F 1O mm thk.
AIR CHAMBER
CEMENT
ADHESIVE

100
300
LAV
STRAINER
3/4"X3/4" dia
G.I TEE 50
GV 65 mm thk.
1"X3/4" dia G.I CONCRETE SLAB
TEE
3/4" dia.SOCKET
1 1/2" dia. P-TRAP

800
EXTENSION

3" dia. X 45 deg.


1" dia. G.I PIPE PVC ELLBOW
(SCHEDULE 40)
3" dia. X 45 deg.
SANIYARY WYE
3" dia. PVC PIPE
3" dia CLEANOUT
3" dia.X 3" dia X 45
deg. SANIYARY
WYE FFL

NGL

2 % SLOPE

3" dia X45 deg.


PVC ELLBOW

1. ALL PLUMBING PLAN SPECIFICATIONS AND SHOP DRAWINGS SHALL MEET ALL REQUIREMENTS SET BY THE
NATIONAL BUILDING CODE,NATIONAL PLUMBING CODE, AND THE LOCAL CODE OF CAGAYAN DE ORO CITY.
2. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED,
G
IN E
MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
IST IN
EX ERL F G 3. SHOP DRAWINGS WITH THE ERECTION AND PLACING OF PLUMBING MEMBERS SHALL BE SUBMITTED FOR THE
TIN ING
O T
GT A KS
IN W S ENGINEER/DESIGNER'S APPROVAL BEFORE FABRICATION.
IST GE I D
EXAINA E
TODR LIN
EXBUIL 4. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED PROPER EXECUTION OF
CO
OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER.
5.PROPOSED PLUMBING UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF
ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.
6. PLUMBING INSTALLATION SHALL NOT IMPAIR THE STRENGTH OF ANY STRUCTURAL MEMBER, COORDINATE WITH
STRUCTURAL PLANS AND DETAILS.
7. MATERIALS USED IN INSTALLATIONS SHALL BE OF APPROVED BRAND, FREE FROM ANY DEFECTS AND PASSED
THE QUALITY SET FORTH BY THE BUREAU OF PHIL. STANDARDS.
8. ALL PIPES AND UTILITIES SHALL BE ANCHORED TO A FIXED SUPPORT.
9. ALL SLOPE FOR SEWER HORIZONTAL BRANCHES SHALL MAINTAIN A 2% SLOPE MINIMUM UNLESS OTHERWISE
WATER METER M
SPECIFIED.
TO EXISTING TO EXISTING GATE VALVE 10. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS
DRAINAGE WATERLINE
LINE INSTRUCTIONS.
CHECK VALVE
11. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE THE WORKS WITH THE
LAVATORY LAV SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTION POINT.
12. CONNECT ALL SEWER INSTALLATION TO A STANDARD SEPTIC TANK IN THE ABSENCE OF SEWER SYSTEM.
SEPTIC VAULT SV
13. MINIMUM EARTH COVER OF 300mm SHALL BE OBSERVED FOR ALL PLUMBING PIPES.
CATCH BASIN CB 14. CONNECT ALL PLUMBING INSTALLATIONS WITH THE APPROPRIATE FITTINGS USING PROCEDURES. SEE
EXISTING MANUFACTURERS SPECIFICATIONS.
VENT.THRU ROOF VTR
BUILDING 15. CONDUCT PROPER ROUGHING-INS AND/OR WATER TEST PRIOR TO POURING TO ENSURE AGAINST LEAKAGE.
FLOOR DRAIN FD 16. ALL PLUMBING FIXTURES SHALL BE AS PER ARCHITECTS SPECIFICATIONS.

CLEANOUT CO
17. ALL PLUMBING INSTALLATIONS AS INDICTED HEREIN SHALL BE DONE AS PER PLANS AND SPECIFICATIONS; NO
ALTERNATIONS SHALL BE DONE WITHOUT THE APPROVAL OF THE DESIGNER; CONSULT DESIGNER AND/OR HIS
FAUCET F
REPRESENTATIVE ON THIS REGARD.
18. ALL WATER SUPPLY PIPES SHALL BE POLYPROPYLENE RANDOM (PPR) PN 20.
19. ALL SOIL AND WASTE PIPES AND FITTINGS SHALL BE PVC SERIES 1000.