Professional Documents
Culture Documents
ELECTRONICS INDUSTRIES
IPC-S-816
IPC-S-816
A standard developed by IPC
Notice IPC Standards and Publications are designed to serve the public interest through eliminating
misunderstandings between manufacturers and purchasers, facilitating interchangeability and
improvement of products, and assisting the purchaser in selecting and obtaining with minimum
delay the proper product for his particular need. Existence of such Standards and Publications
shall not in any respect preclude any member or nonmember of IPC from manufacturing or sell-
ing products not conforming to such Standards and Publication, nor shall the existence of such
Standards and Publications preclude their voluntary use by those other than IPC members,
whether the standard is to be used either domestically or internationally.
Recommended Standards and Publications are adopted by IPC without regard to whether their
adoption may involve patents on articles, materials, or processes. By such action, IPC does
not assume any liability to any patent owner, nor do they assume any obligation whatever to
parties adopting the Recommended Standard or Publication. Users are also wholly responsible
for protecting themselves against all claims of liabilities for patent infringement.
IPC Position It is the position of IPC’s Technical Activities Executive Committee (TAEC) that the use and
Statement on implementation of IPC publications is voluntary and is part of a relationship entered into by
Specification customer and supplier. When an IPC standard/guideline is updated and a new revision is pub-
Revision Change lished, it is the opinion of the TAEC that the use of the new revision as part of an existing
relationship is not automatic unless required by the contract. The TAEC recommends the use
of the lastest revision. Adopted October 6. 1998
Why is there Your purchase of this document contributes to the ongoing development of new and updated
a charge for industry standards. Standards allow manufacturers, customers, and suppliers to understand one
this standard? another better. Standards allow manufacturers greater efficiencies when they can set up their
processes to meet industry standards, allowing them to offer their customers lower costs.
IPC spends hundreds of thousands of dollars annually to support IPC’s volunteers in the
standards development process. There are many rounds of drafts sent out for review and
the committees spend hundreds of hours in review and development. IPC’s staff attends and
participates in committee activities, typesets and circulates document drafts, and follows all
necessary procedures to qualify for ANSI approval.
IPC’s membership dues have been kept low in order to allow as many companies as possible
to participate. Therefore, the standards revenue is necessary to complement dues revenue. The
price schedule offers a 50% discount to IPC members. If your company buys IPC standards,
why not take advantage of this and the many other benefits of IPC membership as well? For
more information on membership in IPC, please visit www.ipc.org or call 847/790-5372.
©Copyright 1993. IPC, Northbrook, Illinois. All rights reserved under both international and Pan-American copyright conventions. Any
copying, scanning or other reproduction of these materials without the prior written consent of the copyright holder is strictly prohibited and
constitutes infringement under the Copyright Law of the United States.
IPC-S-816
ASSOCIATION CONNECTING
ELECTRONICS INDUSTRIES
Contact:
IPC
2215 Sanders Road
Northbrook, Illinois
60062-6135
Tel 847 509.9700
Fax 847 509.9798
IPC-S-816 June 1993
Acknowledgment
Any Standard involving a complex technology draws material from a vast number of sources. While the principal members
of the IPC Soldering Surface Mount Devices Task Group of the IPC Joining Processes Committee are shown below, it is not
possible to include all of those who assisted in the evolution of this standard. To each of them, the members of the IPC
extend their gratitude.
Joining Processes Committee Soldering Surface Mount Devices Technical Liaison of the
Task Group IPC Board of Directors
Chairman Chairman
David Schoenthaler Les Hymes Bonnie Fena
AT&T Plexus Hibbing Printed Circuits
Abbagnaro, L., Pace Inc. Evans, G.P., Indium Corp. of Kenealey, G.W., GWK Enterprises
Abel, C.W., E.I. DuPont de Nemours America Inc.
& Co. Evans, J.W., NASA HQ Kenyon, Dr. W.G., E.I. DuPont de
Amick, P.J., McDonnell Douglas Feldmesser, H.S., Johns Hopkins Nemours and Co.
Elec. Sys. Co. University Knowles, L.P., Librascope Corp.
Aoki, E.M., Hewlett-Packard Flaten, A.D., AT&T Information Kraszewski, R., Litton Systems
Laboratories Systems Division
Aoki, H., Airex, Inc. Gamalski, J., Siemens AG Kumar, V., Martin Marietta
Astbury, A., Altron Incorporated Gandhi, V., Teradyne Connections Electronics
Baker, J., Robotic Process Systems Systems Kuo, S.Y., Boeing Aerospace &
Inc. Gechter, J., Delco Systems Electronics
Bates, G., Sherwood Medical Operations Lambert, L.P., Digital Equipment
Bellia, F., Raytheon Co. Gonzalez, C.J., SCI Manufacturing Corp.
Bernier, D.F., Litton Systems Inc. Gray, B.W., Bull HN Information Le, Q.N., Boeing Aerospace &
Systems Electronics
Bora, S.T., Smiths Industries
Gundotra, V., Motorola Inc. Leibowitz, J.D., Shireline Composites
Bradshaw, C., Avex Electronics Inc.
Inc.
Brill, C., Amp Inc. Hampshire, W.B, Tin Information
Ctr., Lichtenberg, L.R., Motorola Inc.
Brooks, C.P., Amp Inc.
Hiett, C.E., Martin Marietta Mackzum, S.C., Ericsson GE
Burg, J.S., 3M Company
Astronautics Maguire, J.F., Boeing Aerospace &
Caci, S.F., Raytheon Co.
Hillman D.D., Rockwell International Electronics
Carroll, T.A., Hughes Aircraft Co.
Hinton, P.E., Hinton ‘‘PWB’’ McKenna, G.T., Symbol
Cash, A.S., Northrop Corporation Technologies Inc.
Engineering
Cook, D.A., Synoptics Meeks, S., Lexmark International/
Holmes, R.R., AT&T
Communications Inc. IBM Corp.
Microelectronics
Couble, E.C., Shipley Co. Moffitt, J.H., U.S. Navy
Hook, M., U.S. Navy
Currie, D., Teledyne Systems Munie, G.C., AT&T Bell Laboratories
Hymes, L, Plexus Corp.
Company
Inpyn, B., Pitney Bowes Inc. Nickell, R.D., U.S. Navy
Davison, R.C., Jet Propulsion
Laboratory Jawitz, M.W., Litton Guidance & Nielsen, R.L., Eastman Kodak Co.
Control System KAD
Davy, J.G., Westinghouse Electric
Corp. Johnson, K.L, Hexacon Electric Co. Novick, D.T., Rockwell International
Elliott, D.A., Electrovert Ltd. Jones, S.A., Wilcox Electric Inc. O’Halloran, Dr. H., Siemens
Stromberg-Carlson Corp.
Engelmaier, W., Engelmaier Kasilag, M., Aerojet Electrosystems
Associates Inc. Co. Officer, R.B., Lockheed Sanders Inc.
ii
June 1993 IPC-S-816
Parkinson, E.H., Digital Equipment Rusignuolo, N., Hexacon Electric Co. Sovinsky, J.R., Indium Corp. of
Corp. Russell, J.H., Defense General America
Payne, R., Sundstrand Data Control Supply Center Stanik, E., Loral Defense Systems
Inc. Scheiner, D., Kester Solder Division Starosta, A., Eldec Corporation
Pond, R., Texas Instruments Inc. Schneider, A., Alpha Metals Inc. Supp, M., Kester Solder Division
Reed, J.R., Texas Instruments Inc. Schoenthaler, D., AT&T Bell Svensson, J., Ericsson Telecom AB
Rehm, P.M., Intel Corp. Laboratories Theroux, G., Honeywell, Inc.
Reithinger, M., Siemens AG Seltzer, M.L., Delco Systems Turbini, Dr. L.J., Georgia Institute of
Rietdorf, B.C, Magnavox Electronic Operations Technology
Systems Co. Shah, K.K., Racal-Datacom Underwood, H., U.S. Air Force
Robertson, D.E., Pace Inc. Siegel, E.S., Pace Inc. Vollmar, E., Methode Electronics Inc.
Rosser, J.G., Hughes Aircraft Co. Slezak, E., Litton Systems Inc. White, C.E., Indim Corp. of America
Rotman, A.B., DCMDN - QTC (Dept Small, E., Multicore Solders White, P.D., Tandem Computers Inc.
of Defense) Smith, W.A., Hughes Missiles Won, Dr. T.S., Allied Signal
Rubin, Dr. W., Multicore Solder Ltd. Systems Co. Aerospace
Rudy, D., AT&T Bell Laboratories Socolowski, N., Alpha Metals Inc. Woodgate, R., Woodcorp. Inc.
Rumps, D.W., AT&T Technology Soper, W.A., TRW
Systems
iii
July 1993 IPC-S-816
Table of Contents
1.0 SCOPE ...................................................................... 1 7.12 Observed Condition: Delamination ................ 21
1.1 Environmental, Safety, and Industrial 7.13 Observed Condition: Warp.............................. 21
Hygiene Considerations .................................... 1 7.14 Observed Condition: Disturbed Joints............ 21
1.2 Applicable Documents ...................................... 1 7.15 Observed Condition: Dewetting...................... 21
2.0 HANDLING .............................................................. 1 8.0 VAPOR PHASE REFLOW SOLDERING ............. 21
2.1 Electrostatic Discharge (ESD) Concerns .......... 1 8.1 General............................................................. 22
2.2 Component Leads.............................................. 1 8.2 Problems .......................................................... 22
2.3 Storage ............................................................... 1
9.0 WAVE SOLDERING .............................................. 24
2.4 Interim Handling ............................................... 2
9.1 Observed Condition: Solder Skips.................. 24
3.0 INCOMING INSPECTION OF MATERIALS 9.2 Observed Condition: Solder Bridges .............. 25
AND COMPONENTS ............................................... 2
9.3 Observed Condition: Unfilled Via Holes........ 26
4.0 ADHESIVE APPLICATION ....................................... 2 9.4 Observed Condition: Solder Wave
4.1 Dispensing ........................................................ 2 Overflooding Board ......................................... 26
5.0 SOLDER PASTE APPLICATION ............................ 4 9.5 Observed Condition: Grainy or
Disturbed Joints ............................................... 26
5.1 Stencil Printing ................................................. 5
9.6 Observed Condition: Cold Joints.................... 27
5.2 Screen Printing ................................................ 12
9.7 Observed Condition: Solder Balls
5.3 Syringe Dispensing.......................................... 14
on Assembly .................................................... 27
6.0 COMPONENT PLACEMENT ................................ 16 9.8 Observed Condition: Cracked Chip
6.1 Observed Condition: Wrong Component Components or Plastic-Bodied Leaded
Orientation ...................................................... 16 Components .................................................... 27
6.2 Observed Condition: Wrong component 10.0 CLEANING .......................................................... 27
placed on board ............................................... 16 10.1 Observed Condition: Visible Residue............. 27
6.3 Observed Condition: Missing Component ..... 16 10.2 Observed Condition: Failure of Conformal
6.4 Observed Condition: Component Coating............................................................. 28
Misalignment ................................................... 17
11.0 REPAIR/REWORK ................................................ 28
6.5 Observed Condition: Damaged
Component....................................................... 17 11.1 Scope................................................................ 28
11.2 General............................................................. 28
7.0 INFRARED/CONVECTION REFLOW
SOLDERING .......................................................... 17 11.3 Goals and Guidelines ...................................... 29
7.1 Observed Condition: No Reflow ................... 18 11.4 Primary Heating Methods ............................... 29
7.2 Observed Condition: Solder Balls .................. 19 11.5 Preheating and Auxiliary Heating................... 30
7.3 Observed Condition: Charring of Board/ 11.6 Vision Systems and Component Placement ... 30
Components .................................................... 19 11.7 Selecting Optimum Method of Rework/Repair... 31
7.4 Observed Condition: Damaged 11.8 Troubleshooting ............................................... 31
Components ..................................................... 20
11.9 Observed Condition: Insufficient solder
7.5 Observed Condition: Cracked Joints .............. 20 reflow to affect SMD removal ........................ 31
7.6 Observed Condition: Insufficient Solder......... 20 11.10 Observed Condition: Component not
7.7 Observed Condition: Bridging ........................ 20 removable after solder reflow or lifted lands
upon attempted removal.................................. 31
7.8 Observed Condition: Voids ............................. 20
11.11 Observed Condition: Lands being lifted or
7.9 Observed Condition: Opens ............................ 21
damaged during removal of old solder........... 31
7.10 Observed Condition: Spatter ........................... 21
11.12 Observed Condition: Insufficient or poor
7.11 Observed Condition: Component adhesion of solder on lands during
Alignment ........................................................ 21 pretinning operation ........................................ 32
iv
IPC-S-816 July 1993
v
June 1993 IPC-S-816
1.2 Applicable Documents The following documents, of 1) Has process machinery been properly grounded?
the issue currently in effect, are applicable to the extent 2) Have work stations and storage areas been properly
specified herein. grounded?
1.2.2 Joint Industry Standards1 2) Has component lead solderability concerns in relation to
handling been reviewed and precautions taken where
J-STD-002 Solderability Test for Component Leads, Ter- deemed necessary?
mination, Lugs, Terminals and Wires
2.3 Storage The following are concerns regarding stor-
J-STD-003 Solderability Tests for Printed Boards age:
1
IPC-S-816 June 1993
1) Have the effects of the storage environment on compo- Incoming inspection of materials and components should
nents, materials or assemblies been reviewed within have a defined purpose and be performed in conjunction
your manufacturing environment? with a good statistical process control plan. Emphasis on a
well-planned incoming inspection system results in lower
2) Does your handling system have a method of monitor-
manufacturing costs through fewer surface mount assembly
ing shelf life issues of stored components or assembly
defects and a reduction in the number of surface mount
materials to prevent unacceptable material from being
assembly scrapped.
issued into the manufacturing environment?
3) Would the use of date codes on assembly materials and 4.0 ADHESIVE APPLICATION
components be beneficial in ensuring timely usage? In surface mount technology the most prevalent use of
adhesives is for component retention prior to, and during,
2.4 Interim Handling The following are concerns regard- bottom side wave soldering.
ing interim handling: The most common method of adhesive application is auto-
1) Would the use of dedicated assembly or component car- matic syringe dispensing. Hand syringe dispensing is also
riers prevent handling defects between process opera- used for lower volumes and rework/repair operations. Pin
tions? transfer is another method often used in high volume, low
mix operations.
2) Have operators and assembly routers who handle com-
ponents or surface mount assemblies between process Control of adhesive location and material properties for
operations been properly trained and made aware of effective dispensing are the most common difficulties
their potential impact on the assembly process? encountered.
This section presents a general listing of problems encoun-
3.0 INCOMING INSPECTION OF MATERIALS AND COM- tered in the adhesive application process, potential causes,
PONENTS
and suggestions for corrective actions. These solutions may
Surface mount assembly complexity can range from just a be related to equipment, materials, design, or prior pro-
few components to several hundred on one printed wiring cesses. Accordingly some of the solutions cannot be imme-
board (PWB). Adhesives, solder, flux, printed circuit diately implemented on the shop floor.
boards, heat sinks, and components are just some of the
variety of ‘‘building blocks’’ used in surface mount tech- 4.1 Dispensing
nology (SMT) assembly. The breakdown of form, fit, or 4.1.1 Dispensing One Part Adhesive
function of just one of these building blocks can result in a
4.1.1.1 Observed Condition: Stringing Most frequently
rework operation or even the rejection of a completed
assembly. Incoming inspection of the materials and compo- related to both dispenser and adhesive.
nents which comprise an assembly is one method of reduc- A. Equipment/Process Related
ing, or eliminating, the possibility of this situation occur- Potential Cause Corrective Action
ring. Incoming inspection can accomplish two purposes:
1. Dispenser pressure too Reduce pressure
1. Conformance of Material to Specification Require- high
ments Surface mount assembly costs rise sharply 2. Dispensing period too Increase nozzle tip size
long
when nonconforming materials find their way into the
manufacturing process. Important key material charac- 3. Nozzle too far from sub- Reduce distance of nozzle to
strate substrate
teristics can be identified and checked prior to the relase
4. Nozzle drools Use vacuum suck back
of the material to the manufacturing floor. Conformance
testing can also be utilized for evaluating materials 5. Adhesive on soldering Change direction of nozzle
surface travel
which can degrade over time, such as solderability or
6. Tip length too long Shorten tip
adhesive shelf life.
B. Material/Prior-Process Related
2. Vendor Evaluation When a particular material or com- Potential Cause Corrective Action
ponent is procured from several different sources, 1. Viscosity of adhesive too Lower viscosity
incoming inspection can be used for evaluation com- high Increase reservoir tempera-
parisons. The comparison may reveal one particular ture
vendor which supplies a material more consistently and 2. Viscosity of adhesive too Reduce reservoir tempera-
with less variation between different material lots. This low ture
type of data can be shared with vendors to improve a 3. Plastic flow of adhesive Choose more thixotropic
(dribble) material
particular assembly manufacturing process or be incor-
4. Air in adhesive Remove air by centrifuging
porated into a vendor rating system.
2
June 1993 IPC-S-816
1. Reaction by absorption of Keep nozzle tip closed dur- Potential Cause Corrective Action
moisture (epoxy) ing down time 1. Insufficient energy Adjust cure time/temperature
2. Mixing of two different Thoroughly clean system Check output of UV lamps
adhesives when changing adhesives 2. Too much energy which Reduce temperature
damages components
Select another adhesive with
4.1.1.3 Observed Condition: Skipping and Insufficient different cure cycle
Adhesive Most frequently related to clogged nozzle.
B. Material/Prior-Process Related
A. Equipment/Process Related Potential Cause Corrective Action
Potential Cause Corrective Action 1. Local heat sinks Move components on PWB
1. Clogged nozzle, bubbles, Remove cured adhesive, 2. Heat sensitive compo- Move components to bottom
and foreign material lumps, air nents side, IR heat top side
2. Worn or bent nozzle tip Replace tip
4.1.1.6 Observed Condition: Lost Components Most
3. Insufficient height Dispense adhesive on top of
original dot (double dis- frequently related to insufficient cure, poor bond or adhe-
pense) sive, or non-wetted component.
4. Variation in dot size Check dispenser output for
consistency A. Equipment/Process Related
3
IPC-S-816 June 1993
4
June 1993 IPC-S-816
5
IPC-S-816 June 1993
6
June 1993 IPC-S-816
7
IPC-S-816 June 1993
8
June 1993 IPC-S-816
9
IPC-S-816 June 1993
A. Equipment/Process Related
Potential Cause Corrective Action
No information available
10
June 1993 IPC-S-816
11
IPC-S-816 June 1993
12
June 1993 IPC-S-816
13
IPC-S-816 June 1993
14
June 1993 IPC-S-816
15
IPC-S-816 June 1993
5.3.5 Observed Condition: Solder Paste Will Not Adhere 6.2 Observed Condition: Wrong component placed on
to the Pad board
6.1 Observed Condition: Wrong Component Orientation Potential Cause Corrective Action
1. Vacuum pickup not on Verify there is vacuum at
A. Equipment/Process Related pickup
Potential Cause Corrective Action 2. No components at pickup Restock feeder
location
1. Placement program Verify correct revisions
problems Add rotational data to 3. Component not picked up Reprogram for correct
program pick-up
Change rotational data 4. Feeder malfunction
in program a) Low/off air pressure Verify correct pressure/
2. Different board/program Verify correct version vacuum at feeder
version b) No electricity Verify power is turned on at
feeder and verify feeder is
B. Material/Prior-Process Related
correctly connected
Potential Cause Corrective Action c) Waste tape is clogging Remove excess tape and
1. Components in feeder Correct orientation of compo- re-thread
have wrong orientation nents d) Excessive vibation or Remove jammed component
low vibration
2. Components have mixed Orientate components in e) Excessive vibration or Adjust vibratory feeder vibra-
orientations at pickup feeder low vibration tion control
location
5. Incorrect chuck used Modify program to use cor-
3. Board marking incorrect Verify orientation with both rect chuck
assembly drawing and
schematic 6. No placement data Add placement data to pro-
gram
7. Incorrect placement Reteach correct placement
location data
8. Component did not Clean chuck and/or check
release from chuck for vacuum release
9. Different board/program Verify correct board/program
version version
16
June 1993 IPC-S-816
17
IPC-S-816 June 1993
There are some defects which may not make themselves B. Material/Prior-Process Related
known immediately, such as cracks in chip capacitors or Potential Cause Corrective Action
flux residue under parts. Tight process control is a neces- 1. Clogged stencil/dispenser Clean stencil/dispenser
sity to prevent these defects, as it is far too late to start (see section 5)
corrective action when the defects don’t appear until the 2. Print process out of con- Adjust squeegee pressure or
product built is in service. trol (See Section 5.0 for durometer
more detail) Change print speed
This section presents a general listing of problems encoun- Check stencil alignment
Check dispenser accuracy
tered in the infrared/convection reflow soldering process,
(see section 5)
potential causes and suggestions for corrective actions.
3. Paste drying out (See Change process to reduce
These solutions may be related to equipment, materials, Section 5.0 for more time paste remains on
design or prior processes. Accordingly some of the solu- detail) stencil
tions cannot be immediately implemented on the shop Increase humidity and
floor. reduce drafts in the screen
printing area
7.1 Observed Condition: No Reflow Do not reuse old paste
(see section 5)
7.1.1 Observed Condition: No Reflow of Solder Paste/ 4. Solder paste viscosity too Obtain lower viscosity paste
Cold Solder Joints high (see section 5)
5. Paste not ‘‘wetting’’ the Change paste
A. Equipment/Process Related stencil (see section 5)
Potential Cause Corrective Action 6. Solder clogging stencil/ Use different particle size
dispenser paste
1. Reflow profile incorrect Increase/change reflow tem-
perature Check paste for unevenness
of texture
2. Thermal load too great Decrease product loading for
machine capacity rate Use different viscosity paste
B. Material/Prior-Process Related Use paste with slower drying
time
Potential Cause Corrective Action
(see section 5)
1. Incorrect solder paste Use the solder alloy speci-
alloy fied 7.1.2.2 Observed Condition: No Solder: Solder not
Reflowed
7.1.2 Observed Condition: No Solders No solders may
be the result of a non-reflow condition or they may be due A. Equipment/Process Related
to problems associated with placement, solder paste appli- Potential Cause Corrective Action
cation, solderability of the parts, or errors in the design of 1. Reflow temperature not Adjust profile
the assembly that make reflow of some of the joints very high enough Increase time above liquidus
difficult. Thus a ‘‘no solder’’ may be defined as a condition: Verify that all heaters are
working
1. In which solder is completely absent from the intended
area. 2. Machine being thermally Reduce rate of product input
overloaded to match equipment thermal
2. Where the solder paste is present, but reflow has not capacity and recovery capa-
bility
occurred.
3. Board layout causing Reorientation of board on
3. Where solder is present and has reflowed, but has not shadowing conveyor
wet either the lead, the board, or both. Change reflow profile
Select alternate reflow pro-
4. Where the solder is present, has reflowed, has wet the cess
board/lead, and pulled back away from the solder joint,
4. Heat sinking from board/ Change reflow profile
i.e., dewetting. parts Select alternate reflow pro-
cess
7.1.2.1 Observed Condition: No Solder—Solder Not
Increase preheating stage
Present
A. Equipment/Process Related
Potential Cause Corrective Action
No information available
18
June 1993 IPC-S-816
Select alternate reflow pro- 4. Other effects Check items under 7.1.2
cess above
5. Thermal capacity and Repair or replace oven
7.1.2.3 Observed Condition: No Solders: No Wetting recovery capability
B. Material/Prior-Process Related
A. Equipment/Process Related Potential Cause Corrective Action
Potential Cause Corrective Action 1. Board layout causing Design change required
No information available shadowing
B. Material/Prior-Process Related 2. Heat sinking from board/ Design change required
parts
Potential Cause Corrective Action
3. Other effects Check items under 7.1.2
1. Lead not wetting Check part solderability (see
J-STD-002)
More active paste may be 7.2 Observed Condition: Solder Balls Solder balls are
helpful often due to excessive outgassing of the paste or boards
2. Board not wetting Check board solderability during reflow or an excess of oxide on the paste particles,
(see J-STD-003) components, or boards.
More active paste may be
helpful A. Equipment/Process Related
3. Part may not be in con- Check print accuracy Potential Cause Corrective Action
tact with paste Check part placement (see 1. Incomplete paste cure Pre-cure paste or change
section 6.0) preheat portion of reflow pro-
file for cure
Check lead planarity/skew
2. Conveyor speed too high Reduce conveyor speed
Check board warp
B. Material/Prior-Process Related
7.1.2.4 Observed Condition: No Solders: Dewetting Potential Cause Corrective Action
1. Incomplete paste cure Change paste
A. Equipment/Process Related
2. Moisture in boards Pre-bake boards
Potential Cause Corrective Action
3. Entrapped solvents in Pre-bake boards
1. Excess time above reflow Change profile to reduce boards
temperature time above reflow
4. Oxidized paste Refer to J-STD-005 for
B. Material/Prior-Process Related incoming paste controls
Potential Cause Corrective Action 5. Solder mask/paste Change in paste or mask
1. Board has excess Increase solder thickness on interaction needed
intermetallics board
Reduce storage time 7.3 Observed Condition: Charring of Board/
Improve storage condition Components Thermal damage to the boards or compo-
nents during reflow can be due to oven temperature or
2. Chip termination has poor Use parts that have barrier
leach resistance layers (see J-STD-002) uneven thermal transfer during reflow.
19
IPC-S-816 June 1993
A. Equipment/Process Related
7.8 Observed Condition: Voids Voids are the result of
Potential Cause Corrective Action
the entrapment of flux or other volatiles in the solder joints
1. Insufficient cool down Change thermal profile during reflow.
after reflow
2. Too rapid of cool down Change thermal profile A. Equipment/Process Related
after reflow, e.g., immedi-
Potential Cause Corrective Action
ate transfer to cleaner
3. Dropping of board after Change handling procedures 1. Insufficient paste cure Modify cure or reflow profile
oven Change paste
20
June 1993 IPC-S-816
7.10 Observed Condition: Spatter Spatter is related to 7.13 Observed Condition: Warp Excessive warp can
solder balling (see 7.2). Accordingly, it may be caused by cause unsatisfactory solder joints. Warp may be a result of
the paste, the boards (see above), or the paste deposition the board manufacturing process. It is important that it be
process (see Section 5.0). determined if boards are warped when they are received or
if they deform during the process.
A. Equipment/Process Related
Potential Cause Corrective Action 7.14 Observed Condition: Disturbed Joints Disturbed
1. Smearing in printing Adjust printing process joints are similar to the cracked joint phenomena discussed
2. Printing of paste on non- Check for alignment of above. The major considerations are the handling of the
solderable surface printing board, either during or after the reflow process.
3. Paste not cured Check cure and/or change
reflow profile
7.15 Observed Condition: Dewetting Dewetting is asso-
B. Material/Prior-Process Related
ciated with the solderability characteristics of the compo-
Potential Cause Corrective Action
nents. The solderability is affected by storage conditions,
1. Moisture in paste Store paste only in dry con- basic metallurgy of the surface, the reflow process, flux
ditions
used, and composition of the solder used. A discussion of
2. Moisture/solvents trapped Pre-bake board
in board the various causes has been given in 7.1.2.
7.11 Observed Condition: Component Alignment Com- 8.0 VAPOR PHASE REFLOW SOLDERING
ponent alignment affects both the shape of the final solder The vapor phase process has some unique characteristics. It
joint and the tendency of the solder operation to form sol- has a fixed upper temperature determined by the boiling
der bridges. Many of these issues have been addressed point of the fluid used. It is a rapid heating method and
above (and in other sections, i.e., 5.0 and 6.0). It should be quite tolerant of large mass differentials on a given circuit
noted, however, that as pitch on surface mount parts board or assembly. It is a very uniform method of heating
decreases, the need for reduced tolerance in placement as the vapor surrounds the components, heating from all
increases. In addition, post placement, e.g., operator touch sides. As with most mass soldering techniques, it has been
up and handling after reflow (see above), influence part found that preheat is an essential part of the process and
alignment. typically this is provided with an infrared preheater. The
21
IPC-S-816 June 1993
accepted standard for preheat is a 2 to 3°C per second tem- 8.2.2 Observed Condition: Dull, graying, crystallized
perature rise to within 100°C of the reflow temperature, solder Most frequently related to material.
followed by a short stabilization and equalization period
A. Equipment/Process Related
prior to reflow.
Potential Cause Corrective Action
To aid cooling of the assembly through liquidus, and to 1. Excessive time in preheat Reduce preheat time
improve solder grain density and shorten liquidus time, causing solder oxidation
many machines have a convection cooldown system inte- 2. Excessive time in reflow Reduce reflow time
gral to the equipment. causing excessive leach-
ing
8.1 General As with any mass soldering process, defects B. Material/Prior-Process Related
detected in the soldered assemblies are often related to Potential Cause Corrective Action
prior process and material variables. The defects that relate 1. Excessive leaching of Select components with
passive component termi- nickel barrier
to prior process or material are much larger in number and
nations
can be very difficult to classify after the fact. That is, once
2. Gold not removed from Solder coat components
the assembly is soldered, it is hard to determine things like active components
whether a component was out of position before reflow, or 3. Board plating too far from Check board plating
whether the solder paste deposit was properly registered. eutectic composition
There are some defects which may not make themselves 4. Oxidized component ter- Reject components
minations
known immediately, such as cracks in chip capacitors or
flux residue under parts. Tight process control is a neces- 8.2.3 Observed Condition: Opens Most frequently
sity to prevent these defects, as it is far too late to start caused by lead coplanarity or solder wicking.
corrective action when the defects don’t appear until the
product built is in service. A. Equipment/Process Related
Potential Cause Corrective Action
8.2 Problems This section presents a general listing of 1. Wicking of solder to fine Increase preheat tempera-
problems encountered in the vapor phase reflow soldering leads pulling solder away ture and/or time from joint
process, potential causes and suggestions for corrective from joint (125 to 150°C).
actions. These solutions may be related to equipment, Vertical batch use 2% silver
or special slow melt solder to
materials, design or prior processes. Accordingly, some of slow solder melt
the solutions cannot be immediately implemented on the
B. Material/Prior-Process Related
shop floor.
Potential Cause Corrective Action
Differences in machine construction can in some cases 1. Solder wicking to adja- Correct design deficiencies
cause special situations, i.e., no preheat in vertical batch cent pad or down feed
through hole
units. Where appropriate, machine specific items have been
listed under ‘‘Equipment/Process Related.’’ 2. Poor lead coplanarity Reject or reform components
3. Misregistered solder Correct application
8.2.1 Observed Condition: No Reflow of Paste or Pre- paste registration
forms Most frequently related to reflow time. 4. Insufficient solder paste Check for plugged screen or
stencil
A. Equipment/Process Related
Potential Cause Corrective Action 8.2.4 Observed Condition: Bridges Most frequently
1. Inadequate reflow power Increase power setting
caused by solder application registration tolerance.
Verify that all heaters are A. Equipment/Process Related
working
Potential Cause Corrective Action
2. Inadequate reflow time Reduce conveyor speed
No information available
Increase dwell
B. Material/Prior-Process Related
3. Boiling temperature too Check for correct fluid tem-
low perature for application Potential Cause Corrective Action
22
June 1993 IPC-S-816
8.2.5 Observed Condition: Tombstoning Most fre- 8.2.7 Observed Condition: Component Alignment Most
quently caused by unequal melt or solder paste quantity. frequently caused by pad design or placement error.
Potential Cause Corrective Action 2. Capacitors cracking in Check centering jaws and
placement placement pressure
1. Solder flux spattering in Increase preheat tempera-
reflow ture and/or increase preheat 3. Post handling cracking Do not bend boards after
time reflow
B. Material/Prior-Process Related
8.2.9 Observed Condition: Plastic Package Cracking
Potential Cause Corrective Action
Most frequently caused by water entrapped in plastic.
1. Oxidized solder paste Use fresh solder paste
2. Misregistration of solder Check application registra- A. Equipment/Process Related
paste tion Potential Cause Corrective Action
3. Improperly cured solder Correct condition at board 1. Excessive reflow Be sure fluid used is 215°C
mask fabrication temperature or below
2. No preheat Set preheat to achieve 2 to
3°C per second rise to within
100°C of reflow
B. Material/Prior-Process Related
Potential Cause Corrective Action
1. Excessive water vapor Bake components or pur-
pressure chase pre-baked compo-
nents (see IPC-SM-786)
23
IPC-S-816 June 1993
8.2.10 Observed Condition: Low Surface Insulation soldering of surface mount assemblies and for providing
Resistance Most frequently caused by flux entrapped acceptable quality solder joints.
under component.
The guidelines are presented in order of priority where
A. Equipment/Process Related possible. Some process problems are easy to correct by the
Potential Cause Corrective Action operator, others are more difficult. Some require a longer
1. Contaminated vapor Run plain substrate and time period to resolve or need outside help, and some may
phase soldering fluid retest
be more expensive than others to correct.
Replace or reclaim fluid if
resistance too low
B. Material/Prior-Process Related 9.1 Observed Condition: Solder Skips A solder skip
Potential Cause Corrective Action occurs where a solder joint did not form. Solder skips are
1. Flux entrapped under Improve cleaning process usually observed in random locations and may be caused
component Reform leads to increase by the wave soldering equipment, the materials, or poor
clearance process control. They can also result from an incorrectly
2. Board contamination prior Check incoming boards for performed prior assembly operation or the board design
to reflow contamination layout. If many joints do not solder, for example in a cor-
3. Wrong flux specified for Check flux and cleaning ner or specific area of the SMA, it is most probably related
product type method for particular
application
to the wave soldering equipment or to process steps prior
to wave soldering. Solder skips in a random manner can be
8.2.11 Observed Condition: Insufficient Solder Fillets caused by any of the reasons suggested below.
Most frequently caused by insufficient solder paste.
A. Equipment Related
A. Equipment/Process Related Potential Causes Corrective Action
Potential Cause Corrective Action 1. Turbulent wave OFF Turn Turbulent wave ON
1. Solder wicking up leads Increase preheat time and/or 2. Vibratory device in 2nd Turn ON vibratory wave
temperature wave OFF device
B. Material/Prior-Process Related 3. Turbulent wave too low Increase height of turbulent
wave
Potential Cause Corrective Action
4. Turbulent nozzle Clean flux or dross in nozzle
1. Too little solder paste Increase size of stencil
clogged
openings
Increase stencil thickness 5. Carrier bent or damaged Send carrier/fixture to repair
Check solder application 6. Conveyor fingers bent Replace bent fingers
2. Solder wicking away from Correct design location of 7. Rails not level or parallel Reset rails level/parallel
joint on board feed throughs over nozzles
Correct design of trace to 8. Waves/Nozzles not level Reset pot and nozzles level
pad connections Use LevChek
Use solder mask if not now 9. 1st Wave height lower in Pull pump and nozzles
using spots Use LevChek
Clean out pot
9.0 WAVE SOLDERING 10. Conveyor width too tight Adjust conveyor width
Wave soldering of surface mount assemblies is easy to do 11. Conveyor speed too fast Reduce conveyor speed
providing that the boards and all components have solder- for flux volatiles
able metallic surfaces; the board design meets recom- 12. Board not run best Turn SMA 90, 180 or 270
direction (orientation) degrees
mended guidelines for pad layout geometry; the compo-
nents have been properly placed using a proper adhesive B. Material/Prior-Process Related
which is correctly cured; and the wave soldering machine Potential Cause Corrective Action
is under correct process control. This means using good 1. Flux solids too high Change to low solids flux
flux at the correct specific gravity and solder with verified (15–35%) (1–3%)
purity, selecting preheat settings, and matching the tem- 2. Flux specific gravity Add thinner to correct spe-
gone too high cific gravity
perature of the solder wave with a conveyor speed so that
3. Solder purity exceeds Refresh and maintain the pot
this relationship provides sufficient heat for the correct time contamination limits
duration to perform acceptable solder joints. Verifying that
4. Analysis period Send solder sample for
all of these are under proper process control is the first exceeded analysis
overall requirement or guideline for mass production wave 5. Oil contaminated (on Drain and replace oil, if used
waves needing oil)
24
June 1993 IPC-S-816
25
IPC-S-816 June 1993
Potential Cause Corrective Action 4. Conveyor speed too slow Optimize conveyor speed
1. Non-uniform fluxing Check foam specific gravity 5. Preheat settings too high Optimize preheat
across bottom of board bubbles, crest uniform 6. Pallet not equipped with Redesign pallet
2. Conveyor too fast or Decrease speed for more center support device
insufficient preheat heat in holes 7. Center support device not Readjust
3. Vibratory device in 2nd Turn ON vibratory wave adjusted correctly
wave OFF B. Material/Prior-Process Related
4. Set-point for vibratory Increase power Potential Cause Corrective Action
device too low 1. Boards warped Stiffen or fixture board
5. Carrier bent or damaged Send carrier/fixture to repair 2. Heavy parts designed in Redesign heavy parts to
6. Conveyor fingers bent Replace bent fingers center of board edges
7. Rails not level or parallel Reset rails level/parallel 3. Multilayer ground/power Redesign boards to balance
over nozzles planes not balanced not balanced or relieve
ground/power planes
8. Waves/Nozzles not level Reset pot and nozzles level
Use LevChek 4. Holes or cutouts in board Mask the holes
9. Insufficient flux applied Increase flux application 5. Board dimensions not Change length-width ratio
optimized Use stiffeners
B. Material/Prior-Process Related
Potential Cause Corrective Action
9.5 Observed Condition: Grainy or Disturbed Joints
1. Flux specific gravity gone Add thinner to correct spe-
too high cific gravity
A. Equipment/Process Related
2. Solder purity exceeds Refresh and maintain the pot
contamination limits Potential Cause Corrective Action
3. Analysis period exceeded Send solder sample 1. Vibration or jerky action in Clean and lubricate in con-
for analysis conveyor veyor chains
4. Oil contaminated (on Drain and replace oil, if used 2. Removing assembly from Allow assembly to travel to
waves needing oil) conveyor too early conveyor end to permit
solidification of all joints
5. Warped boards—causes Do not use warped boards
assembly to lift off wave 3. Excessive solder Reduce temperature,
temperature/slow cooling increase cooling
6. Solder mask smeared on Verify incoming acceptance rate
pads around holes report
4. Too much liquid flux in Provide more preheat to
7. Holes not solderable or Don’t use unsolderable holes volatilize flux thinners
‘‘Weak Knee’’ condition boards
B. Material/Prior-Process Related
8. Poor plating (not continu- Use good boards that pass
Potential Cause Corrective Action
ous) in barrels Float Test
1. Solder alloy contaminated Analyze and correct solder
9. Solder mask or other con- Use good boards that pass
composition
tamination in holes Float Test
C. Design Related 2. Water or contamination in Check and clean air filter on
fluxer air supply inlet air line
Potential Cause Corrective Action
3. High lead in board solder Check board solder coating
1. Solder mask too thick Specify thinner solder mask coat
2. Solder mask too close Redimension more hole 4. High gold content Follow gold removal process
around pad clearance per ANSI/J-STD-001
5. Moisture in board material Bake boards prior to wave
9.4 Observed Condition: Solder Wave Overflooding causing outgassing soldering
Board 6. Chip terminations Do not use contaminated
contaminated parts
A. Equipment/Process Related 7. Contamination on some Do not use contaminated
Potential Cause Corrective Action component leads parts
1. Board too large or Install stiffeners Pre-tin
assembly to heavy 8. Off-spec solder on bare Analyze and correct
2. Pallet, carrier or fingers Readjust for board expan- board
adjusted too tight sion
3. Wave height set too high Adjust wave (lower) or con-
or conveyor too low veyor (raise)
26
June 1993 IPC-S-816
27
IPC-S-816 June 1993
28
June 1993 IPC-S-816
11.3 Goals and Guidelines In the three basic processes • Add New Solder
of SMD removal, SMT land preparation and SMD This is accomplished by either prefilling (pretinning)
installation/replacement, the fundamental goals include the lands by reflowing wire solder with a soldering iron (or
following: some other heating method), or by applying solder paste
A. Non-destructive Process. No damage or degradation to with a dispenser, typically, but not always, prior to com-
the board (both substrate and circuit elements), adjacent ponent placement.
components, and the component to be installed or
removed. This damage may be either mechanical, 11.3.3 SMD Installation The particular process goals
thermo/mechanical or purely thermal in nature and may and guidelines for safe SMD installation include the fol-
result in either immediate failure, latent degradation in lowing:
performance and lifetime, or a combination of both. • Align and place component to lands (tack if necessary)
B. Controllable, Reliable and Repeatable Process. The pro- • Preheat assembly and/or component, as required
cess can be employed and, when necessary, modified by • Pre-dry applied solder paste with gentle heating
a trained operator in a repetitive fashion with consis- • Reflow Solder Joints (individually, in groups or all
tently acceptable results. together) with concentrated ‘‘targeted’’ heat in a rapid,
C. Process Appropriate to Particular Application. The pro- controlled manner while maintaining alignment of com-
cess (or modification thereof) employed is appropriate ponent to lands
to the particular application based on the relevant • Avoid thermal and/or mechanical damage to component,
guidelines described below. board, adjacent components and their joints
D. Operator Friendly Process. An operator of average skill • Clean and inspect
can become acceptably proficient in employing and
appropriately modifying the process with a reasonable 11.4 Primary Heating Methods Primary heating meth-
amount of training and practice. ods are those principally responsible for achieving solder
melt during an SMD installation or removal process. These
In addition to these common goals, each of the three basic
are to be distinguished from methods used for pre-heating
processes has its own particular goals and guidelines due to
and auxiliary heating which are employed in addition to
differences in thermal considerations and other process
primary heating methods in particular situations, as
requirements.
described in 11.5 Preheating and Auxiliary Heating.
11.3.1 Non-destructive SMD Removal The particular
11.4.1 Conductive (by contact) Heating Methods
process goals and guidelines for non-destructive removal of
SMDs include the following:
11.4.1.1 Continuously Heated Devices Handheld con-
• Preheat assembly and/or component as required ductive heating devices generally fall into one of two cat-
• Evenly heat all joints in a rapid, controllable fashion to egories. The first is continuously heated devices such as
achieve complete, simultaneous solder reflow soldering irons, thermal tweezers and thermal pick devices
• Avoid thermal and/or mechanical damage to component, which may be held at a selected idle tip temperature prior
board, adjacent components and their joints to use.
• Immediately remove component from board before mol- Continuously heated devices generally employ tinnable tips
ten solder resolidifies to optimize heat transfer to the work.
Continuously heated conductive heating devices in SMT
11.3.2 SMT Land Preparation SMT land preparation rework and repair situations offer the following potential
should be performed prior to the installation (new build) or advantages:
replacement (rework) of a new component. Avoidance of
• Can effectively transfer a large amount of heat rapidly
thermal and/or mechanical damage to the land and sub-
strate is critical. The two primary steps include: • Can control heat delivery with tip temperature and dwell
time
• Remove Old Solder
• Can safely access hard-to-reach places and confine heat to
This has been traditionally performed with solder wicking
limited areas with proper tip design, selection and use
material and a soldering iron. Newer techniques include
continuous vacuum desoldering with a solder extractor With continuously heated conductive heating devices, the
and continuous ‘‘flow’’ desoldering employing a solder following guidelines and precautions should be observed:
extractor and special tip which allows reflow and vacuum • Must establish good thermal linkage with joints for effec-
aspiration of the old solder to occur simultaneously. tive heat transfer
29
IPC-S-816 June 1993
• Contact may disturb component lead-to-land alignment • Can control heat delivery with:
• May transfer heat too rapidly for use with solder paste or —Gas/air temperature
sensitive components —Gas/air flow rate
• May obstruct view during alignment and reflow and inter- —Dwell time
fere with joint formation during reflow. —Distance from work
• May disturb lead/land alignment With convective heating devices, the following guidelines
and precautions should be observed:
11.4.1.2 Pulse Heated Devices The second category is • Significant possibility of damaging errant heating - must
pulse heated devices such as lapflo type tools, resistance properly focus and control gas/air flow to avoid this
tweezers and other handheld devices which produce heat • Must adequately control exit gas/air velocity (via pressure
directly in the tip or the work with current. These devices or flow rate) to avoid:
generally employ low mass, non-tinnable tips which can
—Displacement of applied solder paste
remain in contact with solder joints as they cool thereby
—Disturbing the alignment of components AND
facilitating proper component alignment.
—Minimize errant heating
Pulse heated conductive heating devices in SMT rework • Inefficient means of primary heat delivery when com-
and repair situations offer the following potential advan- pared to conductive methods
tages:
11.5 Preheating and Auxiliary Heating There are two
• Can effectively transfer a large amount of heat rapidly
principal reasons for pre-/auxiliary heating during SMT
• Can control heat delivery with dwell time, power setting rework and repair. Preheating is required when there is
and tip selection present a risk of thermal shock in the substrate, compo-
• Slim design tips can safely access tight places and confine nents or both. The goal here is to ‘‘thermally soak’’ the
heat to limited areas. component and/or assembly to a given temperature and
• Low mass tips heat up and cool down rapidly thereby eliminate dangerous temperature gradients which
could produce immediate damage, reduction of reliability
• Non-tinnable tips can contact joint cold, heat to reflow,
or degradation over time.
and remain in contact during solder resolidification to sta-
bilize component alignment For avoidance of thermal shock, the rate of temperature
rise of the work during preheating is critical. For example,
• More gradual heat-up works well with solder paste
many ceramic chip capacitor manufacturers recommend
• Offers greater (though typically insufficient by itself) mar- that pre-heating occur at a rate no greater than 2–4°C/sec.
gin of safety for thermal shock sensitive components until a given minimum temperature is reached.
With pulse heated conductive heating devices, the follow- Pre-/auxiliary heating is also required when the primary
ing guidelines and precautions should be observed: heating method cannot bring all of the solder joints com-
• Less effective means to control heat delivery since hand- pletely up to proper reflow temperature at all or in an
held devices are generally not temperature controlled acceptably rapid period of time due to heat sinking by
• Must establish good thermal linkage with joints for effec- nearby portions of the substrate, circuit elements and adja-
tive heat transfer cent components. The goal here is to bring the assembly
(or a portion thereof) up to a sufficient (yet safe) tempera-
• Improper contact may disturb component lead-to-land
ture whereby the rate of heat sinking is reduced to a level
alignment
at which the primary heating device can affect proper sol-
• May produce unacceptable residual stress in some stiff der reflow.
leads if not coplanar with lands
Pre-heating for SMT repair/rework is typically accom-
plished by either a temperature controlled conductive heat-
11.4.2 Convective (by gas/air flow) Heating Methods
ing plate, by controlled heated gas/air flow and to a lesser
Convective heating methods are generally found in devices
extent IR heat. Again, controlling the rate of heat-up of the
such as semi-automated benchtop workstations, high pow-
work during the pre-heating phase (as measured by rate of
ered handheld hot air guns and nozzle-focused hot air jet
temperature rise) is critical to avoid the risk of thermal
handpieces.
shock.
Convective heating devices in SMT rework and repair situ-
11.6 Vision Systems and Component Placement As
ations offer the following potential advantages:
high lead count, fine pitch SMDs become commonplace,
• Non-contact process—generally won’t disturb joints or the task of properly aligning and placing these devices dur-
obstruct view ing manual or semi-automated SMT rework becomes more
• Under most conditions, work well with solder paste challenging.
30
June 1993 IPC-S-816
Appropriate vision systems with sufficient magnification, 11.9 Observed Condition: Insufficient solder reflow to
resolution, field of view and working distance are critical affect SMD removal
for viewing alignment of component leads to lands and
Potential Cause Corrective Action
monitoring joint reflow during SMD installation.
1. High thermal mass condi- Use pre-auxiliary heating
For installation of large body, fine pitch devices, it is often tion
difficult for traditional vision systems to provide the level 2. Insufficient heat from pri- Use more efficient heating
of magnification necessary to align fine pitch leads to lands mary heating device method or device, or
increase idle tip temperature
with a field of view showing the entire component. New
3. Insufficient heating time Increase heating time
split image systems address this problem by providing suf-
ficiently magnified views of a large component’s opposite
For Conductive Heating Methods:
corners such that accurate lead/land alignment can be
Potential Cause Corrective Action
achieved.
1. Insufficient thermal link- Improve thermal linkage with
Proper component handling systems which can adequately age between heating tip solder and/or select tip which
establish and maintain X, Y, Z and THETA positioning are and work provides more contact area
also essential for successful alignment and placement dur- For Convective Heating Methods:
ing SMD installation. Potential Cause Corrective Action
1. Insufficient air tempera- Use more efficient heating
Vision systems come in various forms including stereo ture method or increase air
microscopes, trinocular microscopes and CCTV (video) temperature
systems. While microscopes are generally more economi- 2. Insufficient air flow Increase air flow
cal, CCTV systems offer greater ease of use and less opera- 3. Air nozzle too far from Bring air nozzle closer to
tor fatigue. See IPC-OI-645 for further information on opti- work work
cal inspection equipment.
11.10 Observed Condition: Component not removable
11.7 Selecting Optimum Method of Rework/Repair after solder reflow or lifted lands upon attempted
Other than reasons such as purchase and life cycle costs of removal
equipment, operator training and skill costs and other eco-
Potential Cause Corrective Action
nomic considerations, selecting the optimum method for
1. Solder resolidifying before Use method in which
SMT rework/repair depends on a variety of factors. These removal can be affected removal can be affected
include: immediately upon complete
reflow of all joints
• Type of component
2. Adhesive holding compo- Shear bond after heating to
• Size of component nent free component (i.e. theta
• Type of substrate movement)
3. Not all joints have been Use alternate method which
• Component mounting site
reflowed provides rapid simultaneous
—thermal mass considerations reflow of all joints followed
by immediate removal to
—adjacent components keep process time to a mini-
—safe access to site mum. Assure that heated tip
or air properly contacts and
• Whether the component is being installed or removed
reflows all joints equally.
• Whether the component being removed is being salvaged
• Applicable workmanship specifications 11.11 Observed Condition: Lands being lifted or dam-
aged during removal of old solder
• EOS/ESD control requirements
Every rework/repair method and its attendant equipment Potential Cause Corrective Action
has advantages and disadvantages in each particular SMD 1. Lands being overheated Use lower temperature or
installation or removal situation. These can be evaluated in alternate method which
doesn’t overheat lands
terms of their ability to achieve the process goals and
2. Lands subject to Use alternate method or
guidelines contained herein when used by a properly mechanical force while minimize mechanical force to
trained operator. being heated which lands are subjected
31
IPC-S-816 June 1993
11.12 Observed Condition: Insufficient or poor adhe- 11.15 Observed Condition: Blistering or measling of
sion of solder on lands during pretinning operation substrate, or lifted lands during SMD installation or
removal
Potential Cause Corrective Action
1. Lands oxidized or con- Clean lands using appropri- For Conductive Heating Methods:
taminated ate method Potential Cause Corrective Action
2. Idle tip temperature of Lower idle tip temperature 1. Preheat temperature too Lower preheat temperature
soldering iron too high high
3. Improper size or shape of Use appropriate size and 2. Tip temperature too high Reduce tip temperature
soldering tip shape tip
3. Too much pressure Reduce pressure on tip and
applied improve thermal linkage with
11.13 Observed Condition: Misalignment of component solder joint(s)
to land pattern during SMD installation
4. Poor contact with solder Assure good thermal contact
joints with solder joint(s)
Potential Cause Corrective Action
For Convective Heating Methods:
1. Some leads are not Tack some leads or hold
tacked or the component component in place during Potential Cause Corrective Action
is not being held in place reflow, or use convective 1. Preheat temperature too Lower preheat temperature
(conductive heating) method high
2. Air velocity too high (con- Lower air flow rate 2. Air temperature too high Reduce air temperature
vective heating)
3. Air volume or velocity too Reduce air volume or veloc-
high ity or use more focused con-
11.14 Observed Condition: Dispersion or solderballing vective heating method
of solder paste during reflow
32
ANSI/IPC-T-50 Terms and Definitions for
ASSOCIATION CONNECTING
Interconnecting and Packaging Electronic Circuits
ELECTRONICS INDUSTRIES
Definition Submission/Approval Sheet
The purpose of this form is to keep SUBMITTOR INFORMATION:
current with terms routinely used in Name:
the industry and their definitions.
Individuals or companies are Company:
invited to comment. Please
City:
complete this form and return to:
IPC State/Zip:
2215 Sanders Road Telephone:
Northbrook, IL 60062-6135
Fax: 847 509.9798 Date:
Term Definition
Office Use
IPC Office Committee 2-30
Date Received: Date of Initial Review:
Comments Collated: Comment Resolution:
Returned for Action: Committee Action: ❑ Accepted ❑ Rejected
Revision Inclusion: ❑ Accept Modify
IEC Classification
Classification Code • Serial Number
Terms and Definition Committee Final Approval Authorization:
Committee 2-30 has approved the above term for release in the next revision.
Name: Committee: IPC 2-30 Date:
Technical Questions
The IPC staff will research your technical question and attempt to find an appropriate specification
interpretation or technical response. Please send your technical query to the technical department via:
tel 847/509-9700 fax 847/509-9798
www.ipc.org e-mail: answers@ipc.org
IPC video tapes and CD-ROMs can increase your industry know-how and on the job effectiveness.
For more information on IPC Video/CD Training, contact Mark Pritchard
tel 505/758-7937 ext. 202 fax 505/758-7938
e-mail: markp@ipcvideo.com www.ipc.org
www.ipc.org
Thank you for your decision to join IPC. IPC Membership is site specific, which
means that IPC member benefits are available to all individuals employed at the
PLEASE CHECK site designated on the other side of this application.
APPROPRIATE
To help IPC serve your member site in the most efficient manner possible, please
tell us what your facility does by choosing the most appropriate member category.
CATEGORY
■ Our facility manufactures and sells to other companies, printed wiring boards or other electronic
INDEPENDENT interconnection products on the merchant market.
PRINTED
BOARD WHAT PRODUCTS DO YOU
MANUFACTURERS MAKE FOR SALE?
■ One-sided and two-sided rigid ■ Flexible printed boards ■ Discrete wiring devices
printed boards ■ Flat cable ■ Other interconnections
■ Multilayer printed boards ■ Hybrid circuits
Our facility assembles printed wiring boards on a contract basis and/or offers other electronic
■ interconnection products for sale.
INDEPENDENT
PRINTED BOARD ■ Turnkey ■ Through-hole ■ Consignment
ASSEMBLERS ■ SMT ■ Mixed Technology ■ BGA
EMSI ■ Chip Scale Technology
COMPANIES
■ Our facility purchases, uses and/or manufactures printed wiring boards or other electronic interconnection
OEM – products for our own use in a final product. Also known as original equipment manufacturers (OEM).
MANUFACTURERS
OF ANY END IS YOUR INTEREST IN:
PRODUCT USING ■ purchasing/manufacture of printed circuit boards
PCB/PCAS ■ purchasing/manufacturing printed circuit assemblies
OR CAPTIVE
MANUFACTURERS What is your company’s main product line?
OF PCBS/PCAS
_________________________________________________________________________________
■ Our facility supplies raw materials, machinery, equipment or services used in the manufacture or
INDUSTRY assembly of electronic interconnection products.
SUPPLIERS What products do you supply?
_________________________________________________________________________________
■ We are representatives of a government agency, university, college, technical institute who are directly
concerned with design, research, and utilization of electronic interconnection devices. (Must be a non-
GOVERNMENT profit or not-for-profit organization.)
AGENCIES/
ACADEMIC
TECHNICAL
LIAISONS
Please be sure to complete both pages of application.
Application Site
for Membership ASSOCIATION CONNECTING
ELECTRONICS INDUSTRIES
Company Name
Street Address
❏ $1,000.00 Annual dues for Primary Site Membership (Twelve months of IPC membership begins
from the time the application and payment are received)
❏ $800.00 Annual dues for Additional Facility Membership: Additional membership for a site within
an organization where another site is considered to be the primary IPC member.
❏ $600.00** Annual dues for an independent PCB/PWA fabricator or independent EMSI provider with
annual sales of less than $1,000,000.00. **Please provide proof of annual sales.
AMRC Membership ❏ Please send me information for Membership in the Assembly Marketing
Research Council (AMRC)
Payment Information
Authorized Signature
IPC IPC
Dept. 851-0117W 2215 Sanders Road
PLEASE ATTACH BUSINESS CARD
P.O. Box 94020 Northbrook, IL 60062-6135
OF OFFICIAL REPRESENTATIVE HERE
Palatine, IL 60094-4020 Tel: 847 509.9700
Fax: 847 509.9798
ASSOCIATION CONNECTING
ELECTRONICS INDUSTRIES
Submitted by:
Name Telephone
Company E-mail
Address
City/State/Zip Date
ASSOCIATION CONNECTING
ELECTRONICS INDUSTRIES
ISBN #1-58098 2215 Sanders Road, Northbrook, IL 60062-6135
Tel. 847.509.9700 Fax 847.509.9798
www.ipc.org