You are on page 1of 14

Nig strike

Project: AZURE WIND FRI,8/5/2022 NORDEX HSE Field Observer:


Weather: Clear and Victor Espinosa
hot. Up to 104 today NO INCIDENTS TO victorespinosa@ymail.com
REPORT victor Cell #: 325-721-0940

WTG and Daily Task / Total Hc = 17


Task Crew and Lead Tower
Replace IPC, DWT, Alltite, RTC, Spark, K-6, N-2, K-1, J-5,
Maintenance, T Kosh,

Safety/Personnel Observations

Safety topics: Propper lifting practices, any injures are to be reported


immediately, use your legs for lifting not your back.

 Daily Fit to work Stretch and Flex @


7:am
 Daily Documentation: as in JSCA
must be completed before work.
 Daily Conditions and Resources to the
field. 
 Confirmation of LIFE Saving Rules
Compliance at all times
 Support the day-to-day startup of
Operations: Make a plan with your
group
 Daily Turn Page communication with
AM HSE Filed Advisor: communicate
bring up to each other of an incident
or accidents.
Up tower inspection at K-1 and I-6
Base of Tower:
 Drop Zone Establishment and
compliance, Radios Vehicle Parking,
housekeeping and conditions, it is
important to set up your perimeters
 Base of tower documentation, Area
set up, documents and communication
JSCA must be available with contact
info.
 In general Area, gear, tools and
conditions set up and keep up.
 Rescue gear availability YES

At all times weather awareness, wind speed


limitations, Crew locations, Head count
during Shift, BE aware when lightning is in
the area. If employees leave, please let the
lead know.

Material / Equipment / Environment. End of day overall Safety.

All equipment inspected and working condition observed. Check power cords and hydraulic
hoses. Every day before use must be inspected.

Overall Observed, LOTO tags Need to be completed, was discussed and Corrected
All crews and individuals observed committed to HSE Program. Good use of PPE and
keeping hands out of pinch points.
Heat and humidity major concern of workforce. Heat up to 104 Degrees today

Comments: Safety Cones are being set up for drop zone in proper locations, good jobs.

Radio Resources Observed and Constant Radio


Checks during shift.

Radio Check Times:


8:19 am
10:46:am
1:30 PM & 3:30 PM
Temp Check Times:
82 degrees @ 6:45 am

Field Images

S
Tower I-6 JSCA good and complete
Tower I-6 Inspection on lifting bags
or in good Condition
Tower I-6 back side of JSCA
Tower I-6 inspection of lifting bags
in good condition.
Tower I-6 confined space log must be
complete before entering.
Tower I-6 Photo of proper
extracting practices for working in
the blade for confined space.
Tower K-1 JSCA Need to have tower #
Tower K-1 need to have correct day,
Issue was corrected.
Tower K-1 wire out of box in
the Lift.
End of Report
Tower K-1 equipment should
not have power cord
underneath