0% found this document useful (0 votes)
3K views11 pages

Questionnaire On Positive Isolation Standard

The document contains a questionnaire on positive isolation standards with 31 multiple choice questions. Some key points covered are: - Actions that can lead to termination of employment for standard violations - When group isolation is done and interlinking of group isolation boxes - Criteria for control stop procedure and try out under LOTO-TO - Meaning of ESI and colors of isolation padlocks - Sequence of permit work flow and who is authorized to put yellow locks - Difference between isolation and positive isolation - Energies covered and training requirements under positive isolation standard

Uploaded by

Bata Jena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views11 pages

Questionnaire On Positive Isolation Standard

The document contains a questionnaire on positive isolation standards with 31 multiple choice questions. Some key points covered are: - Actions that can lead to termination of employment for standard violations - When group isolation is done and interlinking of group isolation boxes - Criteria for control stop procedure and try out under LOTO-TO - Meaning of ESI and colors of isolation padlocks - Sequence of permit work flow and who is authorized to put yellow locks - Difference between isolation and positive isolation - Energies covered and training requirements under positive isolation standard

Uploaded by

Bata Jena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Questionnaire on Positive Isolation Standard: This section contains a series of multiple-choice questions regarding the Positive Isolation Standard, which include procedures and safety protocols for equipment isolation.

Questionnaire on Positive Isolation Standard

All Question Carry 1 Mark

T otal Marks : 30, Passing Marks :26

T ime Limit - 20 Minutes

1. What actions can leads to termination of employment for standard violation (Multiple
Answers)
*

Forgot t o remove personal lock before leaving from dut y

Tempering wit h lock put on isolat or and t rying t o remove it by mechanical means

Energizing t he isolat or t hat has been put off and locked out

Working in equipment wit hout Posit ive Isolat ion t hat is covered under ESI

Not Put t ing personal lock while working on isolat ed equipment

2. Employee Code *

913776

3. At what circumstances group isolation is done (Multiple Answers) *

Mult iple Agencies are working in same equipment

Equipment is having Mult iple Energy Sources

Equipment is int erlinked t o upst ream and downst ream equipment

Mult iple Agencies is working in Int erlinked upst ream and downst ream equipment
More t han one permit t aken by single Agency in one equipment having Single energy source

4. Which statements are correct for Interlinking of Group Isolation Box (Multiple Answers) *

More t han one group isolat ion box is used due t o work permit t aken in separat e t imes or
any ot her sit uat ion t hat demands it s use

Done by put t ing yellow lock by owner agency in first isolat ion box and key dropped t o
second isolat ion box

Done if de-solat ion of a pre-isolat ed energy by one working agency which is not covered in
ESI may pose secondary risk t o ot her working agency

Depends upon requirement by working agency

5. Separate Cutting Power to be filled up by all agencies working in the same equipment *

True 

False

6. What criteria's are to be full filled before 'Try Out' under LOTO-TO (Multiple Answers) *

Owner agency should be present at Sit e

Lock out and Tag out is complet ed 

Emergency st op under release condit ion

Belt Tripping Devices like Belt Sway Swit ch, Smart Conveyor Guard and Pull Cord is in
Heat hy (Released) Condit ion

7. What are the criteria needs to be Qualify for Control Stop Procedure (Multiple Answers) *

Act ivit y should be of frequent and rout ine t ype


Act ivit y could be complet ed in less t han 30 minut es

Consequence should be low in event of isolat ion failure

Act ivit y should not be relat ed t o product ion process

8. ESI document is referred as *

Elect rical Source Ident ificat ion

Energy Source Ident ificat ion

Elect rical Source Isolat ion

Energy Source Isolat ion

9. Which action does not falls under consequence management for lock handling and use
(Multiple Answers)
*

Not carrying Lock while on dut y

Misuse of Lock by using it for personal use

Using Ot her Person Personal lock

Not following t he color coding st andard of locks

Not Put t ing personal lock while working on isolat ed equipment

10. Company Name *

TSM
11. What is the theme of Positive Isolation *

Save My Life

Save My Team Life

My Life is My Life

Safe Work Saves Life

12. Which sequence is correct for Permit Work Flow under Positive Isolation *

Permit t o Work Approval - Cut t ing Power Approval - Isolat ion and Lock Out - Get t ing
Power Approval - De-isolat ion - Permit t o Work Closure

Cut t ing Power Approval - Isolat ion and Lock Out - Permit t o Work Approval - Permit t o
Work Closure - Get t ing Power Approval - De-isolat ion

Cut t ing Power Approval - Permit t o Work Approval - Isolat ion and Lock Out - Permit t o
Work Closure - Get t ing Power Approval - De-isolat ion

Cut t ing Power Approval - Permit t o Work Approval - Isolat ion and Lock Out - Get t ing
Power Approval - De-isolat ion - Permit t o Work Closure

13. Among below points what is not mandatory to be mentioned in Tag under LOTO-TO
(Multiple Answers)
*

Equipment Name

Isolat ing Person Name and cont act no.

Permit Request er Name and cont act no.

Dat e and Time of Isolat ion

Job Descript ion


14. What LOTO-TO stands for *

Lock Out , Tag Out and Try Out

Lock Out , Try Out and Tag Out

Lock Out , Turn Off and Try Out

Lock Out , Try Out and Turn Off

15. Agency that isolate the equipment is referred as *

Execut ing Agency

Isolat ing Agency

Isolat or Agency

Owner Agency

16. Who is a Protected Person as per Positive Isolation Standard *

Person from bot h Execut ing and Working Agency

Person from Isolat ing Agency

Person from Working Agency

Person from Execut ing Agency

17. Agency that approves positive isolation *

Execut ing Agency


Owner Agency

Isolat ing Agency

18. Working with Emergency Stop is Covered under Positive Isolation Standard *

True

False

19. Which statement is correct for Isolation Pad lock Color Coding *

Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Yellow, Group
Isolat ion Lock - Black, Equipment Lock - Blue

Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Black, Group
Isolat ion Lock - Blue, Equipment Lock - Black

Tat a Engineer Personal Lock - Red, Cont ract or Supervisor Personal Lock - Blue, Group
Isolat ion Lock - Black, Equipment Lock - Yellow

Tat a Engineer Personal Lock - Blue, Cont ract or Supervisor Personal Lock - Red, Group
Isolat ion Lock - Black, Equipment Lock - Yellow

20. In which case Try Out under LOTO-TO is done from Control Room *

Working agency does not know how t o operat e equipment from Local Cont rol St at ion
(LCS)

Working Agency is not present at Sit e

Local Cont rol St at ion (LCS) is not available at sit e

Execut ing Agency has aut horized Cont rol room Operat or t o operat e t he equipment
21. Name *

Binit Kumar Jena

22. Who is Authorized to put Yellow Lock *

Owner of t he equipment

Any Person from Elect rical Depart ment only

Any Person from Elect rical and Mechanical Depart ment

Isolat ing Person wit h Level 1A t raining approved by Head of Depart ment / Chief

23. Which statement is correct for difference between isolation and positive isolation *

No difference as bot h are same t erms

Isolat ion does not require work permit syst em while posit ive isolat ion requires Work Permit
Syst em

Isolat ion is done for any equipment while posit ive isolat ion is done only for elect rical
equipment s

In isolat ion, equipment can be de-isolat ed by any one as it is not locked out while in posit ‐
ive isolat ion, de-isolat ion can be done only t hrough unlocking aft er permit closure by re‐
quest ing agency

24. Which Agency is responsible is to verify Cutting power request is as per ESI *

Owner Agency

Bot h Owner and Execut ing Agency

Execut ing Agency


Working Agency

25. What are the energies that are covered under positive isolation (Multiple Answers) *

Elect rical Energy

Fluid Energy

Chemical Energy

Pot ent ial Energy

26. Which training requirement is correct as per Positive Isolation Standard *

Prot ect ed Person (Level 1A), Isolat ing Person (Level 1), Isolat ion Planners (Level 2)

Prot ect ed Person (Level 2), Isolat ing Person (Level 1A), Isolat ion Planners (Level 1)

Prot ect ed Person (Level 1), Isolat ing Person (Level 1A), Isolat ion Planners (Level 2)

Prot ect ed Person (Level 1), Isolat ing Person (Level 2), Isolat ion Planners (Level 1A)

27. Which statements are true for personal lock (Multiple Answers) *

Not t o be used ot her t han for purpose of posit ive isolat ion

These can be exchanged

Should be removed before leaving from dut y

Key can be handed over t o ot her person

28. In Control Stop procedure Green Light at Control Stop Box means *
Equipment is running and not safe t o work

Equipment is isolat ed and safe t o work

Equipment under Local Operat ion

Equipment under Aut o Operat ion

29. Which Statements are correct for a Blue Lock (Multiple Answers) *

It is for t he prot ect ion of only Cont ract or Supervisor

It is for t he prot ect ion of bot h Cont ract or Supervisor and it s t eam

It is t o be put in isolat or or group isolat ion box before st art ing t he job

Shall remain in locked condit ion t ill work is complet e

Has t o be removed when owner of lock leaves from dut y

30. At what situation Black Lock is put in Group Isolation Box (Multiple Answers) *

Posit ive Isolat ion t hat falls under Group Isolat ion

Execut ing and Working agency unable t o put personal lock direct ly at isolat or

All Posit ive Isolat ion Requires Black Lock

Depends upon risk assessment by Owner Agency

31. Following electrical energy is exempted from Positive Isolation Standard  *

Less t han 220V DC

Less t han 250V AC


Less t han 220V DC and 250V AC

Less t han 220V DC and 250 V AC except t hose t hat powers t he cont rol valves act uat ion

32. Which statement is correct *

Equipment Key and Tag is handed over t o Owner agency by Working agency and Group lock
put by Owner Agency

Equipment Key and Tag is handed over t o Owner agency by Execut ing Agency agency and
Group lock put by Isolat ing Agency

Equipment Key and Tag is handed over t o Owner agency by Isolat ing Agency and Group
lock put by Owner Agency

Equipment Key and Tag is handed over t o Owner agency by Isolat ing Agency agency and
Group lock put by Execut ing Agency

33. Which feature is applicable for selector switch at Control Stop Box *

Should have only t wo posit ion On and Off

Should have only t wo posit ion Aut o and Local

Should have t hree posit ion On, Off and Neut ral

No special feat ure - Same as in LCS

34. Designation *

JET

Go back to t hank you page


T his content is created by the owner of the form. T he data you submit will be sent to the form owner. Microsoft is not responsible
for the privacy or security practices of its customers, including those of this form owner. Never give out your password.

Powered by Microsoft Forms |


T he owner of this form has not provided a privacy statement as to how they will use your response data. Do not provide personal
or sensitive information.
| T erms of use

You might also like