Professional Documents
Culture Documents
RFP for Construction of Eight Lane access-controlled expressway starting from MP/Gujarat
Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan
village in Dahod district (Ch. 696+920 to 729+755) section of Delhi – Vadodara Greenfield
Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.
The Ministry of Road Transport & Highways through National Highways Authority of India
is engaged in the development of National Highways and as part of this endeavour, it has
been decided to undertake Construction of Eight Lane access-controlled expressway starting
from MP/Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River
near Hathiyavan village in Dahod district (Ch. 696+920 to 729+755) section of Delhi –
Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in
the State of Gujarat through an Engineering, Procurement and Construction (EPC) Contract.
The National Highways Authority of India now invites bids from eligible contractors for the
following project:
The complete BID document can be viewed / downloaded from official portal of the NHAI
website https:// nhai.gov.in or e-procurement portal of NHAI https://etenders.gov.in from
23.06.2020 to 27.08.2020 (upto 1100 Hrs. IST). Bidder must submit Technical Bid at https://
Construction of Eight Lane access-controlled expressway starting from MP/Gujarat Border near Chhayan village and ending
after Bridge Over Hadaf River near Hathiyavan village in Dahod district (Ch. 696+920 to 729+755) section of Delhi –
Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.
etenders.gov.in and https://bims.gov.in and Financial bid at https:// etenders.gov.in on or
before 27.08.2020 (upto 1100 hours IST). Bids received online shall be opened on
28.08.2020 (at 1130 hours IST).
Bid through any other mode shall not be entertained. Bidder shall be required to submit
original of the documents such as Bid Securing Declaration, Power of Attorney and Joint
Bidding Agreement etc. after declaration of bid evaluation result by Authority. Please note
that the National Highways Authority of India reserves the right to accept or reject all or any
of the BIDs without assigning any reason whatsoever.
Officer In-charge
Construction of Eight Lane access-controlled expressway starting from MP/Gujarat Border near Chhayan village and ending
after Bridge Over Hadaf River near Hathiyavan village in Dahod district (Ch. 696+920 to 729+755) section of Delhi –
Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.