Mobilization 12000

Temporary Fencing 1500


Excavation 80 m3 1500
Refill 103.5 m3 1553
PCC 6.2
Footings 19.5
NC 1.3
Sub-Struct
GB PCC 0.4
GB 5.0 67553
59000
SOG 4.2
Cols 3.0
Slab 13.7
Super-Struct
Parapet 3.0
Totl Qty 56.2
Insulation 1500
Stairs, RC Decor 2500
Solid Blockworks 37.5 90 3375
Therml Blockworks 87.5 90 7875
Blockworks 23.1 70 1617
Plaster 73.88 32 2364.2
Paint Interior 37 40 1480
Ceramic Floors 37 70 2590
Stair Landing 7.99 150 1198.5 40393
Stair Run 12.6 150 1890
T-Holds 2 150 300
Roof Insulation Ht&Mstr 43 105 4515
Exterior Paint 77 55 4235
Ceramic Walls 91.44 65 5943.6
Roof Finishing 43 70 3010
Kitchen Cabinets 7 1000 7000
9000
Door 2 1000 2000
Electric Works 23000
Pipefitting+Sewage works 9000 39000
AC Works 7000
167947