National Water Supply & Drainage Board
OORQOO EDO - NDEHADS HMAaEA sEnSmen Onswa
S609 H.5G - UNdpeIdUT gaiilnombgs Gr oiGGuras BLL
KANDY NORTH PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT
g6mD86 / Telephone : 081 2492287 / 081 2500861
ouded | Fax : 081 2492286 moi Gozo aboea,
Email : kandynorthpiwsp@gmail.com (959 sntldnefo, aDadam0
oes alate gg 25508 Project Director's Office,
Project Director Pahala Konadeniya, Katogastota
208 ger we
My No Date
RSC-C/Kandy-North/ 03-BC'5 724)/ (2022-6187) 2022.09. 07
Mr. Shi Zhifeng,
Project Manager,
M/s Sinohydro Corporation Ltd
Hotel Sunrich,
Hedeniya,
Kandy.
Dear Sir,
TEMENT.
rth - P;
Reference:
Your letter number L-KNPIWSP-PD-2022-3015 dated 31 August. 2022
‘The adverse effects of Covid 19, materials shortage and fuel shortage on the project activities has
been noted by us and we are in understanding in this regard. However, we are not fully convinced
that the delay of permanent reinstatement completely caused by the same issues. We draw your
attention to the matter form the beginning of the contract, prior to financial crisis of the country.
‘As you already know some of the permanent reinstatement activities have been delayed more
than year as at to date. Further you have been able to hand over less than 100 km of pipe laying,
roads to respective road authorities out of the 500 km pipe laying completed sections.
We are in the opinion that, lack of monitoring and poor coordinati resources arrangement
has also been contributed to the situation. Hence, we observe this as a serious issue, and violation
of contract requirement. We also understand that the management of the contractor including,
key technical and supervision team is responsible for the slow progress of permanent road
reinstatement.
Therefore, you are advised to prepare the schedule for reinstatement RDA, PRDA & PS roads
separately and send to PMU within a week time. Also, you are advised to coordinate with all
sub teams and asphalt suppliers so that bulk quantities of asphalt and concrete could be
supplied for road reinstatement works as the asphalt suppliers need sufficient day demand for
plant operations,
We wish to draw your attention to the meeting we had with CE (RDA) regarding the RDA issues
regarding the road condition after pipe laying. Please note that the asphalt suppliers
recommended RDA and their contact details for your attention.
a aemanao : wim aaa
Head OMe lenhone:—Chainman 011 2634888 Genera Manager OFM2086H9 St
fare, ons ewsetes sa 00 8000 Telex: 21482 NWSDB CE
Aires: PO.Bor Mutsvinia Galle Road __ Ral, ri Lanka Fax: 2636449 2637178
\\192.168..26\L draft document\Pradeep\Leters\2BRINESTOTARWNGA OBI ABELYZ2 cNPWSP_Delay of Road Relastatement_Sino
2012-3017_pradoce “Water- Every Drop is Precious”RSC-C/Kandy-North/ 03-BiCI5 724), (9022-5157. ) 2022.09. 07
1. Maganaguma plants at Mahawa and Kothmale ~ Ms.Prabashi ~ 0719988670
2. Senarath Metal Crusher & asphalt supplier (Narammala ~ Kurunegala) - Ms. Shyamali ~
0777787587, MrSenarath Dissanayake - 0717787586
Please note that these suppliers are capable of supplying required asphalt quantity without any
delays, as informed by RDA.
Further you are hereby informed to submit the progress schedule of permanent reinstatement of
roads weekly to PMU. If you are not showing due attention to solve issue, we are compelled to
deduct the BOQ payment for key technical staff of September 2022 for not adhering to the critical
road safety consideration emphasis by PMU as well as road authorities.
Your understanding and prompt action in this regard is very much appreciated.
Yours faithfully,
Kandy North - Pathaudmbara Integrated Water Supply Project
lh
Eng. D V Medawatte
Project Director
cc Contractor has agreed to attend
01. Eng. BV1C B Vithanage, DPD / KNPIWSP permanent reinstatement activities
02, Eng, Asanka Nanayakkara - Chief Engineer with priority, Hence no deductions are
03. Eng. P PN Kumara, PM (Akurana / Pujapitya) required for key technical staff in
04, Eng. HAP KD Henakarachchi, PM (Patha. / Haris.)| August 2022 regarding same. Need to
05. Mr. Rusiru Hangarangoda, P QS. monitor within Sept 2022 and will take
actions if necessary.