1.WELL TESTING DATA SUMMARY
7. SEQUENCE OF EVENTS
Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.
dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 11:15 6/10/2022 15:15 4:00 128+128 98 119 80 109 N 116 98 62000
Type SRP
ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load
06-October-2022
2022/10/06 10:45 ESWT#1 arrived on location well no - S-770,
2022/10/06 10:47 Held safety meeting prior to rig up,
2022/10/06 10:49 Checked the well Existing conditions were:- WHP-140 psi and GC- 130 psi,
2022/10/06 10:51 Started to spot the equipment and commenced rig up,
2022/10/06 11:01 Completed rig up and started to perform the pressure test,
2022/10/06 11:06 Completed the pressure test for U/S and D/S @ 750 psig (OK),
2022/10/06 11:08 Diverted the flow through the choke manifold at fixed choke size (128+128)/64" and bypass Separator,
2022/10/06 11:10 Diverted the flow through the separator,
2022/10/06 11:15 Started Flow measurements,
2022/10/06 11:30 128+128 99 146 133 90 143 167 0.946 66.00 0.000 0.908 0 21.93 22 328 6000 66.3 494.51
2022/10/06 11:45 128+128 99 143 133 90 140 140 0.946 64.00 0.000 0.908 0 21.35 21 253 6000 64.3 393.08
2022/10/06 11:45 128+128 Lower down the orifice plate 0,250" into the gas 2" line,
2022/10/06 12:00 128+128 99 143 133 90 140 134 0.946 66.00 7.962 0.908 59 21.28 81 264 6000 66.3 398.06
2022/10/06 12:15 N/A N/A 128+128 99 141 131 91 138 128 0.946 64.00 9.658 0.908 76 21.02 97 230 6000 64.3 357.61
2022/10/06 12:30 128+128 99 140 130 90 137 136 0.946 64.00 8.469 0.908 62 20.84 83 244 6000 64.3 379.79
2022/10/06 12:45 128+128 99 140 130 90 137 142 0.946 62.00 8.684 0.908 61 20.87 82 234 6000 62.3 376.57
2022/10/06 13:00 128+128 99 138 128 91 136 135 0.946 64.00 9.109 0.908 67 20.57 88 244 6000 64.3 378.93
2022/10/06 13:15 N/A N/A 128+128 99 135 125 91 133 145 0.946 62.00 9.628 0.908 66 20.04 86 240 6000 62.3 385.13
2022/10/06 13:30 128+128 99 130 120 91 127 147 0.946 62.00 9.725 0.908 66 18.97 85 242 6000 62.3 389.45
2022/10/06 13:45 128+128 98 124 114 91 121 136 0.946 60.00 12.689 0.908 93 17.80 111 206 6000 60.2 341.70
2022/10/06 14:00 128+128 98 109 98 91 106 153 0.946 62.00 15.099 0.908 99 14.88 114 252 6000 62.2 404.47
2022/10/06 14:15 N/A N/A 128+128 98 92 82 91 89 140 0.946 60.00 14.853 0.908 106 11.53 118 212 6000 60.2 351.69
2022/10/06 14:30 128+128 98 85 76 92 83 146 0.946 62.00 8.797 0.908 60 10.32 71 239 6000 62.2 384.42
2022/10/06 14:45 128+128 98 90 81 91 88 148 0.946 60.00 6.686 0.908 45 11.34 57 224 6000 60.2 371.48
2022/10/06 15:00 128+128 98 96 87 92 94 154 0.946 62.00 6.780 0.908 44 12.49 57 253 6000 62.2 407.20
2022/10/06 15:15 N/A N/A 128+128 98 102 92 92 99 164 0.946 60.00 6.818 0.908 41 13.57 55 249 6000 60.2 412.95
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
06-October-2022
2022/10/06 11:30 15 5.2 98 5.17 66.00 1.76 0.988 60 0.946 60 0.946 1.000 1.000 1.74 166.8 1.74 18.1
2022/10/06 11:45 30 9.3 98 4.11 64.00 1.48 0.988 60 0.946 60 0.946 1.000 1.000 1.46 140.4 3.20 18.1
2022/10/06 12:00 45 13.4 98 4.16 66.00 1.42 0.988 60 0.946 60 0.946 1.000 1.000 1.40 134.3 4.60 18.1
2022/10/06 12:15 60 17.2 98 3.74 64.00 1.35 0.988 60 0.946 60 0.946 1.000 1.000 1.33 127.8 5.93 18.1
2022/10/06 12:30 75 21.2 97 3.97 64.00 1.43 0.989 60 0.946 60 0.946 1.000 1.000 1.41 135.7 7.34 18.1
2022/10/06 12:45 90 25.1 97 3.94 62.00 1.50 0.989 60 0.946 60 0.946 1.000 1.000 1.48 142.1 8.82 18.1
2022/10/06 13:00 105 29.1 97 3.96 64.00 1.43 0.989 60 0.946 60 0.946 1.000 1.000 1.41 135.4 10.23 18.1
2022/10/06 13:15 120 33.1 97 4.03 62.00 1.53 0.989 60 0.946 60 0.946 1.000 1.000 1.51 145.3 11.75 18.1
2022/10/06 13:30 135 37.2 97 4.07 62.00 1.55 0.989 60 0.946 60 0.946 1.000 1.000 1.53 147.0 13.28 18.1
2022/10/06 13:45 150 40.7 97 3.57 60.00 1.43 0.990 60 0.946 60 0.946 1.000 1.000 1.42 135.9 14.70 18.1
2022/10/06 14:00 165 45.0 97 4.23 62.00 1.61 0.991 60 0.946 60 0.946 1.000 1.000 1.59 152.9 16.29 18.1
2022/10/06 14:15 180 48.6 97 3.67 60.00 1.47 0.993 60 0.946 60 0.946 1.000 1.000 1.46 140.1 17.75 18.1
2022/10/06 14:30 195 52.7 98 4.01 62.00 1.53 0.994 60 0.946 60 0.946 1.000 1.000 1.52 145.5 19.26 18.1
2022/10/06 14:45 210 56.5 98 3.88 60.00 1.55 0.993 60 0.946 60 0.946 1.000 1.000 1.54 148.0 20.80 18.1
2022/10/06 15:00 225 60.8 98 4.25 62.00 1.62 0.993 60 0.946 60 0.946 1.000 1.000 1.60 154.0 22.41 18.1
2022/10/06 15:15 240 65.1 98 4.32 60.00 1.73 0.992 60 0.946 60 0.946 1.000 1.000 1.71 164.4 24.12 18.1
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
2022/10/06 11:30 15 90 158 0 0.00 0.250 0.908 12.71 1.0494 1.0000 0.9726 1.0284 13.339 0.000 0.000 62000 7.6
2022/10/06 11:45 30 90 155 0 0.00 0.250 0.908 12.71 1.0494 1.0000 0.9723 1.0278 13.327 0.000 0.000 62000 7.6
2022/10/06 12:00 45 90 154 4 24.90 0.250 0.908 12.71 1.0494 1.0003 0.9720 1.0276 13.324 7.962 0.083 62000 7.6
2022/10/06 12:15 60 91 153 6 30.21 0.250 0.908 12.71 1.0494 1.0005 0.9718 1.0273 13.320 9.658 0.184 62000 7.6
2022/10/06 12:30 75 90 152 5 26.48 0.250 0.908 12.71 1.0494 1.0004 0.9723 1.0273 13.325 8.469 0.272 62000 7.6
2022/10/06 12:45 90 90 152 5 27.16 0.250 0.908 12.71 1.0494 1.0004 0.9721 1.0272 13.322 8.684 0.362 62000 7.6
2022/10/06 13:00 105 91 151 5 28.50 0.250 0.908 12.71 1.0494 1.0004 0.9719 1.0269 13.315 9.109 0.457 62000 7.6
2022/10/06 13:15 120 91 148 6 30.15 0.250 0.908 12.71 1.0494 1.0005 0.9716 1.0264 13.305 9.628 0.557 62000 7.6
2022/10/06 13:30 135 91 142 7 30.48 0.250 0.908 12.71 1.0494 1.0006 0.9716 1.0253 13.292 9.725 0.659 62000 7.6
2022/10/06 13:45 150 91 136 12 39.81 0.250 0.908 12.71 1.0494 1.0011 0.9713 1.0242 13.281 12.689 0.791 62000 7.6
2022/10/06 14:00 165 91 121 19 47.46 0.250 0.908 12.71 1.0494 1.0019 0.9713 1.0215 13.257 15.099 0.948 62000 7.6
2022/10/06 14:15 180 91 104 21 46.79 0.250 0.908 12.71 1.0494 1.0025 0.9714 1.0185 13.227 14.853 1.103 62000 7.6
2022/10/06 14:30 195 92 98 8 27.80 0.250 0.908 12.71 1.0494 1.0010 0.9709 1.0174 13.185 8.797 1.195 62000 7.6
2022/10/06 14:45 210 91 103 4 21.10 0.250 0.908 12.71 1.0494 1.0005 0.9715 1.0183 13.200 6.686 1.264 62000 7.6
2022/10/06 15:00 225 92 109 4 21.41 0.250 0.908 12.71 1.0494 1.0005 0.9703 1.0192 13.194 6.780 1.335 62000 7.6
2022/10/06 15:15 240 92 114 4 21.50 0.250 0.908 12.71 1.0494 1.0004 0.9710 1.0203 13.216 6.818 1.406 62000 7.6
2022/10/06 15:15 End of test . Bypass separator .
2022/10/06 15:20 Started rig down surface lines.
2022/10/06 15:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
6-Oct-2022
Eastern United Petroleum Services
SEQUENCE OF EVENTS
GC Press (psi(g))
GOR (scf/bbl)
99 136 105 847 281 51
50 68 53 424 140 25
25 34 26 212 70 13
0 0 0 0 0 0
11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00
October 06 2022 (Thursday)