Work Method Statement

Al Fattal Group
COMPANY NAME FACILITY:

SITE MANAGER: Rami Fattal

CONTACT: +971 55 376 6638; Rami@fattal-group.net

DATE ATART DATE: 03/08/2022

SIEND DATE: 10/08/2022

RISK RATING
WORK ACTIVITY HAZARD(S) CONTROL MEASURE(S)
1-25

Break the activity down into steps. Each step should accomplish Identify the hazards in each step and give them Identify what control measures will be implemented to
some major task and be in a logical sequence. a risk rating using the Hazard ID and Risk eliminate the hazard or minimise the risk.
Assessment Summary.
Required job activity is to remove signage from front
facade. Workers will use supported stairs to remove - - -
signage. Team of 5 persons will perform the job.
Ladder with anti slip rubber base pads will be used to
Clearing the workspace and hoisting the ladder under Slipping of workers, falling of ladder on avoid slippage. Workers will be wearing gloves, eye
3
the signboard workers glasses, anti-slip shoes and equipped with proper PPE.
While working
Injuries / cuts on hands and body during Workers will be wearing gloves, eye glasses, anti-slip
Unscrewing the sign board 3
unscrewing shoes and equipped with proper PPE. While working
Workers will be wearing gloves, eye glasses, anti-slip
Removal of the screws and dis-attaching the sign board Slipping of workers, falling of workers and shoes and equipped with proper PPE. While working at
2
to lower it to the ground items from height height workers will be equipped with fall arrest
harness.
Injuries / cuts on hands and body, slipping of
Workers will be wearing gloves, eye glasses, anti-slip
Filling the pits and paint finishing the surface workers, paint spill and chemical eye contact 8
shoes and equipped with proper PPE.
hazard

What Plant and Equipment will be used to carry out this Activity? (Note: A Plant Checklist will need to be completed)
Screw Drill, Ladder, Paint brush, & Scrappers

Risk Assessment

Site Name Al Seef Community Client Dubai Holding

Project Removal of Arabian Souvenir signages Location Dubai - UAE


CURREN RESPONSIBL
HAZARD AND EFFECT TO WHOM PREVENTIVE MEASURES
T RISK E
Falling of objects / workers from Workers will be equipped with safety harness, safety
Installation Team Low Site Supervisor
height gloves, safety helmet and anti-slip shoes
Safety gloves, helmet anti slip shoes and eye glasses
Injuries while using power tools Installation Team Low Site Supervisor
will be used while working
Provide regular rest breaks, reschedule if weather too
Hot weather conditions installation Team Low hot to work, Dress appropriately as per weather Site Supervisor
condition, availability of shady areas
Workers will be equipped with safety gloves, anti-slip
Cuts while using blade / cutter installation Team Low Site Supervisor
shoes, helmets and proper PPE

Ranking Method
Probability
1 2 3 4 5
5 ☐ M (5) ☐M (10) ☐ H (15) ☐ H (20) ☐ H (25)
Consequence

4 ☐ L (4) ☐ M (8) ☐ M (12) ☐ H (16) ☐ H (20)

3 ☐ L (3) ☐ M (6) ☐ M (9) ☐ M (12) ☐ H (15)

2 ☐ L (2) ☐ L (4) ☐ M (6) ☐ M (8) ☐M (10)

1 ☐ L (1) ☐ L (2) ☐ L (3) ☐ L (4) ☐M (5)