PROCUREMENT OF WORKS
(International Competitive Bidding)
(Package No. MAHSR–C–8)
Employer
NATIONAL HIGH SPEED RAIL CORPORATION LIMITED
2nd Floor, Asia Bhawan,
Road No. 205, Sector-9, Dwarka,
New Delhi – 110077, India.
Tel: +91-11-28070000
Fax: +91-11-28070250
OCTOBER 2020
BIDDING DOCUMENT
FOR
PROCUREMENT OF WORKS
(International Competitive Bidding)
Design and Construction of Civil and Building Works for the Depot on De-
sign Build Lump Sum Price Basis for Double Line High Speed Railway in-
volving works for Site Formation, Abutment, Retaining Walls, Roadbed for
track, Box Culvert, Roads, Cable Duct, Foundations of OHE Masts, Piping,
Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping,
Boundary Wall, General Inspection Train Shed, Maintenance Depot and
other Associated works At Sabarmati between MAHSR Km. 507.599 and
MAHSR Km. 509.726 in the State of Gujarat
for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail
Date: 22.10.2020
Loan Agreement No: ID-P277 & ID-P279
IFB No: MAHSR-C-8
Design and Construction of Civil and Building Works for the Depot on
Design Build Lump Sum Price Basis for Double Line High Speed Railway
involving works for Site Formation, Abutment, Retaining Walls, Roadbed
for track, Box Culvert, Roads, Cable Duct, Foundations of OHE Masts,
Piping, Drainage, Water Supply, Water Harvesting, Fire Fighting,
Landscaping, Boundary Wall, General Inspection Train Shed,
Maintenance Depot and other Associated works At Sabarmati between
MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat
for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail
1) The Government of India has received a loan from the Japan International Cooperation
Agency (JICA) towards the cost of the Project for Construction of Mumbai – Ahmeda-
bad High Speed Rail. It is intended that part of the proceeds of this loan will be applied
to eligible payments under this Contract for the works as described in the title.
2) The Government of India through National High Speed Rail Corporation Limited
(NHSRCL) (herein after referred to as Employer) now invites online Bids from eligible
Bidders for the construction and completion of the Works as described in the title.
International Competitive Bidding will be conducted in accordance with JICA’s Single
Stage (“Two Envelope”) Bidding Procedure.
3) Bidding will be conducted through procedures in accordance with the applicable Guide-
Page 1 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
lines for Procurement under Japanese ODA Loans and is open to all Bidders from eli-
gible source countries, as mentioned in Section-V Eligible Source Countries of Japa-
nese ODA Loans.
4) Interested eligible Bidders may obtain further information from and inspect the Bidding
Documents at the office of:
Managing Director
National High-Speed Rail Corporation Limited (NHSRCL)
2nd Floor, Asia Bhawan
Road No.205, Sector-9, Dwarka
New Delhi – 110077, India.
Tel: +91-11-28070000
Fax: +91-11-28070250
E-mail: c8packagetender@nhsrcl.in
5) A complete set of Bidding Documents, shall be available for downloading from e-
procurement portal of NIC https://etenders.gov.in/eprocure/app from 23.10.2020
(09:00 Hrs) to 17.02.2021 (up to 15:00 Hrs) IST upon payment of a non-refundable fee
of INR 236,000.00 (Indian Rupee Two Hundred and Thirty-Six Thousand only)
including GST towards cost of Bidding Documents in the form of online remittance/
RTGS/NEFT/IMPS and uploading of Non-Disclosure Agreement (NDA) duly filled as
per format Appendix to IFB. Interested Bidders, upon payment of Cost of Bidding
Documents, shall be required to upload the NDA duly filled in the e-procurement portal
and send an email to the Employer at email address mentioned in para 4) above along
with necessary details (i.e. name and address of the Bidder, email id and copy of proof
of payment of cost of Bidding Document), atleast 2 working days in advance of deadline
for submission of Bids. Upon verification of receipt of cost of Bidding Document and
NDA, Employer will approve or reject the Bidder to download the Bidding Document
from e-procurement portal of NIC https://etenders.gov.in/eprocure/app. IFB No. i.e.
MAHSR-C-8 must be entered in remarks at the time of online transaction of payment,
failing which payment may not be considered. NHSRCL account details for online
remittance are given below:
Account Name - National High Speed Rail Corporation Limited,
Bank - HDFC Bank Limited, 209-214, Kailash Building, 26, Kasturba Gandhi Marg,
New Delhi-110001
Account No - 57500000079852
Page 2 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
6) The provisions in the Instructions to Bidders and in the General Conditions of Contract
are the provisions of the Standard Bidding Documents under Japanese ODA Loans for
the Procurement of Electrical and Mechanical Plant and for Building and Engineering
Works, Designed by the Contractor, by Japan International Cooperation Agency (JICA),
July 2015 Trial Version and FIDIC Conditions of Contract for Plant and Design Build,
First Edition 1999, respectively.
7) Bids must be submitted online only on e-procurement portal https://etend-
ers.gov.in/eprocure/app from 12.02.2021 (09:00 Hrs.) upto deadline for submission of
bids i.e. 18.02.2021 (15:00 hrs). Bid through any other mode shall not be entertained.
However, Bid Security of INR64,000,000 (Indian Rupee Sixty-Four Million only) in
original shall be submitted physically by the Bidder on or before deadline for submis-
sion of Bids. The Instructions for Online Bid Submission are annexed herein.
8) To participate in the e-bidding process, it is mandatory for the Bidder to register their
firm with e-procurement portal https://etenders.gov.in/eprocure/app to have a user ID
and password and the Bidder should be in possession of Class III Digital Signature
Certificate (DSC) in the name of the person duly authorized to sign and submit the Bid
on behalf of the Bidder from any Certifying Authority recognized by CCA India, with
their profile.
9) Only the Technical Bid will be opened online at e-procurement portal https://etend-
ers.gov.in/eprocure/app at 15:30 hrs on 19.02.2021.
10) Interested eligible Bidders, who purchased the Bidding Documents beforehand, are in-
vited to attend a Pre-bid meeting to be held on 23.11.2020 at 1100 hrs. The Pre-bid
meeting will be held through Video Conference (VC).
The Bidders who wish to join the VC shall be required to send a request email (along
with necessary details such as name and address of the bidder, name, designation &
email id of the person(s) who shall attend the meeting), at email mentioned at para 4)
above, atleast 2 working days in advance of the date of pre-bid meeting. Employer shall
send the link for VC. Employer reserves the right to restrict the number of links per
Bidder based on the total requests received. Employer reserves the right to reject any
request received after the deadline of such requests stated above.
Participation in this Pre-Bid Meeting is not mandatory.
Page 3 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
11) Courts in Delhi alone shall have the jurisdiction to entertain any application or other
proceedings in accordance with Laws in India, in respect of anything arising under this
bid.
S/d
Managing Director
National High Speed Rail Corporation Limited (NHSRCL)
2nd Floor, Asia Bhawan
Road No.205, Sector-9, Dwarka
New Delhi – 110077, India
Page 4 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
APPENDIX TO IFB
AGREEMENT ON NON-DISCLOSURE
OBLIGATION
1.0 PURPOSE
The purpose of this Agreement of “Non-Disclosure Obligation” is for the Invitee to be able
to properly manage and maintain the confidentiality of the information provided or disclosed
by the NHSRCL for Mumbai-Ahmedabad High Speed Railway Corridor (hereinafter re-
ferred to as “the Projects”).
2.0 DEFINITIONS
The following terms as used in this Agreement are defined as follows:
(a) that is, at the time of its disclosure, possessed by the Invitee without owing any
confidentiality obligation;
Page 5 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
(e) that is disclosed by the NHSRCL to a third party without imposing any confi-
dentiality obligation thereon; or
(f) that subsequently becomes publicly known for a reason other than that attributa-
ble, directly or indirectly, to the Invitee after its disclosure.
3.0 CONFIDENTIALITY
3.1 The Invitee shall be obligated to keep the Confidential Information in confidence
with the care of a good manager and shall not disclose or divulge the Confidential
Information to any third party without the prior written consent of the NHSRCL.
Upon the discovery of any breach of this Agreement or the improper disclosure or
misuse of the Confidential Information, the Invitee shall notify the NHSRCL and
shall take all necessary actions to prevent any further breach, improper disclosure or
misuse, including by causing the persons to whom the Invitee disclosed the Confi-
dential Information to agree and adhere to non-disclosure terms similar to those set
forth in this Agreement.
3.2 Notwithstanding Section 3.1 above, the Invitee may disclose the Confidential Infor-
mation: (i) to the extent necessary, to (a) the Invitee’s officers and employees (here-
inafter collectively referred to as the “Employees”) who need to know such Confi-
dential Information for purposes of the Projects, (b) lawyers, advisors and other spe-
cialists owing confidentiality obligations under applicable laws, regulations or agree-
ments and who are engaged by the Invitee to render services in connection with the
Projects, (c) potential members participating in bids of the Projects and (ii) in ac-
cordance with applicable laws, rules and regulations, and any mandatory order by a
court with jurisdiction or other public agency with jurisdiction; provided, however,
that, if, and legally permitted to do so, the Invitee shall promptly notify the NHSRCL
and take reasonable steps to assist the NHSRCL in contesting such order or otherwise
in protecting the NHSRCL’s rights prior to disclosure, to minimize the Confidential
Page 6 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
The Parties have expressly understood and agreed that all rights, including but not
limited to those rights for property and intellectual property rights (including but not
limited to patent rights, design rights, copyrights, trade secret rights and all other
intellectual and industrial property rights of any sort throughout the world, the same
shall apply hereinafter), regarding the Confidential Information or any other infor-
mation mutually shared among the Parties will remain the exclusive property rights of
the respective property rights holder.
5.0 NO WARRANTS
The Invitee has expressly understood and agreed that neither NHSRCL nor the In-
vitee have any obligation under or by virtue of this Agreement to enter into furnish-
ing, trading, development, or technology licensing agreement, or any other agreement,
from or to the Invitee any products, services, or any technologies.
In the event that sample products or technology including the Confidential Infor-
mation is exported to India or any other country or provided to a resident in country
by the Invitee, the Parties hereby confirm and agree on the need to adhere to the laws
and regulations of such and other countries and perform any necessary procedures,
including obtaining export permits.
Page 7 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
7.0 DAMAGES
Each Party agrees to indemnify, save and hold harmless the other Parties from and
against any and all losses, liabilities, expenses (including, legal fees and costs), claims,
liens, damages or the like (limited to common direct damages actually incurred) in-
curred by the other Parties as a result of any breach of any provision of this Agreement.
This Agreement shall be governed by and construed in accordance with the laws of
the Republic of India.
9.0 JURISDICTION
The Parties will submit any disputes arising from or in connection with this Agree-
ment that cannot be solved by good faith consultation among the Parties to the ex-
clusive jurisdiction of Courts of Delhi for the court of first instance.
10.0 TERM
(1) The effective term of this Agreement shall run for a six (6) year period from the
date hereof, and thereafter automatically extended for successive period of one (1)
year each, unless each Party shall have otherwise notified to the other Parties in
writing at least one (1) month prior to the expiry of this Agreement or any exten-
sion thereof.
10.1 Notwithstanding the above, the obligations of the Invitee in relation to the Confidential
Information shall survive after the termination of this Agreement.
10.2 Upon the termination of this Agreement, or at any time prior thereto upon the written
request of the NHSRCL, the Invitee shall cease all use of and shall promptly return to
the NHSRCL (at the expense of the Invitee), or shall promptly destroy in accordance
with the reasonable instructions of the NHSRCL, all of the Confidential Information
it received that is in tangible or electronic/digital form (including but not limited to
originals, all summaries, copies and excerpts). In the event of its destroying, the In-
vitee shall destroy such Confidential Information by the way of non-reusable.
11.0 MISCELLANEOUS
11.1 This Agreement is the entire agreement between the Parties as to the subject matter
Page 8 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
hereof and supersedes any and all previous agreements, whether oral or written, as to
its subject matter. It may be modified only by the written agreement of the Parties.
11.2 Any information disclosed to the Invitee by the NHSRCL before execution of this
Agreement shall be treated subject to this Agreement.
11.3 If any provision of this Agreement shall be invalid or unenforceable, such invalidity
or unenforceability shall not render the entire agreement invalid. Rather, this Agree-
ment shall be construed as if not containing the particular invalid or unenforceable
provision, and the right and obligations of each Party shall be construed and enforced
accordingly.
11.4 No failure or delay by each Party in exercising any right, power or privilege hereunder
shall operate as a waiver thereof nor shall any single or partial exercise thereof pre-
clude any other or further exercises of any rights, powers or privileges hereunder.
11.5 This Agreement constitutes a non-disclosure agreement only and shall not be construed
as a teaming, joint venture or other such arrangement. Nothing in this Agreement shall
grant to any Party the right to make commitments of any kind for or on behalf of the
other Parties without the prior written consent of the other Parties.
Page 9 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
1) Bidders are required to enroll on the above mentioned e-Procurement portal by clicking on
the link “Online bidder Enrollment” on the Portal which is free of charge.
2) As part of the enrolment process, the bidders will be required to choose a unique username
and assign a password for their accounts.
3) Bidders are advised to register their valid email address and mobile numbers as part of the
registration process. These would be used for any communication from the e-procurement
Portal.
4) Upon enrolment, the bidders will be required to register their valid Digital Signature
Certificate (Class III Certificates with signing key usage) issued by any Certifying Authority
recognized by CCA India (e.g. Sify / nCode / eMudhra etc.), with their profile. For foreign
bidders, the Digital Signature Certificate (DSC) is issued by eMudhra (https://www.e-
mudhra.com/foreign-dsc.html).
5) Only one valid DSC should be registered by a Bidder. Please note that the bidders are
responsible to ensure that they do not lend their DSC’s to others which may lead to misuse.
6) Bidder then logs in to the site through the secured log-in by entering their user ID / password
and the password of the DSC / e-Token.
1) There are various search options built in the e-Procurement Portal, to facilitate bidders to
search active bids by several parameters. These parameters could include Bid ID, Organization
Name, Location, Date, Value, etc. There is also an option of advanced search for bids, wherein
the bidders may combine a number of search parameters such as Organization Name, Form of
Page 10 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
Contract, Location, Date, Other keywords etc. to search for a bid published on the e-
procurement Portal.
2) Once the bidders have selected the tenders they are interested in, they may download the
required bidding documents after paying the cost of bidding document. These bids can be
moved to the respective ‘My Tenders’ folder. This would enable the e-procurement Portal to
intimate the bidders through SMS / e-mail in case there is any corrigendum issued to the
bidding document.
3) The bidder should make a note of the unique Bid ID assigned to each tender, in case they
want to obtain any clarification / help from the Helpdesk.
PREPARATION OF BIDS
1) Bidder should take into account any corrigendum published on the bidding document before
submitting their bids.
2) Please go through the tender advertisement and the bidding document carefully to
understand the documents required to be submitted as part of the bid. Please note the number
of covers in which the bid documents have to be submitted, the number of documents –
including the names and content of each of the document that need to be submitted. Any
deviations from these may lead to rejection of the bid.
3) Bidder, in advance, should get ready the bid documents to be submitted as indicated in the
bidding document / schedule and generally, they can be in PDF / XLS / RAR / DWF/JPG
formats. Bid documents may be scanned with 100 dpi with black and white option which helps
in reducing size of the scanned document.
4) To avoid the time and effort required in uploading the same set of standard documents which
are required to be submitted as a part of every bid, a provision of uploading such standard
documents (e.g. PAN card copy, GST certificate copy, annual reports, auditor certificates etc.)
has been provided to the bidders. Bidders can use “My Space” or ‘’Other Important
Documents’’ area available to them to upload such documents. These documents may be
directly submitted from the “My Space” area while submitting a bid, and need not be uploaded
again and again. This will lead to a reduction in the time required for bid submission process.
SUBMISSION OF BIDS
1) Bidder should log into the website well in advance for bid submission so that they can upload
the bid in time i.e. on or before the bid submission time. Bidder will be responsible for any
Page 11 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
2) The Bidder has to digitally sign and upload the required bid documents one by one as
indicated in the bidding document. The Digital signature (DSC) used for uploading of the bid
submission should be in the name of the person to whom the power of attorney (POA) have
been issued.
3) Bidder has to select the payment option as “offline” to pay the tender fee/ cost to bidding
document/ Bid Security as applicable and enter details of the instrument.
4) Bidder should prepare the Bid Security as per the instructions specified in the tender
document. The original should be posted/couriered/given in person to the concerned official,
latest by the last date of bid submission or as specified in the tender documents. The details of
the DD/any other accepted instrument, physically sent, should tally with the details available
in the scanned copy and the data entered during bid submission time. Otherwise the uploaded
bid will be rejected.
5) Bidders are requested to note that they should necessarily submit their Price Bids in the
format provided and no other format is acceptable. If the Price bid has been given as a standard
BOQ/Price Schedule format with the bidding document, then the same is to be downloaded
and to be filled by each Bidder. Bidders are required to download the BOQ/Price Schedule file,
open it and complete the coloured (unprotected) cells with their respective financial quotes and
other details (such as name of the Bidder). No other cells should be changed. Once the details
have been completed, the Bidder should save it and submit it online, without changing the
filename. If the BOQ/Price Schedule file is found to be modified by the Bidder, the bid shall
be rejected.
6) The server time (which is displayed on the bidders’ dashboard) will be considered as the
standard time for referencing the deadlines for submission of the bids by the bidders, opening
of bids etc. The bidders should follow this time during bid submission.
7) All the documents being submitted by the bidders would be encrypted using PKI encryption
techniques to ensure the secrecy of the data. The data entered cannot be viewed by unauthorized
persons until the time of bid opening. The confidentiality of the bids is maintained using the
secured Socket Layer 128 bit encryption technology. Data storage encryption of sensitive fields
is done. Any bid document that is uploaded to the server is subjected to symmetric encryption
using a system generated symmetric key. Further this key is subjected to asymmetric
encryption using buyers/bid openers public keys.
Page 12 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents
Package No. MAHSR – C-8 Invitation for Bids
8) The uploaded bid documents become readable only after the bid opening by the authorized
bid openers.
9) Upon the successful and timely submission of bids (i.e. after Clicking “Freeze Bid
Submission” in the portal), the portal will give a successful bid submission message & a bid
summary will be displayed with the bid no. and the date & time of submission of the bid with
all other relevant details.
10) The bid summary has to be printed and kept as an acknowledgement of the submission of
the bid. This acknowledgement may be used as an entry pass for any bid opening meetings.
ASSISTANCE TO BIDDERS
1) Any queries relating to the bidding document and the terms and conditions contained therein
should be submitted online on the CPP portal and addressed to the Bid Inviting Authority for
a tender or the relevant contact person indicated in the bidding documents.
2) Any queries relating to the process of online bid submission or queries relating to CPP Portal
in general may be directed to the 24x7 CPP Portal Helpdesk.
3) For any Technical queries related to Operation of the Central Public Procurement Portal
Contact at:
Tel: The 24 x 7 Help Desk Number 0120-4200 462, 0120-4001 002/5, 0120-6277 787.
Mobile: 87008 97687
E-Mail: support-eproc@nic.in
Page 13 of 13
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section I, II, III, IV and V
BIDDING DOCUMENTS
FOR
PROCUREMENT OF WORKS
(International Competitive Bidding)
(Package No. MAHSR-C-8)
Design and Construction of Civil and Building Works for the Depot on
Design Build Lump Sum Price Basis for Double Line High Speed
Railway involving works for Site Formation, Abutment, Retaining
Walls, Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations
of OHE Masts, Piping, Drainage, Water Supply, Water Harvesting, Fire
Fighting, Landscaping, Boundary Wall, General Inspection Train Shed,
Maintenance Depot and other Associated works At Sabarmati between
MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat
for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail
BIDDING DOCUMENTS
PART 1 – BIDDING PROCEDURES
Table of Contents
Page 2 of 2
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section I. Instructions to Bidders
The Instructions to Bidders governing this bidding process are the “Instructions to Bidders
included in Option A, Single-Stage Two-Envelope Bidding, Section I,” of the Standard
Bidding Documents under Japanese ODA Loans, Procurement of Electrical and Mechanical
Plant, and For Building and Engineering Works, Designed by the Contractor (Trial Version)
published by JICA in July 2015. Those Instructions to Bidders are available on the JICA’s web
site shown below.
https://www.jica.go.jp/english/our_work/types_of_assistance/oda_loans/oda_op_info/guide/t
ender/index.html
Page 1 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
ITB 1 Replace the title of the clause as “Scope of Bid and Instructions for Online Bid
Submission”
ITB 1.1 The number of the Invitation for Bids is: Package No. MAHSR-C-8
ITB 1.1 The Employer is: National High Speed Rail Corporation Limited (NHSRCL)
ITB 1.1 The name, identification and number of the lot(s) (contract(s)) comprising this
ICB are:
The Name of the Contract is: “Design and Construction of Civil and Building
Works for the Depot on Design Build Lump Sum Price Basis for Double Line
High Speed Railway involving works for Site Formation, Abutment, Retaining
Walls, Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations of OHE
Masts, Piping, Drainage, Water Supply, Water Harvesting, Fire Fighting, Land-
scaping, Boundary Wall, General Inspection Train Shed, Maintenance Depot and
other Associated works At Sabarmati between MAHSR Km. 507.599 and
MAHSR Km. 509.726 in the State of Gujarat for the Project for Construction of
Mumbai-Ahmedabad High Speed Rail”.
The identification Number of the Contract is: Package No. MAHSR- C-8.
The number of the lot(s) is: One.
ITB 1.2 Add new paragraph after last paragraph of ITB 1.2 with the following:
(d) “Joint Venture” shall be replaced with “Joint Venture or Consortium”.
(e) “JV” shall be replaced with “JV/Consortium”.
(f) Financial Bid and Price Bid are synonymous where ever mentioned in the
Bidding Documents
Page 2 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
The Bidders are required to submit soft copies of their bids electronically on the
e-procurement portal of NIC (CPP Portal) https://etenders.gov.in/eprocure/app,
using valid Digital Signature Certificates. The instructions given below are meant
to assist the bidders in registering on the CPP Portal, prepare their bids in
accordance with the requirements and submitting their bids online on the CPP
Portal.
More information useful for submitting online bids on the Portal may be obtained
on the same portal of NIC i.e. https://etenders.gov.in/eprocure/app.
REGISTRATION
1) Bidders are required to enroll on the above mentioned e-Procurement portal
by clicking on the link “Online bidder Enrollment” on the Portal which is free
of charge.
2) As part of the enrolment process, the bidders will be required to choose a
unique username and assign a password for their accounts.
3) Bidders are advised to register their valid email address and mobile numbers
as part of the registration process. These would be used for any communication
from the e-procurement Portal.
4) Upon enrolment, the bidders will be required to register their valid Digital
Signature Certificate (Class III Certificates with signing key usage) issued by any
Certifying Authority recognized by CCA India (e.g. Sify / nCode / eMudhra etc.),
with their profile. For foreign bidders, the Digital Signature Certificate (DSC) is
issued by eMudhra (https://www.e-mudhra.com/foreign-dsc.html).
5) Only one valid DSC should be registered by a Bidder. Please note that the
bidders are responsible to ensure that they do not lend their DSC’s to others which
may lead to misuse.
6) Bidder then logs in to the site through the secured log-in by entering their user
ID / password and the password of the DSC / e-Token.
Page 3 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
3) The bidder should make a note of the unique Bid ID assigned to each tender,
in case they want to obtain any clarification / help from the Helpdesk.
PREPARATION OF BIDS
1) Bidder should take into account any corrigendum published on the bidding
document before submitting their bids.
2) Please go through the tender advertisement and the bidding document carefully
to understand the documents required to be submitted as part of the bid. Please
note the number of covers in which the bid documents have to be submitted, the
number of documents – including the names and content of each of the document
that need to be submitted. Any deviations from these may lead to rejection of the
bid.
3) Bidder, in advance, should get ready the bid documents to be submitted as
indicated in the bidding document / schedule and generally, they can be in PDF /
XLS / RAR / DWF/JPG formats. Bid documents may be scanned with 100 dpi
with black and white option which helps in reducing size of the scanned
document.
4) To avoid the time and effort required in uploading the same set of standard
documents which are required to be submitted as a part of every bid, a provision
of uploading such standard documents (e.g. PAN card copy, GST certificate
copy, annual reports, auditor certificates etc.) has been provided to the bidders.
Bidders can use “My Space” or ‘’Other Important Documents’’ area available to
them to upload such documents. These documents may be directly submitted
from the “My Space” area while submitting a bid, and need not be uploaded again
and again. This will lead to a reduction in the time required for bid submission
process.
SUBMISSION OF BIDS
1) Bidder should log into the website well in advance for bid submission so that
they can upload the bid in time i.e. on or before the bid submission time. Bidder
will be responsible for any delay due to other issues.
2) The Bidder has to digitally sign and upload the required bid documents one by
one as indicated in the bidding document. The Digital signature (DSC) used for
uploading of the bid submission should be in the name of the person to whom the
power of attorney (POA) have been issued.
3) Bidder has to select the payment option as “offline” to pay the tender fee/ cost
to bidding document/ Bid Security as applicable and enter details of the
instrument.
4) Bidder should prepare the Bid Security as per the instructions specified in the
tender document. The original should be posted/couriered/given in person to the
concerned official, latest by the last date of bid submission or as specified in the
tender documents. The details of the DD/any other accepted instrument,
physically sent, should tally with the details available in the scanned copy and
the data entered during bid submission time. Otherwise the uploaded bid will be
rejected.
5) Bidders are requested to note that they should necessarily submit their Price
Bids in the format provided and no other format is acceptable. If the Price bid has
Page 4 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
been given as a standard BOQ/Price Schedule format with the bidding document,
then the same is to be downloaded and to be filled by each Bidder. Bidders are
required to download the BOQ/Price Schedule file, open it and complete the
coloured (unprotected) cells with their respective financial quotes and other
details (such as name of the Bidder). No other cells should be changed. Once the
details have been completed, the Bidder should save it and submit it online,
without changing the filename. If the BOQ/Price Schedule file is found to be
modified by the Bidder, the bid shall be rejected.
6) The server time (which is displayed on the bidders’ dashboard) will be
considered as the standard time for referencing the deadlines for submission of
the bids by the bidders, opening of bids etc. The bidders should follow this time
during bid submission.
7) All the documents being submitted by the bidders would be encrypted using
PKI encryption techniques to ensure the secrecy of the data. The data entered
cannot be viewed by unauthorized persons until the time of bid opening. The
confidentiality of the bids is maintained using the secured Socket Layer 128 bit
encryption technology. Data storage encryption of sensitive fields is done. Any
bid document that is uploaded to the server is subjected to symmetric encryption
using a system generated symmetric key. Further this key is subjected to
asymmetric encryption using buyers/bid openers public keys.
8) The uploaded bid documents become readable only after the bid opening by
the authorized bid openers.
9) Upon the successful and timely submission of bids (i.e. after Clicking “Freeze
Bid Submission” in the portal), the portal will give a successful bid submission
message & a bid summary will be displayed with the bid no. and the date & time
of submission of the bid with all other relevant details.
10) The bid summary has to be printed and kept as an acknowledgement of the
submission of the bid. This acknowledgement may be used as an entry pass for
any bid opening meetings.
ASSISTANCE TO BIDDERS
1) Any queries relating to the bidding document and the terms and conditions
contained therein should be submitted online on the CPP portal and addressed to
the Bid Inviting Authority for a tender or the relevant contact person indicated in
the bidding documents.
2) Any queries relating to the process of online bid submission or queries relating
to CPP Portal in general may be directed to the 24x7 CPP Portal Helpdesk.
3) For any Technical queries related to Operation of the Central Public
Procurement Portal Contact at:
Tel: The 24 x 7 Help Desk Number 0120-4200 462, 0120-4001 002/5, 0120-6277 787.
E-Mail: support-eproc@nic.in
International bidders are requested to prefix +91 as country code.
Page 5 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
ITB 2.1 The number of the Loan Agreements are: ID-P277 and ID-P279
The amount of the Japanese ODA Loan: JPY89,547,000,000 and
JPY150,000,000,000.
The signed dates of the Loan Agreements are: 28 September 2018 and 29 October
2018.
ITB 2.1 The name of the Project is: Project for Construction of Mumbai-Ahmedabad High
Speed Rail.
ITB 2.2 The applicable Guidelines for Procurement under Japanese ODA Loans are those
published in April 2012.
ITB 3.1(c) A list of debarred firms and individuals is available at the World Bank’s
website: www.worldbank.org/debarr.
ITB 3.2 Replace the words "of the General Conditions” with “of the General Conditions
and the Particular Conditions”.
Page 6 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
In the case of the combination, all members of the JV/Consortium shall be jointly
and severally liable for the execution of the Contract in accordance with the
Contract terms.
The JV/Consortium, shall nominate one Member entity as “Lead Member” who
will represent all the members in discharging their obligations. Accordingly, the
JV/Consortium shall nominate one person as “Representative” from the Lead
Member who shall have the authority to conduct all business for and on behalf of
any and all members of the JV/Consortium during the Bidding process and, in
the event that the JV/Consortium is awarded the Contract, during the Contract
execution.
Page 7 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
Page 8 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
The Bid shall comprise two parts submitted simultaneously, one called the
Technical Bid containing the documents listed in ITB 11.2 and the other the Price
Bid containing the documents listed in ITB 11.3.
ITB 11.2 (b) Replace ITB 11.2 (b) with the following:
Page 9 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
For those inputs to the Works that the Bidder expects to supply from within the
Employer’s country, in Indian Rupee (INR), the name of the currency of the
Employer’s country (referred to as “the local currency”); and
For those inputs to the Works that the Bidder expects to supply from outside the
Employer’s country (referred to as “the foreign currency”), in Japanese Yen
(JPY), United States Dollar (USD) and/or European Euro (EUR).
ITB 20.1 The Bid validity period shall be one hundred and eighty (180) days.
ITB 20.3 (b) The fixed portion of the Bid Price shall be adjusted by the following factor: Not
Applicable.
ITB 21.1 INR64,000,000 (Indian Rupee Sixty Four Million only) The Bid Security
submitted in multiples in the name of JV/Consortium will also be acceptable.
ITB 21.2 Replace ITB 21.2 with the following: -
The Bid Security shall be a demand guarantee in any of the following forms at
the Bidder’s option:
(a) an unconditional guarantee issued by a bank;
Page 10 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
Page 11 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
Page 12 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
For submitting Bid Security in original as specified in ITB 23.2, the Employer’s
address is:
Attention : General Manager (Contract), National High Speed
Rail Corporation Limited
Street Address : Asia Bhawan, Road No.205, Sector-9, Dwarka
New Delhi, India
Floor/Room number : 2nd Floor/Room number: 201
City : New Delhi
Zip Code : 110077
Country : India
The deadline for online Bid submission on e-procurement portal (ITB 23.1) and
physical submission of Original Bid Security (ITB 23.2) is:
Date : 18.02.2021
Time : 15:00 Hrs.
ITB 25.1 Replace ITB 25.1 with the following:
Submission of Bids shall be closed on e-procurement portal at the date & time of
submission as prescribed in ITB 24.1 after which no bid can be uploaded. The
Employer shall not consider any bids after the deadline of bid submission.
The Employer shall not consider any Bid for which Original Bid Security arrives
after the deadline in accordance with ITB 24. Any Bid Security received by the
Employer after the deadline for submission of Bids shall not be considered and
returned unopened to the Bidder.
Page 13 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
Page 14 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
and time of the opening of Price Bids will be published after the technical
evaluation on e-procurement portal.
27.6 The Employer will also publish on the e-procurement portal, the names
of Bidders whose bid have not been found substantially responsive to the
requirements of the Bidding Document as a result of evaluation of
Technical Bid. The e-procurement portal will not open the Price Bids of
the technically non-responsive Bidders.
27.7 The Employer shall conduct the electronic opening of Price Bids on e-
procurement portal. The opening of the Price Bids and subsequent details
can be viewed by the Bidders by logging on the e-procurement portal.
E. Evaluation, and Comparison of Bids
ITB 29.1 Replace ITB 29.1 with the following:
The Bidder shall respond to the queries in writing to the Employer’s/ Bidder’s
address and also through email. If a Bidder does not provide clarifications of its
bid by the date and time set in the Employer’s request for clarification, their bid
shall be evaluated as per the available information in the submitted Bid.
ITB 37.1 The currency that shall be used for Bid evaluation and comparison purposes to
convert all Bid Prices expressed in various currencies into a single currency is to
be Indian Rupees (INR).
The exchange rate shall be the reference rate of the Reserve Bank of India (RBI).
Page 15 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section II. Bid Data Sheet
The date for the exchange rate shall be twenty-eight (28) days prior to the
deadline for submission of Bids.
ITB 43.3 Add the following new Sub-clause ITB 43.3 after ITB 43.2:
(New) If the JV/Consortium submitted a ‘Letter of Intent’ along with draft agreement
according to the BDS ITB 22.2 (b) and 11.2 (e), they shall submit a
JV/Consortium Agreement at the time of the signing of the Contract Agreement.
ITB 45 Add ITB 45
Jurisdiction Courts in Delhi alone shall have the jurisdiction to entertain any application or
of Courts other proceedings in accordance with Laws in India, in respect of anything arising
under this bid.
Page 16 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Table of contents
Page 17 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
A. General Provisions
A.1 Evaluation Sequence
a) Bids will be evaluated through the following five stages:
i) Stage 1 : Evaluation of Administrative Requirements
ii) Stage 2 : Evaluation of Compliance and Responsiveness
iii) Stage 3 : Evaluation of Compliance with the Qualification
Requirements
iv) Stage 4 : Technical Evaluation
v) Stage 5 : Financial Evaluation
A.2 Clarification of Bids
a) The Employer may request clarification of any Bid in accordance with the
provisions of the Bid Documents (Part 1, Section-I: Instructions to Bidders, Clause
29).
b) If clarification is required, the Employer will send written (courier/ e-mail with
PDF attachments) requests to the Authorised Representative for clarification,
specifying the deadline for receipt of reply.
c) Replies to the above requests shall be sent by the Bidder through courier/email
with PDF attachments and the same shall be solely to clarify and/or elaborate the
items already included in the submitted Bids for the purpose of evaluation.
A.3 Employer’s Rights
Further to the provisions of Instructions to Bidders, Clause 30 and 32, the Employer
reserves the right in accordance with the provision of the Bidding Documents (Part 1,
Section-I: Instructions to Bidders, Clause 33 and 34).
A.4 Bid Forms
a) Bidders should note that the information required to be inserted into the Bid Forms
shall be comprehensive and detailed. The technical information shall be furnished
in line with the requirements of Part 1, Part 2 and Part 3 of the Bidding Documents.
b) All Forms contained in the Bid Documents must be fully and properly completed
and all the forms must be returned, as they will be reviewed exactly as submitted
and errors or omissions may count against the Bidder.
c) Any Bidder who is found to have intentionally submitted false or inaccurate
statements/information shall be disqualified from the Bid process.
Page 18 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 19 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
2.1. General
a) The Stage 2 Evaluation will consist of checking the Bids to confirm whether they
are substantially responsive to the requirements of the Bidding Documents.
b) This stage of the evaluation shall be on a “Pass” or “Fail” basis. Each of the items
listed below will be checked and if any item is evaluated to “Fail” then the entire
Bid will be failed under this stage of the evaluation.
ii) Whether only One Bid Per Bidder has been submitted as per ITB 4.2(c);
iii) Whether all Bid Forms have not been altered and are correctly filled in
and signed as per ITB 12.1; and
All Bids that have passed this stage of the evaluation will proceed to the next stage.
Page 20 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 21 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Criteria
Wherever a Form in Section IV, Bidding Forms, requires a Bidder to state a monetary
amount, Bidders shall indicate the INR equivalent as indicated in the respective form
using the rate of exchange determined as follows:
i) For construction turnover or financial data required for each year - Exchange rate
prevailing on the last day of the respective year.
ii) Value of single contract - Exchange rate prevailing on the date of the Contract
Award.
Exchange rates shall be taken from reference rate of the Reserve Bank of India (RBI).
Any error in determining the exchange rates may be corrected by the Employer.
In the case where a Bidder is required to convert a monetary amount from a currency
other than for which the RBI reference rate is published, the INR equivalent shall be
worked out using the rate of exchange as published by the central bank of the country
issuing the said currency.
Page 22 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Nationality Nationality in accordance with Must meet N/A Must meet N/A Forms ELI-1
3.2(a)
(i) ITB 4.3 requirement requirement and ELI-2
Conflict of No conflicts of interest as Must meet N/A Must meet N/A Letter of Technical
3.2(a)
Interest described in ITB 4.2 requirement requirement Bid
(ii)
JICA Not having been declared Must meet N/A Must meet N/A Letter of Technical
3.2(a)
Ineligibility ineligible by JICA, as described requirement requirement Bid
(iii)
in ITB 4.4 Form ACK
Contract Non-Performance
History of Non-performance of a contract(i) Must meet N/A Must meet N/A Form CON
3.2(b)
Non- did not occur as a result of requirement (ii) requirement (ii)
(i)
Performing Contractor’s default since 1st
Contracts January 2019.
Page 23 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Pending All pending litigation against the Must meet N/A Must meet N/A Form CON
3.2(b)
(ii) Litigation Bidder shall in total not requirement(ii) requirement(ii)
represent more than hundred
percent (100%) of the Bidder’s
net worth and shall be treated as
resolved against the Bidder.
Litigation No consistent history of Must meet N/A Must meet N/A Form CON
3.2(b)
History court/arbitral award decisions requirement(ii) requirement(ii)
(iii)
against the Bidder (iii) since 1st
January 2016 up to 28 days prior
to the Bid Submission deadline.
Page 24 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 25 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
3.2(c) Financial Details in Form FIN-1 shall be Must meet N/A Must meet N/A Form FIN –1
(i) Performance provided in reference to the audited requirement requirement
balance sheets or, if not required by
the laws of the Bidder’s country,
other financial statements for the last
three (3) years and must demonstrate
the current soundness of the Bidder’s
financial position and indicate its
prospective long-term profitability.
As the minimum requirement, a
Bidder’s net worth is calculated as
the difference between total assets
and total liabilities and should be
positive in the last year and for at
least two (2) years during the last
three (3) years.
Page 26 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
3.2(c) Average Minimum average annual Must meet Must meet Must meet Must meet Form FIN – 2
(ii) Annual construction turnover of INR310 requirement requirement twenty five fifty percent
Construction Crores (INR 3,100 Million) percent (50%)
Turnover calculated as total certified payments (25%) of the
received for contracts in progress of the requirement
and/ or completed within the last requirement
three (3) years and divided by three
(3).
3.2(c) Bankruptcy/ The Bidder shall not have suffered Must meet N/A Must meet N/A Form FIN –3
(iii) Insolvency bankruptcy/insolvency during the last requirement requirement
and Debt three (3) years from the date of
Restructuring deadline of submission of this Bid,
and
1. The Bidder shall have neither
obtained debt restructuring in the
immediately preceding three (3) years
from the date of deadline of
Page 27 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 28 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 29 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
3.2(d) Experience
3.2(d) General Experience under construction Must meet N/A Must meet N/A Form EXP – 1
(i) Construction contracts in the role of prime requirement requirement
Experience Contractor (single entity or
JV/Consortium member), or
Subcontractor, or management
contractor (i) since 1st January
2016 up to Bid submission
deadline.
3.2(d) Specific A minimum similar(ii) work that Must meet Must meet N/A N/A Form EXP – 2
(ii) Construction has been satisfactorily and requirement requirement(v) (a)
(iii)
Experience substantially completed as a
prime contractor (single entity
or JV/Consortium member)(v)
between 1st January 2016 and
the Bid submission deadline.
Page 30 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
3.2(d) Construction [Not Applicable] [Not [Not [Not [Not [Not Applicable]
(iii) Experience in Applicable] Applicable] Applicable] Applicable]
Key Activities
Page 31 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
i) A management contractor is a firm that does not normally perform directly construction work associated with the contract. Rather, it manages
the work of other (sub) contractors while bearing full responsibility and risk for price, quality, and timely performance of the work contract.
ii) Similar work would mean a contract/contracts comprising the following activities:
a) Minimum 3,000 cubic meter (total) of reinforced cement concrete in one single contract; and
b) Minimum 500,000 cubic meter (total) of earth works in formation/embankment in railway/ metro rail/ state highway/ national highway/
expressway projects in one single contract.
iii) Substantial completion shall be based on 80% or more payment received under the contract.
iv) [Not Used]
v) For contracts under which the Bidder participated as a JV/Consortium member, only the Bidder’s share shall be counted to meet this
requirement.
vi) [Not Used]
vii) [Not Used]
Page 32 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
3.2(e) Financial (i) The Bidder shall demonstrate Must meet Must meet Must meet Must meet Form FIR – 1
Resources that it has access to, or has requirement requirement twenty-five forty
available, liquid assets, percent percent
unencumbered real assets, lines (25%) (40%)
of credit, and other financial of the of the
means (independent of any requirement requirement
contractual advance payment)
sufficient to meet the
construction cash flow
requirements estimated as
INR55 Cr (INR 550 Million) for
the subject contract(s) net of the
Bidder’s other commitments.
(ii) The Bidder shall also Must meet Must meet N/A N/A Form FIR – 1
demonstrate, to the satisfaction requirement requirement and Form FIR –
Page 33 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
All Bids that have passed this stage of the evaluation will proceed to the next stage.
Page 34 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
a) The Stage 4 Evaluation will consist of checking the technical aspects of the Bids
to confirm whether they substantially conform to the requirements of the Bidding
Documents.
b) This Stage shall be evaluated on an overall “Pass” or “Fail” basis. In order to
determine whether the Bid substantially conforms to the technical requirements
of the Bidding Documents, the technical proposal shall broadly cover the
following items:
Technical Proposal
5 Major Plant & Equipment
Form EQU
The Bidder’s preparedness along with technical capability will be judged by the
quality of the Technical Proposal submitted. It is expected that the Bidder visits the
site and is fully aware of all the work requirements under this Bid, and then prepares
the Technical Proposal. The Technical Proposal shall cover the following items with
the minimum requirements for “Pass”.
Organisation charts for project head office (each member in the case of a
JV/Consortium) and Site organisation, including relevant departments and personnel.
Page 35 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
The Bidder shall describe in the Method Statement the sequence of works in
accordance with the proposed Work Execution Programme and shall state how he
proposes to proceed with the Works. The Bidder shall describe his proposed method
of construction for following items of works-
1. Earthwork
2. RCC works
3. Pipe work
4. Road & Road bed
5. Sheds (GIT shed, Maintenance Car shed and Safety Confirmation Car shed)
6. Ground water recharge & Rainwater harvesting and Artificial recharge.
The indicative description shall include following-
(1) Design method of each item of works.
(2) Material and/or equipment, its supply and storage
(3) Temporary works
(4) Inspection & Testing
(5) Restoration of the Site
(6) Safety measures
(7) Quality Assurance and Quality Control
The Bidder shall specifically describe the following activities of the Works:
Arrangement of fill material by the Bidder (or the Contractor) i.e. supply of fill
material from the Bidder’s (or Contractor’s) borrow area(s) or from other sources.
The Bidder shall describe the details of his proposed borrow area(s) i.e. the location,
the ownership, method of excavation, method of selection of suitable fill material,
hauling method, haul routes and planned restoration of the borrow area after
completion. In case the Bidder proposes different arrangement than fill material from
his own borrow area(s), the Bidder shall describe the details of these arrangements.
The evaluation of the Work Execution Programme will be made by work breakdown,
logical sequence, activity relationship, construction duration with proposed sets of
equipment to meet specified Milestones, Sections (if any), Time for Completion on
Page 36 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Critical path.
The evaluation of the Key Personnel proposed by the Bidder in their Technical
Proposal in Bid Form PER-1 and Form PER-2 will be according to the following
evaluation sub-items:
Position Total Work Experience in
S. no.
Experience Similar
(years) Works (years)
Project Manager (to be Contractor’s 20 10*
1
Representative under Sub-Clause 4.3
of the General Conditions)
Design Manager 15 10*
2
3 Interface Manager 10 5*
MEP Engineer 10 5*
7
Note: Similar Works for the purpose of the experience shall be considered as
follows:
*Civil construction works.
**Experience in large scale pipe-line works or rainwater harvesting.
The Contractor shall ensure that during the execution of the Works the Key Personnel
deployed shall continue to meet the experience criteria as mentioned above.
Page 37 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
1 4 nos.
Excavator of required capacity
2 15 nos.
Dumper
Note: The Bidder shall provide further details of proposed items of equipment using
Form EQU in Section IV, Bidding Forms.
a) All Bids which have passed this Stage of the Evaluation will proceed to the
next Stage.
b) Any Bid that is evaluated to “Fail”, as determined above, will be considered
as substantially not conforming to the requirements of the Bidding
Documents and will be rejected at this Stage and will not be subjected to any
further evaluation.
5.1. General
i) Whether the Letter of Price Bid is compliant (i.e., does not include any
alteration to the basic terms and does not constitute an alternative offer).
ii) Whether all Forms and Price Schedules have not been altered and are
correctly completed and signed.
a) After passing the above requirements, the Bid will then proceed for Price Bid
Page 38 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section III. Evaluation and Qualification Criteria
Page 39 of 39
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 1 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 2 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Date: ………………………
Loan Agreement No.: ID-P277 & ID-P279
IFB No: Package No. MAHSR-C-8
To:
Managing Director
National High Speed Rail Corporation Limited
2nd Floor, Asia Bhawan, Road No. 205
Sector-9, Dwarka,
New Delhi – 110077, India
Page 3 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
We hereby certify that we have taken steps to ensure that no person acting for us or on
our behalf will engage in any type of fraud and corruption; and
In case incorrect, fabricated or suppressed information is noticed after the award of the
Contract, then NHSRCL reserves the right to terminate the Contract and to take action in
accordance with the Contract.
Name of the person duly authorized to sign the Bid on behalf of the Bidder** [insert complete
name of person duly authorized to sign the Bid].
Title of the person signing the Bid [insert complete title of the person signing the Bid].
Signature of the person named above [insert signature of person whose name and capacity are
shown above].
Date signed [insert date of signing] day of [insert month], [insert year].
* In the case of the Bid submitted by JV/Consortium specify the name of the
JV/Consortium as Bidder.
** Person signing the Bid shall have the power of attorney given by the Bidder to be
attached with the Bid.
Page 4 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
in MS Excel format
Page 5 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
SCHEDULES
in MS Excel format
Page 6 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
PRICE SCHEDULES
in MS Excel format
Page 7 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Technical Proposal
Page 8 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
The Bidder shall propose and include his proposed site organization in the bid. The
Site Organization shall indicate and include the followings:
(1) Organization Chart of the project with the name of key personnel and
description of designated duties and responsibilities of every key personnel.
(2) Organization Chart of the Head Office with the name of key personnel and
description of designated duties and responsibilities of every key personnel. In
case of the joint venture, Organization Chart of the Head Office of all members
of the joint venture with the name of key personnel and description of designated
duties and responsibilities of every key personnel.
(3) Mobilization and demobilization program of key personnel in the form of bar
chart in corporation with the Bidder’s proposed Project Execution Program.
Page 9 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
The Bidder shall propose and describe method statement for the works as mentioned
in sub-clause 4.2.2 of Section III Evaluation and Qualification Criteria.
Page 10 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
The Bidder shall propose and provide in the Bid his proposed Work Execution
Program, which consists of (1) Construction Program, (2) Quality Assurance/Quality
Control Program, (3) Safety Management Program and (4) Environmental
Management Program. The Bidder shall note the followings for the preparation of his
proposal;
(1) The Construction Program may be in the form of a bar chart showing the
relationship and timing of major operation required for construction of the Works
allowing due consideration for climatic and hydrological conditions pertaining to
the Site.
(2) The Quality Assurance/Quality Control Program may brief Bidder’s quality
assurance/quality control plan and procedures, including practices and sequence
of activities to be followed and resources to be input to meet the quality
administration requirements of Section-VI-1 [Employer’s Requirement-General
Specification] of the Bidding Document Part 2.
(3) The Safety Management Program may brief Bidder’s Safety Management Plan
in compliance with the requirements of Section-VI-1 [Employer’s Requirement-
General Specification].
(4) The Environment Management Program may brief Bidder’s Environment
Management Plan (EMP) which will demonstrate the manner in which he will
implement, manage and control environmental mitigation measures as required
under the Section-VI-1 [Employer’s Requirement-General Specification].
Page 11 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Refer to:
Form PER – 1: Proposed Personnel
Form PER – 2: Resume of Proposed Personnel
Page 12 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The Bidder shall provide the names of suitably qualified personnel to meet the specified
requirements stated in Section III, Evaluation and Qualification Criteria, Clause 4.2.4.]
1. Title of position
Name
2. Title of position
Name
3. Title of position
Name
4. Title of position
Name
5. Title of position
Name
6. Title of position
Name
Bidder’s Representative:
Signature: ………………….…….
Name: ………………….………..
Position: ………………….……..
Date: ………………….…………
Company: ………………….……
Company stamp: …………………
Page 13 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The Bidder shall provide the data on the experience of the personnel indicated in Form PER-
1, in the form below:]
Name of Bidder
Position
Page 14 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ………………….…….
Name: ………………….…….….
Position: ………………….….….
Date: ……………………….…….
Company: ………………….…….
Company stamp: …………………
Page 15 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 16 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The Bidder shall provide adequate information to demonstrate clearly that it has the
capability to meet the requirements for the key equipment listed in Section III, Evaluation and
Qualification Criteria, Clause 4.2.5. A separate Form shall be prepared for each item of
equipment listed, or for alternative equipment proposed by the Bidder.]
Item of equipment
Page 17 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Provide the following information for equipment not owned by the Bidder:
Bidder’s Representative:
Signature: ………………….…….
Name: ………………….……..….
Position: ………………………….
Date: ………………………….….
Company: ………………….…….
Company stamp: ……………...…
Page 18 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Qualification
To establish its qualifications to perform the contract in accordance with Section III,
Evaluation and Qualification Criteria, the Bidder shall provide the information
requested in the corresponding Forms included hereunder:
Page 19 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ………………….…
Name: ………………….…….
Position: ………………….….
Date: …………………………..
Company: ……………………..
Page 20 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following form is additional to Form ELI-1, and shall be completed to provide information
relating to each JV/Consortium member (in case the Bidder is a JV/Consortium) as well as
specialist Subcontractor proposed to be used by the Bidder for any part of the Contract
resulting from this process.]
Bidder’s Representative:
Page 21 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Signature: ………………….…….
Name: ………………….…….….
Position: …………………..…….
Date: ……………………..….…..
Company: ………………..….…..
Company stamp: …….………..…
Page 22 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following table shall be filled in for the Bidder and for each member of a JV/Consortium.]
Non-Performing Contracts
Contract non-performance did not occur since 1st January 2019, in accordance with the
Section III: Evaluation and Qualification Criteria, Sub-Factor 3.2 (b) (i).
Contract(s) not performed since 1st January 2019, in accordance with the Section III:
Evaluation and Qualification Criteria, Sub-Factor 3.2 (b) (i) indicated below:
Year Non-performed Contract Identification Total Contract
Portion of Amount
Contract (current value,
currency,
exchange rate
and INR
equivalent)
[insert [insert amount and Contract Identification: [indicate complete [insert amount]
year] percentage] contract name, number, and any other
identification]
Name of Employer: [insert full name]
Address of Employer: [insert
street/city/country]
Reason(s) for non-performance: [indicate
main reason(s)]
Note: The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents.
Page 23 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ………………….…….
Name: ………………….………..
Position: ………………….……..
Date: …………………………….
Company: ……………………….
Company stamp: …………………
Page 24 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Pending Litigation
No pending litigation in accordance with the Section III: Evaluation and Qualification Criteria,
Sub-Factor 3.2 (b) (ii).
Pending litigation in accordance with the Section III, Evaluation and Qualification Criteria, Sub-
Factor 3.2 (b) (ii), is indicated below:
Year of Amount in Outcome as Contract Identification Total Contract
Dispute Dispute Percentage of Amount (current
(currency) Net Worth value, currency,
exchange rate and
INR equivalent)
[insert year] [insert [insert Contract Identification: [insert amount]
amount] percentage] [indicate complete contract
name, number, and any other
identification]
Name of Employer: [insert full
name]
Address of Employer: [insert
street/city/country]
Matter in dispute: [indicate
main issues in dispute]
Status of dispute: [indicate if it
is being treated by the
Adjudicator, under Arbitration
or being dealt with by the
Judiciary]
Note: The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents.
Bidder’s Representative:
Signature: ………………….……
Name: …………………….…….
Page 25 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Position: ………………….…….
Date: …………….……………...
Company: ………………………
Company stamp: ……………….
Page 26 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Litigation History
No court/arbitral award decisions against the Bidder or any member of the JV/consortium
since 1st January 2016 up to 28 days prior to the Bid Submission deadline, in accordance
with the Section III, Evaluation and Qualification Criteria, Sub-Factor 3.2 (b)
Court/ arbitral award decisions against the Bidder or any member of the JV/consortium
since 1st January 2016 up to 28 days prior to the Bid Submission deadline, in accordance
with the Section III, Evaluation and Qualification Criteria, Sub-Factor 3.2 (b) (iii), are
indicated below:
Year of Contract Identification Total Contract
Award Amount (current
value, currency,
exchange rate and
INR equivalent)
[insert year] Contract Identification: [indicate complete contract [insert amount]
name, number, and any other identification]
Name of Employer: [insert full name]
Address of Employer: [insert street/city/country]
Matter in dispute: [indicate main issues in dispute]
Party who initiated the dispute: [indicate “Employer”
or “Contractor”]
Status of dispute: [Indicate if it is being treated by the
Adjudicator, under Arbitration or being dealt with by
the Judiciary]
Note: The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents.
Bidder’s Representative:
Signature: ……………………
Name: ………………………..
Position: ……………………..
Date: ………………….……..
Page 27 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Company: ……………………..
Company stamp: ……………….
Page 28 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Note:
1. The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents. All information furnished in this Form shall be certified
by a Chartered Accountant/Company Auditor/Statutory Auditor.
Page 29 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ……………………..
Name: ………………….……..
Position: …………….………..
Date: …………………………..
Company: …………….………..
Company stamp: ……………...
Signature: ……………………..
Name: …………………………
Position: ………………………..
Date: …………………………...
Company: ……………….……..
Company stamp: ………………
Membership No: ……...……………
Address: …………………...…………
Contact No: …………………………..
Email ID: ……………………………..
Page 30 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
*Total INR equivalent for all years divided by the total number of years, in accordance with
Section III, Evaluation and Qualification Criteria, Sub-Factor 3.2 (c) (ii).
Note: The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents. All information furnished in this Form shall be certified
by a Chartered Accountant/Company Auditor/Statutory Auditor.
Bidder’s Representative:
Signature: ……………………..
Name: …………………….…...
Position: ………………...……..
Date: …………………….……..
Company: ……………………..
Company stamp: …………..…..
Signature: ………………………..
Page 31 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Name: ……………………………
Position: ………………………….
Date: ……………………..………..
Company: …………………………
Company stamp: …………………..
Membership No: ……...……………
Address: ……………...………………
Contact No: …………………………..
Email ID: ……………………………..
Page 32 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The Bidder shall submit the following undertaking for bankruptcy/insolvency and debt
restructuring and shall be filled in for the Bidder and for each member of a JV/Consortium]
(Undertaking as per Sub-Factor 3.2 (c) (iii), Section III, Evaluation and Qualification Criteria,
Part 1)
Page 33 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ……………………..
Name: ………………..………..
Position: ………………..……..
Date: …………………………..
Company: ……………………..
Company stamp: ………………
The Statement of the Bidder as stated above is verified and certified as true and correct.
Signature ……………………..:
Name: ………………………….
Position: ……………………….
Date: …………………………..
Company: ……………………..
Company stamp: ………………
Membership No: ……...……………
Address: ……………...………………
Contact No: …………………………..
Email ID: ……………………………..
Notes:
1. The Bidder should strike-off either paragraph no. 1 (or) 2 as above which is not
applicable.
Page 34 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following table shall be filled in for the Bidder and for each member of a JV/Consortium]
[Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines
of credit, and other financial means, net of current commitments, available to meet the total
construction cash flow demands of the subject contract or contracts as specified in Section III,
Evaluation and Qualification Criteria, Sub-Factor 3.2 (e) (i).]
Financial Resources
No. Source of Financing Amount (INR equivalent)
2
3
4
Note: The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents. All information furnished in this Form shall be certified
by a Chartered Accountant/Company Auditor/Statutory Auditor.
Bidder’s Representative:
Signature: ……………………..
Name …………………….........
Position: ……………………….
Date: ……………………….......
Company: ………………………
Company stamp: ………………
Signature: ……………………..
Page 35 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Name: ………………….……..
Position: ……………………..
Date: ………………..………..
Company: ……………………..
Company stamp: ……….…….
Membership No: ………...…………
Address: ……………………...………
Contact No: ……………………….….
Email ID: ……………………………..
Page 36 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following table shall be filled in for the Bidder and for each member of a JV/Consortium]
[Bidders and each member of a JV/Consortium should provide information on their current
commitments on all contracts that have been awarded, or for which a letter of intent or
acceptance has been received, or for contracts approaching completion, but for which an
unqualified, full completion certificate has yet to be issued, in accordance with Section III,
Evaluation and Qualification Criteria, Sub-Factor 3.2 (e) (ii).]
Notes:
1. The Bidder is not required to submit any document as documentary evidence along
with the Bidding Documents. All information furnished in this Form shall be
certified by a Chartered Accountant/Company Auditor/Statutory Auditor.
2. The ‘Annexure to Form FIR-2’ is an extension of the above table of Form FIR-2.
The Bidder shall provide details for the evaluation of the adequacy of its financial
resources to meet project cash flow requirements.
Page 37 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ……………………..
Name: ……………….………..
Position: …………….………..
Date: …………………………..
Company: ……………………..
Company stamp: ……………….
Signature: ……………………..
Name: …………….…………..
Position: ………….…………..
Date: …………..….…………..
Company: ……………………..
Company stamp: …..……….…
Membership No: ……………….……
Address: …………………….…
Contact No. : ……………….…….…..
Email ID: ………………….………....
Page 38 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 39 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ……………………..
Name: ………………….……..
Position: ……………………..
Date: ………………….……..
Company: ……………..………
Company stamp: …………….
Signature: ……………………..
Name: …………………….…..
Position: ………………….…..
Date: ……………………..…..
Company: ……………………
Company stamp: …………….
Membership No: ………………
Address: …………………………
Contact No: ……………….……..
Email ID: ………………….……..
Page 40 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following table shall be filled in for the Bidder and for each member of a JV/Consortium]
[Identify contracts that demonstrate continuous construction work since 1st January 2016 up
to Bid submission deadline pursuant to Section III, Evaluation and Qualification Criteria,
Sub-Factor 3.2 (d) (i). List contracts chronologically, according to their commencement
(starting) dates.]
Note: The Bidder is required to submit the documentary evidence for the information
furnished in the form.
Bidder’s Representative:
Signature: …………………….
Page 41 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Name: ………………………..
Position: ……………………..
Date: ………………………….
Company: ……………..……..
Company stamp: ……….……
Page 42 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[The following table shall be filled in for the Bidder and for each member of a JV/Consortium]
[Fill out one (1) form per contract, in accordance with Section III, Evaluation and
Qualification Criteria, Sub-Factor 3.2 (d) (ii).]
Page 43 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Note: The Bidder is required to submit the documentary evidence for the information
furnished in the form. The Completion/Substantial Completion Certificates indicating
the nature/scope of work, actual completion cost and actual date of completion for such
Page 44 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bidder’s Representative:
Signature: ………………….…
Name: ………….………….…
Position: ………………….….
Date: ………….………………
Company: ……………………..
Company stamp: ………………
Page 45 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[Fill out one (1) form per contract, in accordance with Section III, Evaluation and
Qualification Criteria, Sub-Factor 3.2 (d) (iii).]
Key Activity No. (1): [insert brief description of the Activities, emphasizing its specificity]
Total Quantity of Activity under the Contract:
Page 46 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Note: The Bidder is required to submit the documentary evidence for the information furnished
in the form. The Completion Certificates for the Key Activities shall be submitted duly
certified from the Client.
Bidder’s Representative:
Signature: ………………….…….
Name: ………….………….…….
Position: ………………….……..
Date: ………….…………………
Company: ……………………….
Company stamp: …………………
Page 47 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Form ACK
Acknowledgement of Compliance with Guidelines for Procurement under
Japanese ODA Loans
A) I, [insert name and position of authorized signatory], being duly authorized by [insert
name of Bidder/members of joint venture (“JV”)] (hereinafter referred to as the “Bidder”)
to execute this Acknowledgement of Compliance with the Guidelines for Procurement
under Japanese ODA Loans, hereby certify on behalf of the Bidder and myself that:
(i) all information provided in the Bid submitted by the Bidder and its subcontractors for
the Project for Construction of Mumbai-Ahmedabad High Speed Rail, name of the
Contract “Design and Construction of Civil and Building Works for the Depot on
Design Build Lump Sum Price Basis for Double Line High Speed Railway involving
works for Site Formation, Abutment, Retaining Walls, Roadbed for track, Box Culvert,
Roads, Cable Duct, Foundations of OHE Masts, Piping, Drainage, Water Supply,
Water Harvesting, Fire Fighting, Landscaping, Boundary Wall, General Inspection
Train Shed, Maintenance Depot and other Associated works At Sabarmati between
MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail” [Package No.
MAHSR-C-8], and number of lot(s) is one (1), is true, correct and accurate to the best
of the Bidder’s and my knowledge and belief; and
(ii) the Bidder or any of its subcontractors has not, directly or indirectly, taken any action
which is or constitutes a corrupt or fraudulent practice and is not subject to any conflict
of interest as stipulated in the relevant section of the Guidelines and the Bidding
Document.
<If debarment for more than one year by the World Bank Group is NOT imposed, use the
following sentence B).>
B) I certify that the Bidder has NOT been debarred by the World Bank Group for more than
one year since the date of issuance of Invitation for Bids.
<If debarment for more than one year by the World Bank Group has been imposed BUT
three (3) years have passed since the date of such debarment decision, use the following
sentence B’).>
B’) I certify that the Bidder has been debarred by the World Bank Group for a period more
than one year BUT that on the date of issuance of Invitation for Bids at least three (3) years
had passed since the date of such debarment decision. Details of the debarment are as
follows:
Page 48 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
C) I certify that the Bidder will not enter into a subcontract with a firm which has been
debarred by the World Bank Group for a period more than one year, unless on the date of
the subcontract at least three (3) years have passed since the date of such debarment
decision.
D) I certify, on behalf of the Bidder and its subcontractors, that if selected to undertake works
and services in connection with the Contract, the Bidder and its subcontractors shall carry
out such works and services in continuing compliance with the terms and conditions of the
Contract.
E) I further certify, on behalf of the Bidder and its subcontractors, that if the Bidder and any
of its subcontractors is requested, directly or indirectly, to engage in any corrupt or
fraudulent practice under any applicable law, such as the payment of a rebate, at any time
or any stage of a process of procurement such as negotiations, execution or
implementation of contract (including amendment thereof), the Bidder shall report all
relevant facts regarding such request to the relevant section in JICA (details of which are
specified below) in a timely manner.
JICA’s information desk on fraud and corruption (A report can be made to either of the
offices identified below.)
(1) JICA Headquarters: Legal Affairs Division, General Affairs Department
URL: https://www2.jica.go.jp/en/odainfo/index.php
Tel: +81 (0)3 5226 8850
The Bidder acknowledges and agrees that the reporting obligation stated above shall NOT
in any way affect the Bidder’s responsibilities, obligations or rights, under relevant laws,
regulations, contracts, guidelines or otherwise, to disclose or report such request or other
information to any other person(s) including the Employer or to take any other action,
required to or allowed to, be taken by the Bidder. The Bidder further acknowledges and
agrees that JICA is not involved in or responsible for the procurement process in any way.
F) If any of the statements made herein is subsequently proven to be untrue or incorrect based
on facts subsequently determined, or if any of the warranties or covenants made herein is
not complied with, the Bidder will accept, comply with, and not object to any remedies
taken by the Employer and any sanctions imposed by or actions taken by JICA.
Bidder’s Representative:
Page 49 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Signature: ………………….…….
Name: ………….………….…….
Position: ………………….…….
Date: ………….………………..
Company: ……………………..
Company stamp……………….
Signature: ………………….…….
Name: ……….………….…….
Position: ………………….…….
Date: ………….………………..
Company: ……………………..
Company stamp: …………………
Membership No: ………...…………
Address: ……………………...………
Contact No.: …………………………
Email ID: ……………………………..
Page 50 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 51 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 52 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
29. Duly signed and stamped copy of BDS ITB 11.2 (l) (i)
“Section V. Eligible Source
Countries of Japanese ODA
Loans” of the Bidding Documents
30. Any other Documents -
Certificate:
This is to certify that our Technical Submissions is in full compliance with all the conditions,
requirements and specifications as included in the Bid Documents including all the Addenda
thereto.
Bidder’s Representative:
Signature: ……………………..
Name: ………………….……..
Position: ……………….……..
Date: ……………………….....
Company: ……………………..
Company stamp: ……………....
Page 53 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Bid Requirements
Page 54 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
WHEREAS:
National High-Speed Rail Corporation Limited, New Delhi, India, which is owned by the
Government of India [hereinafter referred to as “Employer”], has invited bids for the Works of
“Design and Construction of Civil and Building Works for the Depot on Design Build Lump
Sum Price Basis for Double Line High Speed Railway involving works for Site Formation,
Abutment, Retaining Walls, Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations
of OHE Masts, Piping, Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping,
Boundary Wall, General Inspection Train Shed, Maintenance Depot and other Associated
works At Sabarmati between MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of
Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail” [Package
No. MAHSR-C-8].
Page 55 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 56 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
7) Executive Authority
The said JV/Consortium through its Authorized Representative (as specified
above) shall receive instructions, payments from the Employer. The management
structure for the Works shall be prepared in mutual consultation to enable
completion of the Work to quality requirements within permitted cost and time.
8) Guarantees
Till the award of the Contract, all the Bank Guarantees to the Employer shall be
furnished in the name of JV/Consortium or in the name of all future members as
named in the letter of intent referred to BDS 4.1 & 22.2 which shall be legally
binding on all the Members of the JV/Consortium.
10) Arbitration
Any dispute, controversy or claim arising out of or relating to this agreement shall
be settled in the first instance amicably between Parties. If an amicable settlement
cannot be reached as above, it will be settled by…………………………. [Bidder
to specify].
Page 57 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
11) Validity
This JV/Consortium Agreement shall remain in force till one of the following
occurs of, unless by mutual consent, the Parties agree in writing to extend the
validity for a further period.
(a) The Bid submitted by the JV/Consortium is declared unsuccessful;
(b) Cancellation/ shelving of the Project by the Employer for any reasons prior
to award of the Contract;
(c) Execution of detailed JV/Consortium agreement by the Parties, setting out
detailed terms after award of the Contract by the Employer, substantially
covering the requirements as mentioned in the Bidding Documents; or,
(d) Successful execution of the Contract and settlement of all/any disputes
between the Employer and the Contractor.
12) This JV/Consortium Agreement shall be construed under the laws of India.
13) Notices
The names, addresses and fax numbers of the Authorized Representatives of the
other Members of the JV/Consortium to which notices may be given in writing
by fax confirmed by registered mail or commercial courier shall be as follows:
_____[Name] ____[Designation] ____[Address] ____[Ph. No., Fax No., E-
mail ID]
_____[Name] ____[Designation] ____[Address] ____[Ph. No., Fax No., E-
mail ID]
_____[Name] ____[Designation] ____[Address] ____[Ph. No., Fax No., E-
mail ID]
Notes:
This Agreement shall be executed in English and according to the applicable laws of India,
taking into accounts the notes stated below:
Page 58 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 59 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
We hereby agree to ratify all acts, deeds and things lawfully done by our said attorney pursuant
to this Power of Attorney and that all acts, deeds and things done by our aforesaid attorney
shall and shall always be deemed to have been done by us.
_________________________
(Signature and Name in Block letters of Signatory)
Seal of Company
Witness
Witness 1: Witness 2:
Name: Name:
Address: Address:
Occupation: Occupation:
Notes:
This Power of Attorney shall be executed according to the applicable laws and in English
in the Bidder’s country, taking into account the notes stated below:
Page 60 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
1) The mode of execution should be in accordance with the procedure, if any, laid down
by the applicable law in the Bidder’s country and the charter documents of the
executants(s) and when it is so required, the same should be under common seal
affixed in accordance with the required procedure.
(2) Whenever required, the Bidder should submit for verification the extract of the charter
documents and the shareholder resolution in favour of the person executing this
document on behalf of the Bidder.
(3) For a required document executed and issued overseas, the document will also have
to be legalised by the Indian Embassy in the Bidder’s country and notarized in the
jurisdiction where it is being issued. However, documents provided by Bidders from
countries that have signed the Hague Legislation Convention 1961 are not required to
be legalized by the Indian Embassy, if they carry a conforming Apostille certificate.
Page 61 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
We hereby agree to ratify all acts, deeds and things lawfully done by our said attorney pursuant
to this Power of Attorney and that all acts, deeds and things done by our aforesaid attorney
shall and shall always be deemed to have been done by us.
_________________________
(Signature and Name in Block letters of Signatory)
Seal of Company
Witness
Witness 1: Witness 2:
Name: Name:
Address: Address:
Occupation: Occupation:
Notes:
Page 62 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
This Power of Attorney shall be executed according to the applicable laws and in English
in the Bidder’s country, taking into account the notes stated below:
Page 63 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Whereas, the Managing Director of National High Speed Rail Corporation Limited, which is
owned by the Government of India, has invited Bids for the Works of “Design and Construction
of Civil and Building Works for the Depot on Design Build Lump Sum Price Basis for Double
Line High Speed Railway involving works for Site Formation, Abutment, Retaining Walls,
Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations of OHE Masts, Piping,
Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping, Boundary Wall,
General Inspection Train Shed, Maintenance Depot and other Associated works At Sabarmati
between MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail” [Package No. MAHSR-C-
8], and Whereas, the members of the JV/Consortium comprising of M/s.
__________________(Lead Member)_______, M/s. _________________________,
M/s_________________________, .... and M/s___________________________________
are interested in submission of bid for this Works of in accordance with the terms and
conditions contained in the Bid documents.
Page 64 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
members. During all such period when the lead member is not able to have an Authorised
Representative, the MD/Chairman of the Lead Member will be considered to be the Authorised
Representative for the purpose of this bid and subsequent contract (if applicable).
We hereby agree to ratify all acts, deeds and things lawfully done by authorized representative,
our said representative, pursuant to this power of attorney and that all acts deeds and things
done by our aforesaid representative shall and shall always be deemed to have been done by us
(JV/Consortium).
Dated this the________ day of _________________________20_____.
(Signature)
(Name in Block letters of Executants)
Seal of Company
Witness 1: Witness 2:
Name: Name:
Address: Address:
Occupation: Occupation:
Notes:
This Power of Attorney shall be executed according to the applicable laws and in English in
the Bidder’s country, taking into account the notes stated below:
(1) In the case of an existing JV/Consortium, a certified copy of JV/Consortium Agreement
shall be furnished.
(2) The mode of execution should be in accordance with the procedure, if any, laid down by
the applicable law in the bidder’s country and the charter documents of the executants(s)
and when it is so required, the same should be under common seal affixed in accordance
with the required procedure.
(3) Whenever required, the Bidder should submit for verification the extract of the charter
documents and the shareholder resolution in favour of the person executing this document
on behalf of the bidder.
(4) For a required document executed and issued overseas, the document will also have to be
legalised by the Indian Embassy in the Bidder’s country and notarized in the jurisdiction
where it is being issued. However, documents provided by Bidders from countries that
have signed the Hague Legislation Convention 1961 are not required to be legalized by
the Indian Embassy, if they carry a conforming Apostille certificate.
Page 65 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Beneficiary:
Managing Director
National High-Speed Rail Corporation Limited
2nd Floor, Asia Bhawan
Road No.205, Sector-9
Dwarka, New Delhi – 110077, India
IFB No.: Package No. MAHSR-C-8
Date: [Insert date of issue]
BID GUARANTEE No.: [Insert guarantee reference number]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that [insert name of the Bidder, which in the case of a JV/Consortium
shall be the name of the JV/Consortium (whether legally constituted or prospective) or the
names of all members thereof] (hereinafter called "the Applicant") has submitted or will submit
to the Beneficiary its Bid (hereinafter called "the Bid") for the execution of “Design and
Construction of Civil and Building Works for the Depot on Design Build Lump Sum Price
Basis for Double Line High Speed Railway involving works for Site Formation, Abutment,
Retaining Walls, Roadbed for track, Box Culvert, Roads, Cable Duct, Foundations of OHE
Masts, Piping, Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping,
Boundary Wall, General Inspection Train Shed, Maintenance Depot and other Associated
works At Sabarmati between MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of
Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail” [Package
No.- MAHSR-C-8], under Loan Agreement: ID-P277 and ID-P279.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of [insert amount in words]
([insert amount in figures]) upon receipt by us of the Beneficiary’s complying demand,
supported by the Beneficiary’s statement, whether in the demand itself or a separate signed
document accompanying or identifying the demand, stating that either the Applicant:
has withdrawn its Bid during the period of bid validity set forth in the Applicant’s Letter
of Bid (“the Bid Validity Period”), or any extension thereto provided by the Applicant;
or
Page 66 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
having been notified of the acceptance of its Bid by the Beneficiary during the Bid
Validity Period or any extension thereto provided by the Applicant, (i) has failed to
execute the contract agreement, or (ii) has failed to furnish the Performance Security,
in accordance with the Instructions to Bidders of the Beneficiary’s bidding documents.
This guarantee will expire and shall be returned: (a) if the Applicant is the successful Bidder,
upon our receipt of copies of the contract agreement signed by the Applicant and the
Performance Security issued to the Beneficiary in relation to such contract agreement; or (b) if
the Applicant is not the successful Bidder, upon the earlier of (i) our receipt of a copy of the
Beneficiary’s notification to the Applicant of the results of the bidding process; or (ii) twenty-
eight days after the end of the Bid Validity Period.
Consequently, any demand for payment under this guarantee must be received by us at the
office indicated above on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision,
ICC Publication No. 758.
_____________________________
[Signature (s)]
[Note: All italicized text is for use in preparing this form and shall be deleted from the final
product.]
Page 67 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
Page 68 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section IV. Bidding Forms
[signature]
Name:
(Authorized Signatory)
Organization:
Date:
Page 69 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section V. Eligible Source Countries of Japanese ODA Loans
(1) The Eligible Nationality of the supplier(s) and/or contractor(s) shall be the following:
(a) Japan and/or India in the case of the prime contractor; and
(b) All countries and areas in the case of the sub-contractor(s).
(2) With regard to (1) above, in case where the prime contractor is a joint venture, such joint
venture shall be eligible provided that the nationality of partner, both lead and other
partner is Japan and/or India.
(3) With regard to (1) and (2) above, the nationality of the supplier(s) and/or contractor(s)
can be regarded as Japan (hereinafter referred to as the “Japanese Company”) if all of
the following conditions are satisfied:
(a) Such supplier(s) and/or contractor(s) shall be nationals of Japan and/or juridical
persons incorporated and registered in Japan, and have their appropriate facilities
for producing or providing goods and services in Japan and actually conduct their
business there;
(b) Notwithstanding (a) above, a juridical person incorporated in a country or area
other than Japan that satisfies all of the following conditions can be regarded as the
Japanese Company:
(i) It is a subsidiary included in the scope of consolidation and factored into the
aggregated accounting figure of a consolidated financial statement of the
Japanese Company made in accordance with the Financial Instruments and
Exchange Act of Japan and the related ministerial ordinances; and
(ii) It is registered in the country or area where it was incorporated, has its
appropriate facilities for producing or providing goods and services there, and
actually conducts its business therein.
(4) With regard to (1) and (2) above, the nationality of the supplier(s) and/or contractor(s)
can be regarded as India (hereinafter referred to as the “Indian Company”) if all of the
following conditions are satisfied:
(a) Such supplier(s) and/or contractor(s) shall be nationals of India and/or juridical
persons incorporated and registered in India, and have their appropriate facilities
for producing or providing goods and services in India and actually conduct their
business there;
(b) In the case of a juridical person, a majority of the subscribed shares shall be held
by nationals of India or juridical persons incorporated and registered in India; and
Page 1 of 2
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 1
Package No. MAHSR-C-8 Section V. Eligible Source Countries of Japanese ODA Loans
(c) In the case of a juridical person, a majority of the full-time directors shall be
nationals of India.
(End of Section V)
Page 2 of 2
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VII, VIII and IX
BIDDING DOCUMENTS
FOR
PROCUREMENT OF WORKS
(International Competitive Bidding)
(Package No. MAHSR - C-8)
Design and Construction of Civil and Building Works for the Depot on Design
Build Lump Sum Price Basis for Double Line High Speed Railway involving
works for Site Formation, Abutment, Retaining Walls, Roadbed for track,
Box Culvert, Roads, Cable Duct, Foundations of OHE Masts, Piping,
Drainage, Water Supply, Water Harvesting, Fire Fighting, Landscaping,
Boundary Wall, General Inspection Train Shed, Maintenance Depot and
other Associated works At Sabarmati between MAHSR Km. 507.599 and
MAHSR Km. 509.726 in the State of Gujarat
for the
Project for Construction of Mumbai-Ahmedabad High Speed Rail
BIDDING DOCUMENTS
PART 3 – CONDITIONS OF CONTRACT AND
CONTRACT FORMS
Table of Contents
Page 1 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
The General Conditions governing this Contract shall be the "Conditions of Contract for
Plant and Design-Build for Electrical and Mechanical Plant, and for Building and
Engineering Works, Designed by the Contractor”, First Edition 1999, published by the
International Federation of Consulting Engineers (Fédération Internationale des Ingénieurs-
Conseils; FIDIC), designated as Section VII [General Conditions].
The General Conditions are normally linked with the Particular Conditions referred to as
Section VIII by the corresponding numbering of the Clauses, so that Section VII and Section
VIII together comprise the conditions governing the rights and obligations of the Parties.
A copy of the "Section VII General Conditions" is not attached to these Bidding Documents.
1) At FIDIC’s office;
World Trade Centre II, P.O. Box 311, 1215 Geneva 15, Switzerland.
E-mail:fidic@fidic.org
http://fidic.org/books/plant-and-design-build-contract-1st-ed-1999-yellow-book
(http://fidic.org/organization/123)
(http://fidic.org/organization/129)
Page 2 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
The following Particular Conditions shall supplement the GC. Whenever there is a conflict,
the provisions herein shall prevail over those in the GC.
Table of Contents
Page 3 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-
Conditions Data
Clause
Employer’s name and 1.1.2.2 National High-Speed Rail Corporation Limited
address & 1.3(b) 2nd Floor, Asia Bhawan,
Road No.205, Sector-9, Dwarka,
New Delhi-110077, India
Tel: +91-11-28070000
Fax: +91-11-28070250.
E-mail: c8packagetender@nhsrcl.in
Attention to:
Managing Director
Engineer’s name and 1.1.2.4 (To be Appointed)
address & 1.3(b)
Bank’s name 1.1.2.11 Japan International Cooperation Agency (JICA)
Borrower’s name 1.1.2.12 The President of India
Time for Completion 1.1.3.3 1461 days
Page 4 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-
Conditions Data
Clause
2 90 70%
3 180 100%
Refer Clause 2 [Work Area Access Schedule] in
Sub-Division 04090 of the Employer's
Requirements - General Specifications.
Engineer’s Duties and 3.1(B) 0.05%, until the cumulative amount of Variations
Authority (ii) instructed by the Engineer without obtaining the
approval of the Employer reaches 1% of the
Accepted Contract Amount.
Performance Security 4.2 The Performance Security shall be in the form of
a demand guarantee in the amount(s) of 5% (five
percent) of the Accepted Contract Amount less
Provisional Sum, if any, and in the same
currencies of the Accepted Contract Amount.
General Design 5.1 Period for notifying errors, faults and defects in
Obligations the Employer’s Requirements:56(fifty-six) days
Normal working hours 6.5 From 8:00 AM to 5:00 PM
Commencement of 8.1(c) No effective access to and possession of the Site
Works on the Commencement Date.
Delay damages for the 8.7 0.01% (zero-point zero one percent) of the
Works Contract Price per day.
Page 5 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-
Conditions Data
Clause
Total advance payment 14.2 10% (ten percent) of the Accepted Contract
Amount excluding the Provisional Sum payable
in the currencies and proportions in which the
Accepted Contract Amount is payable.
The advance payment shall be made in two
instalments as under:
a) 5% (five percent): On submission of a
Performance Security; and
b) 5% (five percent): On submission of an
expenditure statement certified by the
Contractor detailing the utilization of the
first instalment of the advance payment
certified by Chartered Accountant/
Company Auditor.
Repayment 14.2(b) 17 % (seventeen percent) of the amount of each
amortization rate of Interim Payment Certificate
advance payment
Percentage of 14.3(c) 10% (ten percent)
Retention
Limit of Retention 14.3(c) 3% (three percent) of the Accepted Contract
Money Amount excluding the Provisional Sum
Plant and Materials 14.5(b) Plant and Materials for payment Free on Board:
(i) Nil
14.5(c) Plant and Materials for payment when delivered
(i) to the Site:
Nil
Minimum Amount of 14.6 Nil
Interim Payment
Certificates
Delayed Payment 14.8 These financing charges shall be calculated for
1) Foreign currency: at LIBOR as on due date
+ 2% (two percent)
2) Indian currency: the applicable rate shall be
SBI’s MCLR (one month), Marginal Cost of
Funds based Lending Rate.
Periods for submission 18.1
of insurance:
a. evidence of insurance. a. 14 (fourteen) days from the Commencement
Date of Works.
b. relevant policies b. 28 (twenty-eight) days from the
Commencement Date of Works.
Page 6 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-
Conditions Data
Clause
Maximum amount of 18.2(d) INR6,000,000.00 (Indian Rupee Six Million
deductibles for only)
insurance of the
Employer's risks
Minimum amount of 18.3 INR100,000,000.00 (Indian Rupee One
third party insurance Hundred Million only) per occurrence
Minimum amount of 18.5(a) INR600,000,000.00 (Indian Rupee Six Hundred
insurance against Million only)
Liability for Breach of
Professional Duty
Period of insurance 18.5(c) Until 5(five) years after the expiry of the last
against Liability for Defects Notification Period.
Breach of Professional
Duty
Date by which the DB 20.2 56 (fifty-six) days after the Commencement
shall be appointed Date
The DB shall be 20.2 03 (three) Members
comprised of
Appointment (if not 20.3 Secretary General of the International Centre for
agreed) to be made by Alternate Dispute Resolution (ICADR) –
Head Office – Plot No. 6
Vasant Kunj Institutional Area,
Phase-II, New Delhi -110070 (India).
E-mail: icadr@nic.in
Place of Arbitration 20.6 New Delhi, India
Page 7 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 8 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 9 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 10 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 11 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 12 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 1.1.1 Replace the whole of Sub-Clause 1.1.1.9 with the following:
The Contract
1.1.1.9 "Contract Data” means the pages completed by the
Employer entitled contract data which constitute Part A of the
Particular Conditions. Throughout the General Conditions ‘Appendix
to Tender’ is replaced by ‘Contract Data’.
Sub-Clause 1.1.2 Replace the whole of Sub-Clause 1.1.2.9 with the following:
Parties and
Persons 1.1.2.9 “DB” means the person or three persons appointed under Sub-
Clause 20.2 [Appointment of the Dispute Board] or Sub-Clause 20.3
[Failure to Agree on the Composition of the Dispute Board].
1.1.2.11 "Bank” means the financing institution (if any) named in the
Contract Data.
Page 13 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 1.2 Replace the sub-paragraphs (a) to (d) with the following sub-
Interpretation paragraphs (a) to (f):
Page 14 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 1.4 Replace the whole of Sub-Clause 1.4 with the following:
Law and
Language The Contract shall be governed by the law of the country
or other jurisdiction stated in the Contract Data.
The ruling language of the Contract shall be that stated in the Contract
Data.
Sub-Clause 1.5 Replace subparagraphs from (a) to (h) with the following:
Priority of
Documents (a) the Contract Agreement;
(b) the Letter of Acceptance;
(c) the Record of Meeting on Contract Negotiation;
(d) the Addenda (the items of the Addenda shall have priority
over the respective items of the related section of the
Contract Documents);
(e) the Price Bid;
(f) the Technical Bid (except the Technical Proposal);
(g) the Particular Conditions -Part A;
(h) the Particular Conditions -Part B;
(i) the General Conditions;
(j) the Employer’s Requirements-Design Requirement and
Criteria;
(k) the Employer’s Requirements- Technical Specifications
(l) the Employer’s Requirements - General Specifications;
(m) the Employer’s Requirements - Drawings;
(n) the Acknowledgement of Compliance with Guidelines for
Procurement under Japanese ODA Loans;
(o) the Contractor’s Technical Proposal;
(p) the Reference Information/ Report; and
(q) Any other documents forming part of the Contract.
Sub-Clause 1.8 Delete the words “of a technical nature” in the third paragraph.
Care and Supply
of Documents
Sub-Clause 1.12 Replace the whole of Sub-Clause 1.12 with the following:
Confidential
Details The Contractor’s and the Employer’s Personnel shall disclose all such
confidential and other information as may be reasonably required in
order to verify compliance with the Contract and allow its proper
implementation.
Each of them shall treat the details of the Contract as private and
confidential, except to the extent necessary to carry out their
Page 15 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 1.13 Replace the whole of Sub-Clause 1.13 with the following:
Compliance with
Laws The Contractor shall, in performing the Contract, comply with
applicable Laws. Unless otherwise stated in the Particular Conditions:
(a) the Employer shall have obtained (or shall obtain) the planning,
zoning or similar permission for the Permanent Works, and any
other permissions described in the Employer’s Requirements
as having been (or to be) obtained by the Employer; and the
Employer shall indemnify and hold the Contractor harmless
against and from the consequences of any failure to do so. and
(b) the Contractor shall give all notices, pay all taxes, duties and
fees, and obtain all permits, licenses and approvals, as required
by the Laws in relation to the design, execution and completion
of the Works and the remedying of any defects; and the
Contractor shall indemnify and hold the Employer harmless
against and from the consequences of any failure to do so,
unless the Contractor is impeded to accomplish these actions
and shows evidence of its diligence.
Sub-Clause 2.1 Replace the third paragraph with the following two paragraphs:
Right to Access to
the Site
If the Contractor suffers delay and/or damage as a result of a failure
by the Employer to give any such right or possession within such time,
the Contractor shall give notice to the Engineer and shall be entitled
subject to Sub-Clause 20.1 [Contractor’s Claims] to:
Page 16 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
(a) copies of the Laws of the Country which are relevant to the
Contract but are not readily available, and
(b) any permits, licenses or approvals required by the Laws of the
Country:
Sub-Clause 2.4 Replace the whole of Sub-Clause 2.4 with the following:
Employer’s
Financial The Employer shall submit, before the Commencement Date and
Arrangements thereafter within 28 days after receiving any request from the
Contractor, reasonable evidence that financial arrangements have
been made and are being maintained which will enable the Employer
to pay the Contract Price punctually (as estimated at that time) in
accordance with Clause 14 [Contract Price and Payment]. Before the
Employer makes any material change to his financial arrangements,
the Employer shall give notice to the Contractor with detailed
particulars.
In addition, if the Bank has notified to the Borrower that the Bank has
suspended disbursements under its loan, which finances in whole or
in part the execution of the Works, the Employer shall give notice of
such suspension to the Contractor with detailed particulars, including
the date of such notification, with a copy to the Engineer, within 7
days of the Borrower having received the suspension notification
from the Bank. If alternative funds will be available in appropriate
currencies to the Employer to continue making payments to the
Contractor beyond a date 60 days after the date of Bank notification
of the suspension, the Employer shall provide reasonable evidence in
his notice of the extent to which such funds will be available.
Page 17 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Obligations The Employer shall issue to the Contractor the drawings for rebar that
shall be a part of the Standard Design specified in the Employer’s
Requirements, if any such drawing is not included in the Contract,
under Clause 13.
Sub-Clause 3.1 Add the following paragraphs and sub-paragraphs after the existing
Engineer’s Duties Sub-Clause 3.1 as a part of this Sub-Clause.
and Authority
(d) any act by the Engineer in response to a Contractor’s request
except as otherwise expressly specified shall be notified in
writing to the Contractor within 28 days of receipt.
Sub-Clause 3.4 Replace the whole of Sub-Clause 3.4 with the following:
Replacement of
the Engineer If the Employer intends to replace the Engineer, the Employer shall,
not less than 21 days before the intended date of replacement, give
Page 18 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 3.5 Replace the whole of second paragraph with the following:
Determination
The Engineer shall give notice to both Parties of each agreement or
determination, with supporting particulars, within 28 days from the
receipt of the corresponding claim or request except when otherwise
specified. Each Party shall give effect to each agreement or
determination unless and until revised under Clause 20 [Claims,
Disputes and Arbitration].
Sub-Clause 4.1 Insert between the second and third paragraph, the following
Contractor’s paragraph:
General
Obligations All equipment, material and services to be incorporated in or required
for the Works shall have their origin in any eligible source country as
defined by the Loan Agreement between the Bank and the Borrower.
Sub-Clause 4.2 Replace the whole of Sub-Clause 4.2 with the following:
Performance
Security The Contractor shall obtain (at his cost) a Performance Security for
proper performance, in the amount stated in the Contract Data and
denominated in the currency(ies) of the Contract or in a freely
convertible currency acceptable to the Employer. If an amount is not
stated in the Contract Data, this sub-clause shall not apply.
The Contractor shall ensure that the Performance Security is valid and
enforceable until the Contractor has executed and completed the
Works and remedied any defects. If the terms of the Performance
Security specify its expiry date, and the Contractor has not become
entitled to receive the Performance Certificate by the date 28 days
prior to the expiry date, the Contractor shall extend the validity of the
Page 19 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Performance Security until the Works have been completed and any
defects have been remedied.
The Employer shall not make a claim under the Performance Security,
except for amounts to which the Employer is entitled under the
Contract.
Sub-Clause 4.3 In the second paragraph, add “in terms of Sub-Clause 6.9
Contractor’s [Contractor’s Personnel]” after “revoked”.
Representative
Sub-Clause 4.4 Replace the whole of sub-paragraph (a) with the following:
Subcontractors
Page 20 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Add the following three paragraphs after the existing Sub-Clause 4.4
as a part of this sub-clause.
Sub-Clause 4.6 Replace the whole of second paragraph with the following:
Co-operation
Any such instruction shall constitute a Variation if and to the extent
that it causes the Contractor to suffer delays and/or to incur
Unforeseeable Cost. Services for these personnel and other
contractors may include the use of Contractor’s Equipment,
Temporary Works or access arrangements which are the
responsibility of the Contractor.
Sub-Clause 4.15 Add “at Base Date” after “to the Site” in the first sentence of the first
Access Route paragraph.
The Contractor shall include, in the detailed time programme and each
Page 21 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 6.1 Add the following paragraph after the existing Sub-Clause 6.1 as a
Engagement of part of this sub-clause.
Staff and Labour
The Contractor is encouraged, to the extent practicable and
reasonable, to employ staff and labour with appropriate qualifications
and experience from sources within the Country.
Sub-Clause 6.2 Add the following paragraph after the existing Sub-Clause 6.2 as a
Rates of Wages part of this sub-clause.
and Conditions of
Labour The Contractor shall inform the Contractor’s Personnel about their
liability to pay personal income taxes in the Country in respect of such
of their salaries, wages, allowances and any benefits as are subject to
tax under the Laws of the Country for the time being in force, and the
Contractor shall perform such duties in regard to such deductions
thereof as may be imposed on him by such laws.
Sub-Clause 6.5 Replace the whole of Sub-Clause 6.5 with the following:
Working Hours
“No work shall be carried out on the Site on locally recognized days
Page 22 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 6.7 Add the following three paragraphs after the existing Sub-Clause 6.7
Health and Safety as a part of this sub-clause.
Page 23 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Add new Sub-Clauses 6.12, 6.13, 6.14, 6.15, 6.16, 6.17, 6.18, 6.19,
6.20, 6.21, 6.22, 6.23 and 6.24 after Sub-Clause 6.11 as follows:
Sub-Clause 6.15 Sub-Clause 6.15 Measures against Insect and Pest Nuisance
Measures against
Insect and Pest The Contractor shall at all times take the necessary precautions to
Nuisance protect the Contractor’s Personnel employed on the Site from insect
and pest nuisance, and to reduce the danger to their health. The
Contractor shall comply with all the regulations of the local health
authorities, including use of appropriate insecticide.
Page 24 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 25 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
with such laws. Where the relevant labour laws substantially restrict
workers’ organizations, the Contractor shall enable alternative means
for the Contractor’s Personnel to express their grievances and protect
their rights regarding working conditions and terms of employment.
In either case described above, and where the relevant labour laws are
silent, the Contractor shall not discourage the Contractor’s Personnel
from forming or joining workers’ organizations of their choosing or
from bargaining collectively and shall not discriminate or retaliate
against the Contractor’s Personnel who participate, or seek to
participate, in such organizations and bargain collectively. The
Contractor shall engage with such workers’ representatives. Workers’
organizations are expected to fairly represent the workers in the
workforce.
Sub-Clause 7.7 Insert “Except as otherwise specified in the Contract” at the beginning
Ownership of of the first paragraph.
Plant and
Materials
Replace the whole of sub-paragraph (b) with the following:
Sub-Clause 8.1 Replace the whole of Sub-Clause 8.1 with the following:
Commencement
of Works The Commencement Date shall be the date at which the following
precedent conditions have all been fulfilled and the Engineer’s
notification recording the agreement of both Parties on such
fulfilment and instructing to commence the Work is received by the
Contractor:
Page 26 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 8.2 The following paragraph shall be added at the end of Sub-Clause 8.2:
Time for
Completion The Contractor shall complete each Milestone (if any) within the
Time for Completion for the Milestone (as case may be), including
completing all work which is stated in the Contract as being required
for the Milestone to be considered to be completed for the issuance of
Milestone Certificate under Sub-Clause 4.25 [Milestone].
Sub-Clause 8.4 Replace the entire first paragraph of Sub-Clause 8.4 with the
Extension of following:
Time for
Completion The Contractor shall be entitled subject to Sub-Clause 20.1
[Contractor’s Claims] to an extension of Time for Completion if and
to the extent that completion for the purpose of Sub-Clause 10.1
[Taking Over of the Works and Sections] or the issuance of Milestone
Certificate under Sub-Clause 4.25 [Milestone] is or will be delayed
by any of the following causes:
Sub-Clause 8.6 Add the following paragraph after the existing Sub-Clause 8.6 as a
Rate of Progress part of this Sub-Clause.
Sub-Clause 8.7 Replace the entire first paragraph of Sub-Clause 8.7 with the
Page 27 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 8.12 Replace the whole of Sub-Clause 8.12 with the following:
Resumption of
Work After the permission or instruction to proceed is given, the Contractor
and the Engineer shall jointly examine the Works and the Plant and
Materials affected by the suspension. The Contractor shall make good
any deterioration or defect in or loss of the Works or Plant or
Materials, which has occurred during the suspension after receiving
from the Engineer an instruction to this effect under Clause 13
[Variations and Adjustments].
Sub-Clause 11.3 Replace the first paragraph of Sub-Clause 11.3 with the following:
Extension of
Defects The Employer shall be entitled subject to Sub-Clause 2.5 [Employer’s
Notification Claims] to an extension of the Defects Notification Period for the
Period Works or a Section if and to the extent that the Works, Section or a
major item of Plant (as the case may be, and after taking over) cannot
be used for the purposes for which they are intended by reason of a
defect or by reason of damage attributable to the Contractor.
However, a Defects Notification Period shall not be extended by more
than two years.
Page 28 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
As an exception to the above, the Provisional Sum for the cost of the
DB shall be used for payments to the Contractor of the Employer’s
share (one-half) of the invoices of the DB for its fees and expenses, in
accordance with Sub-Clause 20.2 [Appointment of Dispute Board].
No prior instruction of the Engineer shall be required with respect to
the work of the DB. The Contractor shall produce the DB invoices
and satisfactory evidence of having paid 100% of such invoices as
part of the substantiation of those Statements submitted under Sub-
Clause 14.3, which contain requests for payment under the
Provisional Sum toward the cost of the DB. The Engineer’s
certification of such Statements shall be based upon such invoices and
such evidence of payment by the Contractor. Contractor’s overhead,
reasonable profit, etc., shall not be included in the provisional sums
for the cost of the DB.
Sub-Clause 13.7 Add the following paragraph after the existing Sub-Clause 13.7 as a
Adjustments for part of this sub-clause.
Changes in
Legislation Notwithstanding the foregoing, the Contractor shall not be entitled to
an extension of time if the relevant delay has already been taken into
account in the determination of a previous extension of time and such
Cost shall not be separately paid if the same shall already have been
taken into account in the indexing of any inputs to the table of
adjustment data in accordance with the provisions of Sub-Clause 13.8
[Adjustments for Changes in Cost].
Sub-Clause 13.8 Replace the first paragraph of Sub-Clause 13.8 with the following:
Adjustments for
Changes in Cost In this sub-clause, “Schedule of Adjustment Data” means the
completed table of adjustment data for local and foreign currencies
included in the Schedule of Payment Currencies. If there is no such
table of adjustment data, this sub-clause shall not apply.
Page 29 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Price due to the cost of re-bar shall be determined for such SD where
these drawings are provided after entering into the Contract. The
adjustment is to be made to the amounts of the Price Schedule of the
Price Bid offered by the Contractor as part of the Contract Price for
the SD in the following manner:
(b) After the Contactor has submitted to and received from the
Engineer approval for the Construction Designs (CD), the
Contractor shall then allocate the abovementioned SD to the
relevant CD and calculate in tabular form the total price
variation per CD for the Engineer’s approval.
Sub-Clause 14.1 Add the following paragraph after the existing Sub-Clause 14.1 as a
The Contract part of this sub-clause.
Price
Notwithstanding the provisions of subparagraph (b), Contractor’s
Equipment, including essential spare parts therefor, imported by the
Contractor for the sole purpose of executing the Contract shall be
governed by the prevailing laws in this regard.
Sub-Clause 14.2 Replace the first paragraph of Sub-Clause 14.2 with the following:
Advance
Payment The Employer shall make an advance payment, as an interest-free loan
for mobilisation and design, when the Contractor submits a guarantee
in accordance with this Sub-Clause. The total advance payment, the
number and timing of instalments (if more than one), and the
applicable currencies and proportions, shall be as stated in the
Contract Data. The advance payment will be made on submission of
an unconditional bank guarantee for an amount equivalent to the
component of the advance payment requested by the Contractor. Such
Page 30 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 14.3 Add new Sub-Clauses 14.3(h) after Sub-Clause 14.3(g) as follows:
Application for
Interim Payment (h) 90% amount of the statement amount as agreed by the Engineer
Certificates for provisional payment in accordance with Sub-Clause 14.7(d)
Sub-Clause 14.6 Replace the first paragraph of Sub-Clause 14.6 with the following:
Issue of Interim
Payment No amount will be certified or paid until the Employer has received
Certificates and approved the Performance Security. Thereafter, the Engineer
shall, within 28 days after receiving a Statement and supporting
documents, deliver to the Employer and to the Contractor an Interim
Payment Certificate which shall state the amount which the Engineer
fairly determines to be due, with all supporting particulars for any
reduction or withholding made by the Engineer on the Statement if
any and shall include any amounts due to or from the Contractor in
Page 31 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 14.7 Replace the sub-paragraphs (b) and (c), and add one paragraph (d) and
Payment its sub-paragraphs, with the following:
Page 32 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
https://www.jica.go.jp/english/our_work/types_of_assistance/oda_lo
ans/oda_op_info/procedure/index.html
Sub-Clause 14.8 Replace the second paragraph of Sub-Clause 14.8 with the following:
Delayed Payment
Unless otherwise stated in the Contract Data, these financing charges
shall be calculated at the annual rate of three percentage points above
the discount rate of the central bank in the country of the currency of
payment, or if not available, the interbank offered rate, and shall be
paid in such currency.
Sub-Clause 14.9 Replace the entire first paragraph of Sub-Clause 14.9 with the
Payment of following two paragraphs.
Retention Money
When the Taking-Over Certificate has been issued for the Works, and
the Works have passed all specified tests, the first half of the Retention
Money shall be certified by the Engineer for payment to the
Contractor. If a Taking-Over Certificate is issued for a Section, the
relevant percentage of the first half of the Retention Money shall be
Page 33 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Add the following two paragraphs after the existing Sub-Clause 14.9
as a part of this sub-clause.
When the Taking-Over Certificate has been issued and the first half
of total of the Retention Money has been certified for payment by the
Engineer, the Contractor shall be entitled to substitute a guarantee, in
the form annexed to the Particular Conditions or in another form
approved by the Employer and issued by any bank nationalized or
scheduled by the Government of India or any Japanese bank having
corresponding arrangements with the Indian bank for the second half
of the Retention Money. The Contractor shall ensure that the
guarantee is in the amounts and currencies of the second half of the
Retention Money and is valid and enforceable until the Contractor has
executed and completed the Works and remedied any defects, as
specified for the Performance Security in Sub-Clause 4.2. On receipt
by the Employer of the required guarantee, the Engineer shall certify,
and the Employer shall pay the second half of the Retention Money.
The release of the second half of the Retention Money against a
guarantee shall then be in lieu of the release under the third paragraph
of this Sub-Clause. The Employer shall return the guarantee to the
Contractor within 21 days after receiving a copy of the Performance
Certificate.
Sub-Clause 14.11 Replace the second paragraph of Sub-Clause 14.11 with the
Page 34 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 14.13 Replace the first paragraph of Sub-Clause 14.13 with the following:
Issue of Final
Payment Within 28 days after receiving the Final Statement and discharge in
Certificate accordance with Sub-Clause 14.11 [ Application for Final Payment
Certificate] and Sub-Clause 14.12 [Discharge], the Engineer shall
deliver, to the Employer and to the Contractor, the Final Payment
Certificate which shall state:
Sub-Clause 14.15 Replace the entire Sub-Clause 14.15 with the following:
Currencies of
Payment The Contract Price shall be paid in the currency or currencies named
in which the bid price was expressed in the Letter of Bid. If more
than one currency is so named, payments shall be made as follows:
Page 35 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 15.5 Replace the first paragraph of Sub-Clause 15.5 with the following:
Employer’s
Entitlement to The Employer shall be entitled to terminate the Contract, at any time
Termination for for the Employer’s convenience, by giving notice of such termination
Convenience to the Contractor. The termination shall take effect 28 days after the
later of the dates on which the Contractor receives this notice or the
Employer returns the Performance Security. The Employer shall not
terminate the Contract under this Sub-clause in order to execute the
Works himself or to arrange for the Works to be executed by another
contractor or to avoid a termination of the Contract by the Contractor
under Clause 16.2 [Termination by Contractor].
Sub-Clause 16.1 Insert the following paragraph between the first and second
Contractor’s paragraphs of Sub-Clause 16.1:
Entitlement to
Suspend Work Notwithstanding the above, if the Bank has suspended disbursements
under the loan or credit from which payments to the Contractor are
being made, in whole or in part, for the execution of the Works, and
no alternative funds are available as provided for in Sub-Clause 2.4
[Employer’s Financial Arrangements], the Contractor may by notice
suspend work or reduce the rate of work at any time, but not less than
7 days after the Borrower having received the suspension notification
Page 36 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 16.2 Replace the whole of Sub-Clause 16.2 with the following:
Termination by
Contractor The Contractor shall be entitled to terminate the Contract if:
(a) the Contractor does not receive the reasonable evidence within
42 days after giving notice under Sub-Clause 16.1
[Contractor’s Entitlement to Suspend Work] in respect of a
failure to comply with Sub-Clause 2.4 [Employer’s Financial
Arrangements],
(b) the Engineer fails, within 56 days after receiving a Statement
and supporting documents, to issue the relevant Payment
Certificate,
(c) the Contractor does not receive the amount due under an
Interim Payment Certificate within 42 days after the expiry of
the time stated in Sub-Clause 14.7 [Payment] within which
payment is to be made (except for deductions in accordance
with Sub-Clause 2.5 [Employer’s Claims]),
(d) the Employer substantially fails to perform his obligations
under the Contract in such manner as to materially and
adversely affect the economic balance of the Contract and/or
the ability of the Contractor to perform the Contract,
(e) the Employer fails to comply with Sub-Clause 1.6 [Contract
Agreement] or Sub-Clause 1.7 [Assignment],
(f) a prolonged suspension affects the whole of the Works as
described in Sub-Clause 8.11 [Prolonged Suspension],
(g) the Employer becomes bankrupt or insolvent, goes into
liquidation, has a receiving or administration order made
against him, compounds with his creditors, or carries on
business under a receiver, trustee or manager for the benefit of
his creditors, or if any act is done or event occurs which (under
applicable Laws) has a similar effect to any of these acts or
events,
(h) the Contractor does not receive the Engineer’s instruction
recording the agreement of both Parties on the fulfillment of
the conditions for the Commencement of Works under Sub-
Clause 8.1 [ Commencement of Works].
In the event the Bank suspends the loan or credit from which part or
whole of the payments to the Contractor are being made, if the
Contractor has not received the sums due to him upon expiration of
the 14 days referred to in Sub-Clause 14.7 [Payment] for payments
under Interim Payment Certificates, the Contractor may, without
prejudice to the Contractor’s entitlement to financing charges under
Page 37 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 17.1 Replace the sub-paragraph (b), including (i) and (ii), of Sub-Clause
Indemnities 17.1 with the following:
(b) damage to or loss of any property, real or personal (other than the
Works), to the extent that such damage or loss arises out of or in
the course of or by reason of the design, the execution and
completion of the Works and the remedying of any defects, unless
and to the extent that any such damage or loss is attributable to any
negligence, willful act or breach of the Contract by the Employer,
the Employer’s Personnel, their respective agents, or anyone
directly or indirectly employed by any of them.
Sub-Clause 17.3 Replace the sub-paragraphs (b) and (c) of Sub-Clause 17.3 with the
Employer’s Risks following:
(b) rebellion, terrorism, sabotage by persons other than the
Contractor’s Personnel, revolution, insurrection, military or
usurped power, or civil war, within the Country,
(c) riot, commotion or disorder within the Country by persons
other than the Contractor’s Personnel,
Sub-Clause 17.6 Replace the whole of Sub-Clause 17.6 with the following:
Limitation of
Liability Neither Party shall be liable to the other Party for loss of use of any
Works, loss of profit, loss of any contract or for any indirect or
consequential loss or damage which may be suffered by the other
Party in connection with the Contract, other than as specifically
provided in Sub-Clause 8.7 [ Delay Damages ]; Sub-Clause 11.2
[ Cost of Remedying Defects ]; Sub-Clause 15.4 [ Payment after
Termination ]; Sub-Clause 16.4 [Payment on Termination ]; Sub-
Clause 17.1 [ Indemnities]; Sub-Clause 17.4(b) [ Consequences of
Employer’s Risks ] and Sub-Clause 17.5 [ Intellectual and Industrial
Property Rights ].
Page 38 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
This sub-clause shall not limit liability in any case of fraud, deliberate
default or reckless misconduct by the defaulting Party.
If any loss or damage happens to any of the above items while the
Contractor is responsible for their care arising from any cause
whatsoever other than those for which the Employer is liable, the
Contractor shall, at his own cost, rectify the loss or damage to the
satisfaction of the Engineer.
Sub-Clause 18.1 Replace the third paragraph of Sub-Clause 18.1 with the following:
General
Requirements for Wherever the Employer is the insuring Party, each insurance shall be
Insurance effected with insurers and in terms acceptable to the Contractor. These
terms shall be consistent with any terms agreed by both Parties before
the date of the Letter of Acceptance. This agreement of terms shall
take precedence over the provisions of this clause.
Sub-Clause 18.2 Replace the sub-paragraph (d) of Sub-Clause 18.2 with the
Insurance for following:
Works and
(d) shall also cover, to the extent specifically required in the
Contractor’s
bidding documents of the Contract, loss or damage to a part of
Equipment
the Works which is attributable to the use or occupation by the
Employer of another part of the Works, and loss or damage
from the risks listed in sub-paragraphs (c), (g) and (h) of Sub-
Clause 17.3 [Employer’s Risks], excluding (in each case) risks
which are not insurable at commercially reasonable terms,
with deductibles per occurrence of not more than the amount
stated in the Contract Data (if an amount is not so stated, this
Page 39 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 18.4 Replace the second paragraph of Sub-Clause 18.4 with the following:
Insurance for
Contractor’s The insurance shall cover the Employer and the Engineer against
Personnel liability for claims, damages, losses and expenses (including legal
fees and expenses) arising from injury, sickness, disease or death of
any person employed by the Contractor or any other of the
Contractor’s Personnel, except that this insurance may exclude losses
and claims to the extent that they arise from any explicit act or neglect
of the Employer or of the Employer’s Personnel.
Sub-Clause 19.1 Replace the sub-paragraphs (ii) and (iii) in the second paragraph of
Definition of Sub-Clause 19.1 with the following:
Force Majeure
(ii) rebellion, terrorism, sabotage by persons other than the
Contractor’s Personnel, revolution, insurrection, military or
usurped power, or civil war,
(iii) riot, commotion, disorder, strike or lockout by persons other
than the Contractor’s Personnel,
Sub-Clause 19.4 Replace the sub-paragraphs (b) of Sub-Clause 19.4 with the
Page 40 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Consequences of following:
Force Majeure
(b) if the event or circumstance is of the kind described in sub-
paragraphs (i) to (iv) of Sub-Clause 19.1 [Definition of Force
Majeure] and, in the case of subparagraphs (ii) to (iv), occurs
in the Country, payment of any such Cost, including the costs
of rectifying or replacing the Works and/or Goods damaged or
destroyed by Force Majeure, to the extent they are not
indemnified through the insurance policy referred to in Sub-
Clause 18.2 [Insurance for Works and Contractor’s
Equipment].
Sub-Clause 19.6 Replace the sub-paragraphs (c) of Sub-Clause 19.6 with the
Optional following:
Termination,
Payment and (c) any other Costs or liabilities which in the circumstances were
Release reasonably and necessarily incurred by the Contractor in the
expectation of completing the Works;
Sub-Clause 20.1 Replace the whole of Sub-Clause 20.1 with the following:
Contractor’s
Claim If the Contractor considers himself to be entitled to any extension of
the Time for Completion and/or any additional payment, under any
clause of these Conditions or otherwise in connection with the
Contract, the Contractor shall give notice to the Engineer, describing
the event or circumstance giving rise to the claim. The notice shall be
given as soon as practicable, and not later than 28 days after the
Contractor became aware, or should have become aware, of the event
or circumstance.
The Contractor shall also submit any other notices which are required
by the Contract, and supporting particulars for the claim, all as
relevant to such event or circumstance.
Page 41 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Within 42 days after the Contractor became aware (or should have
become aware) of the event or circumstance giving rise to the claim,
or within such other period as may be proposed by the Contractor and
approved by the Engineer, the Contractor shall send to the Engineer a
fully detailed claim which includes full supporting particulars of the
basis of the claim and of the extension of time and/or additional
payment claimed. If the event or circumstance giving rise to the claim
has a continuing effect:
If the Engineer does not respond within the timeframe defined in this
clause, either Party may consider that the claim is rejected by the
Engineer and any of the Parties may refer to the Dispute Board in
accordance with Sub-Clause 20.4 [Obtaining Dispute Board’s
Decision].
Page 42 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 20.2 Replace the title and whole of Sub-Clause 20.2 with the following:
Appointment of
the Dispute Sub-Clause 20.2 Appointment of the Dispute Board
Adjudication
Board Disputes shall be referred to a DB for decision in accordance with
Sub-Clause 20.4 [Obtaining Dispute Board’s Decision]. The Parties
shall appoint a DB by the date stated in the Contract Data. The date
may be changed if both the Parties agree, in writing, to change the
date, up to three hundred and sixty-five days after the Commencement
Date.
If the Parties have not jointly appointed the DB 21 days before the
date stated in the Contract Data and the DB is to comprise three
persons, each Party shall nominate one member for the approval of
the other Party. The first two members shall recommend and the
Parties shall agree upon the third member, who shall act as chairman.
The agreement between the Parties and either the sole member or each
of the three members shall incorporate by reference the General
Conditions of Dispute Board Agreement contained in the Appendix
to these General Conditions, with such amendments as are agreed
between them.
If at any time the Parties so agree, they may jointly refer a matter to
the DB for it to give its opinion. Neither Party shall consult the DB on
Page 43 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 20.3 Replace the title and whole of Sub-Clause 20.3 with the following:
Failure to Agree
Dispute Sub-Clause 20.3 Failure to Agree on the Composition of the
Adjudication Dispute Board
Board
If any of the following conditions apply, namely:
(a) the Parties fail to agree upon the appointment of the sole
member of the DB by the date stated in the first paragraph of
Sub-Clause 20.2 [Appointment of the Dispute Board],
(b) either Party fails to nominate a member (for approval by the
other Party), or fails to approve a member nominated by the
other Party, of a DB of three persons by such date,
(c) the Parties fail to agree upon the appointment of the third
member (to act as chairman) of the DB by such date, or
(d) the Parties fail to agree upon the appointment of a replacement
person within 42 days after the date on which the sole member
or one of the three members declines to act or is unable to act
as a result of death, disability, resignation or termination of
appointment,
then, the appointing entity or official named in the Contract Data shall,
upon the request of either or both of the Parties and after due
consultation with both Parties, appoint this member of the DB. This
appointment shall be final and conclusive. Each Party shall be
responsible for paying one-half of the remuneration of the appointing
entity or official.
Sub-Clause 20.4 Replace the title and whole of Sub-Clause 20.4 with the following:
Obtaining
Dispute Sub-Clause 20.4 Obtaining Dispute Board’s Decision
Adjudication
Board’s Decision If a dispute (of any kind whatsoever) arises between the Parties in
connection with, or arising out of, the Contract or the execution of the
Works, including any dispute as to any certificate, determination,
Page 44 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
If either Party is dissatisfied with the DB’s decision, then either Party
may, within 28 days after receiving the decision, give a Notice of
Dissatisfaction to the other Party indicating its dissatisfaction and
intention to commence arbitration. If the DB fails to give its decision
within the period of 84 days (or as otherwise approved) after receiving
such reference, then either Party may, within 28 days after this period
has expired, give a Notice of Dissatisfaction to the other Party.
Sub-Clause 20.5 Replace the whole of Sub-Clause 20.5 with the following:
Amicable
Settlement Where a Notice of Dissatisfaction has been given under Sub-Clause
20.4 above, both Parties shall attempt to settle the dispute amicably
Page 45 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 20.6 Replace the whole of Sub-Clause 20.6 with the following:
Arbitration
Any dispute between the Parties arising out of or in connection with
the Contract not settled amicably in accordance with Sub-Clause 20.5
above and in respect of which the DB’s decision (if any) has not
become final and binding shall be finally settled by arbitration.
Arbitration shall be conducted as follows:
The arbitrators shall have full power to open up, review and revise
any certificate, determination, instruction, opinion or valuation of the
Engineer, and any decision of the DB, relevant to the dispute. Nothing
shall disqualify representatives of the Parties and the Engineer from
being called as a witness and giving evidence before the arbitrators on
any matter whatsoever relevant to the dispute.
Page 46 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Sub-Clause 20.7 Replace the title and whole of Sub-Clause 20.7 with the following:
Failure to
Comply with Sub-Clause 20.7 Failure to Comply with Dispute Board’s
Dispute Decision
Adjudication
Board’s Decision In the event that a Party fails to comply with a final and binding DB
decision, then the other Party may, without prejudice to any other
rights it may have, refer the failure itself to arbitration under Sub-
Clause 20.6 [Arbitration]. Sub-Clause 20.4 [Obtaining Dispute
Board’s Decision] and Sub-Clause 20.5 [Amicable Settlement] shall
not apply to this reference.
Sub-Clause 20.8 Replace the title and whole of Sub-Clause 20.8 with the following:
Expiry of Dispute
Adjudication Sub-Clause 20.8 Expiry of Dispute Board’s Appointment
Board’s
Appointment If a dispute arises between the Parties in connection with, or arising
out of, the Contract or the execution of the Works and there is no DB
in place, whether by reason of the expiry of the DB’s appointment or
otherwise:
Appendix Replace the title and whole of Appendix with the following:
General
Conditions of Appendix: General Conditions of Dispute Board Agreement
Dispute
Adjudication 1. Definitions
Agreement
Each “Dispute Board Agreement” is a tripartite agreement by and
between:
(i) the sole member of the “DB” and, where this is the case,
all references to the "Other Members” do not apply, or
(ii) one of the three persons who are jointly called the “DB”
(or “Dispute Board”) and, where this is the case, the
other two persons are called the “Other Members”.
The Employer and the Contractor have entered (or intend to enter)
into a contract, which is called the “Contract” and is defined in the
Dispute Board Agreement, which incorporates this Appendix. In
the Dispute Board Agreement, words and expressions which are
Page 47 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
2. General Provisions
3. Warranties
Page 48 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 49 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Personnel respectively.
The Employer and the Contractor undertake to each other and to
the Member that the Member shall not, except as otherwise agreed
in writing by the Employer, the Contractor, the Member and the
Other Members (if any):
6. Payment
(i) being available on 28 days’ notice for all site visits and
hearings;
(ii) becoming and remaining conversant with all project
developments and maintaining relevant files;
(iii) all office and overhead expenses including secretarial
services, photocopying and office supplies incurred in
connection with his duties; and
(iv) all services performed hereunder except those referred
to in sub-paragraphs (b) and (c) of this clause.
The retainer fee shall be paid with effect from the last day of
the calendar month in which the Dispute Board Agreement
becomes effective; until the last day of the calendar month in
which the Taking-Over Certificate is issued for the whole of
Page 50 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
the Works.
With effect from the first day of the calendar month following
the month in which the Taking-Over Certificate is issued for
the whole of the Works, the retainer fee shall be reduced by
one third. This reduced fee shall be paid until the first day of
the calendar month in which the Member resigns or the
Dispute Board Agreement is otherwise terminated.
Page 51 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
apply to the Employer (in the Statements under the Contract) for
reimbursement of one-half of the amounts of these invoices. The
Employer shall then pay the Contractor in accordance with the
Contract.
If the Contractor fails to pay to the Member the amount to which
he/she is entitled under the Dispute Board Agreement, the
Employer shall pay the amount due to the Member and any other
amount which may be required to maintain the operation of the
DB; and without prejudice to the Employer’s rights or remedies.
In addition to all other rights arising from this default, the
Employer shall be entitled to reimbursement of all sums paid in
excess of one-half of these payments, plus all costs of recovering
these sums and financing charges calculated at the rate specified
in Sub-Clause 14.8 of the Conditions of Contract.
If the Member does not receive payment of the amount due within
70 days after submitting a valid invoice, the Member may (i)
suspend his/her services (without notice) until the payment is
received, and/or (ii) resign his/her appointment by giving notice
under Clause 7.
7. Termination
At any time: (i) the Employer and the Contractor may jointly
terminate the Dispute Board Agreement by giving 42 days’ notice
to the Member; or (ii) the Member may resign as provided for in
Clause 2.
If the Member fails to comply with the Dispute Board
Agreement, the Employer and the Contractor may, without
prejudice to their other rights, terminate it by notice to the
Member. The notice shall take effect when received by the
Member.
If the Employer or the Contractor fails to comply with the Dispute
Board Agreement, the Member may, without prejudice to his
other rights, terminate it by notice to the Employer and the
Contractor. The notice shall take effect when received by them
both.
Any such notice, resignation and termination shall be final and
binding on the Employer, the Contractor and the Member.
However, a notice by the Employer or the Contractor, but not by
both, shall be of no effect.
Page 52 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
9. Dispute
2. The timing of and agenda for each Site visit shall be as agreed
jointly by the DB, the Employer and the Contractor, or in the
absence of agreement, shall be decided by the DB. The purpose
of Site visits is to enable the DB to become and remain
acquainted with the progress of the Works and of any actual or
potential problems or claims, and, as far as reasonable, to
endeavor to prevent potential problems or claims from becoming
disputes.
Page 53 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
8. The Employer and the Contractor empower the DB, among other
things to:
Page 54 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section VIII. Particular Conditions (PC)
Page 55 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Table of Forms
Letter of Acceptance................................................................................................................... 57
Contract Agreement.................................................................................................................... 58
Page 56 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Letter of Acceptance
[Insert letterhead paper of the Employer]
[Insert date]
This is to notify you that your Bid dated [insert date] for execution of the [insert name of the
Contract and identification number, as given in the Contract Data] for the Accepted Contract
Amount of the equivalent of [insert amount in words and figures] [insert name of currency], as
corrected and modified in accordance with the Instructions to Bidders, is hereby accepted by our
Agency.
You are requested to furnish the Performance Security within 28 days in accordance with the
Conditions of Contract, using for that purpose one of the Performance Security Forms included
in Section IX, Annex to the Particular Conditions - Contract Forms, of the Bidding Documents
Page 57 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Contract Agreement
THIS AGREEMENT made the [insert day] day of [insert month], [insert year], between [insert
name of the Employer] (hereinafter “the Employer”), of the one part, and [insert name of the
Contractor] (hereinafter “the Contractor”), of the other part:
WHEREAS the Employer desires that the Works known as [name of the Contract] should be
executed by the Contractor, and has accepted a Bid by the Contractor for the execution and
completion of these Works and the remedying of any defects therein,
The Employer and the Contractor agree as follows:
1) In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Contract documents referred to.
2) The following documents shall be deemed to form and be read and construed as part of
this Agreement. This Agreement shall prevail over all other Contract documents.
a) the Letter of Acceptance;
b) the Record of Meeting on Contract Negotiation;
c) the Addenda (the items of the Addenda shall have priority over the respective items
of the related section of the Contract Documents);
d) the Price Bid;
e) the Technical Bid, except the Contractor’s Technical Proposal;
f) the Particular Conditions-Part A;
g) the Particular Conditions-Part B;
h) the General Conditions;
i) the Employer’s Requirements-Design Requirement and Criteria;
j) the Employer’s Requirements- Technical Specifications;
k) the Employer’s Requirements - General Specifications;
l) the Employer’s Requirements - Drawings;
m) the Acknowledgement of Compliance with Guidelines for Procurement under
Japanese ODA Loans;
n) the Contractor’s Technical Proposal;
o) the Reference Information/ Report; and
p) Any other documents forming part of the Contract 1.
1
Like; replies to the Bidders’ queries.
Page 58 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
IN WITNESS, whereof the parties hereto have caused this Agreement to be executed in
accordance with the Laws of the Republic of India. on the day, month and year specified above.
Witness, Name, Signature, Address, Date Witness, Name, Signature, Address, Date
Page 59 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Whereas the Employer and the Contractor have entered into the Contract and desire jointly to
appoint the Member to act as one of the three persons who are jointly called the "DB" [and desire
the Member to act as chairman of the DB]:
The Employer, Contractor and Member jointly agree as follows:
1. The conditions of this Dispute Board Agreement comprise the "General Conditions of
Dispute Board Adjudication Agreement", which is appended to the General Conditions
of the "Conditions of Contract for Plant and Design-Build for Electrical and Mechanical
Plant, and for Building and Engineering Works, Designed by the Contractor”, First
Edition 1999, published by the International Federation of Consulting Engineers
(Fédération Internationale des Ingénieurs-Conseils; FIDIC), designated as SectionVII
[General Conditions]., and the following provisions. In these provisions, which include
amendments and additions to the General Conditions of Dispute Board Agreement,
words and expressions shall have the same meanings as are assigned to them in the
General Conditions of Dispute Board Agreement.
2. [Details of amendments to the General Conditions of Dispute Board Agreement, if any.
For example: In the procedural rules annexed to the General Conditions of Dispute
Board Agreement, Rule ___ is deleted and replaced by: “ … “ ]
3. In accordance with Clause 6 of the General Conditions of Dispute Board Agreement, the
Member shall be paid as follows:
A retainer fee of ________________ per calendar month,
plus a daily fee of _______________ per day.
4. In consideration of these fees and other payments to be made by the Employer and the
Contractor in accordance with Clause 6 of the General Conditions of Dispute Board
Agreement, the Member undertakes to serve, as described in this Dispute Board
Agreement, as one of the three persons who are jointly to act as the DB.
5. The Employer and the Contractor jointly and severally undertake to pay the Member, in
consideration of the carrying out of these services, in accordance with Clause 6 of the
General Conditions of Dispute Board Agreement.
6. This Dispute Board Agreement shall be governed by the Laws of: ________________
Page 60 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
SIGNED by
for and on behalf of the Employer in the presence of:
Witness
Name
Address
Date
SIGNED by
for and on behalf of the Contractor in the presence of
Witness
Name
Address
Date
SIGNED by
The Member in the presence of
Witness
Name
Address
Date
Page 61 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Performance Security
(Demand Guarantee)
[This form is to be used if the BG is to be submitted as individual entity or as a joint
venture/consortium in case of a venture/consortium]
[Insert Guarantor letterhead or SWIFT identifier code]
We have been informed that [insert name of Contractor, which in the case of a joint
venture/consortium shall be the name of the joint venture/consortium] (hereinafter called "the
Applicant") has entered into Contract No. [insert reference number of the contract] dated [insert
date] with the Beneficiary, for the execution of [insert name of the contract and brief description
of the Works] (hereinafter called "the Contract").
At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of [insert amount in
figures]([insert amount in words]), 1 such sum being payable in the types and proportions of
currencies in which the Contract Price is payable, upon receipt by us of the Beneficiary’s
complying demand supported by the Beneficiary’s statement, whether in the demand itself or in
a separate signed document accompanying or identifying the demand, stating that the Applicant
is in breach of its obligation(s) under the Contract, without the Beneficiary needing to prove or
to show grounds for its demand or the sum specified therein.
This guarantee shall expire, no later than the [insert the day] day of [insert month], [insert year] 2,
and any demand for payment under it must be received by us at this office indicated above on or
before that date.
1
The Guarantor shall insert an amount representing the percentage of the Accepted Contract Amount specified
in the Letter of Acceptance, less provisional sums, if any, and denominated either in the currency(cies) of the
Contract or a freely convertible currency acceptable to the Beneficiary.
2
Insert the date twenty-eight days after the expected completion date as described in GC Clause 11.9.
Page 62 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed one
year, in response to the Beneficiary’s written request for such extension, such request to be
presented to the Guarantor before the expiry of the guarantee.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010
Revision, ICC Publication No. 758, except that the supporting statement under Article
15(a) is hereby excluded.
a) Our liability under this Guarantee shall not exceed [insert amount in figures] ([insert
amount in words]),
b) This Guarantee shall be valid up to [insert the day] day of [insert month], [insert year]2,
c) We are liable to pay the guaranteed amount or any part thereof under the Guarantee only
and only if you serve upon us a written claim or demand on or before ____________
(date which is 3 months after date mentioned at (b) above).
Date -------------------
Place --------------------- [Signature of Authorised person of Bank]
[Name in Block letters] ---------- ----------
[Designation] -------------------------------
[P/Attorney] No. ----------------------------
[Note: All italicized text (including footnotes) is for use in preparing this form and shall be
deleted from the final product.]
Page 63 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
Performance Security
(Demand Guarantee)
[This form is to be used if the BG is to be submitted by individual member of a joint
venture/consortium]
The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed one
1
The Guarantor shall insert an amount representing the percentage of the Accepted Contract Amount specified
in the Letter of Acceptance, less provisional sums, if any and denominated either in the currency(cies) of the
Contract or a freely convertible currency acceptable to the Beneficiary.
2
Insert the date twenty-eight days after the expected completion date as described in GC Clause 11.9.
Page 64 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
year, in response to the Beneficiary’s written request for such extension, such request to be
presented to the Guarantor before the expiry of the guarantee.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010
Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is
hereby excluded.
Notwithstanding anything contained herein:
a) Our liability under this Guarantee shall not exceed [insert amount in figures] ([insert
amount in words]),
b) This Guarantee shall be valid up to [insert the day] day of [insert month], [insert year] 2,
c) We are liable to pay the guaranteed amount or any part thereof under the Guarantee only
and only if you serve upon us a written claim or demand on or before ____________ (date
which is 3 months after date mentioned at (b) above).
Date -------------------
Place --------------------- [Signature of Authorised person of Bank]
[Name in Block letters] ---------- ----------
[Designation] -------------------------------
[P/Attorney] No. ----------------------------
[Note: All italicized text (including footnotes) is for use in preparing this form and shall be
deleted from the final product.]
Page 65 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
(Demand Guarantee)
We have been informed that [insert name of Contractor, which in the case of a joint
venture/consortium shall be the name of the joint venture/consortium] (hereinafter called “the
Applicant”) has entered into Contract No. [insert reference number of the contract] dated [insert
date of the contract] with the Beneficiary, for the execution of [insert name of contract and brief
description of Works] (hereinafter called "the Contract").
Furthermore, we understand that, according to the conditions of the Contract, an advance
payment in the sum [insert amount in figures] ([insert amount in words]) is to be made against
an advance payment guarantee.
At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of [insert amount in figures]
([insert amount in words]) 1 upon receipt by us of the Beneficiary’s complying demand supported
by the Beneficiary’s statement, whether in the demand itself or in a separate signed document
accompanying or identifying the demand, stating either that the Applicant:
(a) has used the advance payment for purposes other than the costs of mobilization in respect
of the Works; or
(b) has failed to repay the advance payment in accordance with the Contract conditions,
specifying the amount which the Applicant has failed to repay.
A demand under this guarantee may be presented as from the presentation to the Guarantor of a
certificate from the Beneficiary’s bank stating that the advance payment referred to above has
been credited to the Applicant on its account number [insert number] at [insert name and address
of Applicant’s bank].
The maximum amount of this guarantee shall be progressively reduced by the amount of the
advance payment repaid by the Applicant as specified in copies of interim statements or payment
1
The Guarantor shall insert an amount representing the amount of the advance payment and denominated either
in the currency(ies) of the advance payment as specified in the Contract, or in a freely convertible currency
acceptable to the Employer.
Page 66 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
certificates which shall be presented to us. This guarantee shall expire, at the latest, upon our
receipt of a copy of the interim payment certificate indicating that ninety (90) percent of the
Accepted Contract Amount, less provisional sums, has been certified for payment, or on the
[insert day] day of [insert month], [insert year], 2 whichever is earlier. Consequently, any
demand for payment under this guarantee must be received by us at this office on or before that
date.
The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed one
year, in response to the Beneficiary’s written request for such extension, such request to be
presented to the Guarantor before the expiry of the guarantee.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision,
ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby
excluded.
Date -------------------
Place --------------------- [Signature of Authorised person of Bank]
[Name in Block letters] ---------- ----------
[Designation] -------------------------------
[P/Attorney] No. ----------------------------
[Note: All italicized text (including footnotes) is for use in preparing this form and shall be
deleted from the final product.]
2
Insert the expected expiration date of the Time for Completion.
Page 67 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
1
The Guarantor shall insert an amount representing the amount of the second half of the Retention Money or if
the amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than
half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under
the Performance Security and denominated either in the currency(ies) of the second half of the Retention Money
as specified in the Contract, or in a freely convertible currency acceptable to the Beneficiary.
2 Insert the date twenty-eight days after the expected completion date as described in GC Clause 11.9.
Page 68 of 69
Project for Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 3
Package No. MAHSR-C-8 Section IX. Annex to the Particular Conditions – Contract Forms
The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed one
year, in response to the Beneficiary’s written request for such extension, such request to be
presented to the Guarantor before the expiry of the guarantee.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision,
ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby
excluded.
Date -------------------
Place --------------------- [Signature of Authorised person of Bank]
[Name in Block letters] ---------- ----------
[Designation] -------------------------------
[P/Attorney] No. ----------------------------
[Note: All italicized text (including footnotes) is for use in preparing this form and shall be
deleted from the final product.]
Page 69 of 69