The document is a detailed unit price analysis from the Puerto Princesa City Water District for clearing and grubbing using mechanized methods. It outlines the labor, equipment, materials, and costs per unit needed for the work. Labor includes 2 unskilled laborers for 0.31 PHP per unit. Equipment includes a dump truck, payloader, and bulldozer for 14.06 PHP per unit. With no material costs, the direct unit cost is 14.37 PHP per square meter cleared and grubbed. The output expected per hour using this approach is 500 square meters.
The document is a detailed unit price analysis from the Puerto Princesa City Water District for clearing and grubbing using mechanized methods. It outlines the labor, equipment, materials, and costs per unit needed for the work. Labor includes 2 unskilled laborers for 0.31 PHP per unit. Equipment includes a dump truck, payloader, and bulldozer for 14.06 PHP per unit. With no material costs, the direct unit cost is 14.37 PHP per square meter cleared and grubbed. The output expected per hour using this approach is 500 square meters.
The document is a detailed unit price analysis from the Puerto Princesa City Water District for clearing and grubbing using mechanized methods. It outlines the labor, equipment, materials, and costs per unit needed for the work. Labor includes 2 unskilled laborers for 0.31 PHP per unit. Equipment includes a dump truck, payloader, and bulldozer for 14.06 PHP per unit. With no material costs, the direct unit cost is 14.37 PHP per square meter cleared and grubbed. The output expected per hour using this approach is 500 square meters.
Engineering Services Department -- South National Highway, Bgy. Sta. Monica, Puerto Princesa City DETAILED UNIT PRICE ANALYSIS (DUPA) CY-2022 Item No. / Description Clearing and Grubbing (with Stripping- Mechnized) Unit Measurement m' Output per hour 500 Designation No. of person/s Hour/Unit Hourly Rate Amount (Php) A. Labor a. Unskilled Laborer 2 0.002 77.27 0.31
Sub • Total for A 0.31
Name and Capacity Noof Units Hour/Unit Hourly Rate Amount (Php) B. Equipment a. Dumptruck (12yd3) 2 0.002 1,352.00 5.41 3 b. Payloader (1.50m ) 1 0.002 1,733.00 3.47 c. Bulldozer (155hp) 1 0.002 2,594.00 5.19 Note: Assumed hauling Distance is 3km if actual hauling distance is shorter or longer than 3 km, the time of dumptruck will be adjusted accordingly based on the hauling cycle analysis Based on assumed 150mm cut all throughout. A corresponding adjustment in the output shall be computed based on the actual field requirements. Sub· Total for B 14.06 c. Total A+ B 14.37 Php/unit D. Output per hour 500.00 Unit E. Total Labor & Equipment Cost (C/D) 0.03 Php/hr N ame and Specification Units Quantity Unit Cos t Amount (Php) F. Material a. Sub - Total for F - G. Direct Unit Cost (E+F) -.,"' . -_::·/,/: -14-;3:7< Php/m 2