Republic of the Philippines

Province of Negros Oriental


Municipality of Siaton
Barangay Bonbonon

Region: VII
Province: NEGROS ORIENTAL
Municipality: SIATON
Barangay/Community: BONBONON
Venue: BRGY.HALL
Date: July 31,2019

Activity Profile
Program/Project: DSWD-KALAHI-CIDSS NCDDP PROJECT
Cycle: 4
Activity Name: BARANGAY ASSEMBLY/BARANGAY ACCOUNTABILITY
REVIEW & REPORT
Facilitator/s: JULIE MAE T. FABILLAR (ACT-CEF)

Documenter/Secretary: ANALIE GADIANA

1. Attendance
o Please refer to attached Attendance Sheet

2. Agenda/Objectives
o Project Review and Updates
o To formulate and discuss community monitoring plan based on barangay action plan
o Feedback on accountability reporting on the completed sub-project cycle 3
“Construction of level II Pump Driven Water System Using Solar Power”
o Status of Grievance Redress System
o Reflection session

3. Highlights of the activity


 Signing of Attendance Sheet facilitated by the barangay secretary and assisted by
ACT-CF
 Sa may ala-10:00 ang takna sa kabuntagon, gisugdan ang maong tigom pinaagi sa
usa ka pag-ampo nga gipanguluhan ni Angelita Ragusta ug kini gisundan sa
pagkanta sa Pambansang Awit nga gipanguluhan ni Jovelyn Gahuman, human
masuta nga anaa ang kadaghanan sa lumulopyo sa Brgy. Bonbonon ug human ma-
deklarar nga “quorum” ang maong tigom.
 Misunod si Kapitan Melchor Anque sa paghatag sa iyang welcome remarks.
 Sunod ni-storya si ACT-CF Julie Mae Fabillar. Siya nagpasalamat sa tanang
nanambong sa maong tigom.
 Gisunod dayon pag-presentar ni ACT CF Julie Mae ang participation rate sa
Barangay sa tanang Barangay Assemblies. Mapasalamaton siya sa tinguha nga
pagtambong sa mga katawhan ug sa pagsuporta sa programa sa DSWD.
 Sunod gipresentar ang physical and financial accomplishments sa tanang prioritized
barangays.

CYCLE 1

BARANGAY SUB-PROJECT NAME


ABIGA Construction of Reinforced Concrete Box Culvert
APOLOY Concreting of 0.20 km access road
CASALA-AN Concreting of 0.40 km Access Road
MALABUHAN Construction of 50 ln.m Flood Control System
MALOH Concreting of 0.5 km Access Road
MANTIQUIL Concreting of 0.310km Access Road
MANTUYOP Concreting of 0.5 km Access Road
NAPACAO Construction of Footbrigde
POBLACION II Construction of River Control
SALAG Concreting of 0.5 km Access Road
SUMALIRING Construction of 100.ln.m Drainage Canal
TAYAK Concreting of 0.500 km Access Road

CYCLE 2

BARANGAY NAME OF SUB-PROJECT


ALBIGA Concreting of 0.200 km Purok 3 Access
Road
CASALA-AN Concreting 0f 0.30 km Sitio Candugay
Access Road
DATAG Construction of Two-Storey Community
Center
GILIGA-ON Concreting of 0.30 km Sitio Pusod Access
Road with Drainage canal
MANTIQUIL Concreting of 0.20 km Sitio Dagandang
Access Road
MANTUYOP Concreting of 0.260 km Purok 4 Access
Road
POBLACION I Construction of 50 ln.m Purok 5 River
Control
POBLACIO IV Concreting of 0.180 km Purok 5 Access
Road
SALAG Construction of Level II Pump-Driven Water
System
SAN JOSE Construction of Footbridge at Purok 1, San
Jose
SI-IT Concreting of 0.180 km Sitio Andulay Access
Road
TAYAK Concreting of 0.500 km Sitio Biasong Access
Road

CYCLE 3

BARANGAY NAME OF SUB-PROJECT GRANT ALLOCATION


ALBIGA Concreting of 0.200km Purok 736,050
3 Tire Path
APOLOY Concreting of 0.20 km Sitio 1,419,150.00
Zigzag Access Road
BONAWON Concreting of 0.30 km 2,001,825.00
Access Road at Sitio
Calangag Brgy.Bonawon
BONBONON Construction of Level II pump 890,638.00
Driven Water System using
Solar Power at
Brgy.Bonbonon
CABANGAHAN Concreting og 300m Access 2,064,381.00
Road at Sitio Bantolinao
(150m) and Sitio Nasipit
(150m) sectional at Brgy.
Cabangahan
CANAWAY Concreting of 0.300 km Sitio 1,714,000.00
Luan-Luan Access Road
w/RCPC
CATICUGAN Construction o f 0.18 ln.m 1,460,650.00
Sitio Naga Footbridge
DATAG Construction of Barangay 397,501.00
health Station
GILIGA-ON Construction of Barangay 896,380.00
Giliga-on Day Care Center
INALAD Construction of 15.0 ln.m. 779,055.00
Flood Control System with
50.0m Riprap Protection
MALOH Concreting of 0.20 km 1,413,357.00
Access Road at Sitio Ulayan
Brgy.Maloh
NAPACAO Concreting of 1.20 km Sitio 1,368,050.00
Canaway Pathway
POBLACION I Construction of 30 ln.m 1,024,448.00
Purok 5 river control
POBLACION 3 Constructiion of 100 ln.m 2,691,025.00
Purok 1 river control
SANDULOT Concreting of 0.200km 1,143,550.00
Lower Balanan Access Road

Physical Accomplishment:
BARANGAY DATE STARTED DATE COMPLETED %
ACCOMPLISHMENT
Bonbonon November 14,2018 June 28,2019 100%

Financial Accomplishment:
BARANGAY DEPOSITED PERCENTAGE RFR STATUS
UTILIZATION
Bonbonon Grant 884,358.36 100% 2nd & Final Tranche
LCC 107,357.00 Downloaded

CYCLE 4

BARANGAY SUB-PROJECT NAME GRANT ALLOCATION REMARKS


APOLOY Concreting of 0.150 km Sitio 1,487,600.00 On-going
Bungag Access Road preparation
BONAWON Concreting of 0.340 km Sitio 2,353,200.00 On-going concreting
Catipon Access Road
CASALAAN Concreting of 0.400km Sitio 2,937,225.00 On-going concreting
Candugay and Sitio Balastro
Brgy.Casalaan Access Road
GILIGA-ON Construction of 1 unit Double Barrel 1,339,175.00 Installation of forms
Box Culvert with Concrete and Rebar and
Pavement Approach Pouring of
MALOH Concreting of 0.220 km Sitio Ulayan 1,321,175.00 Completed
Access Road
MANTIQUIL Concreting of 0.250 km at Sitio 2,128,225.00 On going
Sulodpan,Mantiquil Access Road
POBLACION 1 Construction of 0.30 ln.m.Purok 5 1,132,215.00 completed
Brgy.Poblacion 1 River Control
POBLACION 3 Concreting of 0.200 km Purok 4 976,225.00 On-going
Access Road
SALAG Concreting of 0.250 km at Sitio 1,157,600.00 On-going
Gadiane Brgy.Salag Access Road
SI-IT Construction of one storey (2 CL) 1,950,440.00 On-going
School Building
TAYAK Concreting of 0.500 km Access 3,193,725.00 On-going
Road at Sitio Mainit Brgy.Tayak
TOTAL 19,976,805

Financial Disbursement:

 Gisunod ang pagtan-aw sa Barangay Action Plan ug PSA results nga gihimo sa mga
volunteers, kung natubag ba ang problema nga nasinati atong wala pa ang proyekto
ug labaw sa tanan makahimu ug plano kung unsaon pagpalahutay ug pagmentinar
sa maong proyekto.
 Gisunod pagpresentar ang End Cycle Community Monitoring Plan (CMP) sa
barangay. Gisunod ang pagduki-duki kung ang ilang mga plano nahimo ba gayod ug
unsay mga plano pa sa barangay. Sumala sa mga katawhan, natubag ra man ang
ilang mga problema, ug ang ubang wala pa nahatagan ug pagtagad, ila na kining
naduso sa barangay council ug uban pang mga ahensiya.
 Gisunod dayon ang pag-facilitate sa mga katawhan sa paghatag sa ilang
experiences ug lessons learned nga nakuha sa tibuok implementasyon sa KC
NCDDP Project: attending barangay assemblies, participatory situational analysis,
MIBF ug SP implementation. Mao kini ang mga experiences/lessons learned nga
napaabot sa mga katawhan:

Unsa ang mga kalihukan nga atong gihimo sa KALAHI-CIDSS: NCDDP project?

o Barangay Assembly - 80% participation


o Nag-elect ug mga volunteers
o Daghang seminars and trainings sa mga community volunteers
o Naprioritized ang proyekto panahon sa MIBF
o Naghimo ug mga kalihokan sa Procurement (nanganvass)
Unsay mga maayo nga nakuha sa katahan o sa barangay diha sa pag apil-apil sa
mga kalihukan sa KC:NCDDP Project?

o Proyekto pag-oyon sa water system


o Nagtinabangay ang mga volunteers uban sa pag-suporta sa barangay officials
o Naanad ang mga katawhan nga moapil ug magpakabana para sa ilang
barangay
o Maayo nga nakunsulta gayod ang mga katawhan kon unsa ang tinuoray nila
nga kahimtang
o Nakaayo tungod kay nakahibalo kami sa mga pasikot-sikot ug mga pamaagi
nga wala namo mahibaloi sa una
o Nakaangkon ug dako nga kalambu-an
Unsa ang mga dili maayo nga naangkon o eksperyensya diha sa mga kalihukan
sa KC: NCDDP Project?

o Nawad-an ug oras sa pamilya ug oras nga mangita ug panginabuhian


o Dugay ang pagpatapok sa mga tawo sa barangay assembly
o Dugay makumbinser ang mga tawo
o Bisan ug nagkalisod sa panginabuhi mapugos gayod ug ari ilabi na ug adunay
seminar.
o Nasuko ang mga tawo kay sige sila patawag patambong ug assembly
o Walay kooperasyon
Unsay mga nakat-onan sa mga katawhan, community volunteers o sa mga
barangay officials diha sa KC: NCDDP project?

o Pagdumala, pagpalambo sa proyekto sa goberno alang sa katawhan.


o Nakakat-on sa pagpakabana alang sa barangay;
o Nakita ang pagpaningkamot ug pagtinabangay sa mga katawhan ug mga
opisyales
o Naduol sa pang-gobyerno ang mga katawhan
o Nakakat-on sa mga ensakto nga sistema ug pamaagi sa pagpasiugda ug pag-
implementar ug mga proyekto
o Nga makabalo ang mga lumulopyo nga mu-implementar sa projekto.
o Nakakat-onan unsa pagpamalit sa mga materyales
o Nakakat-on sa pagbudget sa kwarta
o Nakakat-on sa pagbahig ang trabaho sa KC
o Ang pagnaghiusa
o Nakakat-on sa dihang niapil sa mga seminar
o Kaalam
Unsay inyong isugyot aron mas maayo o nindot pa ang pagpadagan sa KALAHI-
CIDSS-NCDDP Project?

o Maayog magpadayon pa aron magmauswagon ang barangay


o Kinahanglan nga magtinabangay ang mga lumulopyo aron hapsay ang projekto.
o Transparent ang pagpadayon sa mga pagpadagan sa mga projekto.
o Pamati-on ang mga opinion sa katawhan para mas magmalambo-on ang
barangay tali sa maong projekto.
o Magsinabtanay, magtinabangay
o Padayon ang pag-kooperar sa mga volunteers

KEY ACTIVITY EXPERIENCES LEARNINGS/ACTION


Barangay Lisud ang pagpatapok ug Dasigon ang tanang katawhan sa
Assemblies tawo ilabina kung wala komunidad sa pagtambong.
kasabot ang uban sa Mohangyo sa mga opisyales
proseso sa Kalahi-CIDSS alang sa pagdasig sa mga
katawhan sa pagtambong sa
assembly.

Gamay lamang ang Kung dili matapok ang katawhan


manambong kay daghan sa usa lamang ka hugna,
trabahuon sa ilang isig ka ipahigayon ang Purok Assembly.
balay ug kaning assembly
mag-kalas kalas lang sa
ilang panahon.
Municipal Inter- Makakulba kung mag- Magpursigido ra gihapon, dili na
Barangay Forum presentar na sa utabangan maulaw mo-presentar sa
sa daghang tawo apan utabangan.
malipayon kami nga na-
prioritize ang among
barangay sa ikatulo na nga
hhigayon.
Sub-Project Nakakat-un unsaon Mo-attendar gayod ug seminars
Implementation pagpanganvass sa mga aron makakat-on ug unsaon pag-
materials, unsaon pag- pamalit sa materyales,
atubang sa negosyante, magpasabot sa suppliers sa mga
usahay masuko pa kay proseso sa procurement nga
dugay ang bayad. nakt-unan pod sa mga seminars
nga gipahigayon sa KALAHI-
Daghang mga seminars CIDSS
nga gipahigayon ug kini
nakapadugang pa sa
among kahibalo sa
pagmaniho ug pag-
implementar sa proyekto.

o Human sa sharing of experiences or lessons learned, nagpasalamat ug dako si ACT-


CF Julie Mae Fabillar sa madasigon nga katawhan. Siya malipayon sa positibo (ug
negatibo) nga pagdawat sa proyekto.
o Gitapos ang maong tigom sa usa ka pag-ampo nga gipanguluhan ni Analyn Tan sa
may alas-11:30 ang takna sa kabuntagon.

Prepared by: Approved by:

ANALIE GADIANA HON.MELCHOR ANQUE


Barangay Secretary Barangay Captain