Some of the chemicals used in service and / of repair The dilution factors created by air currents limit any opportunities for Improvement in product quality is leading
Odour 1 3 3 Manager
produce an odour high levels of noxious fumes to less toxic materials being used
Overuse of energy could lead to increased costs which Equipment is serviced and maintained, vehicles are serviced according Checks are carried out to ensure the
Energy Use 3 3 9 Manager
may not be recoverable to the manufacuturer’s instructions. servicing requirements are performed
Enmergency Staff could be unprepared for an eventuality that could Emergency plan in place that is audited as part of the EHQS Emergency plans agreed and briefed to Bill Delamare / David
3 4 12
Preparedness affect their well-being. management system staff Dewberry
Spill kits are provided in the vans in case of of a spillage, staff are
Spill Response Liquid materials could pour down the gullies if split. 3 4 12 Spill kits are checked Driver
trained in their use
The access ladder is inspected prior to use. The step ladder is self
Falls from Height Falling from the Access Ladder 3 5 15 The ladder is inspected prior to use Manager
supporting. Staff have been trained in workin g at height.
Control measures, including using lanyards for tools, are used for
Falling from the Scaffolding 3 5 15 preventing items from falling from the operative also protect any The Manager checks the operation Manager
personnel below
Where possible all materials that could cause a tripping, slipping Pre work inspections by the Manager
Slips, Trips & Slippery materials on the floor 3 3 9 Manager
hazard are removed. Correct footware is always worn, see below. highlights any slippery surfaces
Falls
All staff are provided with the protective clothing required for the task in
Visual PPE audits are made by the
Lack of correct footware 3 4 12 hand, including Safety footware. The wearing of the required protective Manager
Manager during site visits
clothing forms part of the site inspections by the Manager/Directors.
Any cuts and abrasions are dealt with by the on-site first aider. Where
Cuts and First Aiders and Kits are available on all
Potential for gangrene or septicemia 3 3 9 a welfare facility has been provided this has running water, soap and Manager
Abrasions vehicles
disinfectant, also a fully equipped first aid kit.
Staff generally work in areas that have been sealed off from the
Customers staff and other members of the public. Where staff are Incidents of abuse from customers or
Staff could be subjected to abuse from Customers staff
Abuse & Violence 3 3 9 abused then this is reported back to the Client for action. The Haynes pedestrians are reported back to Human Manager
or members of the public
staff are made aware of the need not to react to comments from non Resources for action.
Haynes personnel
Risk (Health & Safety) 4.3
Arrangements are made with the Client to identify and remove any
Contact with asbestos products used in the previous asbestos products from the area being worked. Any additional Staff are told to stop the tasks if they
Asbestos 2 5 10 Manager
vehicle brakes could lead to Mesothelioma products found during the operation are reported back to the Client for suspect the presence of asbestos
removal prior to work re-commencing.
Personnel working for Haynes need to be alert and not The company has a strict policy on the misuse of alcohol or drugs. Any where staff are suspected of being under
suffering from any form of awareness retardation. Use staff performing a role where consumption of alcohol or drugs which the influence of Alcohol or Drugs they will
Drugs & Alcohol 3 4 12 Manager
of alcohol or misuse of drugs can lead to awareness could affect performance must report any consumption to the be taken off the job. Councelling will be
retardation and the potential for a serious injury Managing Director prior to starting work. offered.
Staff workin alone is rare and generally only occurs when a lone
Lone working could result in a person being injured and Staff are required to report into Head
Lone woring 2 4 8 person goes toperform a simple one person task. Their movements Manager
then left to suffer unnecessarily. Office after the job is finished
are monitored.
There are several risks in the process which could lead The Manager and Supervisor assesses the standard of work being
to poor performance and a lack of Customer performed. Evidence is gathered and reported back to the client for
Process Risk 2 4 8 Manager
satisfaction. These risks have been identified and are Customer feedback and gathered in the client file to be used during a
list in the following manual. ‘lessons learnt’ exercise at Management Review
Environmental Aspects
The impacts of the project being performed are assessed during the
Significant Significant Aspects and Impacts are
Have you identified the impacts 3 4 12 client meeting. Remedial actions are agreed with the Client and Manager
Impacts dicuseed at Management Review
monitored by the Director. Any feedback is stored in the project file.
Resources to ensure the efficient completion of the Resources are identified during discussions with the Client. Staff are
7 client's requirements are identified at the contract stage 3 4 12 selected who best fulfill the required skill-set. The quality of their work Manager
and the required resources are allocated is monitored by the Manager and acted upon accordingly.
When levels and the nature of competences are not Levels of competence are assessed at product delivery and staff are
Additional and/or product training training
7.2 Competence correctly identified the potential for poor workmanship 3 4 12 selected as required. The project processes are monitored by the Manager
can be provided.
is increased Manager
Failure to provide the correct documentation could lead Documents required for the business process are controlled by
7.5 Documentation to legal repercussions and an inability to defend you 3 4 12 procedure HB-EHQS-07-05-01 Control of Documentated Information. Manager
actions when something goes wrong Client documents are kept in the project file.
Has a system to ensure tracability of products, Materials are identified by product code and name, these are checked Discrepancies are discussed at
Tracability 8.5.2 Identification Risk 3 4 12 Manager
materials and staff been implemented the technician. Any discrepancies are discussed with the supplier. Management Review
Does the Management Review agenda and minutes Management Review is performed twice year and covers the topics
Management Review 9.3 Monitoring Risk provide the required information regarding the business 3 4 12 required to manage the business effectively. The Review is audited Manager
performance? annually during the BAB surveillance visit.
Page 1 of 9
Risk Assessment Matrix – Environmental
Determination of Risk
Potential for an
Environmental discharge Major pollution leading to sever
Minor pollution discharge which Environmental discharge
which could lead to the environmental damage and
would not create a Statutory which could lead to the
creating of a Statutory action from the Statutory
Nuisance creating of a Statutory
nuisance Authorities
nuisance
2 3 4 5
4 6 8 10
6 9 12 15
8 12 16 20
10 15 20 25
Assessment Matrix – Business Management
Determination of Risk
Could affect the smooth operation of the business Disruption sufficient to warrant a re-think of the
but can be managed project viability
2 3
4 6
6 9
8 12
10 15
4 5
4 5
8 10
12 15
16 20
20 25
isk Assessment Matrix - Health and Safety
1
Trivial
Determination of Risk
Tolerable Risk
M 6-Oct Medium implementing current
control measures
L 1-May Low Tolerable Risk
2 3
Minor Serious
2 3
4 6
6 9
8 12
10 15
4 5
Major Perilous
4 5
8 10
12 15
16 20
20 25