Construction of 6-lane Greenfield Connectivity to Jewar International Airport from DND-Faridabad-Ballabhgarh Bypass KMP Link - Spur to Delhi Mumbai Expressway on Hybrid Annuity mode in the
State of Haryana and Uttar Pradesh under Bharatmala Pariyojana Geotechnical Work Estimate
No of Depth of Total
SI.No. Type of Structure & Chainage Bore bore Depth BH-No. Depth (m) Date of Start Date of Completion Depth (m) Status Remarks
Holes holes (m)
1 Light Vehicular Underpass
1.1 LVUP at Ch. 3+296 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.2 LVUP at Ch. 4+366 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.3 LVUP at Ch. 6+246 1 x 12 x 4 1 25 25 BH-1 25 20-09-2022 13 P No issue
1.4 LVUP at Ch. 7+166 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.5 LVUP at Ch. 10+196 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.6 LVUP at Ch. 10+866 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.7 LVUP at Ch. 11+321 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.8 LVUP at Ch. 12+626 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.9 LVUP at Ch. 13+626 1 x 12 x 4 1 25 25 BH-1 25 20-09-2022 1 P No issue
1.10 LVUP at Ch. 14+916 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.11 LVUP at Ch. 16+716 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.12 LVUP at Ch. 18+255 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.13 LVUP at Ch. 20+035 1 x 12 x 4 1 25 25 BH-1 25 No issue
1.14 LVUP at Ch. 21+170 1 x 12 x 4 1 25 25 BH-1 25 21-09-2022 S No issue
1.15 LVUP at Ch. 21+908 1 x 12 x 4 1 25 25 BH-1 25 21-09-2022 2 P No issue
1.16 LVUP at Ch. 22+698 1 x 12 x 4 1 25 25 BH-1 25 19-09-2022 20-09-2022 25 C No issue
1.17 LVUP at Ch. 23+166 1 x 12 x 4 1 25 25 BH-1 25 16-09-2022 18-09-2022 25 C No issue
1.18 LVUP at Ch. 24+416 1 x 12 x 4 1 25 25 BH-1 25 19-09-2022 20-09-2022 25 C No issue
1.19 LVUP at Ch. 25+158 1 x 12 x 4 1 25 25 BH-1 25 12-09-2022 13-09-2022 25 C No issue
1.20 LVUP at Ch. 26+406 1 x 12 x 4 1 25 25 BH-1 25 10-09-2022 11-09-2022 25 C No issue
1.21 LVUP at Ch. 27+226 1 x 12 x 4 1 25 25 BH-1 25 No issue
2 Vehicular Underpass
2.1 VUP at Ch. 2+513 20 x 5.5 2 40 80 Access Issue (Due to crop)
BH-1 40
2.2 VUP at Ch. 14+331 20 x 5.5 2 40 80 No issue
BH-2 40
2.3 VUP at Ch. 19+161 20 x 5.5 2 40 80
BH-1 40 No issue
BH-2 Access Issue (Due to crop)
BH-1 40 07-09-2022 09-09-2022 40 C
2.4 VUP at Ch. 26+766 20 x 5.5 2 40 80 No issue
BH-2 40 07-09-2022 09-09-2022 40 C
BH-1 40 03-09-2022 05-09-2022 40 C
2.5 VUP at Ch. 28+248 20 x 5.5 2 40 80 No issue
BH-2 40 03-09-2022 05-09-2022 40 C
BH-1
2.6 VUP at Ch. 30+560 30 x 5.5 2 40 80 Access Issue (Due to crop)
BH-2
BH-1
2.7 VUP at Ch. 31+145 30 x 5.5 2 40 80 Access Issue (Water Logged)
BH-2
3 Small Vehicular Underpass
3.1 SVUP at Ch. 3+016 7x4 1 25 25 BH-1 25 No issue
3.2 SVUP at Ch. 3+956 7x4 1 25 25 BH-1 25 No issue
3.3 SVUP at Ch. 8+648 7x4 1 25 25 BH-1 25 No issue
3.4 SVUP at Ch. 23+317 7x4 1 25 25 BH-1 25 16-09-2022 18-09-2022 25 C No issue
5 Major Bridges
P-1
P-2
P-3 Access Issue (Due to crop)
Details of Work done
Construction of 6-lane Greenfield Connectivity to Jewar International Airport from DND-Faridabad-Ballabhgarh Bypass KMP Link - Spur to Delhi Mumbai Expressway on Hybrid Annuity mode in the
State of Haryana and Uttar Pradesh under Bharatmala Pariyojana Geotechnical Work Estimate
No of Depth of Total
SI.No. Type of Structure & Chainage Bore bore Depth BH-No. Depth (m) Date of Start Date of Completion Depth (m) Status Remarks
Holes holes (m)
P-4
P-5
P-6 50
5.1 MJB @ Ch. 15+571 12*60 13 50 650 P-7 50
P-8 50 18-09-2022 20-09-2022 50 C
P-9 50 08-09-2022 11-09-2022 50 C
P-10 50 12-09-2022 14-09-2022 50 C
P-11 50 15-09-2022 17-09-2022 50 C
P-12 50 12-09-2022 15-09-2022 50 C
P-13 50 15-09-2022 17-09-2022 50 C
6 Flyovers
6.1 Flyover @ ch. 3+660 2*34.6 3 40 120 Access Issue (Due to crop)
6.2 Flyover @ ch. 6+850 2*30 3 40 120 Access Issue (Due to crop)
6.3 Flyover @ ch. 8+250 2*30 3 40 120 Access Issue (Due to crop)
6.4 Flyover @ ch. 9+530 2*30 3 40 120 Access Issue (Due to crop)
BH-1
BH-2 40 20-09-2022 21 P
Permission Required of Expressway
6.5 Flyover @ ch. 13+983 1*34.6+2*57.1+1*34.6 5 40 200 BH-3
Authority
BH-4
BH-5
BH-1 40 13-09-2022 15-09-2022 40 C
BH-2 Access Issue (Due to crop)
6.6 Flyover @ ch. 23+804 3*30 4 40 160
BH-3 40 13-09-2022 15-09-2022 40 C
BH-4 Access Issue (Due to crop)
6.7 Flyover @ ch. 24+700 2*25 3 40 120 Access Issue (Due to crop)
6.8 Flyover @ ch. 29+300 2*25 3 40 120 Access Issue (Due to crop)
NOTE:
1)- Interchange (to wait for design) 4565 m
Length of Bore Holes having Access issue
2)- 2065 m
(Due to crop & Permission)
3)- Length of Bore Holes having no issue 1995 m
S Shifting
P In Progress
C Completed