You are on page 1of 2
HB SesBenen om SOMGOHHD OSIOE BsFus (GF suprised, ongesnsvsniotn) sents National Water Supply & Drainage Board OORQOO EDO - NDEHADS HMAaEA sEnSmen Onswa S609 H.5G - UNdpeIdUT gaiilnombgs Gr oiGGuras BLL KANDY NORTH PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT g6mD86 / Telephone : 081 2492287 / 081 2500861 ouded | Fax : 081 2492286 moi Gozo aboea, Email : kandynorthpiwsp@gmail.com (959 sntldnefo, aDadam0 oes alate gg 25508 Project Director's Office, Project Director Pahala Konadeniya, Katogastota 208 ger we My No Date RSC-C/Kandy-North/ 03-BC'5 724)/ (2022-6187) 2022.09. 07 Mr. Shi Zhifeng, Project Manager, M/s Sinohydro Corporation Ltd Hotel Sunrich, Hedeniya, Kandy. Dear Sir, TEMENT. rth - P; Reference: Your letter number L-KNPIWSP-PD-2022-3015 dated 31 August. 2022 ‘The adverse effects of Covid 19, materials shortage and fuel shortage on the project activities has been noted by us and we are in understanding in this regard. However, we are not fully convinced that the delay of permanent reinstatement completely caused by the same issues. We draw your attention to the matter form the beginning of the contract, prior to financial crisis of the country. ‘As you already know some of the permanent reinstatement activities have been delayed more than year as at to date. Further you have been able to hand over less than 100 km of pipe laying, roads to respective road authorities out of the 500 km pipe laying completed sections. We are in the opinion that, lack of monitoring and poor coordinati resources arrangement has also been contributed to the situation. Hence, we observe this as a serious issue, and violation of contract requirement. We also understand that the management of the contractor including, key technical and supervision team is responsible for the slow progress of permanent road reinstatement. Therefore, you are advised to prepare the schedule for reinstatement RDA, PRDA & PS roads separately and send to PMU within a week time. Also, you are advised to coordinate with all sub teams and asphalt suppliers so that bulk quantities of asphalt and concrete could be supplied for road reinstatement works as the asphalt suppliers need sufficient day demand for plant operations, We wish to draw your attention to the meeting we had with CE (RDA) regarding the RDA issues regarding the road condition after pipe laying. Please note that the asphalt suppliers recommended RDA and their contact details for your attention. a aemanao : wim aaa Head OMe lenhone:—Chainman 011 2634888 Genera Manager OFM2086H9 St fare, ons ewsetes sa 00 8000 Telex: 21482 NWSDB CE Aires: PO.Bor Mutsvinia Galle Road __ Ral, ri Lanka Fax: 2636449 2637178 \\192.168..26\L draft document\Pradeep\Leters\2BRINESTOTARWNGA OBI ABELYZ2 cNPWSP_Delay of Road Relastatement_Sino 2012-3017_pradoce “Water- Every Drop is Precious” RSC-C/Kandy-North/ 03-BiCI5 724), (9022-5157. ) 2022.09. 07 1. Maganaguma plants at Mahawa and Kothmale ~ Ms.Prabashi ~ 0719988670 2. Senarath Metal Crusher & asphalt supplier (Narammala ~ Kurunegala) - Ms. Shyamali ~ 0777787587, MrSenarath Dissanayake - 0717787586 Please note that these suppliers are capable of supplying required asphalt quantity without any delays, as informed by RDA. Further you are hereby informed to submit the progress schedule of permanent reinstatement of roads weekly to PMU. If you are not showing due attention to solve issue, we are compelled to deduct the BOQ payment for key technical staff of September 2022 for not adhering to the critical road safety consideration emphasis by PMU as well as road authorities. Your understanding and prompt action in this regard is very much appreciated. Yours faithfully, Kandy North - Pathaudmbara Integrated Water Supply Project lh Eng. D V Medawatte Project Director cc Contractor has agreed to attend 01. Eng. BV1C B Vithanage, DPD / KNPIWSP permanent reinstatement activities 02, Eng, Asanka Nanayakkara - Chief Engineer with priority, Hence no deductions are 03. Eng. P PN Kumara, PM (Akurana / Pujapitya) required for key technical staff in 04, Eng. HAP KD Henakarachchi, PM (Patha. / Haris.)| August 2022 regarding same. Need to 05. Mr. Rusiru Hangarangoda, P QS. monitor within Sept 2022 and will take actions if necessary. \\192.168.1.26\2-drat document\Pradeep\Letters\2022\09.2022\edited. 06th, Set 2022_NPIWSP_Delayof Road Reinstatement Sino 20223017 pradoce

You might also like