Professional Documents
Culture Documents
LEVEL 3
TITLE :
ENGINE MAINTENANCE REQUIREMENTS PREPARATION
INSTRUCTIONAL AIMS :
QUANTITY
TOOLS, EQUIPMENTS AND
MATERIALS Marker Pen 2
Whiteboard Eraser 1
Laptop 1
LCD Projector 1
CODE NO.: H522-001-3:2016-C02/IS/(1/6)LP Page : / Of :
INSTRUCTIONAL
INSTRUCTIONAL ACTIVITIES TIME
AIDS
PREPARATION :
1. Warm-up session
Greet trainess
Do warm up session
Write name and level of program, trainers name
and date on whiteboard.
2. Check attendance and focus on discipline, attitude and
teamwork.
3. Get attention and raise interest to trainees
Relate ideas / skills with work experience or
past training to relate of the present topic.
4. State the title and write it on the whiteboard.
ENGINE MAINTENANCE REQUIREMENTS
PREPARATION
5. Brief the objectives/aims of the topic and write on the
whiteboard.
1. Explain workshop practice guidelines.
2. Explain the regulatory/authority authorities.
3. Explain type of Ground Support Equpment (GSE).
4. Describe scope of maintenance services.
5. Describe type of maintenance
equipment/tools/materials and documentation.
6. Explain the purpose / interests/ benefits of this lesson.
Knowledge on engine requirements preparation.
7. Investigate the trainee’s knowledge of the subject that
will be learned through question-and-answer session.
What is engine maintenance activities?
CODE NO.: H522-001-3:2016-C02/IS/(1/6)LP Page : / Of :
INSTRUCTIONAL INSTRUCTIONAL
INSTRUCTIONAL TOPIC TIME
ACTIVITIES AIDS
PRESENTATION :
1. workshop practice 1) Explain the workshop
guidelines. practice guidelines:
1.1) Safety, Health and
Environment (SHE)
requirements
a)
CODE NO.: Page : / Of :
INSTRUCTIONAL
INSTRUCTIONAL ACTIVITIES TIME
AIDS
APPLICATION :
Page : / Of :
CODE NO.:
INSTRUCTIONAL
INSTRUCTIONAL ACTIVITIES TIME
AIDS
CONFIRMATION :