Chief Electrical Engineer/Con.
Eastern Railway,
17,N.S. Road,
Kolkata-700001
वविषय/Sub: Guidance/Feasibility for erection of Feeder Mast (B-series,11.4m) along with 3mtr
Super Mast to carry 02 nos. Feeder wire along with02 nos.AEC for PSI work of
2x25KV system in connection with raising of speed to 160/200 Kmph on existing
HWH-NDLS route.
संदरर/Ref:(i) CEE/Con./ER,office letter no. CEE/CON/TRD/2x25 KV/HWH-NDLS/763 dated
23.03.2022 and 30.03.2022.

Vide subject and reference above, on the basis of submitted design data and
proposed sketch, feasibility for erection of Feeder Mast (B-series, 11.4m) along with 3mtr
Super Mast to carry 02 nos. Feeder wire along with 02 nos.AEC for PSI work of 2x25KV
system has been studied.Quantity of Super Mast Channel ISMC-100 shown in proposed
sketch should be examined. The following guidelines should be followed:

(i) The selection of the OHE mast and relevant Foundation Bending Moment code should be
consider as per table given below:

S.N. Wind Pressure 155Kgf/m2 Wind Pressure 178Kgf/m2

1. Span(m) Type of Mast11.4m Type of FBM Type of Type of


code Mast,11.4m FBMCode
2. From 27 up to B-175 140 B-200 147
36m

3. From 40.5 up to B-200 161 B-225 168


45m

4. From 49.5 up to B-225 178 B-250 193


63m

(ii) It should be ensured that the ground clearance of 25kV Feeder wire under maximum sag should
not be less than 5.2m, 5.8m and 6.1m in open route, along the street and across the street
respectively as per clause 58 of CEA Regulation 2010.
(iii) It should be ensured that the distance between two 25kV Feeder wire on same mast should be
minimum 2m.
(iv) The distance between the feeder & OHE of different elementary section should be minimum 2m.

Refer: (i) Foundation drawing No. TI/DRG/CIV/FND/00001/13/0, (Sheet -1 to 5)


(ii)OHE Mast drawing No. TI/DRG/CIV/B-Mast/00001/13/0.

This is issued with the approval of competent authority.