You are on page 1of 21

Annex 1

NATIONAL POWER CORPORATION


Small Power Utilities Group
Status of Petitions/Applications with ERC
As of June 2022

DATE OF FORMAL OFFER


PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
A. SUBSIDIZED APPROVED GENERATION RATE (SAGR)
Proposed New SAGR 1. In compliance with Republic Act No. 10963, otherwise known 2018-048 RC 12 Dec 2018 - Notice of Public Hearing 09 Sep 2019 Last hearing: 12 Sep 2019
Date Filed: 24 May 2018 as the Tax Reform for Acceleration and Inclusion (TRAIN) is
Test Period: CY 2018 to 2020 the first package of the comprehensive tax reform program ERC issued an Order dated 29 Sep 2021 CY 2022
2. (CTRP)
Proposed to increase the SAGR (promulgated on 31 January 2022), whereby to
APPROVES the instant Petition, subject to the CY 2024
following modifications:

1. The increase in Subsidized Approved


Generation Rate (SAGR) shall be gradually
implemented as follows:

The Year 3 SAGR shall prevail thereafter,


unless otherwise changed or revoked by the
Commission

2. NPC is directed to implement the above


increase in SAGR in the first billing period for
Calendar Year (CY) 2022 and shall inform the
Distribution Utilities, and the New Power
Providers (NPPs) operating in the Small Power
Utilities Group (SPUG) areas of the increase
for their own implementation.

3. The fuel component/fuel base rate for the


calculation of NPC-SPUG's allowable fuel cost
shall be as follows:

4. The final allowable fuel cost shall be


calculated through the Generation Rate
Adjustment Mechanism (GRAM).
page 1 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
Proposed New SAGR 1. In compliance with the Commission's Order in ERC Case 2014-135 RC 03 Nov 2014 - Notice of Public Hearing 30 Sep 2015 Last hearing: 07 Aug 2015
Date Filed: 14 Sep 2014 No. 2012-085 RC dated 12 Aug 2013 to study and assess
Test Period: CY 2012 the existing Subsidized Approved Generation Rate (SAGR) ERC issued a DECISION dated 15 Sep 2021,
for each SPUG areas. promulgated on 29 Apr 2022, among others:
2. Proposed to increase the SAGR to reduce UCME.
Area Classification Luzon Visayas Mindanao 1. The proposed revised rate for SAGR is
Large Areas 6.5896 7.4503 6.5847 DENIED
NPP’s 6.5896 7.4503 -
Busuanga DPP 5.7516 2. NPC is DIRECTED to file a new petition,
within six (6) months from receipt of this
Medium Areas 6.5896 - 6.2704 Decision, for the necessary adjustments on
Ticao DPP 5.7516 the applicable SAGR in the Small Power
Small Areas 6.8354 6.2704 Utilities Group (SPUG) areas. Moreover, the
Group 1 5.7516 new petition must be as a result of a
Group 2 6.5896 proper study and assessment of the
existing SAGR of the SPUG areas taking
into account the economic development in
the subject areas, in accordance with the
previous directive of the Commission under
ERC Case No. 2012-085 RC

B. UNIVERSAL CHARGE FOR MISSIONARY ELECTRIFICATION (UCME)


CYs 2015 - 2016 BASIC UCME 1. In compliance with the Commission's Order in ERC Case 2014-135 RC 03 Nov 2014- Notice of Public Hearing 30 Sep 2015 Last hearing: 07 Aug 2015
Date Filed: 14 Sep 2014 No. 2012-085RC dated 12 Aug 2013 to re-file its 2015 and 03 Nov 2014 - Provisional Authority (PA) Jan-Aug 2015
2016 Basic Universal Charge for Missionary Electrification
2. (UCME).
To apply Basic UCME rates for the Years 2015 to 2016. 17 Aug 2015 - Extension of PA Sep '15 onwards
Proposed Rate (P/kWh)
ERC issued a DECISION dated 15 Sep 2021, CY 2015
Particulars DAA in Peso DAA in P/kWh promulgated on 29 Apr 2022, among others: to
2015 12,093,887,870 0.1476 CY 2016
2016 11,371,002,556 0.1467 3. The provisionally approved UC-ME rate of
PhP0.1561/kWh for CYs 2015 and 2016 is
ADOPTED AS THE FINAL RATE with the
following breakdown:

page 2 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
CY 2017 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2016-134 RC 23 Jan 2017 - Notice of Public Hearing 26 Feb 2018 Last hearing: 20 Mar 2018
Date Filed: 26 May 2016 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. To apply Basic UCME rates for the Year 2017.
Proposed Rate (P/kWh)
PHP0.1248
Proposed Amount (In Pesos)
PHP10.324 billion
CY 2018 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2017-054 RC 04 Apr 2018 - Notice of Public Hearing 10 Dec 2018 Last hearing: 23 Nov 2018
Date Filed: 30 May 2017 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. To apply Basic UCME rates for the Year 2018
Proposed Rate (P/kWh)
PHP0.1530
Proposed Amount (In Pesos)
PHP13.304 billion
CY 2019 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2018-076 RC 01 Aug 2018 - Notice of Public Hearing 19 Dec 2018 Last hearing: 19 Dec 2018
Date Filed: 12 Jul 2018 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. To apply Basic UCME rates for the Year 2019
Proposed Rate (P/kWh)
PHP0.1948
Proposed Amount (In Pesos)
PHP17.805 billion
CY 2020 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2019-069 RC 24 Sep 2019 - Notice of Public Hearing 11 Aug 2021 Last hearing: 27 Jul 2021
Date Filed: 12 Sep 2019 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 29 Jun 2021 - Order for the continuation of 10 Mar 2020 - continuation of cross
Electrification Areas" presentation of evidence set on 27 Jul 2021 10 Mar 2020 - continuation of cross
2. To apply Basic UCME rates for the Year 2020 10 Mar 2020 - continuation of cross
Proposed Rate (P/kWh) 10 Mar 2020 - continuation of cross
PHP0.1920
Proposed Amount (In Pesos)
PHP18.461 billion
CY 2021 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2020-011 RC 03 Jul 2020 - Notice of Public Hearing 12 Jul 2021 Last hearing: 19 Feb 2021
Date Filed: 13 Mar 2020 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 17 Aug 2020 - Order to conduct all previously
Electrification Areas" scheduled physical hearings through virtual
2. To apply Basic UCME rates for the Year 2021 hearings
Proposed Rate (P/kWh)
PHP0.2055
Proposed Amount (In Pesos)
PHP20.730 billion

page 3 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
CY 2022 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2021-022 RC 12 Apr 2021 - Notice of Virtual Hearing 16 Dec 2021 Awaiting ERC Resolution
Date Docketed: 31 Mar 2021 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary ERC issued an Order dated 16 Jun 2021, NPC filed an Urgent Motion to
Electrification Areas" promulgated on 31 Dec 2021 denying the Resolve on 10 Jun 2022
Proposed Rate (P/kWh) Petitioner's prayer for the issuance of
PHP0.1908 provisionaly authority
Proposed Amount (In Pesos)
PHP20.209 billion
CY 2023 BASIC UCME 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2022-014 RC The Commission issued an Order and Notice
Date Docketed: 15 Mar 2021 "Amended Guidelines for the Setting and Approval of of Virtual Hearing both dated 30 Mar 2022,
Electricity Generation Rates and Subsidies for Missionary promulgated on 05 Apr 2025 setting the case
Electrification Areas" for hearing on the following schedules:
Proposed Rate (P/kWh) 19 May 2022 - Determination of compliance with jurisdictional requirements concluded
PHP0.1839 and Expository Presentation for LVM Stakeholders
Proposed Amount (In Pesos) 26 May 2022 - Pre-trial Conference and Presentation of Evidence concluded
PHP20.462 billion 02 Jun 2022 - Presentation of Evidence concluded
09 Jun 2022 - Presentation of Evidence cancelled

Partial Compliance with Motion for


Extension was filed on 17 Jun 2022

C. UCME TRUE-UP MECHANISM


CY 2012 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2013-191 RC 24 Apr 2014 Awaiting ERC Resolution
Date Filed: 20 Sep 2013 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
entitled to an increase in the UC-ME to cover the shortfall…."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP0.0782
Proposed Amount (In Pesos)
PHP5.370 billion
CY 2013 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2014-089 RC 07 Jul 2014 - Notice of Public Hearing 28 Jun 2016 Awaiting ERC Resolution
Date Filed: 20 Jun 2014 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
entitled to an increase in the UC-ME to cover the shortfall…."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP0.0769
Proposed Amount (In Pesos)
PHP5.462 billion

page 4 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
CY 2014 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2016-008 RC 23 Mar 2017 - Notice of Public Hearing 10 Feb 2021 Awaiting ERC Resolution
Date Filed: 26 Jan 2016 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 10 Aug 2020 - Order for submission of
Electrification Areas" documents
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP0.0788
Proposed Amount (In Pesos)
PHP5.89 billion
CY 2015 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2017-006 RC 04 Apr 2018 - Notice of Public Hearing 21 Dec 2018 Awaiting ERC Resolution
Date Filed: 27 Jan 2017 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
entitled to an increase in the UC-ME to cover the shortfall…."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP0.0134
Proposed Amount (In Pesos)
PHP1.112 billion
CY 2016 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2019-004 RC 13 Mar 2019 - Notice of Public Hearing 10 Sep 2019 Awaiting ERC Resolution
Date Filed: 11 Jan 2019 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary
Electrification Areas"
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
entitled to an increase in the UC-ME to cover the shortfall…."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP-0.0162
Proposed Amount (In Pesos)
CY 2017 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2019-084 RC 11 Nov 2019 - Notice of Public Hearing 16 Oct 2020 Awaiting ERC Resolution
Date Filed: 28 Oct 2019 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 05 Dec 2019 - ERC Order to read as: " the
Electrification Areas" motion for issuance of provisional
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME
authority as contained in the Petition of
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be the National Power Corporation (NPC) filed
entitled to an increase in the UC-ME to cover the shortfall…." on 28 October 2019 is hereby DENIED ."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh) 17 Aug 2020 - Order to conduct all previously
PHP0.0381 scheduled physical hearings through virtual
Proposed Amount (In Pesos) hearings
PHP849.456 million
page 5 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
CY 2018 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2020-004 RC 03 Feb 2020 - Notice of Public Hearing 05 Jan 2021 Awaiting ERC Resolution
Date Filed: 23 Jan 2020 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 17 Aug 2020 - Order to conduct all previously
Electrification Areas" scheduled physical hearings through virtual
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME hearings
"if the reconciliation results in the NPC SPUG having a
deficiency, as confirmed by the ERC, NPC-SPUG shall be
entitled to an increase in the UC-ME to cover the shortfall…."
3. To recover the difference of actual UCME and basic UCME.
Proposed Rate (P/kWh)
PHP0.0591
Proposed Amount (In Pesos)
PHP5.919 billion
CY 2019 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2021-017 RC 30 Mar 2021 - Notice of Virtual Hearing Awaiting ERC Resolution
Date Docketed: 16 Mar 2021 "Amended Guidelines for the Setting and Approval of
Electricity Generation Rates and Subsidies for Missionary 10 May 2021 - new NVH Motion for Leave to File and Admit
Electrification Areas" FOE was filed on 9 Jun 2022
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME ERC issued an Order dated 26 May 2021,
"if the reconciliation results in the NPC SPUG having a The Commission notes that NPC would still be
deficiency, as confirmed by the ERC, NPC-SPUG shall be able to operate and supply the needed power
3. To recover the difference of actual UCME and basic UCME. in missionary areas using the current UCME
Proposed Rate (P/kWh) rate of PhP0.1544/kWh (exclusive of the
PHP0.0720 UCME RE Developer Cash Incentive (REDCI)
Proposed Amount (In Pesos) of PhP0.0017/kWh even without a provisional
PHP7.562 billion authority under the subject Peition.

WHEREFORE, the issuance of provisional


authority contained in the Petition was
DENIED.
CY 2020 True-up 1. In compliance with ERC Resolution No. 21, Series of 2011 - 2022-030 RC The Commission issued an Order and NPC filed an Urgent Motion to
Date Docketed: 22 Apr 2022 "Amended Guidelines for the Setting and Approval of Notice of Virtual Hearing both dated 18 May Resolve on 06 May 2022
Electricity Generation Rates and Subsidies for Missionary 2022, promulgated on 23 May 2022 setting
Electrification Areas" the case for hearing on the following NPC filed 2nd Urgent Motion to
2. ARTICLE V, Section 2(c)- Reconciliation of Actual UC-ME Resolve on 09 Jun 2022
"if the reconciliation results in the NPC SPUG having a 05 Jul 2022 - Determination of compliance with jurisdictional requirements
deficiency, as confirmed by the ERC, NPC-SPUG shall be and Expository Presentation for LVM Stakeholders
entitled to an increase in the UC-ME to cover the shortfall…." 12 Jul 2022 - Pre-trial Conference and Presentation of Evidence
3. To recover the difference of actual UCME and basic UCME. 19 Jul 2022 - Presentation of Evidence
Proposed Rate (P/kWh) 26 Jul 2022 - Presentation of Evidence
PHP0.0490
Proposed Amount (In Pesos)
PHP5.542 billion

page 6 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
D. GENERATION RATE ADJUSTMENT MECHANISM (GRAM)
10th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2013-186 RC 07 Jan 2014 - Notice of Public Hearing 24 Mar 2014 Last hearing: 24 Mar 2014
Date Filed: 10 Sep 2013 Adjustment (DAA) the difference between the allowable and
Test Period: CY 2012 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP4.206 billion period Jan 2012 to Dec 2012
Proposed Rate (P/kWh)
Luzon =1.4769; Visayas=1.4695; Mindanao=1.7971
Proposed Recovery Period:
LVM - 48 months
11th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2014-090 RC 07 Jul 2014 - Notice of Public Hearing 09 Sep 2014 Last hearing: 01 Sep 2014
Date Filed: 20 Jun 2014 Adjustment (DAA) the difference between the allowable and
Test Period: 1st Sem 2013 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP1.833 billion period Jan 2013 to Jun 2013
Proposed Rate (P/kWh)
Luzon =2.1097; Visayas=1.9125; Mindanao=1.4837
Proposed Recovery Period:
LVM - 24 months
12th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2014-188 RC 29 Jul 2015 - Notice of Public Hearing 02 Feb 2017 Last hearing: 09 Nov 2015
Date Filed: 22 Dec 2014 Adjustment (DAA) the difference between the allowable and
Test Period: 2nd Sem 2013 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP1.652 billion period Jul 2013 to Dec 2013
Proposed Rate (P/kWh)
Luzon =1.8279; Visayas=2.1585; Mindanao=1.4654
Proposed Recovery Period:
LVM - 24 months
13th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2015-203 RC 26 Jul 2016 - Notice of Public Hearing 02 Feb 2017 Last hearing: 27 Jan 2017
Date Filed: 4 Dec 2015 Adjustment (DAA) the difference between the allowable and
Test Period: 1st Sem 2014 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP1.893 billion period Jan 2014 to Jun 2014
Proposed Rate (P/kWh)
Luzon =2.0627; Visayas=2.3236; Mindanao=1.4585
Proposed Recovery Period:
LVM - 24 months
14th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2016-144 RC 29 May 2017 - Notice of Public Hearing 23 Jun 2021 Last hearing: 10 Jun 2021
Date Filed: 28 Jun 2016 Adjustment (DAA) the difference between the allowable and
Test Period: 2nd Sem 2014 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP1.653 billion period Jul 2014 to Dec 2014
Proposed Rate (P/kWh)
Luzon =1.5594; Visayas=2.0170; Mindanao=1.2921
Proposed Recovery Period:
LVM - 24 months
15th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2017-015 RC 14 Feb 2018 - Notice of Public Hearing 23 Jul 2018 Last hearing: 31 May 2018
Date Filed: 03 Mar 2017 Adjustment (DAA) the difference between the allowable and
Test Period: 1st Sem 2015 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP1.078 billion period Jan 2015 to Jun 2015
Proposed Rate (P/kWh)
Luzon =1.0982; Visayas=1.0541; Mindanao=0.7657
Proposed Recovery Period:
LVM - 24 months
page 7 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
16th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2017-052 RC 14 Feb 2018 - Notice of Public Hearing 23 Jul 2018 Last hearing: 31 May 2018
Date Filed: 26 May 2017 Adjustment (DAA) the difference between the allowable and
Test Period: 2nd Sem 2015 billed fuel and purchased power costs covering the billing
DAA in PhP: PHP931 million period Jul 2015 to Dec 2015
Proposed Rate (P/kWh)
Luzon =0.6202; Visayas=0.5068; Mindanao=0.6428
Proposed Recovery Period:
LVM - 24 months
17th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2018-014 RC 02 Aug 2018 - Notice of Public Hearing 27 Nov 2018 Last hearing: 10 Oct 2018
Date Filed: 22 Mar 2018 Adjustment (DAA) the difference between the allowable and
Test Period: CY 2016 billed fuel and purchased power costs for the billing period
DAA in PhP: PHP1.579 billion Jan 2016 to Dec 2016
Proposed Rate (P/kWh)
Luzon =1.0343; Visayas=0.8009; Mindanao=0.9862
Proposed Recovery Period:
LVM - 24 months
18th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2019-025 RC 28 Jun 2019 - Notice of Public Hearing 24 Oct 2019 Last hearing: 10 Oct 2019
Date Filed: 05 Apr 2019 Adjustment (DAA) the difference between the allowable and
Test Period: CY 2017 billed fuel and purchased power costs for the billing period
DAA in PhP: PHP1.984 billion Jan 2017 to Dec 2017
Proposed Rate (P/kWh)
Luzon =1.8580; Visayas=1.7281; Mindanao=1.6879
Proposed Recovery Period:
LVM - 24 months
19th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2020-036 RC 03 Nov 2020 - Notice of Virtual Hearing 02 Mar 2021 Last hearing: 05 Mar 2021
Date Docketed: 22 Oct 2020 Adjustment (DAA) the difference between the allowable and
Test Period: CY 2018 billed fuel and purchased power costs for the billing period
DAA in PhP: PHP3.228 billion Jan 2018 to Dec 2018
Proposed Rate (P/kWh)
Luzon =1.9361; Visayas=1.7259; Mindanao=1.6814
Proposed Recovery Period:
LVM - 36 months
20th GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2021-041 RC 15 Jun 2021 - Notice of Virtual Hearing 02 Dec 2021 Last hearing: 24 Nov 2021
Date Filed: 03 Jun 2021 Adjustment (DAA) the difference between the allowable and
Test Period: Jan to Jun 2019 billed fuel and purchased power costs for the billing period 08 Jul 2021 - New Order and NVH 05 Jul 2021 - Urgent Motion to Reset
DAA in PhP: PHP1.751 billion Jan 2019 to Jun 2019
Proposed Rate (P/kWh) ERC issued an Order dated 11 Aug 2021, 24 Dec 2021 - Motion for Leave to
Luzon =1.5768; Visayas=1.4181; Mindanao=1.2819 promulgated on 31 Dec 2021 denying the Admit Memorandum
Proposed Recovery Period: Applicant's prayer for the issuance of
LVM - 24 months provisionaly authority
21st GRAM DAA 1. To recover/(refund) through the Deferred Accounting 2021-053 RC 03 Aug 2020 - Notice of Virtual Hearing 25 Nov 2021 Last hearing: 25 Nov 2021
Date Docketed: 19 Jul 2021 Adjustment (DAA) the difference between the allowable and
Test Period: Jul to Dec 2019 billed fuel and purchased power costs for the billing period ERC issued an Order dated 07 Oct 2021,
DAA in PhP: PHP1.686 billion Jul 2019 to Dec 2019 promulgated on 31 Dec 2021 denying the
Proposed Rate (P/kWh) Applicant's prayer for the issuance of
Luzon =1.3938; Visayas=1.4034; Mindanao=1.3766 provisionaly authority
Proposed Recovery Period:
LVM - 24 months
page 8 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
22nd GRAM DAA 1. To recover/(refund) through the Deferred Accounting Pre-filed with ROS, ERC on 17 May
Test Period: Jan to Jun 2020 Adjustment (DAA) the difference between the allowable and 2022
DAA in PhP: PHP1.431 billion billed fuel and purchased power costs for the billing period
Jan 2020 to Jun 2020 ROS issued a Checklist of pre-
Proposed Rate (P/kWh) filing requirements dated 26 May
Luzon =1.2578; Visayas=2.0938; Mindanao=1.1187 2022 with the following
Proposed Recovery Period: instructions/comments among
LVM - 24 months others
1. "The excerpts from minutes of
regular board meeting dated 26
April 2022 did not mention the
prayer for provisional authority"
2. Include the recoverable GRAM
for July to December 2020

Pre-filed Application without prayer


for provisioal authority at ROS on
30 Jun 2022
E. INCREMENTAL CURRENCY EXCHANGE RATE ADJUSTMENT (ICERA)
10th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2013-185 RC 07 Jan 2014 - Notice of Public Hearing 24 Mar 2014 Last hearing: 24 Mar 2014
Date Filed: 10 Sep 2013 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: CY 2012 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP14.481 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2012 to Dec 2012
Proposed Rate (P/kWh)
LVM - 0.0242
Proposed Recovery Period:
LVM - 12 months
11th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2014-091 RC 07 Jul 2014 - Notice of Public Hearing 14 Sep 2014 Last hearing: 01 Sep 2014
Date Filed: 20 June 2014 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: 1st Sem 2013 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP8.067 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2013 to Jun 2013
Proposed Rate (P/kWh)
LVM - 0.0162
Proposed Recovery Period:
LVM - 12 months
12th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2014-189 RC 29 Jul 2015 - Notice of Public Hearing 11 Feb 2016 Last hearing: 28 Jan 2016
Date Filed: 22 Dec 2014 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: 2nd Sem 2013 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP8.996 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Ju 2-13 to Dec 2013
Proposed Rate (P/kWh)
LVM - 0.0194
Proposed Recovery Period:
LVM - 12 months

page 9 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
13th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2015-204 RC 26 Jul 2016 - Notice of Public Hearing 02 Feb 2017 Last hearing: 27 Jan 2017
Date Filed: 4 Dec 2015 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: 1st Sem 2014 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP8.774 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2014 to Jun 2014
Proposed Rate (P/kWh)
LVM : 0.0178
Proposed Recovery Period:
LVM - 12 months
14th, 15th, 16th Consolidated 1. To recover/(refund) through the Deferred Accounting 2017-051 RC 23 Feb 2018 - Notice of Public Hearing 03 Aug 2018 The hearing: 26 Jun 2018
ICERA DAA Adjustment (DAA) the deferred incremental costs/(savings)
Date Filed: 26 May 2017 on foreign currency exchange rate fluctuations in the
Test Period: 2nd Sem 2014, settlement of Debt Service and Operation Expenses (OPEX)
1st and 2nd Sem 2015 for the following billing period:
DAA in PhP: PHP24.798 million 14th ICERA - Jul 2014 to Dec 2014
15th ICERA - Jan 2015 to Jun 2015
16th ICERA - Jul 2015 to Dec 2015
Proposed Rate (P/kWh)
14th ICERA=0.0160; 15th ICERA=0.0149; 16th ICERA=0.0162
Proposed Recovery Period:
LVM - 12 months
17th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2018-007 RC 13 Jun 2018 - Notice of Public Hearing 27 Nov 2018 Last hearing: 10 Oct 2018
Date Filed: 15 Feb 2018 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: CY 2016 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP17.665 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2016 to Dec 2016
Proposed Rate (P/kWh)
LVM : 0.0243
Proposed Recovery Period:
LVM - 12 months
18th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2019-026 RC 28 Jun 2019 - Notice of Public Hearing 24 Oct 2019 Last hearing: 10 Oct 2019
Date Filed: 5 Apr 2019 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: CY 2017 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP23.525 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2017 to Dec 2017
Proposed Rate (P/kWh)
LVM : 0.0437
Proposed Recovery Period:
LVM - 12 months
19th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2020-034 RC 30 Oct 2020 - Notice of Virtual Hearing 17 Mar 2021 Last hearing: 04 Mar 2021
Date Docketed: 15 Oct 2020 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: CY 2018 on foreign currency exchange rate fluctuations in the
DAA in PhP: PHP33.789 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2018 to Dec 2018
Proposed Rate (P/kWh)
LVM : 0.0615
Proposed Recovery Period:
LVM - 12 months
page 10 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
20th ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2021-042 RC 15 June 2020 - Notice of Virtual Hearing 02 Dec 2021 Last hearing: 24 Nov 2021
Date Docketed: 03 Jun 2021 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: Jan to Jun 2019 on foreign currency exchange rate fluctuations in the 08 Jul 2021 - New Order and NVH 01 Jul 2021 - Urgent Motion to Reset
DAA in PhP: PHP18.584 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jan 2019 to Jun 2019 ERC issued an Order dated 11 Aug 2021,
Proposed Rate (P/kWh) promulgated on 31 Dec 2021 denying the
LVM : 0.0328 Applicant's prayer for the issuance of
Proposed Recovery Period: provisionaly authority
LVM - 12 months
21st ICERA DAA 1. To recover/(refund) through the Deferred Accounting 2021-067 RC 03 Sep 2021 - Notice of Virtual Hearing 11 Mar 2022 Last hearing: 05 Mar 2021
Date Docketed: 23 Aug 2021 Adjustment (DAA) the deferred incremental costs/(savings)
Test Period: Jul to Dec 2019 on foreign currency exchange rate fluctuations in the 27 Sepl 2021 - New Order and NVH 13 Sep 2021 - Urgent Motion to Reset
DAA in PhP: PHP8.190 million settlement of Debt Service and Operation Expenses (OPEX)
for the billing period Jul 2019 to Dec 2019 ERC issued an Order dated 07 October 2021,
Proposed Rate (P/kWh) promulgated on 06 Jan 2021 denying the
LVM : 0.0144 Applicant's prayer for the issuance of
Proposed Recovery Period: provisionaly authority
LVM - 12 months

22nd ICERA DAA 1. To recover/(refund) through the Deferred Accounting pre-filed with ROS on 17 May 2022
Test Period: Jan to Jun 2020 Adjustment (DAA) the deferred incremental costs/(savings)
DAA in PhP: PHP8.488 million on foreign currency exchange rate fluctuations in the ROS issued a Checklist of pre-
settlement of Debt Service and Operation Expenses (OPEX) filing requirements dated 25 May
for the billing period Jan 2020 to Jun 2020 2022 with the following
Proposed Rate (P/kWh) instructions/comments among
LVM : 0.0154 others
1. "The excerpts from minutes of
Proposed Recovery Period: regular board meeting dated 26
LVM - 12 months April 2022 did not mention the
prayer for provisional authority"
2. Include the recoverable ICERA
for July to December 2020

Pre-filed Application without prayer


for provisioal authority at ROS on
30 Jun 2022

page 11 of 12
DATE OF FORMAL OFFER
PARTICULARS GROUNDS FOR FILING ERC CASE NO. ERC ORDER /DECISION EFFECTIVITY OF EVIDENCE REMARKS
(FOE)
F. TRANSMISSION DELIVERY SERVICE CHARGE (TDSR)
TDSR 1. To recoverd costs for the transmission delivery service rates 2007-009 RC 23 Jun 2008 Last hearing: 10 Jun 2008
Date Filed: 29 Jan 2007 for CY 2004 test period
Test Period: CY 2004
Proposed Amount (ThP)
Mindoro : 124,235
Palawan : 129,079
Marinduque : 69,679
Proposed Rate (P/kWh)
Mindoro : 0.8952
Palawan : 1.1877
Marinduque : 2.4207
G. MOTION FOR PARTIAL RECONSIDERATION
1. Petition for the Recovery of Basic UCME for the Years 2012 2012-085 RC
to 2016 and Shortfall in the UCME for CY 2011

Date Filed: 11 Oct 2013 NPC filed for an Omnibus Motiuon for Partial ERC issued a Notice of Resolution dated 21
Reconsideration and Clarification for ERC Decision dated 12 April 2022, resolve to CLARIFY the issues
Aug 2013 raised by NPC
1. Petition for the Recovery of Shortfall in the UCME for CY 2012-046 RC
2010

Date Filed: 20 Dec 2013 NPC prays that the Honorable Commission partially
reconsiders the Decision dated 30 Oct 2013 and allow the
recovery from UCME for the following:
1. Remaining Other Operating expense of PhP985,430,153.00; denied
2. PhP836,660,027.51 depreciation expense; and denied
3. PhP4,596,695.69 debt service for insurance payment approved the amount of PhP4,400,188.69

NPC filed a Motion dated 14 Feb 2022 for the recovery of awaiting ERC Order/Decision
PhP303Mn representing the difference between the Capital
Subsidy Requirement and the Actual Depreciation Expense

updates for the month

for
Ma. Annabel P. Versoza
Manager, Revenue Management Dept.

page 12 of 12
Existing Effective Rates Annex 2
As of June 2022 Annex "A"
EFFECTIVE RATES FOR ELEC. COOPS.
ERC APPROVED UCME RATES (PA)
AND LGU CUSTOMERS
Increase in SAGR per ERC Universal Charge for Missionary
Existing New SAGR
AREAS Case No. 2018-048RC /2 Electrification (UCME) /1
SAGR
CY 2022 CY2023 CY 2024 CY 2022 CY2023 CY 2024 BASIC RED-CI TRUE-UP TOTAL
Mindoro 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Marinduque 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Mainland Palawan 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Puerto Princesa
Coron/Busuanga
Catanduanes 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Masbate 5.1167 0.7289 1.3116 1.7496 5.8456 6.4283 6.8663 0.1544 0.0017 - 0.1561
Tablas 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Romblon 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Bantayan 6.2553 0.8345 1.5022 2.0029 7.0898 7.7575 8.2582 0.1544 0.0017 - 0.1561
Camotes 6.2553 0.8345 1.5022 2.0029 7.0898 7.7575 8.2582 0.1544 0.0017 - 0.1561
Siquijor 6.2553 0.8345 1.5022 2.0029 7.0898 7.7575 8.2582 0.1544 0.0017 - 0.1561
Tawi-Tawi 5.1167 0.6701 1.4285 1.9048 5.7868 6.5452 7.0215 0.1544 0.0017 - 0.1561
Basilan 5.1167 0.6701 1.4285 1.9048 5.7868 6.5452 7.0215 0.1544 0.0017 - 0.1561
Sulu 5.1167 0.6701 1.4285 1.9048 5.7868 6.5452 7.0215 0.1544 0.0017 - 0.1561
Other Luzon
Group 1 4.8024 0.7289 1.3116 1.7496 5.5313 6.1140 6.5520 0.1544 0.0017 - 0.1561
Group 2 5.6404 0.7289 1.3116 1.7496 6.3693 6.9520 7.3900 0.1544 0.0017 - 0.1561
Other Visayas 5.6404 0.8345 1.5022 2.0029 6.4749 7.1426 7.6433 0.1544 0.0017 - 0.1561
Other Mindanao 4.8024 0.6701 1.4285 1.9048 5.4725 6.2309 6.7072 0.1544 0.0017 - 0.1561
/1
ERC Decision dated 15 Sep 2021, promulgated on 29 Apr 2022 under ERC Case No. 2014-135RC, whereas "The provisionally approved UC-ME rate of PhP0.1561/kWh
for CYs 2015 and 2016 is ADOPTED AS THE FINAL RATE…."
/2
ERC Order dated 29 Sep 2021

NOTED BY:
for
Ma. Annabel P. Versoza
Manager, Revenue Management Dept.
Annex 3

NATIONAL POWER CORPORATION


Corporate Affairs Group
Revenue Management Department
List of NPP/QTP and EC/DU/LGU
As of 30 June 2022
NPP/QTP
NPP (UCME-SA)
LUZON AREA
1 Renesons Energy Polilio Inc.
PALAWAN AREA
2 Palawan Power Generation, Inc. (PPGI)
A. Unit 1 & 2
B. Unit 3 & 4
3 Delta P Inc. (e)
4 DMCI Power Corp.
A. Irawan
B. Aborlan
5 Calamian Island Power Corp.
A. Coron Power Station
B. Busuanga Power Station
CATANDUANES / MASBATE AREA
6 DMCI Masbate
7 SUWECO – Catanduanes
MINDORO / ROMBLON AREA
8 Power One Corporation
A. Calapan
B. Bansud/Calapan/Roxas (15MW) in JV with Energreen
9 Ormin Power
10 DMCI Power Corp. – Calapan
11 Occidental Mindoro Cons. Power Corp. (OMCPC)
12 SUWECO Tablas Energy Corp. (STEC)
13 Ormin Power – Inabasan Hydro
14 Philippine Hybrid Energy Systems, Inc. (PHESI)
VISAYAS AREA
15 Isla Norte Power Corporation (INPC)
16 S. I. Power Corp. (SIPCOR)
A. 6 MW Requirement
B. 3MW Additional Requirement
17 Camotes Island Power Generation Corporation (CAMPCOR)
A. Poro
B. Pilar
MINDANAO AREA
18 Kaltimex Rural Energy Corp. (KREC)
QTP (QSSC)
BICOL AREA
19 F. P. Island Energy Corporation (FPIEC), Camarines Sur
PALAWAN AREA
20 Power Source Philippines Inc. (PSPI), Liminangcong, Taytay
21 Sabang Renewable Energy Corp. (SREC), Brgy. Cabayugan, PPC
22 Power Source Philippines Inc. (PSPI), Brgys. Candawagan&Culasian
Page 2 of 3

VISAYAS AREA
23 Power Source Philippines Inc. (Malapascua, Cebu)
MINDANAO AREA
24 Power Source Philippines Inc. (Balut Island, Sarangani, Davao Occidental)

DISTRIBUTION UTILITY / ELECTRIC COOPERATIVE / LOCAL GOVERNMENT UNIT


Power Supply Agreement (PSA)

NORTH LUZON
1 Aurora Electric Cooperative, Inc. (AURELCO)
2 Batanes Electric Cooperative, Inc. (BATANELCO)
3 Isabela 2 Electric Cooperative, Inc. (ISELCO II)
4 Kalinga Apayao Electric Cooperative, Inc. (KAELCO)
5 LGU-Calayan, Cagayan
SOUTH LUZON
6 Albay Power & Energy Corporation (APEC) (formerly ALECO)
7 Batangas II Electric Cooperative, Inc. (BATELEC II) (Tingloy Is.)
8 Busuanga Island Electric Cooperative, Inc. (BISELCO)
9 Camarines Sur IV Electric Cooperative, Inc. (CASURECO IV)
10 Camarines Norte Electric Cooperative, Inc. (CANORECO)
11 First Catanduanes Electric Cooperative, Inc. (FICELCO)
12 Lubang Electric Cooperative, Inc. (LUBELCO)
13 Marinduque Electric Cooperative, Inc. (MARELCO)
14 Occidental Mindoro Electric Cooperative, Inc. (OMECO)
15 Oriental Mindoro Electric Cooperative, Inc. (ORMECO)
16 Palawan Electric Cooperative, Inc. (PALECO)
17 Quezon II Electric Cooperative, Inc. (QUEZELCO II)
18 Romblon Electric Cooperative, Inc. (ROMELCO)
19 Tablas Island Electric Cooperative, Inc. (TIELCO)
20 Ticao Island Electric Cooperative, Inc. (TISELCO)
21 LGU-Cawayan, Masbate
22 LGU-Claveria, Masbate
23 LGU-Placer, Masbate
24 LGU-San Pascual
VISAYAS
25 Antique Electric Cooperative, Inc. (ANTECO)
26 Bantayan Electric Cooperative, Inc. (BANELCO)
27 Bohol I Electric Cooperative, Inc. (BOHECO I)
28 Bohol II Electric Cooperative, Inc. (BOHECO II)
29 Iloilo Electric Cooperative, Inc. (ILECO III)
30 Northern Samar Electric Cooperative, Inc. (NORSAMELCO)
31 Samar I Electric Cooperative, Inc. (SAMELCO I)
32 Samar II Electric Cooperative, Inc. (SAMELCO II)
33 Southern Leyte Electric Cooperative, Inc. (SOLECO)
34 Maripipi Multi-Purpose Cooperative (MMPC)
35 Eastern Samar Electric Cooperative, Inc. (ESAMELCO)
Page 3 of 3

MINDANAO
36 Basilan Electric Cooperative, Inc. (BASELCO)
37 Cagayan de Sulu (CASELCO)
38 Davao del Norte Electric Cooperative, Inc. (DANECO)
39 Dinagat Island Electric Cooperative, Inc. (DIELCO)
40 Siasi Electric Cooperative, Inc. (SIASELCO)
41 Sultan Kudarat Electric Cooperative, Inc. (SUKELCO )
42 Sulu Electric Cooperative, Inc. (SULECO)
43 Surigao del Norte Electric Cooperative, Inc. (SURNECO)
44 Tawi-Tawi Electric Cooperative, Inc. (TAWELCO)
45 Zamboanga City Electric Cooperative, Inc. (ZAMCELCO)

EC/DU/LGU SUMMARY NPP/QTP SUMMARY:

DUs LGUs NPP 18


NLR 4 1 QTP 06
SLR 15 4 TOTAL 24
VIS 11 0
MIN 10 0
TOTAL 40 5

Note:
1. Inclusion of ORMECO while waiting for the commercial operation of Rental Genset for
the provision of emergency power supply to the province.
2. Removal of DASURECO, due to successful commercial operation of QTP (PSPI) in Balut
area on 8 June 2022.

Reviewed and Approved by:

for
M. A. P. VERSOZA
Manager, RMD
Annex 4

NATIONAL POWER CORPORATION


Small Power Utilities Group
Plant Statistics as of 25 May 2022 (EPIRA Report)

ITEM DESCRIPTION NUMBER REMARKS


1
NPC-SPUG Plants 281
No. of NPPs/QTPs2 23 operational
SPUG Total Rated Capacity, MW 225.449
3
SPUG Total Dependable Capacity, MW 174.148
served by SPUG plants and 69 kV T/L
No. of Household Connected to SPUG facilities4 868,954
only
No. of Municipalities 189
No. of Provinces 35
No. of Service Areas 229
No. of Distribution Utilities 47

Note:
1. All SPUG plants in areas taken over by NPPs are excluded from the count
2. Eco Market Solutions, Inc. (EMS), NPP of Casiguran, Aurora, not operational and
Catanduanes Power Generation, Inc. (CPGI), NPP of Catanduanes; contract terminated
on 17 November 2017; were excluded from the count.
3. Dependable Capacity of rented gensets is equal to the contracted capacity
4. Number of Housholds served by NPPs and QTPs are excluded from the count

NEW POWER PROVIDERS/QUALIFIED THIRD PARTY PROVINCE HOUSEHOLD SERVED


44,363 (based on NEA data as of
Renesons Energy Polillo, Inc. Polillo, Quezon
December 2020)
Palawan Power Generation Inc. (PPGI) Puerto Princesa, Palawan
Delta P (Extension) Puerto Princesa, Palawan
Included in S. Palawan T/L & S/S
DMCI Power Corporation (Irawan) & Puerto Princesa, Palawan &
DMCI Power Corporation (Aborlan) Aborlan, Palawan
22,319 (based on NEA data as of
Calamian Island Power Corporation Busuanga Island, Palawan
December 2020)
DMCI Power Corporation (Masbate) Masbate Included in Masbate T/L & S/S
Sun West Water & Electric Corporation (SUWECO)
Catanduanes Included in Catanduanes Grid
- Catanduanes
Power One Corporation Oriental Mindoro
Ormin Power, Inc. Oriental Mindoro Included in Or. Mindoro T/L & S/S
DMCI Power Corporation - Calapan Oriental Mindoro
Occidental Mindoro Consolidated Power
Occidental Mindoro Included in Occ. Mindoro T/L & S/S
Corporation (OMCPC)
Sun West Water & Electric Corporation - Tablas 46,876 (based on NEA data as of
Tablas Island, Romblon
Energy Corporation (STEC) December 2020)
Ormin Power - Inabasan Hydro Oriental Mindoro
Included in Or. Mindoro T/L & S/S
Philippine Hybrid Energy Systems, Inc. (PHESI) Oriental Mindoro
35,591(based on NEA data as of
Isla Norte Energy Corporation (INEC) Bantayan Island, Cebu
December 2020)
30,219 (based on NEA data as of
Siquijor Island Power Corporation (SIPCOR) Siquijor
December 2020)
Camotes Island Power Generation Corporation 26,075 (based on NEA data as of
Camotes and Pilar, Cebu
(CAMPCOR) December 2020)
13,597 (based on NEA data as of
Kaltimex Rural Electrification Corporation (KREC) Bongao Island, Tawi-Tawi
December 2020)
FP Island Energy Corporation (FPIEC) * Camarines Sur
Powersource Philippines, Inc. (PSPI), Liminangkong, Taytay,
Liminangcong * Palawan
Cabayugan, Puerto Princesa,
Sabang Renewable Energy Corporation (SREC) *
Palawan
Powersource Philippines, Inc. (PSPI), Candawagan Candawaga & Culasian, Rizal,
and Culasian * Palawan
Powersource Philippines, Inc. (PSPI), Malapascua
Malapascua Island, Cebu
*
* - Qualified Third Party
Annex 5
NATIONAL POWER CORPORATION
Power and Receivable Accounting Division, PRAD

MONTHLY SUMMARY OF MANDATED RATE REDUCTION


For the month of May 2022

May
ACTUAL
CUSTOMERS PAR
Amount
(Php)

LUZON
ALBAY POWER AND ELECTRIC CORPORATION 81,403.52
CAMARINES SUR IV MINI GRIDS 876.36
FIRST CATANDUANES ELECTRIC COOP., INC. 4,496.31
TICAO ISLAND ELECTRIC COOP., INC. 313,244.97
AURORA ELECTRIC COOP. INC. 149,096.10
BATANES ELECTRIC COOP. INC. 204,281.40
LGU - CALAYAN 24,237.33
ISABELA ELECTRIC COOP. INC. 25,515.90
KALINGA-APAYAO ELECTRIC COOP. INC. 25,300.50
MARINDUQUE ELECTRIC COOP. INC. 1,194,689.76
QUEZON II ELECTRIC COOP. INC. 77,910.45
BALATUBAT MINI GRID 6,791.49
MINABEL MINI GRID 2,684.70
BUSUANGA ELECTRIC COOP. INC. 81,506.70
PALAWAN ELECTRIC COOP. INC. 695,909.10
BATANGAS II ELECTRIC COOPERATIVE, INC. 61,794.60
LUBANG ELECTRIC COOP. INC. 116,151.00
ROMBLON ELECTRIC COOP. INC. 156,877.78
TABLAS ELECTRIC COOP. INC. 462,085.70
49,869.23
VISAYAS
MARIPIPI ELECTRIC COOPERATIVE 22,287.60
NORTHERN SAMAR ELECTRIC COOPERATIVE INC. 142,083.30
SAMAR I ELECTRIC COOPERATIVE, INC. 61,589.70
SAMAR II ELECTRIC COOPERATIVE 53,496.90
SOUTHERN LEYTE ELECTRIC COOPERATIVE 17,628.60
ALMAGRO MINI GRID 9,573.39
CATBALOGAN MINI GRID 7,928.79
STO NINO MINI GRID 18,318.24
ANTIQUE ELECTRIC COOPERATIVE, INC. 52,605.00
BANTAYAN ELECTRIC COOPERATIVE, INC. 22,579.47
BOHOL I ELECTRIC COOPERATIVE, INC.
ILOILO ELECTRIC COOPERATIVE, INC. 66,093.27
PANAY MINI GRID 6,400.44
NATIONAL POWER CORPORATION
Power and Receivable Accounting Division, PRAD

MONTHLY SUMMARY OF MANDATED RATE REDUCTION


For the month of May 2022

May
ACTUAL
CUSTOMERS PAR
Amount
(Php)
MINDANAO
DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. 36,489.30
DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. 27,020.10
DINAGAT ELECTRIC COOPERATIVE, INC. 413,443.80
SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. 594,538.80
SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC.
BASILAN ELECTRIC COOPERATIVE, INC. 921,455.97
CAGAYAN DE SULU ELECTRIC COOPERATIVE, INC. 57,454.98
SIASI ELECTRIC COOPERATIVE, INC. 102,805.20
SULU ELECTRIC COOPERATIVE, INC. 1,016,694.90
TAWI-TAWI ELECTRIC COOPERATIVE, INC. 276,983.70
ZAMBOANGA ELECTRIC COOPERATIVE, INC. 13,718.85
MANALIPA DPP 102.57
TIGTABON DPP 1,061.58
PANGAPUYAN DPP 290.91

TOTAL 7,677,368.26

Note: Based on power bill issued for the period April 26 to May 25, 2022
and May 26 to June 25, 2022
Annex 6

You might also like