1|R e v i s i o n 0 2 JAS-2022.09.14
68 Kalayaan VCP Building EDG & ATS Testing Checklist
10 Maintenance personnel at LG w/ Radio confirms EDG load
measurements in kW.
Record reading:
L1: __________ kW
L2: __________ kW
L3: __________ kW
Average Power: __________ kW (__________% RC)
11 Safety Officer monitors time of from when EDG measures at
least minimum of 35kW load.
Time starts: __________ HRS
12 Maintenance Personnel at LG ensures all EDG parameters are
normal such as Voltage, Speed, Sound
13 Safety Officer monitors time of activity and continue until 10
minutes duration starting from when EDG measures at least
10kW load, then declare to return electrical source to Normal
Power.
Time after 10 minutes: _________ HRS
14 Last record reading prior to unloading the EDG:
L1: __________ kW
L2: __________ kW
L3: __________ kW
Average Power: __________ kW (__________% RC)
15 Maintenance Personnel at 6th, 8th, & 9th Flr w/ Radio stops
HVAC units in area of responsibility to reduce EDG load. Then
confirm all HVAC are already Off.
16 Maintenance Personnel at LG confirms EDG load was reduced
and measures EDG load on the HMI.
Record reading:
L1: __________ kW
L2: __________ kW
L3: __________ kW
Average Power: __________ kW (__________% RC)
17 Maintenance Personnel at LG normalizes Meralco power by Device ID: ECB 2000A
switching ON the main MCCB.
18 Maintenance Personnel at LG confirms transfer of loads to Note:
Normal Power Source. Expects 3 minutes or 180
Record time MCCB ON: __________ HRS seconds EDG cooldown
Record time ATS action (from after ECB-200A MCCB was time before shutdown
switched ON): __________ seconds
Record time EDG cools down & Stop (in seconds from MCCB
was switched ON): __________ seconds; __________ HRS
19 Security personnel at UG w/ Radio confirms availability of
Normal power within area of responsibility.
20 Maintenance personnel at 6th, 8th, & 9th Flr w/ Radio confirms
ATS switching & the availability of Normal power within area
of responsibility.
20.1 (Optional) IT personnel at 8th Flr w/ Radio at Server room
confirms no loss of server power due to UPS activity and
Normal power was resumed.
2|R e v i s i o n 0 2 JAS-2022.09.14
68 Kalayaan VCP Building EDG & ATS Testing Checklist
21 Safety Officer confirms everything is back to normal, declares
END OF TEST, & records time of activity.
Time Completed: __________ HRS
Signature
Date
3|R e v i s i o n 0 2 JAS-2022.09.14
68 Kalayaan VCP Building EDG & ATS Testing Checklist
Annex A:
4|R e v i s i o n 0 2 JAS-2022.09.14
68 Kalayaan VCP Building EDG & ATS Testing Checklist
Annex B:
Emergency Power
Emergency Power Direction LED
Direction LED
Emergency Power
Emergency Power
Transfer LED
Transfer LED
Auto-Manual Scroll-Up,
Mode Transfer Scroll-Down, &
Button OFF buttons
Work = for
Automatic Transfer
Switch Controller
Operation
5|R e v i s i o n 0 2 JAS-2022.09.14
68 Kalayaan VCP Building EDG & ATS Testing Checklist
Annex C:
6|R e v i s i o n 0 2 JAS-2022.09.14