You are on page 1of 4

Classification: Internal #_x000D_

Appendix B
Mandatory technical Details & documents to be provided for evaluation by the Vendor
Project : Fiesta Street Theming Refurbishment

Note : If the below details and related documents were not submitted by the vendor during the initial submission , the
proposal shall not be considered

SI.No Description
Execution shall be done through Vendor In-house team or sub-contractor?
1 ( Contractor will ensure that the job is executed through his employees on his roles
and shall not sub-contract the job without GV approval )
2 In-house team Strength?
3 Inhouse Artist Strenght ?
Samples to be provided for the below
1. GRP décor rotating fan
4
2. Bamboo theme painting
3. ageing effect on the statues ( 3 samples )
Details of Technical team such as spervisor,Site engineers, Project managers etc and
5
their expereince in terms of theming
6 Sub-contractor details & Team strength if sub-contracting is approved by GV.
Proposed Supervisor for managing project execution (Full Time) and technical
7 qualification, years of experience in the same field, Competency certificate to be
provided if applicable
Proposed Duration of project in calendar days including Mobilization from the date of
confirmation / LPO Issuance. (We expect 30 days from PO issuance as latest
8
acceptable work completion period, however if additional days are required please
clarify with justification.)
Project Engineer /Manager - who shall be assigned from vendor for quality assurance
9
and periodical inspection on site.
Number of projects completed in Global Village last year (2021 August till 2022
10
February ) > 50 K
11 Applicable DLP period
12 Compliance to Clause C-3 Management and HSE Requirement
Vendor has to sign off the undertaking letter, confirming on COVID -19
13 crisis management precautionary measure compliance, before starting
work at site.
Vendor to Specify on the make and brand of the materials supplied. Confirmation
14
that the pricing is done for the brand specified.
15 The Materials warranty & Workmanship warranty details
Vendor should mention the additional works if any foreseen. Variation shall not
16
accepted without GV written approval.
Vendor to provide site based method of statement and Risk Assessment for review
17
along with proposal wherever applicable. (Mention feasibility on compliance.)

18 Vendor to specify on any exclusions from the mentioned scope

Report to be submitted within 2 working days after the job completion along with the
19
invoice and work completion report. (Mention feasibility on compliance.)

GV will notify on the site visit date, it’s mandatory to attend the site visit,
20 and it is the responsibility of the vendor to understand the scope clearly
before submitting the proposal. (Acceptance on the condition)
Classification: Internal #_x000D_

RFQ to be stamped and provided to GV during the submsission of Technical


21
evaluation to consider your Commercial & technical submissions
Contractor profile, Years in the Market ,Acheivement, Clientele and similar projects
22
with documented evidence to be provided
23 CAR insurance shall be obtained if required prior to the execution
Do the contractor having the Warehouse availablity for production, if yes kindly
24
provide more information
25 Machineries and equipments available at Warehouse for the quick production
26 Production will be carried out in Global village or in Contractors ware house
Third party Certficate shall be provided for skilled labours, machineries, Scaffolds,
27
scffold erecters, Machine operators etc.