You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

PUERTO PRINCESA CITY WATER DISTRICT


Engineering Services Department
-- South National Highway, Bgy. Sta. Monica, Puerto Princesa City
DETAILED UNIT PRICE ANALYSIS (DUPA)
CY-2022
Item No. / Description Clearing and Grubbing (with Stripping- Mechnized)
Unit Measurement m'
Output per hour 500
Designation No. of person/s Hour/Unit Hourly Rate Amount (Php)
A. Labor
a. Unskilled Laborer 2 0.002 77.27 0.31

Sub • Total for A 0.31


Name and Capacity Noof Units Hour/Unit Hourly Rate Amount (Php)
B. Equipment
a. Dumptruck (12yd3) 2 0.002 1,352.00 5.41
3
b. Payloader (1.50m ) 1 0.002 1,733.00 3.47
c. Bulldozer (155hp) 1 0.002 2,594.00 5.19
Note: Assumed hauling Distance is 3km if actual hauling distance
is shorter or longer than 3 km, the time of dumptruck will be
adjusted accordingly based on the hauling cycle analysis
Based on assumed 150mm cut all throughout. A corresponding
adjustment in the output shall be computed based on the actual
field requirements.
Sub· Total for B 14.06
c. Total A+ B 14.37 Php/unit
D. Output per hour 500.00 Unit
E. Total Labor & Equipment Cost (C/D) 0.03 Php/hr
N ame and Specification Units Quantity Unit Cos t Amount (Php)
F. Material
a.
Sub - Total for F -
G. Direct Unit Cost (E+F) -.,"' . -_::·/,/:
-14-;3:7< Php/m
2

Prepared & Submitted by: Checked & Review : Verified Correct :

Engr�s
oa
WU�
Recommending Approval Approved by:

ENGR. �� ABREA . LAUREL


AGM for Operation

Page 1