MERCIAL PROPOSAL
System Zero Liquid Discharge System
Capacity 50 KLPD
M/S EMMENNAR PHARMA PVT LTD
A4, Sanathnagar Industrial Estate, Opp Sanathnagar Police Station,
Client Sanathnagar, Hyderabad, Telangana 500018
Mobile: +91-7680064455, +91-7337229999.
Email:purchase@emmennar.com
Proposal Ref KEP19131-MEE-PR-101-R3
Index
" Cover letter
" Basis of Design
• FIONSchema
fil Technical Specifications
Stripper Colum,
Coolirg 1.1101:er
Steam Required
POJ\el" Consumption
• Scope of \/\brk
List of Equipment Supply '
I\Alterial of Construction
List of activities
• Cost and Eoononics
m Terrrs and Condition
ill Annexure-1: M3ke List
4. Steam supply line within battery limits shall be considered in KEP scope. 3 Nos steam control
valve and 1 No steam flow meter is included in KEP scope
5. Standby Pump are considered in Stripper Column.
We wish that our proposal is lined up with your requisite. We are looking forward for encouraging
consideration from your side. For further information or clarification, please do not hesitate to contact
us.
Sai Ram T
+91-9100444811
BASIS OF DESIGN
Capacity of Plant 50 KLPDJ
Operating Hours ZOHrs /'
Mass flow Rate 2500 kg/hr ✓'
Initial TDS 3 -5% (w/wL/
Initial COD 8% (w/w) '-/
Steam Pressure 3 bar (g)
PH 7
C.W. lnlet Temp
C. W. Outlet Temp
Drive Electrical, 415 ± 10% V, 50 Hz, 3cp ,____/,
Operation Continuous ,-
" '
FEED CONC. OUTLET CONC. OUllET SOLID OUT
feed 25C0 kg/hr Feed 2250 kg/hr Feed 357 kg/hr Solid Out 132 kg/hr
TDS 5.0 w/w% TDS 5.6 w/w% ,__, - TDS 35 w/w% TDS 95 w/w%
- ,,. __
'
;c
' '
·llli•-•CF/211'£1 STRIPPER COLUMN l•-@i!iitlilf-"'1ii EVAPORATOR ATFD
'
" t
TECHNICAL SPECIFICATIONS
Stripper Column:
--
Sr.No.
--- --
__ Specifications Units Data
1. Evaporation Rate kg/hr 1893
--
Sr.No. ---- - - - - ----···---
Specifications
--
Units Data -
UTILITY
Cooling Water
5. ATFD m3/hr. ZO J/
Steam:
Power
• Tray SS316
• Stiffer Rings SS304
2. Surface Condenser (20 m2)
• Tubes SS316
• Tube Sheet SS316 01 Nos
• Shell SS316
�\
------- -- - --
,_ _
• Condensate Piping
-- -- --- . - ------- ----------- ----------· ----··· -- - - -- . ------·· - - -- --- - - - -- ----- .
SS304 1 Lot
- -- -
5 m Head) 03 Nos
• Concentrate Pump SS316 ,.,.,
,_________ 01+01 Nos
• Condensate Pump SS304 �-/"
01+01 Nos
6. Miscellaneous Equipment
• Vacuum Pump (171 m3/hr) SS304 01 + 01 Noy
·---·
_ _ _____
•__Non-Condensate Piping
--------·· ---- '' --------------- --- ,,,, - --""
1 Lot /
. ····--·-···--------··
SS304
,,.
' Non-Contact MS
INSTRUMENTATION
ELECTRICAL PANEL
1. Electrical
• Common MCC Panel �- As per Standard
• Cables (Client Scope) � .· As per Standard 1 Unit
• Earthling (Client Scope)v CI
• Cable Trays (Client Scope) �-· . MS
DOCUMENTATION
Engineering Documents :
• Detailed Material balance.
• Equipment load list for design for structure.
• P&ID.
• Layout drawing.
• GA drawing.
• Floor wise Drawing.
• Utility P&ID.
• Single line diagram for electrical panel along with GA.
• Data sheet for instruments.
• Pump performance curve along with spare list.
• Design qualification.
• Installation qualification.
• Operation and maintenance manual.
• Commissioning report
Note: Two sets of drawing and documents will be provided by KEP along with the CD for the softcopy.
Quality Documents:
• QAP.
• Material flow chart.
• Nozzle flow chart.
• Final inspection report.
• All the MTC.
• Third party inspection report for tubes.
• Hydro test certificate.
• WPQ, PQR etc.
(a) 50 % advance along with technically and commercially clear purchase order.
(b) 45 % payment against proforma Invoice along with the Taxes.
(c) 05 % against successful completion of commissioning within 15 days.
Taxes:
GST: 18%
Proposal Validily:
The offer is valid for 30 days.
Insurance:
Transit insurance will be paid by Client.
Transportation:
Transportation will be paid by Client.
Packing:
Packing included in KEP Scope. Any Standard of packing is required then client need to specify before
order finalization.
Completion:
Erection, Commissioning and handing over of the plant shall be construed as completed as detailed
below:
Commissioning:
The plant shall be considered as commissioned on attaining the required rate of evaporation for
maximum 3 runs/cycles jointly witnessed/demonstrated. Minor corrections, modifications like
leakages, component rectification, etc. not affecting commissioning shall be completed later.
Buyer shall also engage personnel's required to operate and run the plant continuously, as per the
instruction of the seller. During this process it is important for these personnel to get trained in the
operation of the plant.
In case the buyer is not able to provide effluent for a period of 1 month then system considered to be
commission. Due change in the effluent characteristic as that of design then seller will not be
responsible for performance of the system. We can study and conclude that changes in effluent,
system capacity can be increased or decrease.Overall efficiency of the system is+-5%.
]-land over:
The plant shall be considered as handed over to client once the commissioning runs/cycles have been
completed as referred above.
Guarantee/ Warran tee:
Date: 15/10/2019 Page 1 18
KEPl9131-MEE-PR-101-R3
Sai Ram T
Sr. Manager Business Development
+91-9100444811
• vss SALZER
• Lamps Esbee
• MCB L&T
• MCCB L&T
• MCC/Control panel Siemens from system intigrator
• Auxiliary Contractor L&T
• DLR L&T
• Cables Finecab/Polycab
• Power Contractor L&T
• Fabricated panel KEP
Miscellaneous
7.
• PHE Sondex/Alfalaval ,/'