Professional Documents
Culture Documents
I have information about your vacancy announcement and I would like to fulfill your
announced vacancy at Utility Operational Unit Head position.
I had worked in PT. Sayap Mas Utama (Wings Group) since March 2000 until April 2021. My
latest position was as Head of Corporate Electrical Engineering (November 2020 - April 2021).
Before, I was as a Head Corporate Project Corporate, Warehouse Maintenance, and Head of
Utility (June 2014 – October 2020). At this position, my responsibility was to coordinate my
engineering team (civil, mechanical, electrical) and user (sister companies) to build and
expand factories (Wings Group) including Warehouses (PT. Sayap Mas Utama) and also make
sure all Utilities or Facility (Power House, Boiler, Compressor, WWTP, WTP) running well
including maintenace.
I have a good managerial and leadership skill. With my educational background and
experiences, I believe I could be useful to your company. I gladly welcome the opportunity for
an interview at your convenience.
Best Regards,
Demak Sirait
From JobStreet.com
sihiong@yahoo.com
Demak Sirait Bekasi
Date of birth 05/07/1976
Head of Corporate Electrical Engineering
081315650819
Married (with child)
As Sub Dept Head of Engineering External (Electric Section), I lead Electrical External Project
Computer skills
for Plants and Warehouses (Power and Control/Instrument) and Warehouse's Maintenance
(Electrical) Microsoft Office
AutoCAD 2D
Head of Engineering External Project & Utility / PT. Sayap Mas Utama (Wings Group) Jakarta
From July 2014 to October 2020
As Engineering's Sub Dept Head (External Plant), my responsibility is to lead team of
engineering to build factories (Greenfield and Brownfield), New Depo (Warehouse),
As Engineering's Sub Dept Head (Head of Utility), my responsibility is to lead team of
Utility to support Production and Facility in PT. Sayap Mas Utama such as Power House,
Boiler (Steam), Compressor (Air), WWTP/WTP. I have to make sure all daily operational
running well including preparing Maintenance Schedule (Breakdown and Preventive)
Sr. Section Head of Electric Section (Power and Instrument/Control)) / PT. Sayap Mas Utama
(Wings Group) Jakarta
From February 2011 to June 2014
As Sr. Section Head of Electric Section, I lead Electrical External Project for Plants and
Warehouses (Power and Control/Instrument) and maintenance activities (Electrical) at PT.
SMU and Warehouses
Section Head of Electrical Section (Power) / PT. Sayap Mas Utama (Wings Group) Jakarta
From March 2007 to August 2011
As Section Head of Electric Section (Power), I lead Electrical External Project for Plants and
Warehouses (Power and Control/Instrument) and maintenance activities (Electrical Power) at
PT. SMU and Warehouses
Electrical Engineer (Sub Section) / PT. Sayap Mas Utama (Wings Group) Jakarta
From July 2003 to February 2007
As Electrical Engineer, my job is to assist Electrical Engineering Section Head preparing all
jobs for projects (document, designing, drawing, budgeting, scheduling, supervising,
commissioning) and maintenance activities (Electrical Power) at PT. SMU and Warehouses
/
From JobStreet.com
Projects
FACTORIES :
PT. Sayap Mas Utama, Jakarta
PT. Prakarsa Alam Segar, Bekasi
PT. Bumi Alam Segar, Bekasi
PT. Aneka Mitra Gemilang, Bekasi
PT. Tirta Alam Segar, Cibitung
PT. Unipack Indisystem, Cibitung
PT. Siamindo, Cibitung
PT. Lestari Alam Segar, Medan
PT. Sriwijawa Alam Segar, Palembang
PT. Alas Pusaka Lestari, Palembang
PT. Mitra Alam Segar, Pasuruan
PT. Calbee Wingsfood, Karawang
PT. Glico Wings, Karawang
Eko Supreme Nigeria Limited, Nigeria
WAREHOUSES :
All PT. Sayap Mas Utama's Depo/Warehouse in West Java, Sumatera, and West Kalimantan
/
From JobStreet.com
DEMAK SIRAIT
PMB-AM-I-2121
From JobStreet.com
DEMAK SIRAIT
PMB-WB-II-2116
From JobStreet.com