You are on page 1of 12

Greatwall Drilling Company

HSE Plan of drilling rig

for well pad K(Ga-K106P)

Rig number Prepared by Audited by Approved by Approved time

GW52 2022-8-25
GWDC Rig-52, Graff Project

1. Brief introduction
1.1 Owner (COMPANY) of the well: Petronas
1.2 Location of the well: 31° 45' 18.96" N; 46° 08' 31.24" E
1.3 Designed depth of the well: 2,462.97 m-TVDDF / 2,613.0 m-MDDF
1.4 Purpose of the well: single selective oil producer
1.5 Well type: Direction well
1.6 Bed of interest: Shall be at PCIHBV Geologist's discretion
2. Identification of new hazardous factors before project commencement (Note:
Mainly including but not limited to the following aspects)
2.1 hazardous factors caused by personnel, technology and equipment / facility
changing
a) If there is new person or key post adjusted person who may be not very familiar

with equipment operation or lack of site experience in the well: (Yes √ , No □)

b) Whether the well uses any new process and new technology: (Yes □, No √ )

c) Equipment and facility changed for the well may have intrinsic fault, safety
protection defect, unimproved technical specifications, or without technical

specifications: (Yes □, No √ )

d) Whether the well uses any new materials that may do harm to people or pollute

environment: (Yes □, No √ )

e) If there is any change in well design: (Yes □, No √ )

f) Green hand easy injury by lack of experience.


g) Key position changed frequently, and new person lack of operation skills and
communications.
h) Unknow the lithology of the formation due to the first time drilling at this area,
May caused stuck and kick. And the damage risk on the drill pipe.
2.2 Main risk hints in geology and engineering design

a) If there is any shallow gas zone in the well (Yes □, No √ )

2
b) If there is toxic and hazardous gas such as H2S、CO etc. in the well:

(Yes √ , No □)

c) If the well is rich in high gas pressure and high pressure of the well and plentiful
Sulfur as specified in the detailed rules for implementation of well control:

(Yes □, No √ )

d) More wiper trip needed, due to the new lithology unknow.


e) Keep good properties of the mud, Make sure enough lubrication on the mud in
the downhole.
2.3 hazardous factors caused by geological and environment
a) If there is any water (steam) injection well and oil (gas) production well

surrounding the well: (Yes √ , No □)

b) If there are three aboveground wires (high and low voltage wires, communication

wires) above the well site ground: (Yes √ , No □)

c) If there are three underground lines (oil, gas, water pipelines, and underground

cable) under the well site ground: (Yes √ ,, No □)

d) If there is any residential building, school, factory and mine (including mining
unit which produce underground resources) and national defense facility:

(Yes □, No √ )

e) If there is any environmental sensitive area such as riverbed, marine beach, lake,
salt pan, reservoir, aquaculture, water resources, wild animal and plant protection

area surrounding the well: (Yes □, No √ )

f) If there is production facility of relevant parties on the well site, such as old
wellhead, oil tank, heating furnace (open fire), transformer, oilfield constructed

joint station, gathering, transportation station, etc. : (Yes √ , No □)

g) If there is road across the well site, and if there is any express highway and

railway in 500m around the well site: (Yes □, No √)

h) Whether the well site is a new location, and whether there is any risk of well site
collapse or landslide, foundation subsiding and mud pit (waste water reservoir)

3
collapse: (Yes □, No √ )

i) If the well site is located on hill top, there is any risk of landslip and debris flow:

(Yes □, No √ )

j) If there is any endemic disease or infectious disease in the area where well site is

located: (Yes √ , No□)

k) If there is local custom taboo and religious belief in the area where well site is

located: (Yes √ , No □)

l) If the public security environment is good surrounding the well: (Yes □, No √ )

m) If there is any underground concealed substance, cultural relics and historic site

surrounding the well: (Yes □, No √ )

n) If there is blind area of communication surrounding the well: (Yes □, No √ )

o) If there is storm, lightning strike, flood, cyclone, storm surge and sand storm etc.

in the well: (Yes □, No √ )

p) If there is high temperature heat stroke, and rotten and deteriorated food such as

vegetables in the locality: (Yes √ , No □)

q) If there is operation in cold winter: (Yes √ , No □)

r) If there is operation in rainy season: (Yes √ , No □)

s) Other risks : Strong season wind caused the cable down to the mast or twist on
the mast from the TDS..
t) Production wells have been working in the same plot, The risk of fire and
explosion probability would be higher.
u) Pandemic COVID-19 is spreading fast in Iraq. It may infect personnel and cause
operation suspended.
v) Local landlord block the road and security issue should pay highly attention to.
3. Risk elimination, reduction and control measures established for new
hazardous factors Identified before operation, One by One. (Note: In term of

4
common operation hazards elimination or reduction, referring to Drilling /
Workover Operation HSE Instructor)
A\ Risk from personal changed: HSE orientation & training according to training
matrix as per HSE-MS, Safety Training Observation Program, etc.
B\ Risk from new process & technology : the same above and management program
of technology change, etc.
C\ Risk from equipment change and repair: the same above, lock out and tagout
program management program of equipment change, work permit, etc.
D\ Green hands. To implement Green Hands Policy including buddy system and
person to person training at rig site. Bule helmets issued for green hands. No
supervision, no work.
E\ risk identifying of others: Stop Work Policy,
Hazard hunt program including STOP card,
Pre-job safety meeting,
JSA,
Permit to Work System
Other HSE tools and risk control measures, etc
F\ COVID-19 prevention. All personnel shall be trained according to “CNPC
Covid-19 management instructions”, “GWDC Covid-19 management instructions”,
“GWDC SOP Against COVID19” to manage Covid-19. All employees shall follow
Eriell covid-19 sop.
Note: 13 wells are designed on wellpad K. Fly camp and the drilling crew will
remain the same. The main risks remain the same for all 13 wells.

4. Emergency Management
4.1 The emergency plan cited or re-established to this well are as follows. (Note:
An existing emergency plan may be cited directly, or re-made according to well
site conditions)
4.1.1 Fire Fighting ERP

5
4.1.2 H2S ERP

4.1.3 Well Control ERP

6
4.1.4 COVID-19 ERP CHART

report it to ERIELL &


Monitor PUI GWDC RM & SMP SMP check the PUI by
ASAP on radio RTK

Irrelevant personnel stay in place and do


not move.

Negative Positive

the local PUI will be sent to local hospital for Initiate the PUI last 14 days history tracing and
further treatment and go home rest until recovery. close contact personnel. Notify ERIELL, and
The GWDC expat PUI will be sent to GSCC and trigger GW52 covide-19 ERP. GWDC RM reports
get treatment by SOS doctor until his recovery. to GSCC.

Suspend the operation temporarily, Find close contact. The close contact personnel will
also be conducted RTK, the personnel who is with positive result will be treated as PUI.

Local Expat

send him to Iraq government designated hospital and connect Iraq government designated
have PCR test, then he will go home for self-isolation PCR agency for test on site.
and wait the result.

Negative Positive Negative

go to Iraq designated get treatment by transfer to the


rest until recovery
hospital for further cure the SOS doctor and need recommended
Positive
case. observed until his hospital by SMP.
recovery and report RM should report
to ERIELL to get the it to GSCC for
approval for further treatment
releasing the case. decision.

ERIELL and GWDC should assess this situation and make decision to suspend or
stop the operation. If need suspend or stop the operation, ensure secure the well.

7
4.1.5 Evacuate emergency flowchart

When hearing a explosion sound or gun shot sound on location

SSM sends alarm signal

Stop all work and lay down on floor. If derrick and


location lighting equipment can be turned off at
night, fly camp area should be kept powered to
communicate with external.

SSM sends second times alarm signal

All person evacuate to bunkers, HSE


supervisor counting people person on
bunkers. Search and rescue team get ready
for search missing person.

If the gate to well site is not effectively controlled, If the gate of well site is not compromised and
rig manager immediately reports to GSCC. All effectively controlled, after the militants retreat,
personnel must not blindly resist, do a good job of report immediately to GSCC according to rig
hiding, and stick to the rescue. manager and wait for the next step of GSCC.

All personnel evacuate from the WPK to GSCC base as


planned.

8
4.2 Emergency drill arrangement (May be arranged according to main risks and
new risks of the well)

4.3 External support and emergency phone numbers


(1) Eriell Project Manager Iskandar Kasimov: +9647812408739
Eriell HSE Manager Leonid Ryabov: +9647812408617
Eriell Security manager A. Khudaybergenov: +9647820167296
Eriell Security manager Mark Henderson: 07834995004
(2) GSCC Clinic Doctor Tel: 00964 7835769646
(3) Yin Honghui: 00964 7834951849
Wang Lijun: 00964 7829774006
Chen Liqi: 00964 7834965086
Luo Wei: 00964 7802145050

9
4 Report program & route

PM ERIELL

HSE Dept Security


Manager

Operation Security Company


Manager Project manager

HSE Rig manager Site Security


Supervisors Manager
Operation
Any
incident incident

Security event

Staff on site Security Guards

5. Traffic Schematic Map of the well pad K

10
6. Emergency Escape Route Map of the well pad K.

11
7.Personal information of key post on board:

Years of Certificates
No. Name Post Age
work qualifying
1 Wang Xuguang RM 44 23 IADC/HSE

2 Nan Xiaofang HSE 41 15 IADC/HSE

3 Wang Chong Toolpusher 37 13 IADC /HSE

4 Li Peifeng Driller 42 23 IWCF /HSE

5 Lei Yu Toolpusher 33 13 IADC /HSE

6 Navied Toolpusher 33 8 IADC /HSE

7 Mustansar Toolpusher 33 8 IADC /HSE

8 Liu Jiang Driller 43 19 IADC /HSE

9 Jiang Liwei Driller 42 16 IADC /HSE

10 Tan Zhengjun Electrician 36 13 IADC/HSE

11 Meng Fantao Mechanic 48 24 IADC/HSE

12 Cheng Zhiwu Mechanic 49 26 IADC/HSE

12