out and Tag Out
Lock Out , Turn Off and Try Out
Lock Out , Try Out and Turn Off
15. Agency that isolate the equipment is referred as *
Execut ing Agency
Isolat ing Agency
Isolat or Agency
Owner Agency
16. Who is a Protected Person as per Positive Isolation Standard *
Person from bot h Execut ing and Working Agency
Person from Isolat ing Agency
Person from Working Agency
Person from Execut ing Agency
17. Agency that approves positive isolation *
Execut ing Agency
Owner Agency
Isolat ing Agency
18. Working with Emergency Stop is Covered under Positive Isolation Standard *
True
False
19. Which statement is correct for Isolation Pad lock Color Coding *
Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Yellow, Group
Isolat ion Lock - Black, Equipment Lock - Blue
Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Black, Group
Isolat ion Lock - Blue, Equipment Lock - Black
Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Blue, Group
Isolat ion Lock - Black, Equipment Lock - Yellow
Tat a Engineer Personal Lock - Blue, Cont ract or Supervisor Personal Lock - Red, Group
Isolat ion Lock - Black, Equipment Lock - Yellow
20. In which case Try Out under LOTO-TO is done from Control Room *
Working agency does not know how t o operat e equipment from Local Cont rol St at ion
(LCS)
Working Agency is not present at Sit e
Local Cont rol St at ion (LCS) is not available at sit e
Execut ing Agency has aut horized Cont rol room Operat or t o operat e t he equipment
21. Name *
Binit Kumar Jena
22. Who is Authorized to put Yellow Lock *
Owner of t he equipment
Any Person from Elect rical Depart ment only
Any Person from Elect rical and Mechanical Depart ment
Isolat ing Person wit h Level 1A t raining approved by Head of Depart ment / Chief
23. Which statement is correct for difference between isolation and positive isolation *
No difference as bot h are same t erms
Isolat ion does not require work permit syst em while posit ive isolat ion requires Work Permit
Syst em
Isolat ion is done for any equipment while posit ive isolat ion is done only for elect rical
equipment s
In isolat ion, equipment can be de-isolat ed by any one as it is not locked out while in posit ‐
ive isolat ion, de-isolat ion can be done only t hrough unlocking aft er permit closure by re‐
quest ing agency
24. Which Agency is responsible is to verify Cutting power request is as per ESI *
Owner Agency
Bot h Owner and Execut ing Agency
Execut ing Agency
Working Agency
25. What are the energies that are covered under positive isolation (Multiple Answers) *
Elect rical Energy
Fluid Energy
Chemical Energy
Pot ent ial Energy
26. Which training requirement is correct as per Positive Isolation Standard *
Prot ect ed Person (Level 1A), Isolat ing Person (Level 1), Isolat ion Planners (Level 2)
Prot ect ed Person (Level 2), Isolat ing Person (Level 1A), Isolat ion Planners (Level 1)
Prot ect ed Person (Level 1), Isolat ing Person (Level 1A), Isolat ion Planners (Level 2)
Prot ect ed Person (Level 1), Isolat ing Person (Level 2), Isolat ion Planners (Level 1A)
27. Which statements are true for personal lock (Multiple Answers) *
Not t o be used ot her t han for purpose of posit ive isolat ion
These can be exchanged
Should be removed before leaving from dut y
Key can be handed over t o ot her person
28. In Control Stop procedure Green Light at Control Stop Box means *
Equipment is running and not safe t o work
Equipment is isolat ed and safe t o work
Equipment under Local Operat ion
Equipment under Aut o Operat ion
29. Which Statements are correct for a Blue Lock (Multiple Answers) *
It is for t he prot ect ion of only Cont ract or Supervisor
It is for t he prot ect ion of bot h Cont ract or Supervisor and it s t eam
It is t o be put in isolat or or group isolat ion box before st art ing t he job
Shall remain in locked condit ion t ill work is complet e
Has t o be removed when owner of lock leaves from dut y
30. At what situation Black Lock is put in Group Isolation Box (Multiple Answers) *
Posit ive Isolat ion t hat falls under Group Isolat ion
Execut ing and Working agency unable t o put personal lock direct ly at isolat or
All Posit ive Isolat ion Requires Black Lock
Depends upon risk assessment by Owner Agency
31. Following electrical energy is exempted from Positive Isolation Standard *
Less t han 220V DC
Less t han 250V AC
Less t han 220V DC and 250V AC
Less t han 220V DC and 250 V AC except t hose t hat powers t he cont rol valves act uat ion
32. Which statement is correct *
Equipment Key and Tag is handed over t o Owner agency by Working agency and Group lock
put by Owner Agency
Equipment Key and Tag is handed over t o Owner agency by Execut ing Agency agency and
Group lock put by Isolat ing Agency
Equipment Key and Tag is handed over t o Owner agency by Isolat ing Agency and Group
lock put by Owner Agency
Equipment Key and Tag is handed over t o Owner agency by Isolat ing Agency agency and
Group lock put by Execut ing Agency
33. Which feature is applicable for selector switch at Control Stop Box *
Should have only t wo posit ion On and Off
Should have only t wo posit ion Aut o and Local
Should have t hree posit ion On, Off and Neut ral
No special feat ure - Same as in LCS
34. Designation *
JET
Go back to t hank you page
T his content is created by the owner of the form. T he data you submit will be sent to the form owner. Microsoft is not responsible
for the privacy or security practices of its customers, including those of this form owner. Never give out your password.
Powered by Microsoft Forms |
T he owner of this form has not provided a privacy statement as to how they will use your response data. Do not provide personal
or sensitive information.
| T erms of use