You are on page 1of 1
HBD SEHSaED om) SOON OAIAES Gpdiur py ouprivnsd, eugesroveniwiy sons National Water Supply & Drainage Board tbe HOS CNS - MHEHA SMaEA SEaBIe OHoAHG Bam OSG, - UNSTSidUT Ooenombs Gr afd DLW KANDY NORTH PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT g¢mdx00 Telephone : 081 2492287 / 081 2500861 cout Fax : 081 2492286 2006 Doce tng, ee E-mail : kandynorthpiwsp@gmailcom, oe emietiags, eejediaao ee (ost 2500004 Project Director's Office, Project Director ahala Kondlacleniya, Katugastota Bec5 gem }RSC-CiKandy-Northi03-B / (16828 C9008 - 5270) too por 1 My No Date Mr. Shi Zhifeng, Project Manager, Mis Sinohydro Corporation Ltd, Hotel Sunrich, Hedeniya, Kandy. Dear Sir, Regarding the Final Connection Work in Ranawana Road (Uduwawala Zone) KANDY NORTH - PATHADUMBARA INTEGRATED WATER SUPPLY PROJECT CONTRACT NO. P&P/DB/PATHADUMBARA/2013 This letter is in reference to your letter L-KNPIWSP-PD-2022-3242 dated on 27" October 2022 regarding the delay in the final connection work of the Ranawana Road. We arranged the first site inspection with the RDA officers on 03"! October 2022. Thereby RDA requested the details of the connections & the road crossings for the estimation works & this estimation work take some time, However, we have arranged an appointment with the Exccutive Engineer of the RDA to explain the tion and we were able to get an approval for the road crossings work on 31° October 2022, Your officers were informed regarding the permission & to prepare a program to execute the final connection works. We hereby informing you that they have submitted the program & the Bokalawala Road final connection will be done on 08" October 2022 as the first As strictly advised by the Executive Engineer of RDA we are reminding you to maintain the safety of the road users during & after the work make sure to carry out the reinstatement properly & immediately. Advise your officers & the subcontractors 10 minimize the damage to the road sections. Thank you. Yours faithfully, KANDY NORTH - PATHADUMBARA INTEGRATED WATER SUPPLY PROJ haa Eng. D V Medawatte PROJECT DIRECTOR Ce: Eng. HP K D Henakaarachchi, SE, KNPIWSP “Fos wee SS er eI Reatonce aman 1 2604488 Gencal Maer Teavortce fraser esi 264081 eae. gon ego Telex: 2148 NWSDB CE yuo. 26\1-Biatefdcument\ abo hitors\ final GokAetion wdggsan. sta FS re MINISTRY OF WATER SUPPLY" Water: Every Drop is eis”

You might also like