SYSTEM NERVOUSNESS
Is a situation wherein a small change in the upper
level production plan causes a major change in
the lower level production plan.
Capacity Planning
Capacity - refer to a firm's labor and machine
resources
Capacity Planning - follows the basic hierarchy of
the materials planning system. At the aggregate level,
Resource Requirements Planning (RRP) - a long-
range capacity planning module, is used to check
whether aggregate resources are capable of satisfying
the aggregate production plan
The medium-range capacity plan, or Rough-Cut
Capacity Plan (RCCP), is used to check the feasibility
of the master production schedule.